Developer docs
API playgroundTry for free, no card

Search company profiles

Geiger Energy Corp.

Full company profile

uuid0003fmk

Namestring
Geiger Energy Corp.
Legal namestring
Geiger Energy Corporation
Websiteurl
baselode.com
Company typeenum
Public
Founded yearint
2020
Descriptiontext

Geiger Energy Corp. (formerly Baselode Energy Corp.) is a Canadian uranium exploration company focused on discovering high-grade, basement-hosted uranium deposits in two of the world's most prospective uranium districts: the Athabasca Basin in Saskatchewan and the Thelon Basin in Nunavut. The company was formed through the 2025 business combination of Baselode Energy and Forum Energy Metals, with the rebrand to Geiger Energy effective October 27, 2025. Geiger controls approximately 350,000-390,000 hectares across 12 projects in the Athabasca Basin and 95,519 hectares in the Thelon Basin, all 100%-owned, with key assets including the flagship Aberdeen Project (hosting the high-grade Tatiggaq and Qavvik discoveries) and the Hook Project (hosting the near-surface ACKIO discovery).

The company employs advanced geophysical exploration technologies, including Mobile MT (magnetotellurics), Falcon Plus airborne gravity gradiometer surveys, and VTEM Plus electromagnetic surveys, combined with diamond drilling to test targets. The 'Athabasca 2.0' exploration thesis targets near-surface, basement-hosted uranium systems outside traditional unconformity-style models, leveraging structural geology targeting. Notable drill intercepts include 2.25% U3O8 over 11.1 metres at Tatiggaq and grades up to 2.45% U3O8 at ACKIO beginning at 28 metres depth.

Geiger is pre-revenue and funds its exploration programs entirely through equity financings, having raised over C$30 million cumulatively since 2020 through private placements, bought deals, and public offerings. The company is publicly listed on the TSX Venture Exchange (BEEP) and the OTCQB market (BSENF) in the United States. Its primary future revenue model contemplates selling or joint-venturing uranium discoveries to major mining companies (e.g., Cameco, Orano, NexGen) or advancing discoveries toward production. Geiger operates with 1-10 employees from its Toronto headquarters and functions within the Ore Group of Companies ecosystem.

Short descriptiontext

Geiger Energy Corp. is a pre-revenue Canadian uranium exploration company that controls district-scale land positions in the Athabasca and Thelon Basins, targeting high-grade basement-hosted uranium deposits for future sale or joint venture with major producers.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1–10
akta.pro rankint
HeadquartersToronto, Canada
HQ citystring
Toronto
HQ countrystring
Canada
HQ regionstring
North America
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
uranium exploration, mineral exploration, geophysical surveys, resource discovery, mining development
Industry1 code
PRIMARYEUAKACAA
Uranium Exploration & Resource Development
Energy, Utilities & Environment/Nuclear Energy/Nuclear Fuel Cycle (Mining, Conversion, Enrichment & Fuel Fabrication)
NAICS code1 code
  • Support Activities for Mining2131
SIC code1 code
  • Metal Mining1000
Product category
Uranium Mineral Exploration
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Exploration Stage - No Current Revenue
TypeOne Time License
Description

Geiger Energy is a pre-revenue uranium exploration company. The company generates no current revenue from operations. Future revenue would be derived from either selling uranium discoveries to major mining companies, entering into joint venture agreements, or potentially developing discoveries into mining operations.

baselode.com
Marketing channels6 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels3 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Operations, Personnel, Technology or R&D, Marketing or Sales, Others
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Geiger Energy is a pre-revenue Canadian uranium exploration company that conducts district-scale uranium mineral exploration across approximately 350,000 hectares in the Athabasca Basin (Saskatchewan) and 95,519 hectares in the Thelon Basin (Nunavut). The company discovers, delineates, and advances high-grade uranium deposits through advanced geophysical surveys (Mobile MT, Falcon Plus, VTEM Plus) and diamond drilling, with the intent of selling, joint-venturing, or developing discoveries. Core assets include the flagship Aberdeen Project (hosting Tatiggaq and Qavvik basement-hosted discoveries) and the Hook Project (hosting the near-surface ACKIO discovery).

