Developer docs
API playgroundTry for free, no card

Search company profiles

Elektroprivreda Srbije

Full company profile

uuid0002pny

Namestring
Elektroprivreda Srbije
Legal namestring
Akcionarsko društvo Elektroprivreda Srbije
Websiteurl
eps.rs
Company typeenum
Private
Founded yearint
1991
Descriptiontext

Elektroprivreda Srbije (EPS) is Serbia's largest company and the country's dominant vertically integrated electricity utility, 100% owned by the Republic of Serbia and headquartered in Belgrade. EPS operates across the full electricity value chain: lignite mining (the Kolubara basin producing approximately 32.79 million tonnes annually, or 75% of Serbia's lignite), thermal and hydroelectric generation (7,759 MW of capacity producing 30,566 GWh per year), and supply to over 3,543,286 customers nationwide. Its portfolio includes the TENT Nikola Tesla thermal complex and Kostolac thermal plants, large hydro facilities including the reversible Bajina Basta pumped storage and the Vlasina cascade (~130 MW), and a nascent renewable portfolio (Kostolac wind farm at 66 MW completed in 2025, with 76 new green MW added that year).

On the commercial side, EPS serves both as a guaranteed supplier at regulated tariffs for households and small commercial customers, and as a commercial supplier at market-based prices (e.g., EUR 98.9-105.8/MWh reference bands per 2024 EUROSTAT data) for industrial and enterprise customers. Customer acquisition runs through regional sales offices, an online portal (portal.eps.rs), a mobile app, and a free 0800 hotline, supported by partnerships with banks, the Serbian Post, and IPS QR-code payment rails. An e-bill discount of 7% drives digital adoption. The company also operates EPS Trading d.o.o. Ljubljana (established 2014) for cross-border electricity trade.

EPS is in the midst of a major capital transition: 2025 saw 52.7 billion RSD invested (97% plan execution) and 42.3 billion RSD in profit (≈EUR 360 million), with EUR 300 million in EBRD financing, EUR 110 million from KfW, a EUR 900 million K-Sure-backed 1 GW solar PV + battery storage project with Hyundai Engineering and UGT Renewables, and a CEO-announced EUR 1.2 billion renewable investment pipeline. Strategic partnerships include Mitsubishi Heavy Industries (TENT B desulfurization), ANDRITZ Hydro (Vlasina modernization), and Western Balkans EU grant financing, positioning EPS as a state-anchored utility simultaneously executing lignite expansion and an EU-aligned decarbonization pathway.

Short descriptiontext

Elektroprivreda Srbije is Serbia's largest state-owned, vertically integrated electricity utility, generating 30,566 GWh annually from lignite, hydro, and renewables to supply 3.5 million+ customers nationwide through regulated and commercial tariffs.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
5,001–10,000
akta.pro rankint
HeadquartersBelgrade
HQ citystring
Belgrade
Markets served

Serves global market

Offices8 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
electricity generation, electricity supply, lignite coal mining, hydropower generation, renewable energy
Industry2 codes
1Gas-Fired Power Plant Development & IPP Ownership (Greenfield/Brownfield)
CodeEUACABAIPrimaryYes
2Incentives, Grants & Program Administration (Auctions, Tenders, IRA/ITC/PTC Advisory)
CodeEUAMAAAJPrimaryNo
NAICS code5 codes
  • Electric Power Generation, Transmission and Distribution2211
  • Electric Power Generation22111
  • Fossil Fuel Electric Power Generation221112
  • Hydroelectric Power Generation221111
  • Solar Electric Power Generation221114
SIC code1 code
  • Electric Services4911
Product category
Electric Utility Services
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model4 records
1Electricity Generation and Supply
TypeSubscription Recurring
Description

EPS generates electricity through thermal power plants (using lignite coal), hydroelectric plants, and increasingly from wind and solar farms. The company supplies electricity to over 3.5 million customers including households, commercial businesses, and industrial customers. Revenue comes from regulated tariffs for guaranteed supply customers and market-based pricing for commercial customers.

eps.rs
2Coal Production
TypeHardware Sales
Description

EPS operates the Kolubara and Kostolac mining basins producing lignite coal for its thermal power plants and potentially for sale. The Kolubara basin accounts for 75% of Serbia's lignite production with annual output of approximately 32.79 million tonnes.

eps.rs
3Electricity Trading
TypeTransaction Fee
Description

EPS Trading d.o.o. Ljubljana, established in 2014, serves as the company's foreign trading entity for electricity trade abroad.

ekapija.com
4Customer Services and Maintenance
TypeProfessional Services
Description

Services including billing systems maintenance for distribution networks across Serbia, technical services, and other utility-related services.

eps.rs
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels5 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Operations, Supply Chain, Personnel, Technology or R&D
Pricing details3 tiers
1Household e-bill discount
ModelSubscriptionBilling cadenceMonthly
Notes

Households that switch to electronic billing and pay by the 20th of each month receive a 7% discount on their next bill.

eps.rs
2Guaranteed Supply Tariffs - Consumption Zones
ModelUsage-basedBilling cadenceMonthly
Notes

