Developer docs
API playgroundTry for free, no card

Search company profiles

Last Energy

Full company profile

uuid00002fd

Namestring
Last Energy
Legal namestring
Last Energy, Inc.
Websiteurl
lastenergy.com
Company typeenum
Private
Founded yearint
2019
Descriptiontext

Last Energy is a nuclear technology company that designs, finances, owns, and operates factory-built micro-modular nuclear power plants for enterprise customers under long-term Power Purchase Agreements. Founded in 2019 by Bret Kugelmass (who previously established the Energy Impact Center in 2017) and now headquartered in Austin, Texas, the company acts as a behind-the-meter independent power producer, removing from customers the complexity of developing, financing, or operating nuclear assets. Its primary customer segments are data centers, heavy industry (metals, food and beverage, pulp and paper, chemicals, cement), defense installations, and port and logistics operators, with named engagements including DP World, the NATO Energy Security Centre of Excellence, and Texas A&M University System.

The company's flagship product is the PWR-20, a 20 MWe (80 MWt) pressurized water reactor packaged in a proprietary 1,000-ton hermetically sealed steel containment structure occupying less than 0.5 acres. The platform uses sub-5% low enriched uranium fuel in proven PWR assemblies, a no-refueling design with a 6-year operational cycle (replacement unit model), and a passive walk-away-safe architecture that physically prevents access to nuclear material. A scaled pilot variant, the PWR-5, is being deployed at the Texas A&M-RELLIS campus to demonstrate criticality under the DOE Reactor Pilot Program by mid-2026. Manufacturing is designed for road transport and 24-month on-site assembly, versus decade-plus timelines for conventional nuclear projects.

Last Energy operates a full-service PPA delivery model that bundles design, licensing, permitting, financing, construction, and operations, with revenue recognized as recurring long-term offtake from behind-the-meter electricity and heat sales. The company has secured commercial agreements for 80 units across Europe, of which 39 are earmarked for data center developers, and is pursuing parallel regulatory pathways in the United States, United Kingdom, and Romania through wholly-owned subsidiaries led by regional CEOs Michael Jenner (UK) and Mihai Darie (Romania). Cumulative capital raised is approximately $164 million across four funding rounds, with the most recent being an oversubscribed $100M+ Series C led by Astera Institute in December 2025.

Short descriptiontext

Last Energy designs, owns, and operates factory-built micro-modular pressurized water nuclear reactors (PWR-20, 20 MWe) sold as long-term Power Purchase Agreements. It serves data centers, heavy industry, defense installations, and port operators across the US, UK, and Romania.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
51–100
akta.pro rankint
HeadquartersAustin, United States
HQ citystring
Austin
HQ countrystring
United States
HQ regionstring
North America
Markets served

Serves global market

Offices5 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
micro nuclear reactors, modular nuclear power, pressurized water reactor, behind-the-meter power, power purchase agreements
Industry5 codes
PRIMARYEUACADAG
Microreactor Power Generation
SECONDARYEUAKADAB
Gen III/III+ Reactor Systems & Components
Energy, Utilities & Environment/Nuclear Energy/Nuclear Reactor Technology & Components (SMRs, Gen III/IV, Instrumentation & Controls)
SECONDARYEUACADAO
Nuclear Power Plant Operations & Maintenance (O&M)
SECONDARYEUACADAA
Pressurized Water Reactor (PWR) Power Generation
SECONDARYEUAEAMAA
Utility-Scale Power Generation Asset Management
NAICS code2 codes
  • Nuclear Electric Power Generation221113
  • Electric Power Generation22111
SIC code1 code
  • Electric Services4911
Product category
Small Modular Nuclear Reactors
Social media profiles2 records
GTM motion2 records

Each record includes

Type, Description, Source

Revenue model2 records
1Power Purchase Agreements (PPA)
TypeSubscription Recurring
Description

Last Energy sells heat and power as-a-service through long-term Power Purchase Agreements (PPAs). The company acts as the designer, owner, operator, and behind-the-meter independent power producer (IPP). PPAs provide predictable cash flows and enable project-level financing for multi-billion dollar buildouts.