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 3 values shown
  • Tatiggaq discovery: 2.25% U3O8 over 11.1 metres at 80-180m depth
+2 more records
Product overview1 text field

Geiger Energy Corp. is a Canadian uranium exploration company formed from the merger of Baselode Energy and Forum Energy Metals. The company operates as a unified portfolio of exploration assets focused on discovering high-grade uranium deposits in two of the world's most prospective uranium districts: the Thelon Basin in Nunavut and the Athabasca Basin in Saskatchewan. The core assets include the Aberdeen Project (flagship, hosting Tatiggaq and Qavvik discoveries) and the Hook Project (hosting the near-surface ACKIO discovery). Additional projects include Catharsis, Shadow, and Bear. The company controls approximately 338,000-390,000 hectares in Saskatchewan's Athabasca Basin and 95,519 hectares in Nunavut's Thelon Basin. Geiger Energy does not have a manufactured product but rather offers exploration services and asset development through its portfolio of uranium projects.

Product and service5 records
1Aberdeen Project
CategoryExploration asset
Description

Flagship uranium exploration asset in Nunavut's Thelon Basin, spanning approximately 95,519 hectares, hosting the high-grade basement-hosted Tatiggaq and Qavvik discoveries with intercepts including 2.25% U3O8 over 11.1 metres at Tatiggaq. Contains 50+ high-priority exploration targets. Sited near Cameco's Key Lake mill and Eagle Point mine infrastructure.

2Hook Project
CategoryExploration asset
Description

Core uranium exploration project in Saskatchewan's Athabasca Basin, part of Geiger Energy's over 350,000-hectare land position across 12 Athabasca Basin projects. Hosts the near-surface ACKIO uranium discovery with grades up to 2.45% U3O8 beginning at 28 metres depth. Located 65 km west of Cameco's Key Lake mill and 25 km from Eagle Point mine.

3Catharsis Project
CategoryExploration asset
Description

Uranium exploration project located 73 km south of the Key Lake deposits in the Athabasca Basin area of Saskatchewan. Spans over 71,100 hectares, 100% owned by Geiger Energy free of royalties. Subject of VTEM Plus and Falcon Plus airborne geophysical surveys.

4Shadow Project
CategoryExploration asset
Description

Uranium exploration project along the Virgin River Shear Zone south of the Athabasca Basin, situated on basement rocks of the Wollaston Domain which hosts the world's highest-grade uranium deposits. Approximately 46,000 hectares in size and subject to Mobile MT and other geophysical surveys.

5Bear Project
CategoryExploration asset
Description

Uranium exploration project in the Athabasca Basin region of Saskatchewan, part of Geiger Energy's district-scale portfolio of over 350,000 hectares across 12 projects in the basin.

Scale indicator5 records

Each record includes

Type, Value, Description, Source

Partnership3 partners
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Parent company/group under which Geiger Energy operates. Hosts Ore Day investor events and provides corporate infrastructure and strategic guidance.

2Orano
Strategic tierMinorTypeStrategic or Co-development Partner
Description

Major uranium producer operating nearby deposits. Tatiggaq is located 5 km west of Orano's Andrew Lake Deposit, highlighting the prospective nature of Geiger's land position.

baselode.com
Strategic tierMinorTypeStrategic or Co-development Partner
Description

World's largest uranium producer. Geiger's Hook property is located 65 km west of Cameco's Key Lake mill and 25 km from Eagle Point mine, demonstrating proximity to processing infrastructure.

Recent move11 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment2 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile2 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles9 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds5 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A1 record

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Geiger Energy Corp.

