Developer docs
API playgroundTry for free, no card

Search company profiles

National High Speed Rail Corporation

Full company profile

uuid0004eep

Namestring
National High Speed Rail Corporation
Legal namestring
National High Speed Rail Corporation Limited
Websiteurl
nhsrcl.in
Company typeenum
Private
Founded yearint
2016
Descriptiontext

National High Speed Rail Corporation Limited (NHSRCL) is a government-owned Special Purpose Vehicle incorporated on 12 February 2016 under the Companies Act 2013 to finance, construct, maintain, and manage high-speed rail corridors in India. Its anchor mandate is the 508-km Mumbai-Ahmedabad High-Speed Rail Corridor — India's first bullet train project — designed for 320 kmph operations using Japanese Shinkansen technology across 12 stations (Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, Mumbai), reducing end-to-end travel time from 6-8 hours to approximately 2 hours and 7 minutes. The equity structure is GoI 50% / Gujarat 25% / Maharashtra 25%, with project funding primarily sourced from Japan International Cooperation Agency (JICA) soft loans at 0.1% interest (~81% of sanctioned cost; Rs 59,396 crore cumulative since 2017).

The technical stack spans first-in-India deployment of a J-Slab ballastless track system, a 2x25 kV overhead traction system covering 1,125 track-km with 14 traction substations and ~22,000 steel masts, ETCS signalling transitioning to the indigenous Bharat Train Control System (BTCS), tunnel hood pressure-relief technology for 300+ kmph sections, an early earthquake detection system using 28 seismometers, and India's first 7-km undersea tunnel beneath Thane Creek being excavated by two Herrenknecht TBMs (~3,000 tonnes each, 13.6 m cutterhead). Construction partners include Larsen & Toubro (~92% of civil works), Afcons Infrastructure (undersea tunnel), BEML and BEML-Medha (rolling stock), Tata Consulting Engineers (Cognitive Digital Twin/Industrial AI pilot on NVIDIA Omniverse), and JARTS (welding certification).

The business model is non-commercial during construction: there is no farebox revenue today and the first operational section (Surat-Bilimora) targets August 2027 with full-corridor operations by end-2029. Once operational, revenue mechanics will rely on ticket sales across the 12 stations serving business travellers, tourists/pilgrims, and general commuters, with pricing yet to be publicly disclosed and the company committed to affordability. The customer base is exclusively Indian public commuters; no private-sector or international fare-paying customers exist. Capital scaling is governed by project cost escalations (Rs 1.08 lakh crore sanctioned → Rs 1.98 lakh crore revised, 83% increase) and a forward mandate covering seven additional HSR corridors totalling ~4,000 km at an estimated Rs 16 lakh crore.

Short descriptiontext

NHSRCL is a government Special Purpose Vehicle (GoI 50%, Gujarat and Maharashtra 25% each) implementing India's first 508-km Mumbai-Ahmedabad bullet train corridor on Japanese Shinkansen technology, with operations targeted from August 2027 and a mandate over ~4,000 km of additional high-speed rail corridors.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1,001–5,000
akta.pro rankint
HeadquartersNew Delhi, India
HQ citystring
New Delhi
HQ countrystring
India
HQ regionstring
Asia
Markets served

Serves global market

Offices7 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
high-speed rail infrastructure, bullet train construction, rail corridor development, railway electrification systems, mass transit systems
Industry1 code
1High-Speed Rail (HSR) Operators
CodeTLAFADABPrimaryYes
NAICS code1 code
  • Rail Transportation48211
SIC code2 codes
  • Transportation Services4700
  • Railroads, Line-Haul Operating4011
Product category
High-Speed Rail Infrastructure
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Government Infrastructure Development
TypeHardware Sales
Description

NHSRCL is a Special Purpose Vehicle (SPV) financed by government equity participation and Japanese loans. The estimated cost of the Mumbai-Ahmedabad project is approximately Rs 1,08,000 crore, with funding from Government of India (50%), Government of Gujarat (25%), and Government of Maharashtra (25%), plus Japanese JICA loans.

nhsrcl.in
Marketing channels4 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Supply Chain, Personnel, Technology or R&D, Operations
Pricing details1 tier
1Bullet train services - pricing not yet announced
ModelOtherBilling cadenceMonthly
Notes