For wide consumption category: Green Zone up to 350 kWh, Blue Zone 350-1,200 kWh, Red Zone above 1,200 kWh. Prices regulated by Energy Agency of Republic of Serbia and applied from October 1, 2025.

kalkulator.eps.rs
3Commercial Supply - Market Prices
ModelUsage-basedBilling cadenceMonthly
Notes

Commercial customers served at market prices formed according to exchange movements. Prices vary on a daily basis. EUROSTAT reference prices for 2024: 0-499 MWh: 105.80 EUR/MWh, 500-1,999 MWh: 105.50 EUR/MWh, 2,000-19,999 MWh: 98.90 EUR/MWh, 20,000-69,999 MWh: 103.30 EUR/MWh.

eps.rs
GTM typeB2B and B2C
B2B and B2C
Offering typeServices
Services
Core offering1 text field

Elektroprivreda Srbije (EPS) is Serbia's vertically integrated state-owned electricity utility that generates electricity from lignite-fired thermal plants, hydropower facilities, and renewable sources; produces lignite coal from the Kolubara basin for its own thermal generation; and supplies electricity to over 3.5 million customers via regulated guaranteed supply for households and small customers, market-priced commercial supply for larger buyers, and prosumer (customer-producer) and reserve supply schemes.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 6 values shown
  • Coal production capacity of 32.79 million tonnes annually from Kolubara basin
+5 more records
Product overview1 text field

Elektroprivreda Srbije (EPS) is Serbia's largest energy company, operating as a vertically integrated utility with four core business segments: coal mining (lignite production from the Kolubara basin at ~32.8 million tonnes/year), electricity generation (thermal, hydro, and growing renewable capacity), and electricity supply. EPS's generation mix includes lignite-fired thermal plants (TENT Nikola Tesla and TE-KO Kostolac with ongoing desulfurization), large and small hydropower (including pumped storage at Bajina Basta and the revitalized Vlasina cascade), and nascent renewable projects (66 MW Kostolac wind farm completed 2025; 1 GW solar with storage under development). On the supply side, EPS serves guaranteed supply customers (households/small businesses at regulated prices), commercial customers (at market prices), and prosumers, through digital channels including the EPS Portal, mobile app, and the EPS Calculator. The company also operates a Ljubljana-based trading subsidiary and is investing over EUR 1 billion in new renewable and modernization projects.

Product and service16 records
1Guaranteed Supply (Garantovano snabdevanje)
CategoryElectricity supply (regulated)
Description

Regulated electricity supply service for households and small customers at government-set prices, mandated by Serbian energy law. Covers over 3.5 million delivery points across Serbia.

2Commercial Supply (Komercijalno snabdevanje)
CategoryElectricity supply (market)
Description

Market-priced electricity supply service for commercial and industrial customers on the open energy market, with flexible contract terms and pricing that varies on a daily basis.

3Reserve Supply (Rezervno snabdevanje)
CategoryElectricity supply (backup)
Description

Backup electricity supply service for customers without an active supplier contract, available for up to 60 days.

4Customer-Producer (Kupac-proizvođač)
CategoryProsumer electricity service
Description

Scheme enabling prosumers who both consume and generate electricity (e.g., via solar panels) to sell surplus power back to EPS.

5Hydropower Generation
CategoryElectricity generation (hydro)
Description

EPS-operated hydroelectric power generation including HPP Djerdap 1, HPP Bajina Basta (pumped storage), the Vlasinske cascade (four plants, approximately 130 MW combined), and 15 small hydropower plants, with ongoing revitalization programs to extend facility lifespans and increase output.

6Thermal Power Generation
CategoryElectricity generation (thermal)
Description

Lignite-fired thermal power generation operated by EPS at TENT Nikola Tesla A and B (Obrenovac) and TE-KO Kostolac, with major ongoing environmental upgrades including desulfurization systems at TENT B to reduce SO2 emissions 30-fold and meet EU standards.

7Renewable Energy Sources
CategoryElectricity generation (renewable)
Description

EPS's growing portfolio of solar and wind power assets, including its first wind farm at Kostolac (66 MW, 187 GWh annual output), solar projects at Kostolac, and the strategic 1 GW solar PV project with battery storage across six sites contracted in 2024.

8Coal Mining
CategoryFuel production (coal)
Description

EPS operates extensive lignite mining operations in the Kolubara basin, including the Radljevo, Polje, and Tamnava mines, producing approximately 32.79 million tonnes of coal annually for its thermal power plants.

9EPS Portal (Uvid u račun)
CategoryDigital customer service
Description

Online customer portal allowing users to view electricity bills, check account status, and manage billing preferences. Supports electronic bill activation and electronic payment.

10EPS Calculator (EPS Kalkulator)
CategoryDigital customer service
Description

Online consumption calculator enabling customers to estimate electricity charges based on category, consumption zone, and billing period. Covers guaranteed and commercial supply scenarios with both EPS-regulated and market-based pricing.

11E-Bill (E-Račun)
CategoryDigital billing service
Description

Electronic billing service offering households a 7% discount on their electricity bill when they switch from paper to electronic billing and pay by the 20th of each month.

12EPS Mobile App
CategoryDigital customer service
Description

Mobile application companion to the EPS Portal for bill viewing, consumption tracking, and account management, available on iOS and Android via OneLink distribution.

