Developer docs
API playgroundTry for free, no card

Search company profiles

Crusoe AI Data Center

Full company profile

uuid0000655

Namestring
Crusoe AI Data Center
Legal namestring
Crusoe Technologies LLC
Websiteurl
crusoe.ai
Company typeenum
Private
Founded yearint
2021
Descriptiontext

Crusoe AI Data Center is a vertically integrated AI infrastructure company that designs, builds, and operates energy-secured AI factories for hyperscale and AI-native customers. Founded in 2021 (originally as Crusoe Energy Systems, pivoting from flare gas-powered bitcoin mining to AI infrastructure), the company is headquartered in Denver, Colorado (with offices in San Francisco, Dublin, Tel Aviv, and other locations) and operates under the legal entity Crusoe Technologies LLC. The platform combines proprietary energy generation and procurement (renewables, stranded gas, second-life EV batteries via Redwood Materials, advanced nuclear via Blue Energy, iron-air batteries via Form Energy) with modular and hyperscale data center development (the 1.2 GW Abilene flagship, plus 4.9 GW of total contracted capacity across five campuses and a 40+ GW development pipeline) and a vertically integrated AI cloud platform (Crusoe Cloud) offering NVIDIA GB200/B200/H200/H100 and AMD MI300X/MI355X GPUs, Managed Inference powered by proprietary MemoryAlloy technology, Crusoe Managed Kubernetes, Crusoe Edge Zones, and Crusoe Spark modular data centers manufactured at the Brighton, Colorado Spark Factory.

Crusoe's business model is built on two complementary revenue streams: long-term, take-or-pay hyperscale infrastructure contracts (Microsoft 900 MW in Abilene, Meta 1.6 GW across Childress and Warrenton, Oracle and OpenAI on the Stargate Abilene campus) which anchor utilization and provide revenue predictability, and a usage-based Crusoe Cloud platform (GPU-as-a-Service and Managed Inference) serving AI-first startups and enterprise developers with self-serve console access and API-first delivery. Pricing is not publicly disclosed, but customer-reported evidence indicates 50% cost savings versus traditional hyperscalers and 99.98% cluster uptime. The company has raised over $4 billion in cumulative capital (most recently a $1.375B Series E at a $10B+ valuation co-led by NVIDIA in October 2025, with a $3B round reportedly in discussion at a $30B valuation as of July 2026), and operates a $15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure for data center development.

Crusoe's core differentiation is its energy-first vertical integration: from patented flare gas mitigation (Digital Flare Mitigation) to on-site power generation, in-house modular manufacturing, and proprietary inference optimization software. This stack targets the binding constraint of AI infrastructure — power availability and speed-to-deployment — and is supported by partnerships with NVIDIA (strategic investor and technology partner), Lancium (Abilene Clean Campus), Tallgrass (Wyoming), Energy Vault (Texas), Baker Hughes and Bergen Engines (generator supply), and channel partners including atNorth (Nordic), Anan (Israel), and Saturn Cloud (enterprise AI development). Major customers include Oracle, OpenAI, Meta, Microsoft, Windsurf, Cursor, Figure, Cartesia, SES AI, and a broad PLG base of AI startups, with deployments across the United States, Iceland, Ireland, Israel, and the Philippines.

Short descriptiontext

Crusoe AI Data Center is a vertically integrated AI infrastructure company that builds, powers, and operates energy-secured AI factories and GPU cloud services (Crusoe Cloud, Managed Inference, Crusoe Spark modular units) for hyperscale anchors like Microsoft, Meta, Oracle, and OpenAI and AI-native startups globally.

Ownership categoryenum
Headcount rangeband
1,001–5,000
akta.pro rankint
HeadquartersDenver, United States
HQ citystring
Denver
HQ countrystring
United States
HQ regionstring
North America
Markets served

Serves global market

Offices15 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
AI cloud infrastructure, GPU compute services, modular data centers, managed AI inference, AI factory operations
Industry3 codes
1AI Datacenter Power, Cooling & Racks (liquid cooling, power delivery)
CodeHDAAAAAHPrimaryYes
2End-to-End Enterprise AI Platforms (MLOps & Model Lifecycle Management)
CodeHDAEANAAPrimaryNo
3AI Observability, Monitoring & Evaluation Platforms (Drift, Quality, Safety)
CodeHDAEANAFPrimaryNo
NAICS code2 codes
  • Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services518
  • Computer Facilities Management Services541513
SIC code3 codes
  • Services-Prepackaged Software7372
  • Services-Computer Integrated Systems Design7373
  • Services-Computer Programming, Data Processing, Etc.7370
Product category
Cloud AI Infrastructure
Social media profiles3 records
GTM motion3 records

Each record includes

Type, Description, Source

Revenue model4 records
1AI Cloud Infrastructure (GPU as a Service)
TypeUsage Based
Description

Provides GPU compute resources (NVIDIA GB200, B200, H200, H100, AMD MI300X, MI355X) on-demand through Crusoe Cloud platform. Customers pay for compute usage with peak performance features including accelerated storage and optimized RDMA networking.

crusoe.ai
2Managed Inference Services
TypeManaged Services
Description

Fully managed AI inference platform offering access to top open-source models (Llama, DeepSeek, Nemotron, Kimi, Qwen, Gemma) and custom fine-tuned models. Proprietary MemoryAlloy technology delivers 9.9x faster inference performance.