NHSRCL has rejected allegations about funding crisis claims and stated that ticket prices will remain affordable. Official ticket pricing will be announced closer to operational launch date.

financialexpress.com
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

National High Speed Rail Corporation Limited (NHSRCL) is a Government of India Special Purpose Vehicle tasked with financing, constructing, maintaining, and managing India's first high-speed rail corridor — the 508 km Mumbai-Ahmedabad High-Speed Rail (MAHSR) project — using Japanese Shinkansen technology under JICA financing. The company also plans and develops additional high-speed rail corridors across India and operates a dedicated High Speed Rail Training Institute (HSRTI) to build local human-capital capacity for HSR operations.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 3 values shown
  • Travel time between Mumbai and Ahmedabad reduced from 6-8 hours to approximately 2 hours
+2 more records
Product overview1 text field

National High Speed Rail Corporation Limited (NHSRCL) operates India's first bullet train system—the 508-km Mumbai-Ahmedabad High-Speed Rail Corridor using Japanese Shinkansen technology—as its core product. The company is expanding into a multi-corridor network with seven new HSR corridors planned. Supporting infrastructure includes indigenous J-Slab ballastless track system, 2×25 kV overhead traction system, Bharat Train Control System (BTCS) for signalling, and rolling stock depots at Sabarmati, Surat, and Thane. Safety systems encompass early earthquake warning with 28 seismometers, rainfall monitoring, and wind speed monitoring. The company is also developing AI-enabled digital twin capabilities through Tata Consulting Engineers for infrastructure monitoring and predictive maintenance.

Product and service7 records
1Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR)
CategoryHigh-Speed Rail Corridor
Description

A 508 km high-speed passenger rail corridor connecting Mumbai and Ahmedabad with 12 stations (Mumbai, Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand/Nadiad, Ahmedabad, Sabarmati) operating at speeds up to 320 km/h and reducing travel time between the two cities to approximately 2 hours. Targeted at business and leisure intercity travelers as well as the general Indian public.

2J-Slab Ballastless Track System
CategoryRail Track Infrastructure
Description

Shinkansen-derived ballastless slab track system engineered for high-speed operations on the MAHSR corridor, providing higher stability, lower maintenance, and longer service life than conventional ballasted track.

32x25 kV Overhead Traction Power System
CategoryRail Electrification Infrastructure
Description

High-capacity 2x25 kV autotransformer-fed overhead electrification system supplying traction power to high-speed trains on the MAHSR corridor, enabling sustained 320 km/h operations.

4Bharat Train Control System (BTCS)
CategoryRail Signaling and Control
Description

Indigenously developed high-speed rail signaling and train control system built to operate alongside ETCS Level 2 on the MAHSR corridor, enabling local technology ownership and reducing lifecycle cost.

5Rolling Stock Maintenance Depot Network
CategoryRolling Stock Maintenance Infrastructure
Description

Network of rolling-stock maintenance depots sized to support E5 series Shinkansen trainsets, providing inspection, servicing, and overhaul capability for the MAHSR corridor fleet.

6High Speed Rail Training Institute (HSRTI), Vadodara
CategoryHigh-Speed Rail Training and Capacity Building
Description

Dedicated training institute at Vadodara that builds India's local workforce capability for high-speed rail operations, signaling, track, rolling stock, and station management, supporting both MAHSR and future HSR corridors.

7Seven Additional High-Speed Rail Corridors (Planned Network Expansion)
CategoryHigh-Speed Rail Corridor Development (Planned)
Description

Network of seven additional planned high-speed rail corridors across India beyond the initial Mumbai-Ahmedabad line, representing NHSRCL's expansion mandate to deliver a national HSR system.

Scale indicator14 records

Each record includes

Type, Value, Description, Source

Partnership7 partners
Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

L&T is executing approximately 92% of the 508-km corridor construction, including civil works, viaduct construction, and track works. The company has been awarded contracts for design, supply, construction, testing, and commissioning of track works for 157 km stretch from Mumbai to Zaroli.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Afcons Infrastructure is executing the underground tunnel section of the Mumbai-Ahmedabad project, including India's first undersea tunnel beneath Thane Creek. The company owns and operates the German-made tunnel boring machines (TBMs) for the project.

