Descriptiontext

Bujagali Energy Limited (BEL) is a privately held Ugandan power producer that owns and operates the 250MW Bujagali Hydro Power Plant, a run-of-river hydroelectric facility situated on the Victoria Nile at Dumbbell Island near Lake Victoria, 8km off Kayunga Road in Jinja, Uganda. Commissioned on August 31, 2012, the plant features 5x50MW Kaplan turbines, a 30-meter gravity dam, a 388-hectare reservoir, and 21.9m gross head with 259cms rated flow, achieving 94.7% turbine efficiency, 98% generator efficiency, and a 99% availability rate since commissioning. The plant contributes 31-34% of Uganda's effective electricity capacity and is the country's largest hydropower facility as well as Africa's largest privately financed hydropower project.

BEL operates as a single-asset, single-counterparty utility, selling 100% of its output under a long-term power purchase agreement to the Uganda Electricity Transmission Company Limited (UETCL), the state-owned national grid operator, at a tariff of approximately $0.11/KWh (reduced from $0.40/KWh). The company holds Clean Development Mechanism (CDM) registration with the UNFCCC (granted December 29, 2011) — the largest CDM project in any Least Developed Country — generating Certified Emission Reductions traded via the EU ETS at a rate of approximately 1 million tons of CO2 avoided per year (5,008,079 tons cumulative). The company is regulated by the Electricity Regulatory Authority (ERA) and operates under agreements with Uganda's Ministry of Energy and Ministry of Finance.

BEL is structured as a Public-Private Partnership owned by SN Power Invest (a majority-owned subsidiary of Oslo-listed Scatec ASA), Bujagali Holdings Power Company Ltd (an affiliate of the Aga Khan Fund for Economic Development / IPS Kenya), and the Government of Uganda. The USD 862 million project was financed by a consortium of development finance institutions (IFC, EIB, AfDB, KfW, DEG, AFD, FMO, Proparco, CDC) and commercial lenders (Absa, Nedbank, Standard Chartered, Fortis). Operations and maintenance are handled by O&M Energy Uganda Limited (a Gas Natural FENOSA vehicle), while Alstom Hydro supplied turbine technology and Salini Impregilo (now Webuild) executed civil works construction.

Short descriptiontext

Bujagali Energy Limited operates Uganda's largest 250MW run-of-river hydropower plant on the Victoria Nile, selling all output under a long-term PPA to the state-owned UETCL national grid operator at approximately $0.11/KWh.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersJinja, Uganda
HQ citystring
Jinja
HQ countrystring
Uganda
HQ regionstring
Africa
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
hydroelectric power generation, run-of-river hydropower, bulk electricity supply, power purchase agreements, clean energy production
Industry3 codes
1Hydropower Operations, Maintenance & Asset Management (O&M, Spares, Performance)
CodeEUAMADAEPrimaryYes
2Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension)
CodeEUACAEAGPrimaryNo
3Substations, Transformers & Grid Step-Up Facilities (EHV Substations, GSU Transformers)
CodeEUAMAFAEPrimaryNo
NAICS code2 codes
  • Hydroelectric Power Generation221111
  • Electric Power Generation22111
SIC code1 code
  • Electric Services4911
Product category
Hydropower Generation
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Generation and Sale
TypeSubscription Recurring
Description

Bujagali Energy Limited generates electricity through its 250MW hydropower plant and sells power to the Ugandan grid under long-term power purchase agreements with UETCL. The company achieved a significant tariff reduction from $0.40/KWh to $0.11/KWh, making power more affordable for Uganda.

bujagali-energy.com
Marketing channels4 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D
Pricing details1 tier
1Bulk electricity supply to national grid
ModelSubscriptionBilling cadenceMulti-year contract
Notes

Power purchase agreements with UETCL at reduced tariff of approximately $0.11/KWh, down from previous $0.40/KWh

bii.co.uk
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Bujagali Energy Limited generates electricity through its 250MW run-of-river hydroelectric power plant on the Victoria Nile near Lake Victoria in Jinja, Uganda. The company exclusively sells bulk power to the Uganda Electricity Transmission Company Limited (UETCL) under long-term power purchase agreements, contributing 31-34% of Uganda's effective energy capacity. The facility has operated at 99% availability since commissioning on August 31, 2012, and is Africa's largest privately financed hydropower project.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 5 values shown
  • Reduced electricity tariffs by 72.5% from $0.40/KWh to $0.11/KWh
+4 more records
Product overview1 text field