13Kostolac Wind Farm
CategoryWind power generation
Description

EPS's first wind farm located at Kostolac with 66 MW capacity and expected annual output of 187 GWh, financed with a EUR 110 million KfW loan and additional EU grants.

14Vlasina Hydropower Cascade Modernization
CategoryHydropower modernization
Description

Modernization of EPS's Vlasina hydropower cascade (four plants operational since 1955, approximately 129-130 MW combined capacity) with a EUR 109.7 million investment, including 10 new turbines from ANDRITZ, increasing capacity by 8 MW and extending operational life by 30-40 years.

151 GW Solar PV Project with Battery Storage
CategorySolar power generation with storage
Description

Serbia's largest solar venture: 1 GW photovoltaic project with battery storage across six plants in Zajecar, Leskovac, Bujanovac, Lebane, Negotin, and Odzaci, contracted with a Hyundai Engineering / UGT Renewables consortium and backed by EUR 900 million in K-Sure export financing.

16EPS Trading Ljubljana (EPS Trgovanje Ljubljana)
CategoryElectricity trading (international)
Description

EPS's foreign trading subsidiary based in Ljubljana, Slovenia, established in July 2014 as the company's first international trading entity for cross-border electricity commerce.

Scale indicator13 records

Each record includes

Type, Value, Description, Source

Partnership8 partners
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-06-23
Description

Consortium contracted in October 2024 for 1 GW photovoltaic power project with battery storage systems. Largest overseas solar power venture secured by a Korean company. Six solar plants to be built in Zajecar, Leskovac, Bujanovac, Lebane, Negotin, and Odzaci. Construction expected to start in 2026.

2China's Heavy Energy International
Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2026-06-05
Description

Acquired 168 MW Alibunar wind project (Alibunar Windfarm A and B) from Nordic developer Emergy and WV International. Project selected for Serbia's second renewable energy auction in February 2025. EPS will purchase electricity under 15-year PPA once operational.

renewablesnow.com
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2026-04-07
Description

Partnership for desulfurization plant at TENT B thermal power plant in Obrenovac. Project costing around EUR 250 million reduces sulfur dioxide emissions by 30 times to meet European environmental standards. Produces approximately 200,000 tons of Euro-quality gypsum annually as by-product.

Strategic tierCoreTypeTechnology or IntegrationAnnounced on2026-02-27
Description

Equipment supplier for Vlasina hydropower cascade modernization. ANDRITZ supplying 10 turbines in a deal valued at lower double-digit million euros. Gamesa Electric also supplying equipment. Project increases capacity by 8 MW.

Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2026-02-27
Description

Main contractor for Vlasina hydropower cascade rehabilitation project worth EUR 109.7 million. Also handles assembly and installation work at Radljevo coal mine.

Strategic tierSupportingTypeTechnology or IntegrationAnnounced on2026-02-25
Description

Handles control system modernization for Vlasina hydropower plants rehabilitation project.

Strategic tierSupportingTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-12-16
Description

Joint bid awarded EBRD supervision contract worth EUR 2.49 million for Vlasina Hydropower Plants reconstruction project. Joint venture includes Belgrade-based Netinvest d.o.o.

Strategic tierSupportingTypeChannel Partner/ Reseller/ DistributorAnnounced on2025-10-21
Description

Partnership with Serbian Post, banks, and payment institutions for bill payment services. Also instant payment via IPS QR code, and payment through e-banking/m-banking services.

Recent move9 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

Croatia's state-owned vertically integrated electric utility, with generation (hydro, thermal, renewables), distribution, and supply. Closest regional peer to EPS in terms of mix (significant hydro + thermal), state ownership, regulated supply, and Western Balkans/EU-accession context.

TypeDirect peer
Description

Hungary's state-owned energy group covering power generation, natural gas, and electricity supply. Comparable to EPS as a Central European state-owned utility with regulated supply obligations and an active role in renewable build-out.

3Public Power Corporation (PPC) - Greece
TypeDirect peer
Description

Greece's incumbent state-influenced utility with lignite-fired generation legacy, large hydro, and an aggressive renewable transition program. Highly comparable to EPS in fuel mix history, EU-alignment decarbonization pressure, and renewable pivot.

TypeDirect peer
Description

Vertically integrated electric utility of Republika Srpska (Bosnia and Herzegovina) operating thermal and hydro generation plus supply. Closely comparable in scale, Balkan market, lignite-and-hydro fuel mix, and state-ownership model.

TypeDirect peer
Description

Montenegro's state-owned electric utility with hydro-dominant generation and a regulated supply franchise. Comparable to EPS in regional context, system-integration role, and ongoing renewable/hybrid project development.

TypeBroad incumbent
Description

Czech Republic's large listed utility with nuclear, thermal, hydro, and renewables across Central Europe. Comparable to EPS as a regional integrated utility executing coal phase-out and major renewable capex, but at substantially larger scale.

TypeBroad incumbent
Description

Global integrated utility with a major European generation and distribution footprint, including a coal-exit and renewables-expansion strategy. Relevant broad incumbent for benchmarking EPS's transition roadmap, customer-platform digitization, and regulated vs. commercial supply segmentation.