Strategic tierCoreTypeTechnology or Integration
Description

German company supplying tunnel boring machines (TBMs) for the project. Two massive TBMs weighing approximately 3,000 tonnes each with 13.6-metre cutterhead diameter were manufactured in Guangzhou, China and imported for the project.

Strategic tierCoreTypeTechnology or Integration
Description

State-owned BEML Limited is manufacturing bullet train sets for the Mumbai-Ahmedabad corridor at its Bengaluru facility. The company secured an Rs 866 crore contract for two prototype trainsets, with negotiations for 16 additional trainsets underway.

Strategic tierCoreTypeTechnology or Integration
Description

BEML-Medha consortium has submitted bids for supplying 16 high-speed trainsets at approximately Rs 250 crore per train including a seven-year maintenance contract.

Strategic tierCoreTypeTechnology or Integration
Description

The KCS-AVADH Consortium signed a contract on August 8, 2026, for the design, manufacture, and supply of specialized maintenance machinery for the Mumbai-Ahmedabad High Speed Rail project, including testing, commissioning, and deployment.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

NHSRCL is collaborating with IITs on technical specifications and developing standardized designs and design library for future bullet train corridors.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight7 records

Each record includes

Type, Description

Peers10 records
TypeBroad incumbent
Description

Parent ministry and 50% equity holder of NHSRCL; operates India's conventional passenger and freight rail network. Comparable as the parent regulator/operator of rail transportation in India and primary stakeholder in NHSRCL's mandate and capital structure.

TypeBroad incumbent
Description

Operates the world's largest high-speed rail network (~45,000 km). Comparable as a state-owned national HSR operator deploying indigenous technology across multi-corridor networks—the trajectory and scale that NHSRCL aspires to replicate in India.

TypeDirect peer
Description

Operates the Shinkansen network, whose J-Slab ballastless track, 2x25 kV traction, and ETCS-derived signalling are the explicit technology platform for NHSRCL's first corridor. Direct peer as the technology originator and JICA-supported partner training Indian engineers.

TypeDirect peer
Description

UK government SPV building a ~530 km high-speed rail network connecting London to Birmingham and Manchester. Closely comparable as a state-led greenfield HSR infrastructure project facing well-documented cost overruns and schedule slippage—providing a directly relevant execution benchmark.

TypeDirect peer
Description

US state agency tasked with building a ~1,300 km HSR system; comparable as a publicly-funded greenfield HSR authority facing land acquisition, cost escalation, and political support challenges analogous to NHSRCL's experience.

TypeDirect peer
Description

Spanish national HSR operator running the AVE network at 310 kmph. Comparable as a national passenger HSR operator with multi-corridor network and operations experience relevant to NHSRCL's planned phased rollout.

TypeBroad incumbent
Description

French national rail operator running TGV services at 320 kmph. Comparable as a state-owned incumbent passenger rail operator transitioning toward next-generation signalling and digital twin infrastructure like NHSRCL's TCE partnership.

TypeOthers
Description

NHSRCL's core construction partner executing ~92% of the 508-km corridor. Comparable as the leading Indian EPC contractor in rail/infrastructure with deep exposure to NHSRCL's economics and an adjacent investment opportunity in the HSR ecosystem.

TypeDirect peer
Description

Indian government-owned rail infrastructure PSU executing rapid rail transit and capacity augmentation projects; Vivek Kumar Gupta, current NHSRCL MD, was previously a director at RVNL. Closely comparable as a public-sector rail project execution entity.

TypeBroad incumbent
Description

German national rail operator running ICE services at up to 300 kmph. Comparable as a state-owned incumbent rail operator with experience in high-speed operations, signalling systems, and depot/maintenance network design relevant to NHSRCL's Sabarmati-Surat-Thane depot strategy.

Market position
Strengths1 record

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers4 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
No

Docs URL, Description

AI capability1 record

Each record includes

Type, Description, Source

AI maturity
App detail

Has app

Feature5 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles1 record

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance1 record

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

National High Speed Rail Corporation

High-Speed Rail Infrastructurenhsrcl.in

NHSRCL is a government Special Purpose Vehicle (GoI 50%, Gujarat and Maharashtra 25% each) implementing India's first 508-km Mumbai-Ahmedabad bullet train corridor on Japanese Shinkansen technology, with operations targeted from August 2027 and a mandate over ~4,000 km of additional high-speed rail corridors.