Bujagali Energy Limited operates the Bujagali Hydro Power Plant as its core offering—a 250MW run-of-river hydropower facility on the Victoria Nile in Uganda. The company does not operate a software product portfolio; its single product is the hydroelectric power generation facility commissioned in 2012. The company provides community support programs including educational tours of the dam site, but these are CSR initiatives rather than separate product offerings.

Product and service1 record
1Bujagali Hydro Power Plant (Electricity Generation Service)
CategoryHydropower Generation / Independent Power Producer
Description

A 250MW run-of-river hydroelectric power plant located near Lake Victoria on the Victoria Nile, commissioned in 2012. Features 5x50MW Kaplan turbines, a 30m gravity dam, and 388-hectare water reservoir. The plant supplies electricity to the Uganda Electricity Transmission Company Limited (UETCL) under long-term power purchase agreements and contributes approximately 31-34% of Uganda's effective energy capacity, with a 99% availability rate since commissioning.

Scale indicator10 records

Each record includes

Type, Value, Description, Source

Partnership7 partners
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2012-01-01
Description

SN Power Invest, a majority-owned subsidiary of Scatec ASA Norway, is a major shareholder in Bujagali Energy Limited. Scatec is a leading renewable power producer with over 3.5 GW in operation and under construction on four continents.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2012-01-01
Description

Bujagali Holdings Power Company Ltd (BHPCL), an affiliate of AKFED, is a major shareholder. Industrial Promotion Services (IPS) Kenya Limited serves as the project sponsor and promoter. AKFED invests in financially stable projects promoting economic development.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2012-01-01
Description

The Government of Uganda is a shareholder in Bujagali Energy Limited, with the project operating under agreements with Ministry of Energy, Ministry of Finance, and regulated by Electricity Regulatory Authority.

Strategic tierMajorTypeTechnology or IntegrationAnnounced on2012-01-01
Description

Alstom Hydro provided the hydro turbine and generator technology for the 5x50MW Kaplan turbine installation at the Bujagali facility.

Strategic tierMajorTypeTechnology or IntegrationAnnounced on2012-01-01
Description

Salini Impregilo (now Webuild) was the main contractor for the civil works construction of the dam, spillway, and associated infrastructure.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2012-01-01
Description

O&M Energy Uganda Limited, established by Gas Natural FENOSA and contracted by BEL, operates and maintains the Bujagali Hydroelectric Power Plant.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2012-01-01
Description

UETCL is the primary off-taker purchasing electricity from Bujagali Energy Limited for transmission across the national grid.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
1Isimba Hydroelectric Power Station
TypeDirect peer
Description

183MW run-of-river hydropower plant on the Victoria Nile in Uganda. Comparable as another Ugandan run-of-river hydro project selling to UETCL under a similar PPA structure, with the same regulatory and hydrological risk profile as Bujagali.

TypeBroad incumbent
Description

Oslo-listed renewable energy company with 3.5+ GW in operation/construction across solar, wind, and hydro, and the parent of SN Power Invest that owns a stake in Bujagali. Closest parent/sister-company analog — same corporate family and shared exposure to emerging-market renewable IPP economics.

TypeBroad incumbent
Description

Norwegian state-owned hydropower major and Europe's largest generator of renewable energy. Highly comparable as a long-established hydrology-driven, run-of-river and reservoir hydropower operator reliant on long-term offtake agreements and exposure to water-resource variability.

TypeBroad incumbent
Description

Vertically integrated South African national power producer and grid operator. Relevant as a benchmark for sub-Saharan African power-utility economics, long-term offtake dynamics, and the historical role of large-scale hydro in the regional generation mix.

TypeEmerging player
Description

Independent power producers in East Africa operating under similar long-term PPA / single-offtaker / regulatory frameworks as Bujagali. They share comparable revenue model (capacity payments + energy tariffs via national utility) and similar project-finance structures, even if generation technology differs.