Uranium Mineral Explorationbaselode.com

Geiger Energy Corp. is a pre-revenue Canadian uranium exploration company that controls district-scale land positions in the Athabasca and Thelon Basins, targeting high-grade basement-hosted uranium deposits for future sale or joint venture with major producers.

What Geiger Energy Corp. does

Geiger Energy Corp. (formerly Baselode Energy Corp.) is a Canadian uranium exploration company focused on discovering high-grade, basement-hosted uranium deposits in two of the world's most prospective uranium districts: the Athabasca Basin in Saskatchewan and the Thelon Basin in Nunavut. The company was formed through the 2025 business combination of Baselode Energy and Forum Energy Metals, with the rebrand to Geiger Energy effective October 27, 2025. Geiger controls approximately 350,000-390,000 hectares across 12 projects in the Athabasca Basin and 95,519 hectares in the Thelon Basin, all 100%-owned, with key assets including the flagship Aberdeen Project (hosting the high-grade Tatiggaq and Qavvik discoveries) and the Hook Project (hosting the near-surface ACKIO discovery).

The company employs advanced geophysical exploration technologies, including Mobile MT (magnetotellurics), Falcon Plus airborne gravity gradiometer surveys, and VTEM Plus electromagnetic surveys, combined with diamond drilling to test targets. The 'Athabasca 2.0' exploration thesis targets near-surface, basement-hosted uranium systems outside traditional unconformity-style models, leveraging structural geology targeting. Notable drill intercepts include 2.25% U3O8 over 11.1 metres at Tatiggaq and grades up to 2.45% U3O8 at ACKIO beginning at 28 metres depth.

Geiger is pre-revenue and funds its exploration programs entirely through equity financings, having raised over C$30 million cumulatively since 2020 through private placements, bought deals, and public offerings. The company is publicly listed on the TSX Venture Exchange (BEEP) and the OTCQB market (BSENF) in the United States. Its primary future revenue model contemplates selling or joint-venturing uranium discoveries to major mining companies (e.g., Cameco, Orano, NexGen) or advancing discoveries toward production. Geiger operates with 1-10 employees from its Toronto headquarters and functions within the Ore Group of Companies ecosystem.

Geiger Energy Corp. firmographics

Firmographics
Name
Geiger Energy Corp.
Legal name
Geiger Energy Corporation
Website
https://baselode.com
Company type
Public
Founded year
2020
Operating status
Operating
Headcount range
1–10 employees
Short description
Geiger Energy Corp. is a pre-revenue Canadian uranium exploration company that controls district-scale land positions in the Athabasca and Thelon Basins, targeting high-grade basement-hosted uranium deposits for future sale or joint venture with major producers.
Ownership category
akta.pro rank

Geiger Energy Corp. industry classification

Industry
Product category
Uranium Mineral Exploration
NAICS
Support Activities for Mining (2131)
SIC
Metal Mining (1000)
akta.pro industry
PRIMARYEUAKACAA
Uranium Exploration & Resource Development
Energy, Utilities & Environment/Nuclear Energy/Nuclear Fuel Cycle (Mining, Conversion, Enrichment & Fuel Fabrication)

Keywords

  • Uranium exploration
  • Mineral exploration
  • Geophysical surveys
  • Resource discovery
  • Mining development

Where Geiger Energy Corp. is headquartered

Location

Headquarters

HQ city
Toronto
HQ country
Canada
HQ region
North America

Offices1 record

Markets served

Geiger Energy Corp. business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Operations, Personnel, Technology or R&D, Marketing or Sales, Others

Revenue model

  1. Exploration Stage - No Current Revenue: Geiger Energy is a pre-revenue uranium exploration company. The company generates no current revenue from operations. Future revenue would be derived from either selling uranium discoveries to major mining companies, entering into joint venture agreements, or potentially developing discoveries into mining operations.