What National High Speed Rail Corporation does

National High Speed Rail Corporation Limited (NHSRCL) is a government-owned Special Purpose Vehicle incorporated on 12 February 2016 under the Companies Act 2013 to finance, construct, maintain, and manage high-speed rail corridors in India. Its anchor mandate is the 508-km Mumbai-Ahmedabad High-Speed Rail Corridor — India's first bullet train project — designed for 320 kmph operations using Japanese Shinkansen technology across 12 stations (Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, Mumbai), reducing end-to-end travel time from 6-8 hours to approximately 2 hours and 7 minutes. The equity structure is GoI 50% / Gujarat 25% / Maharashtra 25%, with project funding primarily sourced from Japan International Cooperation Agency (JICA) soft loans at 0.1% interest (~81% of sanctioned cost; Rs 59,396 crore cumulative since 2017).

The technical stack spans first-in-India deployment of a J-Slab ballastless track system, a 2x25 kV overhead traction system covering 1,125 track-km with 14 traction substations and ~22,000 steel masts, ETCS signalling transitioning to the indigenous Bharat Train Control System (BTCS), tunnel hood pressure-relief technology for 300+ kmph sections, an early earthquake detection system using 28 seismometers, and India's first 7-km undersea tunnel beneath Thane Creek being excavated by two Herrenknecht TBMs (~3,000 tonnes each, 13.6 m cutterhead). Construction partners include Larsen & Toubro (~92% of civil works), Afcons Infrastructure (undersea tunnel), BEML and BEML-Medha (rolling stock), Tata Consulting Engineers (Cognitive Digital Twin/Industrial AI pilot on NVIDIA Omniverse), and JARTS (welding certification).

The business model is non-commercial during construction: there is no farebox revenue today and the first operational section (Surat-Bilimora) targets August 2027 with full-corridor operations by end-2029. Once operational, revenue mechanics will rely on ticket sales across the 12 stations serving business travellers, tourists/pilgrims, and general commuters, with pricing yet to be publicly disclosed and the company committed to affordability. The customer base is exclusively Indian public commuters; no private-sector or international fare-paying customers exist. Capital scaling is governed by project cost escalations (Rs 1.08 lakh crore sanctioned → Rs 1.98 lakh crore revised, 83% increase) and a forward mandate covering seven additional HSR corridors totalling ~4,000 km at an estimated Rs 16 lakh crore.

National High Speed Rail Corporation firmographics

Firmographics
Name
National High Speed Rail Corporation
Legal name
National High Speed Rail Corporation Limited
Website
https://nhsrcl.in
Company type
Private
Founded year
2016
Operating status
Operating
Headcount range
1,001–5,000 employees
Short description
NHSRCL is a government Special Purpose Vehicle (GoI 50%, Gujarat and Maharashtra 25% each) implementing India's first 508-km Mumbai-Ahmedabad bullet train corridor on Japanese Shinkansen technology, with operations targeted from August 2027 and a mandate over ~4,000 km of additional high-speed rail corridors.
Ownership category
akta.pro rank

National High Speed Rail Corporation industry classification

Industry
Product category
High-Speed Rail Infrastructure
NAICS
Rail Transportation (48211)
SIC
Transportation Services (4700), Railroads, Line-Haul Operating (4011)
akta.pro primary industry
High-Speed Rail (HSR) Operators (TLAFADAB)

Keywords

  • High-speed rail infrastructure
  • Bullet train construction
  • Rail corridor development
  • Railway electrification systems
  • Mass transit systems

Where National High Speed Rail Corporation is headquartered

Location

Headquarters

HQ city
New Delhi
HQ country
India
HQ region
Asia

Offices7 records

Markets served

National High Speed Rail Corporation business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Supply Chain, Personnel, Technology or R&D, Operations

Revenue model

  1. Government Infrastructure Development: NHSRCL is a Special Purpose Vehicle (SPV) financed by government equity participation and Japanese loans. The estimated cost of the Mumbai-Ahmedabad project is approximately Rs 1,08,000 crore, with funding from Government of India (50%), Government of Gujarat (25%), and Government of Maharashtra (25%), plus Japanese JICA loans.