TypeBroad incumbent
Description

UK-headquartered African power developer and IPP investor operating thermal, wind, solar and hydro assets across sub-Saharan Africa. Comparable as a privately-financed African power platform competing for similar PPA structures with national utilities.

TypeDirect peer
Description

600MW run-of-river hydropower plant on the Victoria Nile in Uganda, owned by the Government of Uganda through UEGCL. Directly comparable as a fellow large-scale Ugandan hydropower IPP selling into the same UETCL off-take under the same regulatory framework (ERA).

TypeOthers
Description

World Bank Group private-sector development financier and one of the principal lenders to Bujagali. Not a peer in operations but a key counterparty and template investor for privately-financed hydropower in developing markets — useful for valuation reference and follow-on capital.

TypeBroad incumbent
Description

Hydropower-focused developer and IPP with global operations, the historical majority owner of Bujagali via SN Power Invest and now part of Scatec. Directly comparable in technology (large-scale hydropower) and business model (emerging-market hydro IPPs with sovereign off-takers).

TypeDirect peer
Description

Kenya's largest power producer, with the bulk of capacity coming from large-scale hydropower (and geothermal). Comparable as a publicly-traded East African hydro-heavy IPP with a single national grid off-taker (KPLC) and a similar PPA/regulatory regime.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers2 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature3 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles14 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

Subsidiaries1 record

Each record includes

Name, Acquired on, Relationship type, Type, Business focus

Compliance1 record

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds1 record

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors1 record

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Bujagali Energy

Hydropower Generationbujagali-energy.com

Bujagali Energy Limited operates Uganda's largest 250MW run-of-river hydropower plant on the Victoria Nile, selling all output under a long-term PPA to the state-owned UETCL national grid operator at approximately $0.11/KWh.

What Bujagali Energy does

Bujagali Energy Limited (BEL) is a privately held Ugandan power producer that owns and operates the 250MW Bujagali Hydro Power Plant, a run-of-river hydroelectric facility situated on the Victoria Nile at Dumbbell Island near Lake Victoria, 8km off Kayunga Road in Jinja, Uganda. Commissioned on August 31, 2012, the plant features 5x50MW Kaplan turbines, a 30-meter gravity dam, a 388-hectare reservoir, and 21.9m gross head with 259cms rated flow, achieving 94.7% turbine efficiency, 98% generator efficiency, and a 99% availability rate since commissioning. The plant contributes 31-34% of Uganda's effective electricity capacity and is the country's largest hydropower facility as well as Africa's largest privately financed hydropower project.

BEL operates as a single-asset, single-counterparty utility, selling 100% of its output under a long-term power purchase agreement to the Uganda Electricity Transmission Company Limited (UETCL), the state-owned national grid operator, at a tariff of approximately $0.11/KWh (reduced from $0.40/KWh). The company holds Clean Development Mechanism (CDM) registration with the UNFCCC (granted December 29, 2011) — the largest CDM project in any Least Developed Country — generating Certified Emission Reductions traded via the EU ETS at a rate of approximately 1 million tons of CO2 avoided per year (5,008,079 tons cumulative). The company is regulated by the Electricity Regulatory Authority (ERA) and operates under agreements with Uganda's Ministry of Energy and Ministry of Finance.

BEL is structured as a Public-Private Partnership owned by SN Power Invest (a majority-owned subsidiary of Oslo-listed Scatec ASA), Bujagali Holdings Power Company Ltd (an affiliate of the Aga Khan Fund for Economic Development / IPS Kenya), and the Government of Uganda. The USD 862 million project was financed by a consortium of development finance institutions (IFC, EIB, AfDB, KfW, DEG, AFD, FMO, Proparco, CDC) and commercial lenders (Absa, Nedbank, Standard Chartered, Fortis). Operations and maintenance are handled by O&M Energy Uganda Limited (a Gas Natural FENOSA vehicle), while Alstom Hydro supplied turbine technology and Salini Impregilo (now Webuild) executed civil works construction.