TypeBroad incumbent
Description

Large European distribution and customer-solutions operator focused on networks, retail, and energy services. Comparable to EPS's regulated distribution and customer-management scale and to its emerging prosumer and digital-channel strategy.

TypeOthers
Description

Serbia's transmission system operator, the domestic counterpart to EPS. Not a direct competitor but a key ecosystem partner for grid balancing, ancillary services, and integration of EPS's renewable and pumped-storage capacity.

TypeOthers
Description

Strategic technology partner that delivered the EUR 250M FGD/desulfurization systems at TENT A and TENT B. Relevant as an enabling vendor for EPS's environmental-compliance and thermal-modernization roadmap rather than as a competitor.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment4 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile4 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature3 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles11 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

Subsidiaries5 records

Each record includes

Name, Acquired on, Relationship type, Type, Business focus

No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds2 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors1 record

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Elektroprivreda Srbije

Electric Utility Serviceseps.rs

Elektroprivreda Srbije is Serbia's largest state-owned, vertically integrated electricity utility, generating 30,566 GWh annually from lignite, hydro, and renewables to supply 3.5 million+ customers nationwide through regulated and commercial tariffs.

What Elektroprivreda Srbije does

Elektroprivreda Srbije (EPS) is Serbia's largest company and the country's dominant vertically integrated electricity utility, 100% owned by the Republic of Serbia and headquartered in Belgrade. EPS operates across the full electricity value chain: lignite mining (the Kolubara basin producing approximately 32.79 million tonnes annually, or 75% of Serbia's lignite), thermal and hydroelectric generation (7,759 MW of capacity producing 30,566 GWh per year), and supply to over 3,543,286 customers nationwide. Its portfolio includes the TENT Nikola Tesla thermal complex and Kostolac thermal plants, large hydro facilities including the reversible Bajina Basta pumped storage and the Vlasina cascade (~130 MW), and a nascent renewable portfolio (Kostolac wind farm at 66 MW completed in 2025, with 76 new green MW added that year).

On the commercial side, EPS serves both as a guaranteed supplier at regulated tariffs for households and small commercial customers, and as a commercial supplier at market-based prices (e.g., EUR 98.9-105.8/MWh reference bands per 2024 EUROSTAT data) for industrial and enterprise customers. Customer acquisition runs through regional sales offices, an online portal (portal.eps.rs), a mobile app, and a free 0800 hotline, supported by partnerships with banks, the Serbian Post, and IPS QR-code payment rails. An e-bill discount of 7% drives digital adoption. The company also operates EPS Trading d.o.o. Ljubljana (established 2014) for cross-border electricity trade.

EPS is in the midst of a major capital transition: 2025 saw 52.7 billion RSD invested (97% plan execution) and 42.3 billion RSD in profit (≈EUR 360 million), with EUR 300 million in EBRD financing, EUR 110 million from KfW, a EUR 900 million K-Sure-backed 1 GW solar PV + battery storage project with Hyundai Engineering and UGT Renewables, and a CEO-announced EUR 1.2 billion renewable investment pipeline. Strategic partnerships include Mitsubishi Heavy Industries (TENT B desulfurization), ANDRITZ Hydro (Vlasina modernization), and Western Balkans EU grant financing, positioning EPS as a state-anchored utility simultaneously executing lignite expansion and an EU-aligned decarbonization pathway.

Elektroprivreda Srbije firmographics

Firmographics
Name
Elektroprivreda Srbije
Legal name
Akcionarsko društvo Elektroprivreda Srbije
Website
https://eps.rs
Company type
Private
Founded year
1991
Operating status
Operating
Headcount range
5,001–10,000 employees
Short description
Elektroprivreda Srbije is Serbia's largest state-owned, vertically integrated electricity utility, generating 30,566 GWh annually from lignite, hydro, and renewables to supply 3.5 million+ customers nationwide through regulated and commercial tariffs.
Ownership category
akta.pro rank

Elektroprivreda Srbije industry classification

Industry
Product category
Electric Utility Services
NAICS
Electric Power Generation, Transmission and Distribution (2211), Electric Power Generation (22111), Fossil Fuel Electric Power Generation (221112), Hydroelectric Power Generation (221111), Solar Electric Power Generation (221114)
SIC
Electric Services (4911)
akta.pro primary industry
Gas-Fired Power Plant Development & IPP Ownership (Greenfield/Brownfield) (EUACABAI)
akta.pro secondary industry
Incentives, Grants & Program Administration (Auctions, Tenders, IRA/ITC/PTC Advisory) (EUAMAAAJ)

Keywords

  • Electricity generation
  • Electricity supply
  • Lignite coal mining
  • Hydropower generation
  • Renewable energy

Where Elektroprivreda Srbije is headquartered

Location

Headquarters

HQ city
Belgrade

Offices8 records

Markets served

Elektroprivreda Srbije business model

Business model
GTM type
B2B and B2C
Offering type
Services
Cost components
Infrastructure, Operations, Supply Chain, Personnel, Technology or R&D