Pricing tiers

ModelBillingPrice
OtherMonthlyBullet train services - pricing not yet announced

Go-to-market motion1 record

Distribution channels1 record

Marketing channels4 records

National High Speed Rail Corporation product offering

Product offering

Core offering

National High Speed Rail Corporation Limited (NHSRCL) is a Government of India Special Purpose Vehicle tasked with financing, constructing, maintaining, and managing India's first high-speed rail corridor — the 508 km Mumbai-Ahmedabad High-Speed Rail (MAHSR) project — using Japanese Shinkansen technology under JICA financing. The company also plans and develops additional high-speed rail corridors across India and operates a dedicated High Speed Rail Training Institute (HSRTI) to build local human-capital capacity for HSR operations.

Product overview

National High Speed Rail Corporation Limited (NHSRCL) operates India's first bullet train system—the 508-km Mumbai-Ahmedabad High-Speed Rail Corridor using Japanese Shinkansen technology—as its core product. The company is expanding into a multi-corridor network with seven new HSR corridors planned. Supporting infrastructure includes indigenous J-Slab ballastless track system, 2×25 kV overhead traction system, Bharat Train Control System (BTCS) for signalling, and rolling stock depots at Sabarmati, Surat, and Thane. Safety systems encompass early earthquake warning with 28 seismometers, rainfall monitoring, and wind speed monitoring. The company is also developing AI-enabled digital twin capabilities through Tata Consulting Engineers for infrastructure monitoring and predictive maintenance.

Differentiator

Problem solved

Functional benefit

Products and services

  • Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) A 508 km high-speed passenger rail corridor connecting Mumbai and Ahmedabad with 12 stations (Mumbai, Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand/Nadiad, Ahmedabad, Sabarmati) operating at speeds up to 320 km/h and reducing travel time between the two cities to approximately 2 hours. Targeted at business and leisure intercity travelers as well as the general Indian public.
  • J-Slab Ballastless Track System Shinkansen-derived ballastless slab track system engineered for high-speed operations on the MAHSR corridor, providing higher stability, lower maintenance, and longer service life than conventional ballasted track.
  • 2x25 kV Overhead Traction Power System High-capacity 2x25 kV autotransformer-fed overhead electrification system supplying traction power to high-speed trains on the MAHSR corridor, enabling sustained 320 km/h operations.
  • Bharat Train Control System (BTCS) Indigenously developed high-speed rail signaling and train control system built to operate alongside ETCS Level 2 on the MAHSR corridor, enabling local technology ownership and reducing lifecycle cost.
  • Rolling Stock Maintenance Depot Network Network of rolling-stock maintenance depots sized to support E5 series Shinkansen trainsets, providing inspection, servicing, and overhaul capability for the MAHSR corridor fleet.
  • High Speed Rail Training Institute (HSRTI), Vadodara Dedicated training institute at Vadodara that builds India's local workforce capability for high-speed rail operations, signaling, track, rolling stock, and station management, supporting both MAHSR and future HSR corridors.
  • Seven Additional High-Speed Rail Corridors (Planned Network Expansion) Network of seven additional planned high-speed rail corridors across India beyond the initial Mumbai-Ahmedabad line, representing NHSRCL's expansion mandate to deliver a national HSR system.

Quantifiable outcome

  • Travel time between Mumbai and Ahmedabad reduced from 6-8 hours to approximately 2 hours
  • +2 more outcomes

Companies that use National High Speed Rail Corporation

Customer profile

Named customers4 records

Segments3 records

Ideal customer profiles1 record

National High Speed Rail Corporation technology and API

Technology

Technology focussed Yes

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

AI capability1 record

Feature5 records

National High Speed Rail Corporation partnerships and signals

Strategic signal

Partnerships

Seven partnerships are on record, tiered core and minor.