lastenergy.com
2Managed Services
TypeManaged Services
Description

As a full-service developer, Last Energy provides end-to-end project management including plant design and construction, licensing, permitting, financing, and operations, generating recurring revenue through ongoing plant ownership and operation.

lastenergy.com
Marketing channels6 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Technology or R&D, Personnel, Infrastructure, Supply Chain, Operations
Pricing details1 tier
1Power Purchase Agreement (PPA) - Custom Enterprise Contracts
ModelSubscriptionBilling cadenceMulti-year contract
Notes

No publicly disclosed pricing. Customers enter into long-term PPAs for heat and power delivery. The company is designer-owner-operator, with pricing negotiated on a project-by-project basis.

lastenergy.com
GTM typeB2B
B2B
Offering typeServices
Services
Brand1 record
1Prosiect Egni Glan Llynfi
Description

Project name for the South Wales development initiative deploying four micro-nuclear plants at the former Llynfi Power Station site

lastenergy.com
Core offering1 text field

Last Energy designs, builds, owns, and operates micro modular nuclear power plants (the PWR-20) that deliver 20 MWe plus 80 MWt of baseload power to enterprise customers such as data centers and industrial facilities. The company sells heat and power as-a-service through long-term Power Purchase Agreements, removing the need for customers to finance, build, or operate the asset. Plants are factory-fabricated, road-transportable, and assembled on customer or dedicated sites within approximately 24 months.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • Factory-built plant deployment timeline of 24 months vs. traditional nuclear timelines of 10+ years
+3 more records
Product overview1 text field

Last Energy offers a portfolio of micro-modular nuclear power products centered on its proprietary PWR-20 reactor system. The primary commercial offering is the PWR-20, a 20 MWe factory-fabricated pressurized water reactor designed for rapid deployment at data centers and industrial facilities. The company also operates a PWR-5 pilot reactor, which is a scaled version of the PWR-20 technology used for demonstration and regulatory approval purposes at Texas A&M-RELLIS. The product line emphasizes modular factory manufacturing, standardized design, and full-service delivery including ownership and operation of plants under power purchase agreements.

Product and service2 records
1PWR-20 Micro Modular Nuclear Power Plant
CategoryModular nuclear power generation
Description

20 MWe (80 MWt) micro modular nuclear power plant using proven pressurized water reactor technology with proprietary hermetically sealed steel containment. Factory-fabricated, designed for standard road transport and on-site assembly within approximately 24 months. Delivers 24/7 baseload power to enterprise customers such as data centers, industrial facilities, defense installations, and ports under long-term Power Purchase Agreements with Last Energy as designer-owner-operator.

2PWR-5 Pilot Microreactor
CategoryPilot nuclear reactor demonstration
Description

5 MWe pilot reactor physically identical to the commercial PWR-20, scaled down for demonstration of low-power criticality and commercial electricity generation. Deployed at Texas A&M-RELLIS Campus under DOE Reactor Pilot Program with full-core fuel load and signed Other Transaction Agreement with DOE.

Scale indicator16 records

Each record includes

Type, Value, Description, Source

Partnership7 partners
Strategic tierFlagshipTypeStrategic or Co-development PartnerAnnounced on2025-10-15
Description

Partnership for microreactor pilot project at Texas A&M-RELLIS campus. Last Energy secured land lease, procured full-core fuel load, signed OTA with DOE, and began formal licensing submissions. Project features PWR-5 reactor scaled to 5 MW electrical output.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2025-09-15
Description

Partnership to develop world's first port-centric micro-nuclear power plant at London Gateway. £80M investment to power DP World's £1B expansion with 20 MWe clean electricity, aiming to begin operations in 2030.

Strategic tierCoreTypeOthersAnnounced on2025-02-17
Description

UK nuclear regulator confirming Last Energy's formal entry into nuclear site licensing process for four 20 MWe microreactors in South Wales. Seven months of early engagement preceded formal licensing entry.