crusoe.ai
3AI Data Center Development
TypeSubscription Recurring
Description

Design, construction, and operation of modular and hyperscale AI data centers for major enterprise clients including Microsoft, Oracle, OpenAI, and Meta. Revenue from long-term infrastructure contracts and colocation agreements.

globenewswire.com
4Modular AI Factory Sales/Leasing
TypeHardware Sales
Description

Sale and deployment of Crusoe Spark modular AI data centers (~1MW units) to enterprise customers. Includes rapid deployment within three months and flexible configuration options.

enkiai.com
Marketing channels8 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels4 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Technology or R&D, Personnel, Supply Chain, Operations, Marketing or Sales
Pricing details2 tiers
1GPU Cloud instances with various GPU types (H100, H200, B200, GB200, AMD MI300X)
ModelUsage-basedBilling cadencePay-as-you-go
Notes

Flexible on-demand GPU compute pricing with usage-based billing. Specific rates not publicly disclosed.

crusoe.ai
2Managed Inference with MemoryAlloy acceleration
ModelUsage-basedBilling cadenceMonthly
Notes

Managed AI inference services at reportedly 50% lower cost than traditional hyperscalers based on customer reports.

crusoe.ai
GTM typeB2B
B2B
Offering typeSoftware
Software
Brand1 of 6 records shown
1Crusoe Cloud
Description

AI cloud platform providing GPU infrastructure-as-a-service, including managed Kubernetes, managed Slurm, and fault-tolerant AutoClusters.

crusoe.ai
+5 more records
Core offering1 text field

Crusoe AI Data Center operates a vertically integrated AI infrastructure platform that designs, builds, and operates large-scale AI data centers and provides Crusoe Cloud, a GPU-as-a-service platform with on-demand access to NVIDIA and AMD accelerators. The company pairs modular data center manufacturing (Crusoe Spark) with cloud services including Managed Inference, Command Center, and Edge Zones, delivering energy-first AI factories at gigawatt scale for hyperscalers and AI developers.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 5 values shown
  • 9.9x faster time-to-first-token for AI inference workloads
+4 more records
Product overview1 text field

Crusoe AI Data Center operates as a vertically integrated AI infrastructure company offering a platform-plus-modules architecture. The core product is Crusoe Cloud, an AI cloud platform providing infrastructure as a service with high-performance NVIDIA (GB200, B200, H200, H100) and AMD (MI300X, MI355X) GPUs. Key modules include Managed Inference (powered by proprietary MemoryAlloy technology for 9.9x faster inference), Crusoe Intelligence Foundry (for deploying open-source models), Command Center (unified operations), and Crusoe Edge Zones/Spark (modular edge AI data centers). Supporting infrastructure includes Managed Kubernetes, Managed Slurm, and AutoClusters. The company also manufactures modular AI data centers at its Spark Factory facility.

Product and service7 records
1Crusoe Cloud
CategoryAI Cloud Platform
Description

AI cloud platform providing GPU infrastructure-as-a-service with high-performance NVIDIA and AMD compute, accelerated storage, and optimized RDMA networking designed for AI developers, AI startups, and enterprises running training and inference workloads.

2Managed Inference
CategoryManaged AI Service
Description

Managed AI inference service powered by proprietary MemoryAlloy technology, delivering up to 9.9x faster time-to-first-token for production AI workloads across open-source and custom fine-tuned models.

3Crusoe Edge Zones
CategoryModular AI Infrastructure
Description

Modular AI data centers delivering low-latency, sovereign, and rapidly deployable AI infrastructure at virtually any location, leveraging MemoryAlloy technology for accelerated inference performance.

4Crusoe Spark
CategoryModular AI Infrastructure
Description

Modular AI data center units of approximately one megawatt each, manufactured in-house and sold or leased to enterprise customers for rapid scalable edge AI deployments deployable within three months.

5Spark Factory
CategoryManufacturing Facility
Description

Manufacturing facility in Brighton, Colorado producing Crusoe Spark modular AI factory units at scale, with capacity of approximately 100 modular units per year.

6Fastokens
CategoryOpen-Source Software
Description

Open-source Rust-based BPE tokenizer optimized for AI inference workloads, built in collaboration with NVIDIA Dynamo and integrated into SGLang by LMSYS, delivering up to 50% improvement in time-to-first-token for agentic AI workloads.

7AI Data Center Development Services
CategoryData Center Development
Description

End-to-end design, construction, and operation of modular and hyperscale AI data center campuses for major enterprise clients under multi-gigawatt long-term infrastructure contracts.

Scale indicator14 records

Each record includes

Type, Value, Description, Source

Partnership20 partners
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2026-07-04
Description

Major technology and strategic investor partner; Nvidia provides GPU technology (GB200, B200, H200, H100) and has invested in Crusoe. Nvidia CEO Jensen Huang involved in Crusoe's AI factory initiatives. Crusoe is early adopter of NVIDIA's latest AI infrastructure technologies including Vera CPU and Nemotron models.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-06-19
Description

Meta secured 1.6 GW AI computing capacity agreements at Childress, Texas and Warrenton, Missouri facilities. Equivalent to powering 750,000 US homes.