Revenue model

  1. Electricity Generation and Supply: EPS generates electricity through thermal power plants (using lignite coal), hydroelectric plants, and increasingly from wind and solar farms. The company supplies electricity to over 3.5 million customers including households, commercial businesses, and industrial customers. Revenue comes from regulated tariffs for guaranteed supply customers and market-based pricing for commercial customers.
  2. Coal Production: EPS operates the Kolubara and Kostolac mining basins producing lignite coal for its thermal power plants and potentially for sale. The Kolubara basin accounts for 75% of Serbia's lignite production with annual output of approximately 32.79 million tonnes.
  3. Electricity Trading: EPS Trading d.o.o. Ljubljana, established in 2014, serves as the company's foreign trading entity for electricity trade abroad.
  4. Customer Services and Maintenance: Services including billing systems maintenance for distribution networks across Serbia, technical services, and other utility-related services.

Pricing tiers

ModelBillingPrice
SubscriptionMonthlyHousehold e-bill discount
Usage-basedMonthlyGuaranteed Supply Tariffs - Consumption Zones
Usage-basedMonthlyCommercial Supply - Market Prices

Go-to-market motion1 record

Distribution channels5 records

Marketing channels5 records

Elektroprivreda Srbije product offering

Product offering

Core offering

Elektroprivreda Srbije (EPS) is Serbia's vertically integrated state-owned electricity utility that generates electricity from lignite-fired thermal plants, hydropower facilities, and renewable sources; produces lignite coal from the Kolubara basin for its own thermal generation; and supplies electricity to over 3.5 million customers via regulated guaranteed supply for households and small customers, market-priced commercial supply for larger buyers, and prosumer (customer-producer) and reserve supply schemes.

Product overview

Elektroprivreda Srbije (EPS) is Serbia's largest energy company, operating as a vertically integrated utility with four core business segments: coal mining (lignite production from the Kolubara basin at ~32.8 million tonnes/year), electricity generation (thermal, hydro, and growing renewable capacity), and electricity supply. EPS's generation mix includes lignite-fired thermal plants (TENT Nikola Tesla and TE-KO Kostolac with ongoing desulfurization), large and small hydropower (including pumped storage at Bajina Basta and the revitalized Vlasina cascade), and nascent renewable projects (66 MW Kostolac wind farm completed 2025; 1 GW solar with storage under development). On the supply side, EPS serves guaranteed supply customers (households/small businesses at regulated prices), commercial customers (at market prices), and prosumers, through digital channels including the EPS Portal, mobile app, and the EPS Calculator. The company also operates a Ljubljana-based trading subsidiary and is investing over EUR 1 billion in new renewable and modernization projects.

Differentiator

Problem solved

Functional benefit

Products and services

  • Guaranteed Supply (Garantovano snabdevanje) Regulated electricity supply service for households and small customers at government-set prices, mandated by Serbian energy law. Covers over 3.5 million delivery points across Serbia.
  • Commercial Supply (Komercijalno snabdevanje) Market-priced electricity supply service for commercial and industrial customers on the open energy market, with flexible contract terms and pricing that varies on a daily basis.
  • Reserve Supply (Rezervno snabdevanje) Backup electricity supply service for customers without an active supplier contract, available for up to 60 days.
  • Customer-Producer (Kupac-proizvođač) Scheme enabling prosumers who both consume and generate electricity (e.g., via solar panels) to sell surplus power back to EPS.
  • Hydropower Generation EPS-operated hydroelectric power generation including HPP Djerdap 1, HPP Bajina Basta (pumped storage), the Vlasinske cascade (four plants, approximately 130 MW combined), and 15 small hydropower plants, with ongoing revitalization programs to extend facility lifespans and increase output.
  • Thermal Power Generation Lignite-fired thermal power generation operated by EPS at TENT Nikola Tesla A and B (Obrenovac) and TE-KO Kostolac, with major ongoing environmental upgrades including desulfurization systems at TENT B to reduce SO2 emissions 30-fold and meet EU standards.
  • Renewable Energy Sources EPS's growing portfolio of solar and wind power assets, including its first wind farm at Kostolac (66 MW, 187 GWh annual output), solar projects at Kostolac, and the strategic 1 GW solar PV project with battery storage across six sites contracted in 2024.
  • Coal Mining EPS operates extensive lignite mining operations in the Kolubara basin, including the Radljevo, Polje, and Tamnava mines, producing approximately 32.79 million tonnes of coal annually for its thermal power plants.
  • EPS Portal (Uvid u račun) Online customer portal allowing users to view electricity bills, check account status, and manage billing preferences. Supports electronic bill activation and electronic payment.
  • EPS Calculator (EPS Kalkulator) Online consumption calculator enabling customers to estimate electricity charges based on category, consumption zone, and billing period. Covers guaranteed and commercial supply scenarios with both EPS-regulated and market-based pricing.
  • E-Bill (E-Račun) Electronic billing service offering households a 7% discount on their electricity bill when they switch from paper to electronic billing and pay by the 20th of each month.
  • EPS Mobile App Mobile application companion to the EPS Portal for bill viewing, consumption tracking, and account management, available on iOS and Android via OneLink distribution.
  • Kostolac Wind Farm EPS's first wind farm located at Kostolac with 66 MW capacity and expected annual output of 187 GWh, financed with a EUR 110 million KfW loan and additional EU grants.
  • Vlasina Hydropower Cascade Modernization Modernization of EPS's Vlasina hydropower cascade (four plants operational since 1955, approximately 129-130 MW combined capacity) with a EUR 109.7 million investment, including 10 new turbines from ANDRITZ, increasing capacity by 8 MW and extending operational life by 30-40 years.
  • 1 GW Solar PV Project with Battery Storage Serbia's largest solar venture: 1 GW photovoltaic project with battery storage across six plants in Zajecar, Leskovac, Bujanovac, Lebane, Negotin, and Odzaci, contracted with a Hyundai Engineering / UGT Renewables consortium and backed by EUR 900 million in K-Sure export financing.
  • EPS Trading Ljubljana (EPS Trgovanje Ljubljana) EPS's foreign trading subsidiary based in Ljubljana, Slovenia, established in July 2014 as the company's first international trading entity for cross-border electricity commerce.