Strategic tierMinorTypeOthersAnnounced on2025-01-16
Description

Grid operator providing connection offer for South Wales microreactors: 22 MW export capacity and 3 MW import capacity for first unit, enabling grid electricity delivery alongside private-wire connections.

5Oak Ridge National Laboratory
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2024-10-29
Description

Partnership under DOE Clean Technology Accelerator Program for materials development and validation for the PWR-20. Last Energy has collaborated with Oak Ridge since earliest days of the company.

lastenergy.com
6Romanian National Commission for Nuclear Activities Control (CNCAN)
Strategic tierCoreTypeOthersAnnounced on2024-10-07
Description

Romanian nuclear regulatory body confirming Last Energy completed pre-authorization phase and can formally enter authorization phase of nuclear licensing process. CNCAN accepted Last Energy's development strategy and conceptual design.

lastenergy.com
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2024-06-03
Description

Partnership to jointly research military applications for micro-nuclear power and explore deployment opportunities on NATO military installations. First ever agreement between ENSEC COE and a nuclear energy company, signed by CEO Bret Kugelmass and Director Colonel Darius Uzkuraitis.

Recent move7 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight8 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

Developer of the Xe-100 high-temperature gas microreactor/SMR and TRISO-X fuel targeting data centers, industrial customers, and behind-the-meter applications. Directly comparable to Last Energy in product category (advanced small/micro reactor), target customers (industrial/data center PPAs), and go-to-market via long-term offtake agreements.

TypeDirect peer
Description

Public SMR developer (NYSE: SMR) of light-water SMR modules intended for utility-scale baseload and industrial customers. Competes in the same SMR-for-data-center-and-industrial-power category and has the most advanced NRC design certification, making it the closest scale-stage comparable to Last Energy.

TypeDirect peer
Description

Public microreactor developer (NYSE: OKLO) building compact fast reactors sold via long-term PPAs to data center and industrial customers. Same microreactor-PPA model, same behind-the-meter customer thesis, and similar pre-revenue commercialization stage as Last Energy.

TypeDirect peer
Description

UK-headquartered SMR developer pursuing UK Generic Design Assessment and global deployment of factory-fabricated 470 MWe SMR units. Same factory-modular philosophy as Last Energy and a direct competitor for UK and European industrial/data center offtake.

TypeDirect peer
Description

Bill Gates-backed advanced reactor developer pursuing the Natrium sodium-fast reactor with molten salt storage. Competes in the same 'advanced nuclear for industrial and grid customers' category and shares Last Energy's behind-the-meter industrial customer thesis.

TypeDirect peer
Description

Developer of the SMR-300 LWR-based small modular reactor and SMR-160 units targeting data center and industrial customers. Same nuclear-for-data-center commercial thesis and similar pre-commercial regulatory phase as Last Energy.

TypeBroad incumbent
Description

Incumbent nuclear OEM with a broad LWR portfolio now developing the eVinci heat-pipe microreactor for remote, industrial, and microgrid customers. Overlaps Last Energy's industrial behind-the-meter customer base but at significantly larger scale and with deeper licensing infrastructure.

TypeDirect peer
Description

Developer of the fluoride-salt-cooled KP-FHR reactor pursuing iterative demonstration (Hermes test reactor under DOE agreement) followed by commercial units for industrial and data center customers. Comparable in stage, customer thesis, and demonstration-first regulatory pathway to Last Energy.

TypeBroad incumbent
Description

Established nuclear components and fuel manufacturer developing the BANR microreactor for defense, space, and remote industrial applications. Same microreactor-for-mission-critical-customer thesis but with much larger existing nuclear manufacturing and government contracting footprint.