Go-to-market motion1 record

Distribution channels3 records

Marketing channels6 records

Geiger Energy Corp. product offering

Product offering

Core offering

Geiger Energy is a pre-revenue Canadian uranium exploration company that conducts district-scale uranium mineral exploration across approximately 350,000 hectares in the Athabasca Basin (Saskatchewan) and 95,519 hectares in the Thelon Basin (Nunavut). The company discovers, delineates, and advances high-grade uranium deposits through advanced geophysical surveys (Mobile MT, Falcon Plus, VTEM Plus) and diamond drilling, with the intent of selling, joint-venturing, or developing discoveries. Core assets include the flagship Aberdeen Project (hosting Tatiggaq and Qavvik basement-hosted discoveries) and the Hook Project (hosting the near-surface ACKIO discovery).

Product overview

Geiger Energy Corp. is a Canadian uranium exploration company formed from the merger of Baselode Energy and Forum Energy Metals. The company operates as a unified portfolio of exploration assets focused on discovering high-grade uranium deposits in two of the world's most prospective uranium districts: the Thelon Basin in Nunavut and the Athabasca Basin in Saskatchewan. The core assets include the Aberdeen Project (flagship, hosting Tatiggaq and Qavvik discoveries) and the Hook Project (hosting the near-surface ACKIO discovery). Additional projects include Catharsis, Shadow, and Bear. The company controls approximately 338,000-390,000 hectares in Saskatchewan's Athabasca Basin and 95,519 hectares in Nunavut's Thelon Basin. Geiger Energy does not have a manufactured product but rather offers exploration services and asset development through its portfolio of uranium projects.

Differentiator

Problem solved

Functional benefit

Products and services

  • Aberdeen Project Flagship uranium exploration asset in Nunavut's Thelon Basin, spanning approximately 95,519 hectares, hosting the high-grade basement-hosted Tatiggaq and Qavvik discoveries with intercepts including 2.25% U3O8 over 11.1 metres at Tatiggaq. Contains 50+ high-priority exploration targets. Sited near Cameco's Key Lake mill and Eagle Point mine infrastructure.
  • Hook Project Core uranium exploration project in Saskatchewan's Athabasca Basin, part of Geiger Energy's over 350,000-hectare land position across 12 Athabasca Basin projects. Hosts the near-surface ACKIO uranium discovery with grades up to 2.45% U3O8 beginning at 28 metres depth. Located 65 km west of Cameco's Key Lake mill and 25 km from Eagle Point mine.
  • Catharsis Project Uranium exploration project located 73 km south of the Key Lake deposits in the Athabasca Basin area of Saskatchewan. Spans over 71,100 hectares, 100% owned by Geiger Energy free of royalties. Subject of VTEM Plus and Falcon Plus airborne geophysical surveys.
  • Shadow Project Uranium exploration project along the Virgin River Shear Zone south of the Athabasca Basin, situated on basement rocks of the Wollaston Domain which hosts the world's highest-grade uranium deposits. Approximately 46,000 hectares in size and subject to Mobile MT and other geophysical surveys.
  • Bear Project Uranium exploration project in the Athabasca Basin region of Saskatchewan, part of Geiger Energy's district-scale portfolio of over 350,000 hectares across 12 projects in the basin.

Quantifiable outcome

  • Tatiggaq discovery: 2.25% U3O8 over 11.1 metres at 80-180m depth
  • +2 more outcomes

Companies that use Geiger Energy Corp.

Customer profile

Segments2 records

Ideal customer profiles2 records

Geiger Energy Corp. technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

Geiger Energy Corp. partnerships and signals

Strategic signal

Partnerships

Three partnerships are on record, tiered core and minor.