  • Larsen & Toubro (L&T)coreImplementation/ SI/ Consulting PartnerL&T is executing approximately 92% of the 508-km corridor construction, including civil works, viaduct construction, and track works. The company has been awarded contracts for design, supply, construction, testing, and commissioning of track works for 157 km stretch from Mumbai to Zaroli.
  • Afcons Infrastructure LimitedcoreImplementation/ SI/ Consulting PartnerAfcons Infrastructure is executing the underground tunnel section of the Mumbai-Ahmedabad project, including India's first undersea tunnel beneath Thane Creek. The company owns and operates the German-made tunnel boring machines (TBMs) for the project.
  • HerrenknechtcoreTechnology or IntegrationGerman company supplying tunnel boring machines (TBMs) for the project. Two massive TBMs weighing approximately 3,000 tonnes each with 13.6-metre cutterhead diameter were manufactured in Guangzhou, China and imported for the project.
  • BEML LimitedcoreTechnology or IntegrationState-owned BEML Limited is manufacturing bullet train sets for the Mumbai-Ahmedabad corridor at its Bengaluru facility. The company secured an Rs 866 crore contract for two prototype trainsets, with negotiations for 16 additional trainsets underway.
  • BEML-Medha Servo Drives ConsortiumcoreTechnology or IntegrationBEML-Medha consortium has submitted bids for supplying 16 high-speed trainsets at approximately Rs 250 crore per train including a seven-year maintenance contract.
  • KCS-AVADH ConsortiumcoreTechnology or IntegrationThe KCS-AVADH Consortium signed a contract on August 8, 2026, for the design, manufacture, and supply of specialized maintenance machinery for the Mumbai-Ahmedabad High Speed Rail project, including testing, commissioning, and deployment.
  • Indian Institutes of Technology (IITs)minorStrategic or Co-development PartnerNHSRCL is collaborating with IITs on technical specifications and developing standardized designs and design library for future bullet train corridors.

Scale indicators14 records

Recent moves6 records

Expansion highlights7 records

National High Speed Rail Corporation competitors and assessment

Company assessment

Broad incumbents

  • Indian Railways (Ministry of Railways): Parent ministry and 50% equity holder of NHSRCL; operates India's conventional passenger and freight rail network. Comparable as the parent regulator/operator of rail transportation in India and primary stakeholder in NHSRCL's mandate and capital structure.
  • China Railway (China State Railway Group): Operates the world's largest high-speed rail network (~45,000 km). Comparable as a state-owned national HSR operator deploying indigenous technology across multi-corridor networks—the trajectory and scale that NHSRCL aspires to replicate in India.
  • SNCF (France): French national rail operator running TGV services at 320 kmph. Comparable as a state-owned incumbent passenger rail operator transitioning toward next-generation signalling and digital twin infrastructure like NHSRCL's TCE partnership.
  • Deutsche Bahn (DB): German national rail operator running ICE services at up to 300 kmph. Comparable as a state-owned incumbent rail operator with experience in high-speed operations, signalling systems, and depot/maintenance network design relevant to NHSRCL's Sabarmati-Surat-Thane depot strategy.

Direct peers

  • East Japan Railway Company (JR East): Operates the Shinkansen network, whose J-Slab ballastless track, 2x25 kV traction, and ETCS-derived signalling are the explicit technology platform for NHSRCL's first corridor. Direct peer as the technology originator and JICA-supported partner training Indian engineers.
  • High Speed Two (HS2) Ltd: UK government SPV building a ~530 km high-speed rail network connecting London to Birmingham and Manchester. Closely comparable as a state-led greenfield HSR infrastructure project facing well-documented cost overruns and schedule slippage—providing a directly relevant execution benchmark.
  • California High-Speed Rail Authority: US state agency tasked with building a ~1,300 km HSR system; comparable as a publicly-funded greenfield HSR authority facing land acquisition, cost escalation, and political support challenges analogous to NHSRCL's experience.
  • Renfe (Spain): Spanish national HSR operator running the AVE network at 310 kmph. Comparable as a national passenger HSR operator with multi-corridor network and operations experience relevant to NHSRCL's planned phased rollout.
  • Rail Vikas Nigam Limited (RVNL): Indian government-owned rail infrastructure PSU executing rapid rail transit and capacity augmentation projects; Vivek Kumar Gupta, current NHSRCL MD, was previously a director at RVNL. Closely comparable as a public-sector rail project execution entity.

Others

  • L&T (Larsen & Toubro): NHSRCL's core construction partner executing ~92% of the 508-km corridor. Comparable as the leading Indian EPC contractor in rail/infrastructure with deep exposure to NHSRCL's economics and an adjacent investment opportunity in the HSR ecosystem.