Strategic tierMajorTypeTechnology or IntegrationAnnounced on2026-06-03
Description

~750 MW U.S. power agreement for AI data centers. Gas-powered generator solutions for reliable power generation at Crusoe facilities.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2026-04-27
Description

$1 billion deal to establish and operate 40-100 MW server farm at Anan's data center in Afula, Israel. First step in broader collaboration to build global AI infrastructure platform from Israel.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-03-27
Description

Microsoft secured 900 MW AI factory campus development in Abilene, Texas. First building expected to open mid-2027. Microsoft's Azure cloud integration with Crusoe infrastructure.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2026-03-24
Description

12 gigawatt-hours of iron-air batteries for AI data centers. Batteries can store and discharge electricity for up to 100 hours, enabling long-duration energy storage without relying on constrained grids.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2026-03-14
Description

Commitment to build hyperscale data centers in Clark, Pampanga, Philippines as part of broader AI infrastructure expansion.

Strategic tierMajorTypeTechnology or IntegrationAnnounced on2026-03-01
Description

25 BRUSH Power Generation electric generators (1.21 GW total) for Crusoe AI data centers from mid-2026 through 2028. Deal underscores Baker Hughes' push into power solutions for AI infrastructure.

Strategic tierMajorTypeChannel Partner/ Reseller/ DistributorAnnounced on2026-02-24
Description

Expansion of Iceland data center capacity with atNorth partnership. Nordic colocation services and heat reuse partnerships.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2026-02-11
Description

Framework agreement for phased deployment of Crusoe Spark modular AI data centers at Energy Vault's Texas technology center. Initial program scalable up to 25 MW.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2025-10-30
Description

Partnership to develop advanced nuclear-powered AI data center project in Port of Victoria, Texas. Integrating nuclear and renewable energy sources.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2025-10-22
Description

Strategic partnership to become first cloud operator in space, expanding into satellite-based cloud computing.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2025-07-24
Description

Joint venture for AI data center in Wyoming with dedicated gas and renewable power sources. Tallgrass provides energy infrastructure development.

Strategic tierMajorTypeTechnology or IntegrationAnnounced on2025-07-22
Description

29-unit aeroderivative gas turbine deal to deliver power to AI data centers. Major power infrastructure partnership.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2025-06-26
Description

Expansion of partnership to scale renewable-powered AI compute. Deployment scaled from 4 to 24 Crusoe Spark modular data centers at Redwood's Nevada campus. Second-life EV battery microgrid (12 MW / 63 MWh) with solar achieving 99.2% availability.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2025-03-17
Description

Powered data center infrastructure joint venture combining Engine No. 1's investment strategy with Crusoe's infrastructure development.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2025-01-01
Description

Primary anchor tenant for Crusoe Abilene Stargate campus. Part of $500 billion Stargate AI project. OpenAI utilizing hundreds of thousands of GPUs on single integrated network fabric.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2024-07-18
Description

Real estate and energy technology partner for Abilene Clean Campus development. Lancium provides land acquisition, grid interconnect, site engineering, renewables interconnect, and power orchestration. 1.2 GW grid interconnection at Abilene site.

Strategic tierCoreTypeTechnology or IntegrationAnnounced on2024-06-01
Description

Oracle Cloud Infrastructure running on Crusoe Abilene data center campus. Oracle delivers NVIDIA GB200 racks to the facility. Part of broader 4.5 GW Stargate AI infrastructure agreement for OpenAI.

Strategic tierMinorTypeChannel Partner/ Reseller/ DistributorAnnounced on2024-01-16
Description

Partnership for sustainable accelerated computing on Crusoe Cloud through Rescale's AI-powered R&D platform.

Recent move13 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight8 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

Largest pure-play NVIDIA GPU cloud provider offering H100/B200 clusters and managed inference to AI labs and enterprises — directly comparable to Crusoe Cloud in target customer, GPU SKU mix, and large-context inference workload focus.

TypeDirect peer
Description

GPU cloud provider delivering NVIDIA clusters to AI startups, research labs and enterprises with on-demand and reserved capacity — competes head-to-head with Crusoe Cloud for AI-first startups and offers overlapping managed GPU services.

TypeDirect peer
Description

Designs, builds and operates gigawatt-scale AI data center campuses with long-term anchor tenant leases — closest peer to Crusoe's JV-based hyperscale data center development model and renewable power siting strategy.

TypeDirect peer
Description

Vertically integrated AI infrastructure operator combining proprietary GPU cloud with purpose-built data centers in Europe and the US, targeting AI startups and frontier-model customers — directly comparable business model and product breadth.

TypeBroad incumbent
Description

Global hyperscale and enterprise colocation provider with multi-gigawatt campuses across North America and EMEA — overlaps with Crusoe's hyperscale build-and-lease motion but is broader/colocation-focused rather than AI-native.

TypeBroad incumbent
Description

Largest global data center REIT operating 300+ facilities across 50+ metros — comparable as a major AI-ready colocation incumbent, but focused on general-purpose wholesale and retail colocation rather than vertically integrated AI factories.

TypeBroad incumbent
Description

Global interconnection-focused colocation operator with dense cloud on-ramps — comparable in scale and global data center footprint, but serves a broader enterprise interconnection/colo mix rather than Crusoe's AI-factory positioning.

TypeBroad incumbent
Description

Hyperscale-ready colocation provider repurposing legacy infrastructure into AI-suitable capacity — competes for the same anchor tenants and large footprint leases, but is a broader incumbent rather than an AI-native operator.