Bujagali Energy firmographics

Firmographics
Name
Bujagali Energy
Legal name
Bujagali Energy Limited
Website
https://bujagali-energy.com
Company type
Private
Founded year
2012
Operating status
Operating
Headcount range
11–50 employees
Short description
Bujagali Energy Limited operates Uganda's largest 250MW run-of-river hydropower plant on the Victoria Nile, selling all output under a long-term PPA to the state-owned UETCL national grid operator at approximately $0.11/KWh.
Ownership category
akta.pro rank

Bujagali Energy industry classification

Industry
Product category
Hydropower Generation
NAICS
Hydroelectric Power Generation (221111), Electric Power Generation (22111)
SIC
Electric Services (4911)
akta.pro primary industry
Hydropower Operations, Maintenance & Asset Management (O&M, Spares, Performance) (EUAMADAE)
akta.pro secondary industries
Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension) (EUACAEAG), Substations, Transformers & Grid Step-Up Facilities (EHV Substations, GSU Transformers) (EUAMAFAE)

Keywords

  • Hydroelectric power generation
  • Run-of-river hydropower
  • Bulk electricity supply
  • Power purchase agreements
  • Clean energy production

Where Bujagali Energy is headquartered

Location

Headquarters

HQ city
Jinja
HQ country
Uganda
HQ region
Africa

Offices1 record

Markets served

Bujagali Energy business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D

Revenue model

  1. Electricity Generation and Sale: Bujagali Energy Limited generates electricity through its 250MW hydropower plant and sells power to the Ugandan grid under long-term power purchase agreements with UETCL. The company achieved a significant tariff reduction from $0.40/KWh to $0.11/KWh, making power more affordable for Uganda.

Pricing tiers

ModelBillingPrice
SubscriptionMulti-year contractBulk electricity supply to national grid

Go-to-market motion1 record

Distribution channels1 record

Marketing channels4 records

Bujagali Energy product offering

Product offering

Core offering

Bujagali Energy Limited generates electricity through its 250MW run-of-river hydroelectric power plant on the Victoria Nile near Lake Victoria in Jinja, Uganda. The company exclusively sells bulk power to the Uganda Electricity Transmission Company Limited (UETCL) under long-term power purchase agreements, contributing 31-34% of Uganda's effective energy capacity. The facility has operated at 99% availability since commissioning on August 31, 2012, and is Africa's largest privately financed hydropower project.

Product overview

Bujagali Energy Limited operates the Bujagali Hydro Power Plant as its core offering—a 250MW run-of-river hydropower facility on the Victoria Nile in Uganda. The company does not operate a software product portfolio; its single product is the hydroelectric power generation facility commissioned in 2012. The company provides community support programs including educational tours of the dam site, but these are CSR initiatives rather than separate product offerings.

Differentiator

Problem solved

Functional benefit

Products and services

  • Bujagali Hydro Power Plant (Electricity Generation Service) A 250MW run-of-river hydroelectric power plant located near Lake Victoria on the Victoria Nile, commissioned in 2012. Features 5x50MW Kaplan turbines, a 30m gravity dam, and 388-hectare water reservoir. The plant supplies electricity to the Uganda Electricity Transmission Company Limited (UETCL) under long-term power purchase agreements and contributes approximately 31-34% of Uganda's effective energy capacity, with a 99% availability rate since commissioning.

Quantifiable outcome

  • Reduced electricity tariffs by 72.5% from $0.40/KWh to $0.11/KWh
  • +4 more outcomes

Companies that use Bujagali Energy

Customer profile

Named customers2 records

Segments1 record

Ideal customer profiles1 record

Bujagali Energy technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature3 records

Bujagali Energy partnerships and signals

Strategic signal

Partnerships

Seven partnerships are on record, tiered core and major.