TypeBroad incumbent
Description

Joint venture developing the BWRX-300 SMR, targeting utility and industrial customers in North America and Europe. Same small-modular-reactor-for-industrial-power category and shares Last Energy's UK/North America licensing footprint, but as a much larger established nuclear OEM.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers5 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment5 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile5 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature6 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles5 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

Subsidiaries1 record

Each record includes

Name, Acquired on, Relationship type, Type, Business focus

No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds4 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors16 records

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Last Energy

Small Modular Nuclear Reactorslastenergy.com

Last Energy designs, owns, and operates factory-built micro-modular pressurized water nuclear reactors (PWR-20, 20 MWe) sold as long-term Power Purchase Agreements. It serves data centers, heavy industry, defense installations, and port operators across the US, UK, and Romania.

What Last Energy does

Last Energy is a nuclear technology company that designs, finances, owns, and operates factory-built micro-modular nuclear power plants for enterprise customers under long-term Power Purchase Agreements. Founded in 2019 by Bret Kugelmass (who previously established the Energy Impact Center in 2017) and now headquartered in Austin, Texas, the company acts as a behind-the-meter independent power producer, removing from customers the complexity of developing, financing, or operating nuclear assets. Its primary customer segments are data centers, heavy industry (metals, food and beverage, pulp and paper, chemicals, cement), defense installations, and port and logistics operators, with named engagements including DP World, the NATO Energy Security Centre of Excellence, and Texas A&M University System.

The company's flagship product is the PWR-20, a 20 MWe (80 MWt) pressurized water reactor packaged in a proprietary 1,000-ton hermetically sealed steel containment structure occupying less than 0.5 acres. The platform uses sub-5% low enriched uranium fuel in proven PWR assemblies, a no-refueling design with a 6-year operational cycle (replacement unit model), and a passive walk-away-safe architecture that physically prevents access to nuclear material. A scaled pilot variant, the PWR-5, is being deployed at the Texas A&M-RELLIS campus to demonstrate criticality under the DOE Reactor Pilot Program by mid-2026. Manufacturing is designed for road transport and 24-month on-site assembly, versus decade-plus timelines for conventional nuclear projects.

Last Energy operates a full-service PPA delivery model that bundles design, licensing, permitting, financing, construction, and operations, with revenue recognized as recurring long-term offtake from behind-the-meter electricity and heat sales. The company has secured commercial agreements for 80 units across Europe, of which 39 are earmarked for data center developers, and is pursuing parallel regulatory pathways in the United States, United Kingdom, and Romania through wholly-owned subsidiaries led by regional CEOs Michael Jenner (UK) and Mihai Darie (Romania). Cumulative capital raised is approximately $164 million across four funding rounds, with the most recent being an oversubscribed $100M+ Series C led by Astera Institute in December 2025.

Last Energy firmographics

Firmographics
Name
Last Energy
Legal name
Last Energy, Inc.
Website
https://lastenergy.com
Company type
Private
Founded year
2019
Operating status
Operating
Headcount range
51–100 employees
Short description
Last Energy designs, owns, and operates factory-built micro-modular pressurized water nuclear reactors (PWR-20, 20 MWe) sold as long-term Power Purchase Agreements. It serves data centers, heavy industry, defense installations, and port operators across the US, UK, and Romania.
Ownership category
akta.pro rank

Last Energy industry classification

Industry
Product category
Small Modular Nuclear Reactors
NAICS
Nuclear Electric Power Generation (221113), Electric Power Generation (22111)
SIC
Electric Services (4911)
akta.pro industry
PRIMARYEUACADAG
Microreactor Power Generation
SECONDARYEUAKADAB
Gen III/III+ Reactor Systems & Components
Energy, Utilities & Environment/Nuclear Energy/Nuclear Reactor Technology & Components (SMRs, Gen III/IV, Instrumentation & Controls)
SECONDARYEUACADAO
Nuclear Power Plant Operations & Maintenance (O&M)
SECONDARYEUACADAA
Pressurized Water Reactor (PWR) Power Generation
SECONDARYEUAEAMAA
Utility-Scale Power Generation Asset Management

Keywords

  • Micro nuclear reactors
  • Modular nuclear power
  • Pressurized water reactor
  • Behind-the-meter power
  • Power purchase agreements