TypeEmerging player
Description

Crypto-mining operator pivoting to AI/HPC hosting with owned behind-the-meter power and contracted hyperscale customers — shares Crusoe's energy-first heritage and Bitcoin-to-AI transition arc, but remains smaller and earlier-stage.

TypeOthers
Description

Provides accelerated computing infrastructure, cluster design and managed services for AI and HPC workloads (including NVIDIA-based systems) — comparable to the systems-integration and managed-cluster layer of Crusoe's stack rather than competing on bare GPU rental.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat6 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers9 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile3 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
Yes

Docs URL, Description

Integration3 records

Each record includes

Title, Type, Description, Source

AI capability6 records

Each record includes

Type, Description, Source

AI maturity
App detail

Has app

Feature8 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles15 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

Subsidiaries1 record

Each record includes

Name, Acquired on, Relationship type, Type, Business focus

Compliance2 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds3 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors8 records

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Crusoe AI Data Center

Cloud AI Infrastructurecrusoe.ai

Crusoe AI Data Center is a vertically integrated AI infrastructure company that builds, powers, and operates energy-secured AI factories and GPU cloud services (Crusoe Cloud, Managed Inference, Crusoe Spark modular units) for hyperscale anchors like Microsoft, Meta, Oracle, and OpenAI and AI-native startups globally.

What Crusoe AI Data Center does

Crusoe AI Data Center is a vertically integrated AI infrastructure company that designs, builds, and operates energy-secured AI factories for hyperscale and AI-native customers. Founded in 2021 (originally as Crusoe Energy Systems, pivoting from flare gas-powered bitcoin mining to AI infrastructure), the company is headquartered in Denver, Colorado (with offices in San Francisco, Dublin, Tel Aviv, and other locations) and operates under the legal entity Crusoe Technologies LLC. The platform combines proprietary energy generation and procurement (renewables, stranded gas, second-life EV batteries via Redwood Materials, advanced nuclear via Blue Energy, iron-air batteries via Form Energy) with modular and hyperscale data center development (the 1.2 GW Abilene flagship, plus 4.9 GW of total contracted capacity across five campuses and a 40+ GW development pipeline) and a vertically integrated AI cloud platform (Crusoe Cloud) offering NVIDIA GB200/B200/H200/H100 and AMD MI300X/MI355X GPUs, Managed Inference powered by proprietary MemoryAlloy technology, Crusoe Managed Kubernetes, Crusoe Edge Zones, and Crusoe Spark modular data centers manufactured at the Brighton, Colorado Spark Factory.

Crusoe's business model is built on two complementary revenue streams: long-term, take-or-pay hyperscale infrastructure contracts (Microsoft 900 MW in Abilene, Meta 1.6 GW across Childress and Warrenton, Oracle and OpenAI on the Stargate Abilene campus) which anchor utilization and provide revenue predictability, and a usage-based Crusoe Cloud platform (GPU-as-a-Service and Managed Inference) serving AI-first startups and enterprise developers with self-serve console access and API-first delivery. Pricing is not publicly disclosed, but customer-reported evidence indicates 50% cost savings versus traditional hyperscalers and 99.98% cluster uptime. The company has raised over $4 billion in cumulative capital (most recently a $1.375B Series E at a $10B+ valuation co-led by NVIDIA in October 2025, with a $3B round reportedly in discussion at a $30B valuation as of July 2026), and operates a $15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure for data center development.

Crusoe's core differentiation is its energy-first vertical integration: from patented flare gas mitigation (Digital Flare Mitigation) to on-site power generation, in-house modular manufacturing, and proprietary inference optimization software. This stack targets the binding constraint of AI infrastructure — power availability and speed-to-deployment — and is supported by partnerships with NVIDIA (strategic investor and technology partner), Lancium (Abilene Clean Campus), Tallgrass (Wyoming), Energy Vault (Texas), Baker Hughes and Bergen Engines (generator supply), and channel partners including atNorth (Nordic), Anan (Israel), and Saturn Cloud (enterprise AI development). Major customers include Oracle, OpenAI, Meta, Microsoft, Windsurf, Cursor, Figure, Cartesia, SES AI, and a broad PLG base of AI startups, with deployments across the United States, Iceland, Ireland, Israel, and the Philippines.

Crusoe AI Data Center firmographics

Firmographics
Name
Crusoe AI Data Center
Legal name
Crusoe Technologies LLC
Website
https://crusoe.ai
Company type
Private
Founded year
2021
Headcount range
1,001–5,000 employees
Short description
Crusoe AI Data Center is a vertically integrated AI infrastructure company that builds, powers, and operates energy-secured AI factories and GPU cloud services (Crusoe Cloud, Managed Inference, Crusoe Spark modular units) for hyperscale anchors like Microsoft, Meta, Oracle, and OpenAI and AI-native startups globally.
Ownership category
akta.pro rank

Crusoe AI Data Center industry classification

Industry
Product category
Cloud AI Infrastructure
NAICS
Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services (518), Computer Facilities Management Services (541513)
SIC
Services-Prepackaged Software (7372), Services-Computer Integrated Systems Design (7373), Services-Computer Programming, Data Processing, Etc. (7370)
akta.pro primary industry
AI Datacenter Power, Cooling & Racks (liquid cooling, power delivery) (HDAAAAAH)
akta.pro secondary industries
End-to-End Enterprise AI Platforms (MLOps & Model Lifecycle Management) (HDAEANAA), AI Observability, Monitoring & Evaluation Platforms (Drift, Quality, Safety) (HDAEANAF)