  • Ore GroupcoreStrategic or Co-development PartnerParent company/group under which Geiger Energy operates. Hosts Ore Day investor events and provides corporate infrastructure and strategic guidance.
  • OranominorStrategic or Co-development PartnerMajor uranium producer operating nearby deposits. Tatiggaq is located 5 km west of Orano's Andrew Lake Deposit, highlighting the prospective nature of Geiger's land position.
  • CamecominorStrategic or Co-development PartnerWorld's largest uranium producer. Geiger's Hook property is located 65 km west of Cameco's Key Lake mill and 25 km from Eagle Point mine, demonstrating proximity to processing infrastructure.

Scale indicators5 records

Recent moves11 records

Expansion highlights5 records

Geiger Energy Corp. competitors and assessment

Company assessment

Market position

Strengths5 records

Weaknesses5 records

Competitive moat4 records

Key risks7 records

Key highlights7 records

Customer concentration

Geiger Energy Corp. social profiles

Digital presence

Geiger Energy Corp. financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Geiger Energy Corp. leadership team

Management profile

Number of profiles

Profiles9 records

Geiger Energy Corp. funding detail

Funding detail

Funding overview

Funding rounds5 records

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Geiger Energy Corp. M&A and investment

M&A and investment

M&A1 record

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Geiger Energy Corp.

What does Geiger Energy Corp. do?

Geiger Energy is a pre-revenue Canadian uranium exploration company that conducts district-scale uranium mineral exploration across approximately 350,000 hectares in the Athabasca Basin (Saskatchewan) and 95,519 hectares in the Thelon Basin (Nunavut). The company discovers, delineates, and advances high-grade uranium deposits through advanced geophysical surveys (Mobile MT, Falcon Plus, VTEM Plus) and diamond drilling, with the intent of selling, joint-venturing, or developing discoveries. Core assets include the flagship Aberdeen Project (hosting Tatiggaq and Qavvik basement-hosted discoveries) and the Hook Project (hosting the near-surface ACKIO discovery).

Is Geiger Energy Corp. a public or private company?

Geiger Energy Corp. is a public company. It is classified as public and is currently operating.

When was Geiger Energy Corp. founded?

Geiger Energy Corp. was founded in 2020. It employs 1 to 10 people.

Where is Geiger Energy Corp. based?

Geiger Energy Corp. is headquartered in Toronto, Canada, in the North America region.

How does Geiger Energy Corp. make money?

One revenue line is on record: exploration Stage - No Current Revenue.

Does Geiger Energy Corp. have an API?

No public API is recorded for Geiger Energy Corp..

What industry is Geiger Energy Corp. in?