  • Scatec ASA Norway (SN Power Invest)coreStrategic or Co-development Partner · 1 January 2012SN Power Invest, a majority-owned subsidiary of Scatec ASA Norway, is a major shareholder in Bujagali Energy Limited. Scatec is a leading renewable power producer with over 3.5 GW in operation and under construction on four continents.
  • Aga Khan Fund for Economic Development (AKFED) / IPS Kenya LimitedcoreStrategic or Co-development Partner · 1 January 2012Bujagali Holdings Power Company Ltd (BHPCL), an affiliate of AKFED, is a major shareholder. Industrial Promotion Services (IPS) Kenya Limited serves as the project sponsor and promoter. AKFED invests in financially stable projects promoting economic development.
  • Government of UgandacoreStrategic or Co-development Partner · 1 January 2012The Government of Uganda is a shareholder in Bujagali Energy Limited, with the project operating under agreements with Ministry of Energy, Ministry of Finance, and regulated by Electricity Regulatory Authority.
  • Alstom HydromajorTechnology or Integration · 1 January 2012Alstom Hydro provided the hydro turbine and generator technology for the 5x50MW Kaplan turbine installation at the Bujagali facility.
  • Salini ImpregilomajorTechnology or Integration · 1 January 2012Salini Impregilo (now Webuild) was the main contractor for the civil works construction of the dam, spillway, and associated infrastructure.
  • O&M Energy Uganda LimitedmajorImplementation/ SI/ Consulting Partner · 1 January 2012O&M Energy Uganda Limited, established by Gas Natural FENOSA and contracted by BEL, operates and maintains the Bujagali Hydroelectric Power Plant.
  • Uganda Electricity Transmission Company Limited (UETCL)coreStrategic or Co-development Partner · 1 January 2012UETCL is the primary off-taker purchasing electricity from Bujagali Energy Limited for transmission across the national grid.

Scale indicators10 records

Recent moves6 records

Expansion highlights5 records

Bujagali Energy competitors and assessment

Company assessment

Direct peers

  • Isimba Hydroelectric Power Station: 183MW run-of-river hydropower plant on the Victoria Nile in Uganda. Comparable as another Ugandan run-of-river hydro project selling to UETCL under a similar PPA structure, with the same regulatory and hydrological risk profile as Bujagali.
  • Karuma Hydroelectric Power Station: 600MW run-of-river hydropower plant on the Victoria Nile in Uganda, owned by the Government of Uganda through UEGCL. Directly comparable as a fellow large-scale Ugandan hydropower IPP selling into the same UETCL off-take under the same regulatory framework (ERA).
  • Kenya Electricity Generating Company PLC (KenGen): Kenya's largest power producer, with the bulk of capacity coming from large-scale hydropower (and geothermal). Comparable as a publicly-traded East African hydro-heavy IPP with a single national grid off-taker (KPLC) and a similar PPA/regulatory regime.

Broad incumbents

  • Scatec ASA: Oslo-listed renewable energy company with 3.5+ GW in operation/construction across solar, wind, and hydro, and the parent of SN Power Invest that owns a stake in Bujagali. Closest parent/sister-company analog — same corporate family and shared exposure to emerging-market renewable IPP economics.
  • Statkraft: Norwegian state-owned hydropower major and Europe's largest generator of renewable energy. Highly comparable as a long-established hydrology-driven, run-of-river and reservoir hydropower operator reliant on long-term offtake agreements and exposure to water-resource variability.
  • Eskom Holdings SOC Ltd: Vertically integrated South African national power producer and grid operator. Relevant as a benchmark for sub-Saharan African power-utility economics, long-term offtake dynamics, and the historical role of large-scale hydro in the regional generation mix.
  • Globeleq: UK-headquartered African power developer and IPP investor operating thermal, wind, solar and hydro assets across sub-Saharan Africa. Comparable as a privately-financed African power platform competing for similar PPA structures with national utilities.
  • SN Power: Hydropower-focused developer and IPP with global operations, the historical majority owner of Bujagali via SN Power Invest and now part of Scatec. Directly comparable in technology (large-scale hydropower) and business model (emerging-market hydro IPPs with sovereign off-takers).

Emerging players

  • Cummins Cogeneration Kenya (and other East African IPPs): Independent power producers in East Africa operating under similar long-term PPA / single-offtaker / regulatory frameworks as Bujagali. They share comparable revenue model (capacity payments + energy tariffs via national utility) and similar project-finance structures, even if generation technology differs.