Quantifiable outcome

  • Coal production capacity of 32.79 million tonnes annually from Kolubara basin
  • +5 more outcomes

Companies that use Elektroprivreda Srbije

Customer profile

Named customers1 record

Segments4 records

Ideal customer profiles4 records

Elektroprivreda Srbije technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature3 records

Elektroprivreda Srbije partnerships and signals

Strategic signal

Partnerships

Eight partnerships are on record, tiered core, minor and supporting.

  • Hyundai Engineering and UGT RenewablescoreStrategic or Co-development Partner · 23 June 2026Consortium contracted in October 2024 for 1 GW photovoltaic power project with battery storage systems. Largest overseas solar power venture secured by a Korean company. Six solar plants to be built in Zajecar, Leskovac, Bujanovac, Lebane, Negotin, and Odzaci. Construction expected to start in 2026.
  • China's Heavy Energy InternationalminorStrategic or Co-development Partner · 5 June 2026Acquired 168 MW Alibunar wind project (Alibunar Windfarm A and B) from Nordic developer Emergy and WV International. Project selected for Serbia's second renewable energy auction in February 2025. EPS will purchase electricity under 15-year PPA once operational.
  • Mitsubishi Heavy IndustriescoreTechnology or Integration · 7 April 2026Partnership for desulfurization plant at TENT B thermal power plant in Obrenovac. Project costing around EUR 250 million reduces sulfur dioxide emissions by 30 times to meet European environmental standards. Produces approximately 200,000 tons of Euro-quality gypsum annually as by-product.
  • ANDRITZ Hydro / Gamesa ElectriccoreTechnology or Integration · 27 February 2026Equipment supplier for Vlasina hydropower cascade modernization. ANDRITZ supplying 10 turbines in a deal valued at lower double-digit million euros. Gamesa Electric also supplying equipment. Project increases capacity by 8 MW.
  • Energotehnika Južna BačkacoreImplementation/ SI/ Consulting Partner · 27 February 2026Main contractor for Vlasina hydropower cascade rehabilitation project worth EUR 109.7 million. Also handles assembly and installation work at Radljevo coal mine.
  • Mihajlo Pupin InstitutesupportingTechnology or Integration · 25 February 2026Handles control system modernization for Vlasina hydropower plants rehabilitation project.
  • Gruner Stucky Ltd / Gruner Balkans d.o.o.supportingImplementation/ SI/ Consulting Partner · 16 December 2025Joint bid awarded EBRD supervision contract worth EUR 2.49 million for Vlasina Hydropower Plants reconstruction project. Joint venture includes Belgrade-based Netinvest d.o.o.
  • Telecommunications providers (banks, post offices)supportingChannel Partner/ Reseller/ Distributor · 21 October 2025Partnership with Serbian Post, banks, and payment institutions for bill payment services. Also instant payment via IPS QR code, and payment through e-banking/m-banking services.

Scale indicators13 records

Recent moves9 records

Expansion highlights6 records

Elektroprivreda Srbije competitors and assessment

Company assessment

Direct peers

  • Hrvatska elektroprivreda (HEP Group): Croatia's state-owned vertically integrated electric utility, with generation (hydro, thermal, renewables), distribution, and supply. Closest regional peer to EPS in terms of mix (significant hydro + thermal), state ownership, regulated supply, and Western Balkans/EU-accession context.
  • MVM Group: Hungary's state-owned energy group covering power generation, natural gas, and electricity supply. Comparable to EPS as a Central European state-owned utility with regulated supply obligations and an active role in renewable build-out.
  • Public Power Corporation (PPC) - Greece: Greece's incumbent state-influenced utility with lignite-fired generation legacy, large hydro, and an aggressive renewable transition program. Highly comparable to EPS in fuel mix history, EU-alignment decarbonization pressure, and renewable pivot.
  • Elektroprivreda Republike Srpske (ERS): Vertically integrated electric utility of Republika Srpska (Bosnia and Herzegovina) operating thermal and hydro generation plus supply. Closely comparable in scale, Balkan market, lignite-and-hydro fuel mix, and state-ownership model.
  • Elektroprivreda Crne Gore (EPCG): Montenegro's state-owned electric utility with hydro-dominant generation and a regulated supply franchise. Comparable to EPS in regional context, system-integration role, and ongoing renewable/hybrid project development.