Keywords

  • AI cloud infrastructure
  • GPU compute services
  • Modular data centers
  • Managed AI inference
  • AI factory operations

Where Crusoe AI Data Center is headquartered

Location

Headquarters

HQ city
Denver
HQ country
United States
HQ region
North America

Offices15 records

Markets served

Crusoe AI Data Center business model

Business model
GTM type
B2B
Offering type
Software
Cost components
Infrastructure, Technology or R&D, Personnel, Supply Chain, Operations, Marketing or Sales

Revenue model

  1. AI Cloud Infrastructure (GPU as a Service): Provides GPU compute resources (NVIDIA GB200, B200, H200, H100, AMD MI300X, MI355X) on-demand through Crusoe Cloud platform. Customers pay for compute usage with peak performance features including accelerated storage and optimized RDMA networking.
  2. Managed Inference Services: Fully managed AI inference platform offering access to top open-source models (Llama, DeepSeek, Nemotron, Kimi, Qwen, Gemma) and custom fine-tuned models. Proprietary MemoryAlloy technology delivers 9.9x faster inference performance.
  3. AI Data Center Development: Design, construction, and operation of modular and hyperscale AI data centers for major enterprise clients including Microsoft, Oracle, OpenAI, and Meta. Revenue from long-term infrastructure contracts and colocation agreements.
  4. Modular AI Factory Sales/Leasing: Sale and deployment of Crusoe Spark modular AI data centers (~1MW units) to enterprise customers. Includes rapid deployment within three months and flexible configuration options.

Pricing tiers

ModelBillingPrice
Usage-basedPay-as-you-goGPU Cloud instances with various GPU types (H100, H200, B200, GB200, AMD MI300X)
Usage-basedMonthlyManaged Inference with MemoryAlloy acceleration

Go-to-market motion3 records

Distribution channels4 records

Marketing channels8 records

Crusoe AI Data Center product offering

Product offering

Core offering

Crusoe AI Data Center operates a vertically integrated AI infrastructure platform that designs, builds, and operates large-scale AI data centers and provides Crusoe Cloud, a GPU-as-a-service platform with on-demand access to NVIDIA and AMD accelerators. The company pairs modular data center manufacturing (Crusoe Spark) with cloud services including Managed Inference, Command Center, and Edge Zones, delivering energy-first AI factories at gigawatt scale for hyperscalers and AI developers.

Product overview

Crusoe AI Data Center operates as a vertically integrated AI infrastructure company offering a platform-plus-modules architecture. The core product is Crusoe Cloud, an AI cloud platform providing infrastructure as a service with high-performance NVIDIA (GB200, B200, H200, H100) and AMD (MI300X, MI355X) GPUs. Key modules include Managed Inference (powered by proprietary MemoryAlloy technology for 9.9x faster inference), Crusoe Intelligence Foundry (for deploying open-source models), Command Center (unified operations), and Crusoe Edge Zones/Spark (modular edge AI data centers). Supporting infrastructure includes Managed Kubernetes, Managed Slurm, and AutoClusters. The company also manufactures modular AI data centers at its Spark Factory facility.

Differentiator

Problem solved

Functional benefit

Brands

  • Crusoe Cloud: AI cloud platform providing GPU infrastructure-as-a-service, including managed Kubernetes, managed Slurm, and fault-tolerant AutoClusters.
  • Crusoe Spark
  • Crusoe Edge Zones
  • Crusoe Managed Inference
  • Crusoe Intelligence Foundry
  • Crusoe Command Center

Products and services

  • Crusoe Cloud AI cloud platform providing GPU infrastructure-as-a-service with high-performance NVIDIA and AMD compute, accelerated storage, and optimized RDMA networking designed for AI developers, AI startups, and enterprises running training and inference workloads.
  • Managed Inference Managed AI inference service powered by proprietary MemoryAlloy technology, delivering up to 9.9x faster time-to-first-token for production AI workloads across open-source and custom fine-tuned models.
  • Crusoe Edge Zones Modular AI data centers delivering low-latency, sovereign, and rapidly deployable AI infrastructure at virtually any location, leveraging MemoryAlloy technology for accelerated inference performance.
  • Crusoe Spark Modular AI data center units of approximately one megawatt each, manufactured in-house and sold or leased to enterprise customers for rapid scalable edge AI deployments deployable within three months.
  • Spark Factory Manufacturing facility in Brighton, Colorado producing Crusoe Spark modular AI factory units at scale, with capacity of approximately 100 modular units per year.
  • Fastokens Open-source Rust-based BPE tokenizer optimized for AI inference workloads, built in collaboration with NVIDIA Dynamo and integrated into SGLang by LMSYS, delivering up to 50% improvement in time-to-first-token for agentic AI workloads.
  • AI Data Center Development Services End-to-end design, construction, and operation of modular and hyperscale AI data center campuses for major enterprise clients under multi-gigawatt long-term infrastructure contracts.