Where Last Energy is headquartered

Location

Headquarters

HQ city
Austin
HQ country
United States
HQ region
North America

Offices5 records

Markets served

Last Energy business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Technology or R&D, Personnel, Infrastructure, Supply Chain, Operations

Revenue model

  1. Power Purchase Agreements (PPA): Last Energy sells heat and power as-a-service through long-term Power Purchase Agreements (PPAs). The company acts as the designer, owner, operator, and behind-the-meter independent power producer (IPP). PPAs provide predictable cash flows and enable project-level financing for multi-billion dollar buildouts.
  2. Managed Services: As a full-service developer, Last Energy provides end-to-end project management including plant design and construction, licensing, permitting, financing, and operations, generating recurring revenue through ongoing plant ownership and operation.

Pricing tiers

ModelBillingPrice
SubscriptionMulti-year contractPower Purchase Agreement (PPA) - Custom Enterprise Contracts

Go-to-market motion2 records

Distribution channels1 record

Marketing channels6 records

Last Energy product offering

Product offering

Core offering

Last Energy designs, builds, owns, and operates micro modular nuclear power plants (the PWR-20) that deliver 20 MWe plus 80 MWt of baseload power to enterprise customers such as data centers and industrial facilities. The company sells heat and power as-a-service through long-term Power Purchase Agreements, removing the need for customers to finance, build, or operate the asset. Plants are factory-fabricated, road-transportable, and assembled on customer or dedicated sites within approximately 24 months.

Product overview

Last Energy offers a portfolio of micro-modular nuclear power products centered on its proprietary PWR-20 reactor system. The primary commercial offering is the PWR-20, a 20 MWe factory-fabricated pressurized water reactor designed for rapid deployment at data centers and industrial facilities. The company also operates a PWR-5 pilot reactor, which is a scaled version of the PWR-20 technology used for demonstration and regulatory approval purposes at Texas A&M-RELLIS. The product line emphasizes modular factory manufacturing, standardized design, and full-service delivery including ownership and operation of plants under power purchase agreements.

Differentiator

Problem solved

Functional benefit

Brands

  • Prosiect Egni Glan Llynfi: Project name for the South Wales development initiative deploying four micro-nuclear plants at the former Llynfi Power Station site

Products and services

  • PWR-20 Micro Modular Nuclear Power Plant 20 MWe (80 MWt) micro modular nuclear power plant using proven pressurized water reactor technology with proprietary hermetically sealed steel containment. Factory-fabricated, designed for standard road transport and on-site assembly within approximately 24 months. Delivers 24/7 baseload power to enterprise customers such as data centers, industrial facilities, defense installations, and ports under long-term Power Purchase Agreements with Last Energy as designer-owner-operator.
  • PWR-5 Pilot Microreactor 5 MWe pilot reactor physically identical to the commercial PWR-20, scaled down for demonstration of low-power criticality and commercial electricity generation. Deployed at Texas A&M-RELLIS Campus under DOE Reactor Pilot Program with full-core fuel load and signed Other Transaction Agreement with DOE.

Quantifiable outcome

  • Factory-built plant deployment timeline of 24 months vs. traditional nuclear timelines of 10+ years
  • +3 more outcomes

Companies that use Last Energy

Customer profile

Named customers5 records

Segments5 records

Ideal customer profiles5 records

Last Energy technology and API

Technology

Technology focussed Yes

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature6 records

Last Energy partnerships and signals

Strategic signal

Partnerships

Seven partnerships are on record, tiered flagship, core and minor.