Market position

Strengths1 record

Weaknesses5 records

Competitive moat5 records

Key risks7 records

Key highlights7 records

Customer concentration

National High Speed Rail Corporation social profiles

Digital presence

National High Speed Rail Corporation compliance and trust

Trust signal

Compliance1 record

National High Speed Rail Corporation financial estimates

Financial estimate

Revenue estimate

Valuation estimate

National High Speed Rail Corporation leadership team

Management profile

Number of profiles

Profiles1 record

National High Speed Rail Corporation funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

National High Speed Rail Corporation M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about National High Speed Rail Corporation

What does National High Speed Rail Corporation do?

National High Speed Rail Corporation Limited (NHSRCL) is a Government of India Special Purpose Vehicle tasked with financing, constructing, maintaining, and managing India's first high-speed rail corridor — the 508 km Mumbai-Ahmedabad High-Speed Rail (MAHSR) project — using Japanese Shinkansen technology under JICA financing. The company also plans and develops additional high-speed rail corridors across India and operates a dedicated High Speed Rail Training Institute (HSRTI) to build local human-capital capacity for HSR operations.

Is National High Speed Rail Corporation a public or private company?

National High Speed Rail Corporation is a private company. It is classified as state government owned and is currently operating.

When was National High Speed Rail Corporation founded?

National High Speed Rail Corporation was founded in 2016. It employs 1,001 to 5,000 people.

Where is National High Speed Rail Corporation based?

National High Speed Rail Corporation is headquartered in New Delhi, India, in the Asia region.

How does National High Speed Rail Corporation make money?

One revenue line is on record: government Infrastructure Development.

Who are National High Speed Rail Corporation's main competitors?

Broad incumbents on record are Indian Railways (Ministry of Railways), China Railway (China State Railway Group), SNCF (France) and Deutsche Bahn (DB). Direct peers are East Japan Railway Company (JR East), High Speed Two (HS2) Ltd, California High-Speed Rail Authority, Renfe (Spain) and Rail Vikas Nigam Limited (RVNL). L&T (Larsen & Toubro) is listed as an others.

Does National High Speed Rail Corporation have an API?

No public API is recorded for National High Speed Rail Corporation.

What industry is National High Speed Rail Corporation in?