Broad incumbents

  • ČEZ Group: Czech Republic's large listed utility with nuclear, thermal, hydro, and renewables across Central Europe. Comparable to EPS as a regional integrated utility executing coal phase-out and major renewable capex, but at substantially larger scale.
  • Enel Group: Global integrated utility with a major European generation and distribution footprint, including a coal-exit and renewables-expansion strategy. Relevant broad incumbent for benchmarking EPS's transition roadmap, customer-platform digitization, and regulated vs. commercial supply segmentation.
  • E.ON: Large European distribution and customer-solutions operator focused on networks, retail, and energy services. Comparable to EPS's regulated distribution and customer-management scale and to its emerging prosumer and digital-channel strategy.

Others

  • Elektromreža Srbije (EMS): Serbia's transmission system operator, the domestic counterpart to EPS. Not a direct competitor but a key ecosystem partner for grid balancing, ancillary services, and integration of EPS's renewable and pumped-storage capacity.
  • Mitsubishi Heavy Industries: Strategic technology partner that delivered the EUR 250M FGD/desulfurization systems at TENT A and TENT B. Relevant as an enabling vendor for EPS's environmental-compliance and thermal-modernization roadmap rather than as a competitor.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat5 records

Key risks6 records

Key highlights6 records

Customer concentration

Elektroprivreda Srbije social profiles

Digital presence

Elektroprivreda Srbije financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Elektroprivreda Srbije leadership team

Management profile

Number of profiles

Profiles11 records

Elektroprivreda Srbije subsidiaries and ownership

Company hierarchy

Subsidiaries5 records

Elektroprivreda Srbije funding detail

Funding detail

Funding overview

Funding rounds2 records

Investors1 record

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Elektroprivreda Srbije M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Elektroprivreda Srbije

What does Elektroprivreda Srbije do?

Elektroprivreda Srbije (EPS) is Serbia's vertically integrated state-owned electricity utility that generates electricity from lignite-fired thermal plants, hydropower facilities, and renewable sources; produces lignite coal from the Kolubara basin for its own thermal generation; and supplies electricity to over 3.5 million customers via regulated guaranteed supply for households and small customers, market-priced commercial supply for larger buyers, and prosumer (customer-producer) and reserve supply schemes.

Is Elektroprivreda Srbije a public or private company?

Elektroprivreda Srbije is a private company. It is classified as state government owned and is currently operating.

When was Elektroprivreda Srbije founded?

Elektroprivreda Srbije was founded in 1991. It employs 5,001 to 10,000 people.

Where is Elektroprivreda Srbije based?

Elektroprivreda Srbije is headquartered in Belgrade.

How does Elektroprivreda Srbije make money?

Four revenue lines are on record. Electricity Generation and Supply is the primary driver. The others are coal Production, electricity Trading and customer Services and Maintenance.

Who are Elektroprivreda Srbije's main competitors?

Direct peers on record are Hrvatska elektroprivreda (HEP Group), MVM Group, Public Power Corporation (PPC) - Greece, Elektroprivreda Republike Srpske (ERS) and Elektroprivreda Crne Gore (EPCG). Broad incumbents are ČEZ Group, Enel Group and E.ON. Others are Elektromreža Srbije (EMS) and Mitsubishi Heavy Industries.

Does Elektroprivreda Srbije have an API?

No public API is recorded for Elektroprivreda Srbije.

What industry is Elektroprivreda Srbije in?