  • Texas A&M University SystemflagshipStrategic or Co-development Partner · 15 October 2025Partnership for microreactor pilot project at Texas A&M-RELLIS campus. Last Energy secured land lease, procured full-core fuel load, signed OTA with DOE, and began formal licensing submissions. Project features PWR-5 reactor scaled to 5 MW electrical output.
  • DP WorldcoreStrategic or Co-development Partner · 15 September 2025Partnership to develop world's first port-centric micro-nuclear power plant at London Gateway. £80M investment to power DP World's £1B expansion with 20 MWe clean electricity, aiming to begin operations in 2030.
  • UK Office for Nuclear Regulation (ONR)coreOthers · 17 February 2025UK nuclear regulator confirming Last Energy's formal entry into nuclear site licensing process for four 20 MWe microreactors in South Wales. Seven months of early engagement preceded formal licensing entry.
  • National Grid Electricity Distribution (NGED)minorOthers · 16 January 2025Grid operator providing connection offer for South Wales microreactors: 22 MW export capacity and 3 MW import capacity for first unit, enabling grid electricity delivery alongside private-wire connections.
  • Oak Ridge National LaboratorycoreTechnology or Integration · 29 October 2024Partnership under DOE Clean Technology Accelerator Program for materials development and validation for the PWR-20. Last Energy has collaborated with Oak Ridge since earliest days of the company.
  • Romanian National Commission for Nuclear Activities Control (CNCAN)coreOthers · 7 October 2024Romanian nuclear regulatory body confirming Last Energy completed pre-authorization phase and can formally enter authorization phase of nuclear licensing process. CNCAN accepted Last Energy's development strategy and conceptual design.
  • NATO Energy Security Centre of Excellence (ENSEC COE)coreStrategic or Co-development Partner · 3 June 2024Partnership to jointly research military applications for micro-nuclear power and explore deployment opportunities on NATO military installations. First ever agreement between ENSEC COE and a nuclear energy company, signed by CEO Bret Kugelmass and Director Colonel Darius Uzkuraitis.

Scale indicators16 records

Recent moves7 records

Expansion highlights8 records

Last Energy competitors and assessment

Company assessment

Direct peers

  • X-energy: Developer of the Xe-100 high-temperature gas microreactor/SMR and TRISO-X fuel targeting data centers, industrial customers, and behind-the-meter applications. Directly comparable to Last Energy in product category (advanced small/micro reactor), target customers (industrial/data center PPAs), and go-to-market via long-term offtake agreements.
  • NuScale Power: Public SMR developer (NYSE: SMR) of light-water SMR modules intended for utility-scale baseload and industrial customers. Competes in the same SMR-for-data-center-and-industrial-power category and has the most advanced NRC design certification, making it the closest scale-stage comparable to Last Energy.
  • Oklo: Public microreactor developer (NYSE: OKLO) building compact fast reactors sold via long-term PPAs to data center and industrial customers. Same microreactor-PPA model, same behind-the-meter customer thesis, and similar pre-revenue commercialization stage as Last Energy.
  • Rolls-Royce SMR: UK-headquartered SMR developer pursuing UK Generic Design Assessment and global deployment of factory-fabricated 470 MWe SMR units. Same factory-modular philosophy as Last Energy and a direct competitor for UK and European industrial/data center offtake.
  • TerraPower: Bill Gates-backed advanced reactor developer pursuing the Natrium sodium-fast reactor with molten salt storage. Competes in the same 'advanced nuclear for industrial and grid customers' category and shares Last Energy's behind-the-meter industrial customer thesis.
  • Holtec International: Developer of the SMR-300 LWR-based small modular reactor and SMR-160 units targeting data center and industrial customers. Same nuclear-for-data-center commercial thesis and similar pre-commercial regulatory phase as Last Energy.
  • Kairos Power: Developer of the fluoride-salt-cooled KP-FHR reactor pursuing iterative demonstration (Hermes test reactor under DOE agreement) followed by commercial units for industrial and data center customers. Comparable in stage, customer thesis, and demonstration-first regulatory pathway to Last Energy.