National High Speed Rail Corporation's product category is High-Speed Rail Infrastructure. Its primary akta.pro industry code is TLAFADAB, High-Speed Rail (HSR) Operators. Its NAICS code is 48211 and its SIC code is 4700.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
Business StandardBEML rises after securing order worth Rs 5,400 crore from National High Speed Rail CorpBEML rose 3.91% to Rs 2091.75 after securing an order worth over Rs 5,400 crore from NHSRCL for high-speed rolling stock and allied works on the Mumbai-Ahmedabad corridor. The company reported a consolidated net loss of Rs 27.01 crore in Q1 FY27, down from Rs 64.11 crore in the prior quarter, with sales up 29.28% to Rs 819.62 crore.MintIndia’s bullet train turns indigenous: Features, cost, other details about made-in-India first high-speed rail projectIndia's first bullet train between Ahmedabad and Mumbai is expected to become operational in the latter half of this year, with the full project completed by 2030. The ₹1.1 lakh crore project, funded by JICA, will feature indigenously produced trains costing ₹390-400 crore each, capable of 280 kmph. Indian Railways plans seven additional high-speed routes and next-generation trains at 350 kmph.The Times of IndiaIndia’s first bullet train project began with a Rs 1.1 lakh crore estimate, cost has now nearly doubled to Rs 2.1 lakh crore; indigenously made high-speed train to start running from August 2027The Mumbai-Ahmedabad high-speed rail project's cost has risen to about Rs 2.1 lakh crore, nearly double the original Rs 1.1 lakh crore estimate, prompting a Cabinet proposal for approval. The 508-km corridor, built by NHSRCL with Japanese assistance, is expected to be completed by 2030, with the first section operational from August 2027. BEML and ICF are developing an indigenous trainset at 280 kmph, with a next generation planned at 350 kmph.ET NOWMumbai-Ahmedabad Bullet Train: Surat station takes shape, BKC station work underway; check launch updateThe Mumbai-Ahmedabad Bullet Train project, implemented by NHSRCL, is progressing towards its planned August 2027 launch with significant construction milestones achieved at Surat and BKC stations. The 508-km high-speed rail corridor, utilizing Japanese Shinkansen technology, will connect Maharashtra and Gujarat while reducing travel time to approximately two hours.Business TodayHyderabad Chennai bullet train via Amaravati: Check full 760 km route, 18 stations proposed hereThe National High Speed Rail Corporation Limited (NHSRCL) has agreed to conduct feasibility studies and prepare a Detailed Project Report for a proposed 760 km high-speed rail corridor connecting Hyderabad, Amaravati, and Chennai. The planned route includes 18 stations across Telangana, Andhra Pradesh, and Tamil Nadu, with travel times expected to drop from 12 hours to approximately 2 hours and 20 minutes. While the project is currently in the planning stage with final alignments and funding yet to be determined, it aims to strengthen economic links between the three southern states.Construction WorldNHSRCL Signs Contract for Bullet Train Maintenance MachineryThe National High Speed Rail Corporation Limited (NHSRCL) signed a contract with the KCS?AVADH Consortium on August 8, 2026, for the design, manufacture, and supply of specialized maintenance machinery for the Mumbai–Ahmedabad High Speed Rail project. The agreement includes testing, commissioning, and deployment of this equipment to support rolling stock upkeep along the high-speed corridor. This procurement is part of the broader infrastructure requirements aimed at sustaining reliable operations and passenger service standards.Business TodayDelhi to Varanasi in under 4 hours, with stops at Taj Mahal, Ayodhya and Prayagraj: India's bullet train for pilgrims and tourists explainedIndia's National High Speed Rail Corporation Limited (NHSRCL) has advanced the proposed Delhi–Varanasi High-Speed Rail corridor to the Detailed Project Report stage, with LiDAR surveys completed across the 865-km route spanning Delhi and 22 districts of Uttar Pradesh. The bullet train corridor, designed for 320 kmph commercial operation, will cut travel time between Delhi and Varanasi from over 10 hours to under 4 hours, with 12–13 stations including Agra, Lucknow, and Prayagraj, plus a 135-km link to Ayodhya. The project is estimated to cost between Rs 1.21 lakh crore and Rs 1.71 lakh crore, though Kanpur has been excluded from the current alignment despite local parliamentary representation raising concerns.India.comDelhi-Varanasi bullet train: Full route, stations, travel time and latest updateThe National High Speed Rail Corporation Limited is preparing a detailed project report and conducting LiDAR surveys for the proposed Delhi-Varanasi High-Speed Rail corridor, a priority infrastructure project for the Indian government. The 865-km corridor, with an estimated cost of Rs 1.21-1.71 lakh crore, would connect Delhi to Varanasi in approximately 3.55 hours at operating speeds of up to 320 kmph, with 12-13 stations planned across Uttar Pradesh including Jewar Airport, Lucknow, and Prayagraj. The project is awaiting final technical and financial approvals from the Railway Board, with potential future extensions to Siliguri and a dedicated link to Ayodhya also under consideration.Gadgets 360Railways Ministry Shares Progress Images Of Vadodara Station For India's Bullet Train ProjectThe Ministry of Railways shared progress images of the Vadodara Bullet Train Station showing that concrete slab casting has been completed and structural steel erection is now underway. The station is part of the 508.18-kilometer Mumbai-Ahmedabad High-Speed Rail Corridor, being developed by the National High Speed Rail Corporation Limited using Japanese Shinkansen technology, with trains designed to travel at up to 350 kmph. Once operational, the corridor will reduce travel time between Mumbai and Ahmedabad to approximately two hours.Business TodayMumbai–Pune in 48 minutes, Chennai–Bengaluru in 73: India’s 7 new proposed bullet train corridors explainedIndia's Finance Minister announced approximately 4,000 km of new high-speed rail corridors in the Union Budget 2026-27, covering seven routes including Mumbai–Pune, Chennai–Bengaluru, and Delhi–Varanasi. The National High Speed Rail Corporation Limited (NHSRCL) is developing a standardised design library for all corridors to reduce costs and accelerate construction timelines, drawing on lessons from the 508-km Mumbai–Ahmedabad project. Detailed Project Reports for four corridors have been sanctioned, with surveys underway for the remaining three, and the first 47-km stretch of the Mumbai–Ahmedabad corridor opening in August 2027.