Elektroprivreda Srbije's product category is Electric Utility Services. Its primary akta.pro industry code is EUACABAI, Gas-Fired Power Plant Development & IPP Ownership (Greenfield/Brownfield), with a secondary code of EUAMAAAJ, Incentives, Grants & Program Administration (Auctions, Tenders, IRA/ITC/PTC Advisory). Its NAICS code is 2211 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
SeeNewsSerbia expects record low output at Djerdap I HPP in 2026 - reportSerbia's state-owned power utility Elektroprivreda Srbije (EPS) expects record low electricity production at the Djerdap I hydropower plant in 2026 due to critically low water levels on the Danube river, with May and June marking the weakest monthly output since operations began in 1970. The plant is currently generating just over 5,000 MWh per day, approximately one-third of its average daily output, with Danube inflows standing at around half their long-term average. Despite the challenges, EPS stated there is no risk to the stability of electricity supply in the country.bne IntelliNewsAzerbaijan's big gas pushAzerbaijan's Baku Energy Week saw SOCAR and the government net about $7.5bn in energy deals, led by a 15-year Absheron Phase 2 gas supply agreement with Turkey. The deal commits 33bn cubic metres to Turkey, with Phase 2 expected to triple output to 4.5bcm per year. The gas won't reach Europe before 2029, missing the 2027 EU target.RenewablesnowChina's Heavy Energy International buys 168-MW wind project in SerbiaChina's Heavy Energy International has completed the acquisition of the 168-MW Alibunar wind project (comprising Alibunar Windfarm A and B) in Serbia's northern province of Vojvodina from Nordic developer Emergy and its partner WV International, with all transaction conditions now fulfilled. The project, which was selected for Serbia's second renewable energy auction in February 2025, will deliver electricity to state-owned utility Elektroprivreda Srbija under a 15-year power purchase agreement once operational. Emergy, which originated and developed the asset to construction-ready status, described the sale as consistent with its business model of developing and advancing renewable energy projects before selling them.tenderiDesulfurization completed at TENT B – Sulfur dioxide emissions reduced 30 timesElektroprivreda Srbije (EPS) announced the completion of a desulfurization plant at the Nikola Tesla B (TENT B) thermal power plant in Obrenovac, Serbia, reducing sulfur dioxide emissions by 30 times to meet European environmental standards. The project, costing around EUR 250 million, was carried out in partnership with Japan's Mitsubishi Heavy Industries alongside domestic companies, producing approximately 200,000 tons of Euro-quality gypsum annually as a by-product. The milestone extends the operational lifespan and energy efficiency of one of Serbia's largest power-generating facilities, with over EUR 420 million invested in total across TENT A and TENT B desulfurization systems.Balkan Green Energy NewsSerbia officially launches modernization of Vlasina hydropower plantsSerbia's state-owned power utility Elektroprivreda Srbije (EPS) has officially launched a EUR 109.7 million rehabilitation project for the Vlasina hydropower cascade, which has been operating for over 70 years and currently has a total installed capacity of around 129 MW. The project, funded primarily through a EUR 67 million loan from the EBRD and a EUR 15.4 million grant from the EU, will increase the cascade's capacity by 8 MW and ensure reliable operation for the next 30-40 years. The modernization work, expected to take three to four years, will be carried out by Energotehnika – Južna Bačka with equipment supplied by Andritz Hydro and Gamesa Electric.tenderiEPS achieves profit of 42.3 billion dinars in 2025 – Construction of solar power plants with capacity of 1 GW to begin this yearElektroprivreda Srbije (EPS) achieved a profit of 42.3 billion dinars in 2025, significantly outperforming 2024 results despite the worst Danube hydrology in 35 years. The company implemented 97% of its investment plan, allocating 52.7 billion dinars including 44.97 billion from its own funds, while adding 76 new green megawatts and completing environmental projects at TENT A and TENT B. Construction of strategic 1 GW solar power plants with battery storage is expected to begin in 2026.tenderiEBRD awards contract for supervision of Vlasina Hydropower Plants reconstructionThe EBRD has awarded a EUR 2.49 million contract for professional and technical supervision of the Vlasina Hydropower Plants reconstruction project in Serbia, signed on December 1, 2025. The contract was awarded to a joint consortium of Gruner Stucky Ltd (Switzerland), Gruner Balkans d.o.o., and Netinvest d.o.o., with a planned completion date of January 15, 2031. The total project value is EUR 109.7 million, with the main reconstruction work being carried out by contractor Energotehnika Juzna Backa for project client Elektroprivreda Srbije (EPS).tenderiFirst wind megawatts of Elektroprivreda Srbije: Blades start spinning at Kostolac wind farmElektroprivreda Srbije (EPS) has successfully connected its first wind farm in Kostolac to Serbia's power grid, adding 66 megawatts of renewable energy capacity with planned annual production of 187 million kilowatt-hours, enough to supply approximately 30,000 households. The project, financed by a 110 million euro loan from German development bank KfW and 30 million euros in EU grants through the Western Balkans Investment Framework, represents a milestone as the state-owned utility's inaugural wind energy facility. EPS CEO Dusan Zivkovic described it as a historic moment marking the beginning of new green capacity development for the Serbian energy sector, with additional turbines at nearby locations currently undergoing energization.CordmagazineEPS Introduces 7% Discount for Customers Who Switch to E-Bills and Pay on TimeElektroprivreda Srbije (EPS), Serbia's state-owned power company, has announced a new 7% discount for households that switch to electronic billing and pay by the 20th of each month, replacing the previous 5% on-time payment discount. The initiative was presented by EPS Executive Director for Supply Aleksandar Bjeličić at the International Energy Fair in Belgrade. The program aims to promote digitalization and environmental responsibility by incentivizing customers to adopt e-bills, which the company notes are delivered faster than paper bills.tenderiFiscal Council: Implementation of CBAM principles to significantly increase price of Serbian export products on EU market, highest expected for cement, 40 to 60%The Fiscal Council of Serbia presented a report on climate and energy transition projecting that the EU's Carbon Border Adjustment Mechanism (CBAM), launching in 2026, will significantly increase prices of Serbian exports, with cement facing the highest increase of 40-60%, followed by steel (10-20%), fertilizers (10-15%), and aluminum (5%). Total CBAM costs for Serbian industrial exporters are estimated at EUR 45 million in 2026, rising to EUR 150-200 million annually by 2030, as Serbia's carbon footprint per unit of production is 15-20% higher than EU averages for industrial products and three to four times higher for electricity generation. The report attributes Serbia's high emissions primarily to lignite-based electricity production, where Elektroprivreda Srbije (EPS) generates roughly 80% of national greenhouse gas emissions, and calls for urgent decarbonization investments to maintain competitiveness on the EU market.