Others

  • International Finance Corporation (IFC): World Bank Group private-sector development financier and one of the principal lenders to Bujagali. Not a peer in operations but a key counterparty and template investor for privately-financed hydropower in developing markets — useful for valuation reference and follow-on capital.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks6 records

Key highlights7 records

Customer concentration

Bujagali Energy social profiles

Digital presence

Bujagali Energy compliance and trust

Trust signal

Compliance1 record

Bujagali Energy financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Bujagali Energy leadership team

Management profile

Number of profiles

Profiles14 records

Bujagali Energy subsidiaries and ownership

Company hierarchy

Subsidiaries1 record

Bujagali Energy funding detail

Funding detail

Funding overview

Funding rounds1 record

Investors1 record

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Bujagali Energy M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Bujagali Energy

What does Bujagali Energy do?

Bujagali Energy Limited generates electricity through its 250MW run-of-river hydroelectric power plant on the Victoria Nile near Lake Victoria in Jinja, Uganda. The company exclusively sells bulk power to the Uganda Electricity Transmission Company Limited (UETCL) under long-term power purchase agreements, contributing 31-34% of Uganda's effective energy capacity. The facility has operated at 99% availability since commissioning on August 31, 2012, and is Africa's largest privately financed hydropower project.

Is Bujagali Energy a public or private company?

Bujagali Energy is a private company. It is classified as corporate owned and is currently operating.

When was Bujagali Energy founded?

Bujagali Energy was founded in 2012. It employs 11 to 50 people.

Where is Bujagali Energy based?

Bujagali Energy is headquartered in Jinja, Uganda, in the Africa region.

How does Bujagali Energy make money?

One revenue line is on record: electricity Generation and Sale.

Who are Bujagali Energy's main competitors?

Direct peers on record are Isimba Hydroelectric Power Station, Karuma Hydroelectric Power Station and Kenya Electricity Generating Company PLC (KenGen). Broad incumbents are Scatec ASA, Statkraft, Eskom Holdings SOC Ltd, Globeleq and SN Power. Cummins Cogeneration Kenya (and other East African IPPs) is listed as an emerging player. International Finance Corporation (IFC) is listed as an others.

Does Bujagali Energy have an API?

No public API is recorded for Bujagali Energy.

What industry is Bujagali Energy in?

Bujagali Energy's product category is Hydropower Generation. Its primary akta.pro industry code is EUAMADAE, Hydropower Operations, Maintenance & Asset Management (O&M, Spares, Performance), with a secondary code of EUACAEAG, Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension). Its NAICS code is 221111 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
BiiBujagali Energy LimitedBritish International Investment, formerly CDC Group, holds a $44.05 million debt investment in Bujagali Energy Limited, a 250MW hydroelectric plant on the Nile in Uganda commissioned in 2012. The investment is classified as renewable and was made under the Growth portfolio, starting in June 2018.PR NewswireSN Power Completes Investment in Bujagali Hydropower ProjectSN Power AS, a Norwegian hydropower company, completed the acquisition of approximately two-thirds stake in Bujagali Energy Limited, owner of the 250 MW Bujagali Hydropower Project in Uganda, from SG Bujagali Holdings for approximately USD $277 million. The hydropower facility, located near Jinja, generates nearly half of Uganda's energy supply and has delivered cumulative savings of USD $1.9 billion and 5.7 million tons of CO2 emissions reductions since its 2012 commissioning. The project will transfer to the Government of Uganda in 2043 for one US dollar, with SN Power committed to ensuring clean and stable energy supply for Uganda for several decades.PR NewswireSN Power Completes Investment in Bujagali Hydropower ProjectSN Power AS completed the acquisition of a roughly two-thirds stake in Bujagali Energy Limited from SG Bujagali Holdings for approximately USD $277 million. The 250 MW Bujagali Hydropower Project near Jinja, Uganda generates nearly half of Uganda's energy supply and has delivered cumulative savings of USD $1.9 billion and 5.7 million tons of CO2 emissions reductions since its 2012 commissioning. The project will be transferred to the Government of Uganda in 2043 for one US dollar with an expected remaining life of 70+ years.