Broad incumbents

  • Westinghouse (eVinci microreactor): Incumbent nuclear OEM with a broad LWR portfolio now developing the eVinci heat-pipe microreactor for remote, industrial, and microgrid customers. Overlaps Last Energy's industrial behind-the-meter customer base but at significantly larger scale and with deeper licensing infrastructure.
  • BWX Technologies (BWXT): Established nuclear components and fuel manufacturer developing the BANR microreactor for defense, space, and remote industrial applications. Same microreactor-for-mission-critical-customer thesis but with much larger existing nuclear manufacturing and government contracting footprint.
  • GE Hitachi Nuclear Energy (BWRX-300): Joint venture developing the BWRX-300 SMR, targeting utility and industrial customers in North America and Europe. Same small-modular-reactor-for-industrial-power category and shares Last Energy's UK/North America licensing footprint, but as a much larger established nuclear OEM.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks7 records

Key highlights6 records

Customer concentration

Last Energy social profiles

Digital presence

Last Energy financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Last Energy leadership team

Management profile

Number of profiles

Profiles5 records

Last Energy subsidiaries and ownership

Company hierarchy

Subsidiaries1 record

Last Energy funding detail

Funding detail

Funding overview

Funding rounds4 records

Investors16 records

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Last Energy M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Last Energy

What does Last Energy do?

Last Energy designs, builds, owns, and operates micro modular nuclear power plants (the PWR-20) that deliver 20 MWe plus 80 MWt of baseload power to enterprise customers such as data centers and industrial facilities. The company sells heat and power as-a-service through long-term Power Purchase Agreements, removing the need for customers to finance, build, or operate the asset. Plants are factory-fabricated, road-transportable, and assembled on customer or dedicated sites within approximately 24 months.

Is Last Energy a public or private company?

Last Energy is a private company. It is classified as venture growth investor backed and is currently operating.

When was Last Energy founded?

Last Energy was founded in 2019. It employs 51 to 100 people.

Where is Last Energy based?

Last Energy is headquartered in Austin, United States, in the North America region.

How does Last Energy make money?

Two revenue lines are on record. Power Purchase Agreements (PPA) is the primary driver. The others are managed Services.

Who are Last Energy's main competitors?

Direct peers on record are X-energy, NuScale Power, Oklo, Rolls-Royce SMR, TerraPower, Holtec International and Kairos Power. Broad incumbents are Westinghouse (eVinci microreactor), BWX Technologies (BWXT) and GE Hitachi Nuclear Energy (BWRX-300).

Does Last Energy have an API?

No public API is recorded for Last Energy.

What industry is Last Energy in?