Quantifiable outcome

  • 9.9x faster time-to-first-token for AI inference workloads
  • +4 more outcomes

Companies that use Crusoe AI Data Center

Customer profile

Named customers9 records

Segments3 records

Ideal customer profiles3 records

Crusoe AI Data Center technology and API

Technology

Technology focussed Yes

API detail

Has API
Yes
API docs
API detail

Core technology

AI maturity

App detail

Integration3 records

AI capability6 records

Feature8 records

Crusoe AI Data Center partnerships and signals

Strategic signal

Partnerships

20 partnerships are on record, tiered core, major and minor.

  • NvidiacoreTechnology or Integration · 4 July 2026Major technology and strategic investor partner; Nvidia provides GPU technology (GB200, B200, H200, H100) and has invested in Crusoe. Nvidia CEO Jensen Huang involved in Crusoe's AI factory initiatives. Crusoe is early adopter of NVIDIA's latest AI infrastructure technologies including Vera CPU and Nemotron models.
  • Meta PlatformscoreStrategic or Co-development Partner · 19 June 2026Meta secured 1.6 GW AI computing capacity agreements at Childress, Texas and Warrenton, Missouri facilities. Equivalent to powering 750,000 US homes.
  • Bergen EnginesmajorTechnology or Integration · 3 June 2026~750 MW U.S. power agreement for AI data centers. Gas-powered generator solutions for reliable power generation at Crusoe facilities.
  • AnanmajorStrategic or Co-development Partner · 27 April 2026$1 billion deal to establish and operate 40-100 MW server farm at Anan's data center in Afula, Israel. First step in broader collaboration to build global AI infrastructure platform from Israel.
  • MicrosoftcoreStrategic or Co-development Partner · 27 March 2026Microsoft secured 900 MW AI factory campus development in Abilene, Texas. First building expected to open mid-2027. Microsoft's Azure cloud integration with Crusoe infrastructure.
  • Form EnergymajorStrategic or Co-development Partner · 24 March 202612 gigawatt-hours of iron-air batteries for AI data centers. Batteries can store and discharge electricity for up to 100 hours, enabling long-duration energy storage without relying on constrained grids.
  • Blue EnergymajorStrategic or Co-development Partner · 14 March 2026Commitment to build hyperscale data centers in Clark, Pampanga, Philippines as part of broader AI infrastructure expansion.
  • Baker HughesmajorTechnology or Integration · 1 March 202625 BRUSH Power Generation electric generators (1.21 GW total) for Crusoe AI data centers from mid-2026 through 2028. Deal underscores Baker Hughes' push into power solutions for AI infrastructure.
  • atNorthmajorChannel Partner/ Reseller/ Distributor · 24 February 2026Expansion of Iceland data center capacity with atNorth partnership. Nordic colocation services and heat reuse partnerships.
  • Energy VaultmajorStrategic or Co-development Partner · 11 February 2026Framework agreement for phased deployment of Crusoe Spark modular AI data centers at Energy Vault's Texas technology center. Initial program scalable up to 25 MW.
  • Blue EnergymajorStrategic or Co-development Partner · 30 October 2025Partnership to develop advanced nuclear-powered AI data center project in Port of Victoria, Texas. Integrating nuclear and renewable energy sources.
  • StarcloudminorStrategic or Co-development Partner · 22 October 2025Strategic partnership to become first cloud operator in space, expanding into satellite-based cloud computing.
  • TallgrassmajorStrategic or Co-development Partner · 24 July 2025Joint venture for AI data center in Wyoming with dedicated gas and renewable power sources. Tallgrass provides energy infrastructure development.
  • GE VernovamajorTechnology or Integration · 22 July 202529-unit aeroderivative gas turbine deal to deliver power to AI data centers. Major power infrastructure partnership.
  • Redwood MaterialscoreStrategic or Co-development Partner · 26 June 2025Expansion of partnership to scale renewable-powered AI compute. Deployment scaled from 4 to 24 Crusoe Spark modular data centers at Redwood's Nevada campus. Second-life EV battery microgrid (12 MW / 63 MWh) with solar achieving 99.2% availability.
  • Engine No. 1majorStrategic or Co-development Partner · 17 March 2025Powered data center infrastructure joint venture combining Engine No. 1's investment strategy with Crusoe's infrastructure development.
  • OpenAIcoreStrategic or Co-development Partner · 1 January 2025Primary anchor tenant for Crusoe Abilene Stargate campus. Part of $500 billion Stargate AI project. OpenAI utilizing hundreds of thousands of GPUs on single integrated network fabric.
  • LanciumcoreStrategic or Co-development Partner · 18 July 2024Real estate and energy technology partner for Abilene Clean Campus development. Lancium provides land acquisition, grid interconnect, site engineering, renewables interconnect, and power orchestration. 1.2 GW grid interconnection at Abilene site.
  • OraclecoreTechnology or Integration · 1 June 2024Oracle Cloud Infrastructure running on Crusoe Abilene data center campus. Oracle delivers NVIDIA GB200 racks to the facility. Part of broader 4.5 GW Stargate AI infrastructure agreement for OpenAI.
  • RescaleminorChannel Partner/ Reseller/ Distributor · 16 January 2024Partnership for sustainable accelerated computing on Crusoe Cloud through Rescale's AI-powered R&D platform.