Geiger Energy Corp.'s product category is Uranium Mineral Exploration. Its primary akta.pro industry code is EUAKACAA, Uranium Exploration & Resource Development. Its NAICS code is 2131 and its SIC code is 1000.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
Stock TitanGeiger Energy Shareholders Approve All Meeting MattersGeiger Energy Corp. shareholders approved all matters at the company's Annual General and Special Meeting held on July 28, 2026. The meeting clearance allows the company to continue advancing its 2026 drill programs at the Aberdeen and Hook uranium projects located in Saskatchewan's Athabasca Basin and Nunavut's Thelon Basin. The company controls approximately 338,000 hectares in the Athabasca Basin and 95,519 hectares in the Thelon Basin, two of the world's most prospective uranium districts.NewsfileGeiger Mobilizes for Summer Exploration at Aberdeen, Drilling to Begin in JuneGeiger Energy completed supply mobilization for its Aberdeen Project in Nunavut, with drilling set to begin in late June. The 2026 program targets Loki, a potential unconformity-style uranium discovery, and Tatiggaq, a high-grade basement-hosted uranium prospect open for expansion. The company aims to make the first true high-grade uranium discovery in the Thelon Basin.NewsfileGeiger Energy Announces Closing of Equity Offerings for Gross Proceeds of C$7.6 MillionGeiger Energy closed its public offering and private placement, raising C$7,623,850 in gross proceeds. The funds will explore uranium projects in Nunavut and Saskatchewan and incur flow-through exploration expenses. The offerings are subject to TSX Venture Exchange approval.NewsfileGeiger Energy Files Final Short Form Prospectus in Connection with Equity Offerings for Gross Proceeds of up to C$7 MillionGeiger Energy filed a final short form prospectus for a best-efforts public offering of units and flow-through units, with gross proceeds up to C$7 million. The offering includes 4.5 million to 31.8 million units at C$0.22 each and charity flow-through units at C$0.30 to C$0.325 each. Closing is expected on or about May 7, 2026.Stock TitanGeiger Energy hits 11,491 cps at Hook uranium projectGeiger Energy Corp. reported drilling results from its ACKIO prospect at the Hook Project in Saskatchewan's Athabasca Basin, intersecting multiple mineralized zones including a maximum reading of 11,491 cps using a Triple Gamma Probe at 202 meters depth in a 10.1-meter high-grade lens averaging 3,768 cps. The drilling confirmed mineralization continuity in pods 3, 4, and 5, with new mineralization at 80 meters supporting upper-lens expansion potential and the system remaining open along strike. Approximately 1,700 meters of drilling have been completed to date at the Hook Project, with the 2026 winter program targeting additional zones farther south along the broader structural corridor.NewsfileBaselode Announces Private Placement for Gross Proceeds of up to C$5.0 MillionBaselode Energy Corp. agreed to sell up to 35.7 million flow-through units at C$0.14 each, raising gross proceeds of up to C$5 million. Proceeds will fund exploration in the Thelon and Athabasca Basins, with an agent option for an additional C$1 million. The offering is scheduled to close on or about August 15, 2025.Stock TitanGeiger Energy extends shallow uranium at Hook projectGeiger Energy Corp reported results from the first two drill holes of its 2026 winter program at the ACKIO prospect on its 100% owned Hook Project in Saskatchewan\'s Athabasca Basin, extending shallow uranium mineralization with a 10-metre interval beginning at 52 metres downhole and peak radiometric readings reaching 1,000 counts per second. The company confirmed continuity between Pods 1 and 7 within the structurally controlled system, with mineralization remaining open along strike and supporting further expansion potential. Assay results are pending while the next phase of drilling is planned to step south to test for additional zones along the broader fertile trend.Stock TitanGeiger Energy sets PDAC 2026 booth, Ore Day slotGeiger Energy Corp announced it will exhibit at the PDAC 2026 convention being held March 1-4, 2026 at the Metro Toronto Convention Centre, as well as participate in Ore Day 2026, a private investor lunch hosted by Ore Group on February 28th in Toronto. The company is a uranium exploration firm focused on its Hook Project in the Athabasca Basin, Saskatchewan and its Aberdeen Project in the Thelon Basin, Nunavut. This announcement reflects routine corporate activity related to investor engagement and industry visibility ahead of Canada's largest mining convention.Stock TitanGeiger Energy drills uranium across 4 Aberdeen targetsGeiger Energy Corp. has reported final geochemical results from its 2025 drill program at the Aberdeen Project, completing 5,300 metres of drilling across four priority targets (Loki, Bjorn, Tarzan, and Lobster). The Loki target returned particularly significant results with uranium enrichment present in all drill holes, including values locally exceeding 100 ppm and the first confirmed uranium intersections at the unconformity in the northeast Thelon Basin. The company states the results confirm widespread uranium enrichment and large-scale hydrothermal systems, materially upgrading the regional potential for major unconformity-style uranium deposits.NewsfileBaselode Announces Name Change to Geiger Energy Corporation and Share ConsolidationBaselode Energy Corp. announced it will change its name to Geiger Energy Corporation and consolidate its common shares on a 1-for-5 basis, effective October 27, 2025, subject to TSX Venture Exchange approval. The consolidation will reduce the company's outstanding shares from approximately 291.6 million to about 52.3 million shares, with fractional shares rounded to the nearest whole number. The company's common shares will begin trading under the new symbol "BEEP" on October 27, 2025.