Last Energy's product category is Small Modular Nuclear Reactors. Its primary akta.pro industry code is EUACADAG, Microreactor Power Generation, with a secondary code of EUAKADAB, Gen III/III+ Reactor Systems & Components. Its NAICS code is 221113 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
TrendHunter.comMicro Nuclear Reactor ApprovalsLast Energy received U.S. Department of Energy approval of its Documented Safety Analysis for the pilot reactor at Texas A&M–RELLIS, the final safety review before startup authorization. The pilot uses the same core as its commercial design and runs on low-enriched uranium fuel. This approval signals that pilot demonstrations of full-scale cores could help standardized, factory-built nuclear plants move toward commercial power generation.Interesting EngineeringLast Energy’s 5 MW pilot reactor in Texas secures safety clearanceLast Energy secured the Documented Safety Analysis (DSA) for its 5 MW pilot reactor at Texas A&M University's RELLIS campus. The clearance is the final step in the DOE review process, after which startup authorization for criticality and operations will be issued. The pilot facility, PWR-5, uses the same core as the commercial reactor.Business Wire BlogLast Energy Receives DOE Approval of Pilot Reactor Documented Safety AnalysisLast Energy received DOE approval of its pilot reactor's Documented Safety Analysis at Texas A&M–RELLIS. The approval clears the path to a readiness review and startup authorization. The pilot reactor uses the same core as its commercial PWR-20 design, advancing toward power generation.FinancialContent Business PageLast Energy Receives DOE Approval of Pilot Reactor Documented Safety AnalysisLast Energy received DOE approval of its Documented Safety Analysis for the pilot reactor at Texas A&M RELLIS. The approval clears the path to the readiness review and startup authorization, with the reactor using low-enriched uranium fuel. The project bridges to Last Energy's commercial PWR-20 microreactor deployment.NewcivilengineerNew images reveal details about Last Energy’s Welsh micro reactor plansLast Energy UK has revealed new details about its plans to deploy four 20MW PWR-20 micro modular reactors at the Llynfi Clean Energy Project in Bridgend County, South Wales, uploading planning documents to the Welsh Government's portal on 11 June 2026. The £300 million project, proposed on the site of the former Llynfi Power Station, aims to complete construction by 2027 and power approximately 250,000 homes, with expectations to create at least 100 local full-time jobs. The company submitted its notification for a significant infrastructure project application planned for July 2026, having become the first nuclear developer since 1978 to complete a preliminary design review with the Office for Nuclear Regulation.eeNews EuropePowering the AI boomAI data centres face power grid delays, prompting use of solid oxide fuel cells and small modular reactors. Fuel cells like those from Bloom Energy and Ceres Power can handle load swings, while SMRs from Rolls-Royce and startups like Oklo and Kairos Power aim to supply power by 2030–2031.TamusTexas A&M System Advances Future of Nuclear Energy at RELLIS – A&M System NewsLast Energy received U.S. Department of Energy approval for its Preliminary Documented Safety Analysis for the PWR-5 pilot microreactor project at the Texas A&M-RELLIS Campus near Bryan-College Station. Construction of the facility is expected to be completed this week, advancing the project toward final DOE authorization for fuel delivery and reactor operations. The Texas A&M System is positioning RELLIS as a national hub for next-generation energy research, testing and workforce development amid growing electricity demand from advanced manufacturing and AI infrastructure.Sun SentinelPrivate nuclear can solve data center energy crunch | OpinionThe author argues that private nuclear microreactor startups, including Ampera, Kairos Power, Radiant Industries, Last Energy, and Oklo, represent a viable solution to the energy crunch facing data centers as residential electricity prices have risen 27% since 2019 and are projected to climb another 40% by 2030. Kairos Power broke ground in April on the Hermes 2 reactor in Oak Ridge, Tennessee — the first Gen IV unit to receive an NRC construction permit in over 50 years — under a first-of-its-kind deal with the Tennessee Valley Authority to power Google data centers, while Meta has committed to a binding prepayment for power from Oklo's planned 1.2 gigawatt nuclear campus in Pike County, Ohio. The author contends that states embracing private nuclear innovation will reduce costs for ratepayers, contrasting this with states like New York that are considering moratoriums on high-energy data centers while utilities requested over $29 billion in rate hikes in the first half of 2025.of Data Centre NewsData Centre LIVE to Explore Energy TransitionData Centre LIVE: The London Summit will host a panel on "The Future of Energy Transition" on May 20-21, 2026, bringing together executives from CBRE, Pure Data Centres Group, AVK, and Last Energy to discuss how data centre operators can evolve from energy consumers into active participants in grid stabilisation and renewable energy deployment. The event reflects broader industry efforts to address the tension between surging AI-driven capacity demands and decarbonisation commitments, with policymakers increasingly scrutinising the sector's energy footprint. Additional sessions will cover water management strategies and broader sustainability practices across data centre operations.ChamberbusinessnewsSmall modular reactors can help reduce the cost of nuclearState Representatives Michael Carbone and Michael Way argue that small modular reactors (SMRs) can overcome historically high nuclear costs and construction delays through factory-built fabrication, one-time design certifications, and modular deployment, citing cost overruns at projects like Vogtle Units 3 and 4 and Marble Hill as evidence of the traditional model's failures. The article profiles three SMR developers—Last Energy, Kairos Power, and NuCube Energy—as examples of companies pursuing standardized, repeatable reactor designs that can achieve serial production efficiencies, while acknowledging NuScale Power's canceled project as a first-of-kind deployment challenge. The authors contend that the modular approach represents a fundamentally different business model for nuclear power that can deliver clean, reliable, and affordable energy.