Scale indicators14 records

Recent moves13 records

Expansion highlights8 records

Crusoe AI Data Center competitors and assessment

Company assessment

Direct peers

  • CoreWeave: Largest pure-play NVIDIA GPU cloud provider offering H100/B200 clusters and managed inference to AI labs and enterprises — directly comparable to Crusoe Cloud in target customer, GPU SKU mix, and large-context inference workload focus.
  • Lambda: GPU cloud provider delivering NVIDIA clusters to AI startups, research labs and enterprises with on-demand and reserved capacity — competes head-to-head with Crusoe Cloud for AI-first startups and offers overlapping managed GPU services.
  • Applied Digital: Designs, builds and operates gigawatt-scale AI data center campuses with long-term anchor tenant leases — closest peer to Crusoe's JV-based hyperscale data center development model and renewable power siting strategy.
  • Nebius Group: Vertically integrated AI infrastructure operator combining proprietary GPU cloud with purpose-built data centers in Europe and the US, targeting AI startups and frontier-model customers — directly comparable business model and product breadth.

Broad incumbents

  • Vantage Data Centers: Global hyperscale and enterprise colocation provider with multi-gigawatt campuses across North America and EMEA — overlaps with Crusoe's hyperscale build-and-lease motion but is broader/colocation-focused rather than AI-native.
  • Digital Realty: Largest global data center REIT operating 300+ facilities across 50+ metros — comparable as a major AI-ready colocation incumbent, but focused on general-purpose wholesale and retail colocation rather than vertically integrated AI factories.
  • Equinix: Global interconnection-focused colocation operator with dense cloud on-ramps — comparable in scale and global data center footprint, but serves a broader enterprise interconnection/colo mix rather than Crusoe's AI-factory positioning.
  • Iron Mountain Data Centers: Hyperscale-ready colocation provider repurposing legacy infrastructure into AI-suitable capacity — competes for the same anchor tenants and large footprint leases, but is a broader incumbent rather than an AI-native operator.

Emerging players

  • TeraWulf: Crypto-mining operator pivoting to AI/HPC hosting with owned behind-the-meter power and contracted hyperscale customers — shares Crusoe's energy-first heritage and Bitcoin-to-AI transition arc, but remains smaller and earlier-stage.

Others

  • Penguin Solutions: Provides accelerated computing infrastructure, cluster design and managed services for AI and HPC workloads (including NVIDIA-based systems) — comparable to the systems-integration and managed-cluster layer of Crusoe's stack rather than competing on bare GPU rental.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat6 records

Key risks6 records

Key highlights7 records

Customer concentration

Crusoe AI Data Center social profiles

Digital presence

Crusoe AI Data Center compliance and trust

Trust signal

Compliance2 records

Crusoe AI Data Center financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Crusoe AI Data Center leadership team

Management profile

Number of profiles

Profiles15 records

Crusoe AI Data Center subsidiaries and ownership

Company hierarchy

Subsidiaries1 record

Crusoe AI Data Center funding detail

Funding detail

Funding overview

Funding rounds3 records

Investors8 records

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Crusoe AI Data Center M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Crusoe AI Data Center

What does Crusoe AI Data Center do?

Crusoe AI Data Center operates a vertically integrated AI infrastructure platform that designs, builds, and operates large-scale AI data centers and provides Crusoe Cloud, a GPU-as-a-service platform with on-demand access to NVIDIA and AMD accelerators. The company pairs modular data center manufacturing (Crusoe Spark) with cloud services including Managed Inference, Command Center, and Edge Zones, delivering energy-first AI factories at gigawatt scale for hyperscalers and AI developers.

Is Crusoe AI Data Center a public or private company?

Crusoe AI Data Center is a private company. It is classified as venture growth investor backed.

When was Crusoe AI Data Center founded?

Crusoe AI Data Center was founded in 2021. It employs 1,001 to 5,000 people.

Where is Crusoe AI Data Center based?

Crusoe AI Data Center is headquartered in Denver, United States, in the North America region.

How does Crusoe AI Data Center make money?

Four revenue lines are on record. AI Cloud Infrastructure (GPU as a Service) is the primary driver. The others are managed Inference Services, AI Data Center Development and modular AI Factory Sales/Leasing.

Who are Crusoe AI Data Center's main competitors?

Direct peers on record are CoreWeave, Lambda, Applied Digital and Nebius Group. Broad incumbents are Vantage Data Centers, Digital Realty, Equinix and Iron Mountain Data Centers. TeraWulf is listed as an emerging player. Penguin Solutions is listed as an others.

Does Crusoe AI Data Center have an API?

Yes. The Crusoe Cloud Platform provides infrastructure for training, inference, generative AI, and scientific workloads, powered by cutting edge GPUs. The platform provides infrastructure as a service with services including Managed Inference, Command Center, and Edge Zones. Developer documentation is at docs.crusoecloud.com.

What industry is Crusoe AI Data Center in?

Crusoe AI Data Center's product category is Cloud AI Infrastructure. Its primary akta.pro industry code is HDAAAAAH, AI Datacenter Power, Cooling & Racks (liquid cooling, power delivery), with a secondary code of HDAEANAA, End-to-End Enterprise AI Platforms (MLOps & Model Lifecycle Management). Its NAICS code is 518 and its SIC code is 7372.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
BloombergJane Street Secures Crusoe’s AI Cloud Services in Five-Year, $13 Billion Deal - BloombergCrusoe signed a five-year cloud contract with Jane Street Group valued at around $13 billion, providing AI chips and infrastructure for training and inference. The deal, reported by people with knowledge of the matter, is a significant commitment for both companies.BloombergJane Street Secures Crusoe’s AI Cloud Services in Five-Year, $13 Billion Deal - BloombergCrusoe signed a five-year cloud contract with Jane Street Group valued at around $13 billion. The deal provides Jane Street with GPU clusters and infrastructure for AI training and inference via Crusoe's cloud platform.Fierce-networkNeocloud Crusoe puts Aalo nuclear power to the AI data center testCrusoe and Aalo have launched a six-month trial testing Aalo's small modular reactor (SMR) technology with Crusoe's modular Spark AI data center to assess capacity factor, load following capabilities, and energy storage integration for AI workloads. The companies are targeting commercial nuclear-powered AI data center deployments by 2029, aiming to prove the economics of modular SMR technology that can be mass-manufactured and flexibly deployed. Before commercial rollouts can proceed domestically, Aalo must obtain approval from the U.S. Nuclear Regulatory Commission and address growing community skepticism around data center facilities.NaturalNewsBlogsPoll Finds 58% Oppose Local Data Centers as Issue Reshapes Midterm Campaigns – NaturalNews.comA June Yale Program on Climate Communication poll found that 58% of registered voters oppose data-center construction in their local areas, with opposition spanning political party lines, and more than 300 municipalities have enacted bans or moratoriums on hyperscale facilities. The Trump administration is developing a policy requiring major tech companies to cover electricity, water, and grid infrastructure costs for AI data centers, with Amazon and other operators signing the Ratepayer Protection Pledge. Data Center Watch reported $130 billion in major projects delayed or canceled in Q1 2026, including Brookfield-backed Compass Datacenters abandoning a Northern Virginia project and Crusoe pausing a Wyoming campus, as the backlash has become a key midterm campaign issue forcing candidates in both parties to adjust their positions.The Times of IndiaCrusoe enhances AI platform with serverless fine-tuning servicesCrusoe expanded its AI platform with serverless fine-tuning and self-serve inference deployments, enabling enterprises to customize open-weight models without managing GPU infrastructure. The services use dynamic scheduling to reduce idle GPU spending and will be generally available next week with per-million-token and per-GPU-hour pricing.SiliconANGLEAI data center builder Crusoe reportedly raising $3B at $30B valuation - SiliconANGLEAI data center builder Crusoe Inc. is reportedly in talks to raise a $3 billion funding round that could value the company at $30 billion, approximately three times its valuation from the previous year. The startup, which builds modular data centers for major tech firms including Microsoft, Oracle, OpenAI and Meta, has raised $2.77 billion to date and counts Nvidia and Salesforce Ventures among past investors. Crusoe's flagship project is a 1.2-gigawatt data center cluster for OpenAI in Abilene, Texas, with the company having opened a manufacturing facility in March to produce its prefabricated modules.The Fast ModeCrusoe Reaches 4.9 GW of Contracted AI Infrastructure Capacity Across Data Centers & AI CloudCrusoe announced that it has contracted 4.9 gigawatts of AI infrastructure across its data centers and cloud platform, with a total development pipeline exceeding 40 GW. The company is serving leading hyperscalers, enterprises, and AI natives with its vertically integrated approach, including building campuses in the United States for clients such as Oracle and Microsoft.Business StandardNifty slips below 23,200 as US-Iran tensions, FII selling weigh on sentimentIndian benchmark indices erased early gains and ended lower on Thursday, with the Nifty 50 settling below the 23,200 mark at 23,161.60, as escalating US-Iran tensions, persistent foreign institutional investor selling, and higher-than-expected US inflation data weighed on investor sentiment. US annual inflation accelerated to 4.2% in May 2026, its highest level since April 2023, driven by a 23.5% year-on-year surge in energy prices amid the Iran conflict, prompting Iran to announce the closure of the Strait of Hormuz. Individual stocks of note included MTAR Technologies plunging 10.99% after Crusoe paused work on a 1.8 GW AI data centre project in Wyoming, while Zee Entertainment Enterprises advanced 8.52% after its board approved raising a minimum of Rs 2,300 crore.Saur Energy InternationalGM Bets on Sodium-Ion Batteries, Expands Grid Storage and V2G PlansGeneral Motors announced a partnership with Peak Energy to develop grid-scale sodium-ion battery systems while preparing to launch LFP battery production through its joint venture with LG Energy Solution within the next month. The automaker is also deploying approximately 10,000 second-life EV battery packs into energy infrastructure projects, including Crusoe's AI data center in Nevada, with plans to install 100 battery packs at a Michigan facility generating over USD 3 million in electricity savings. GM is further expanding into vehicle-to-grid technology through partnerships with PG&E in California and DTE Energy in Michigan, positioning bidirectional charging as a standard feature across its future vehicle lineup.GlobeNewswireCrusoe’s Contracted AI Infrastructure Capacity Approaches 5 Gigawatts Across Data Centers and CloudCrusoe, an AI factory company, announced it has contracted 4.9 gigawatts of AI infrastructure capacity across its data center projects and cloud platform, with a total development pipeline exceeding 40 GW. The company's portfolio includes five AI data center campuses across the United States contracted to major hyperscale clients, with a flagship 1.2 GW Abilene, Texas campus for Oracle operational and a newly broken ground 900 MW campus for Microsoft also in Abilene. McKinsey projects the market will require 156 GW of AI-related data center capacity by 2030.