Developer docs
API playgroundTry for free, no card

Search company profiles

Flatiron Energy

Full company profile

uuid0005ww4

Namestring
Flatiron Energy
Legal namestring
Flatiron Energy LLC
Websiteurl
flatiron.energy
Company typeenum
Private
Founded yearint
2021
Descriptiontext

Flatiron Energy LLC is a private, Boulder- and Denver-based independent power producer (IPP) founded in 2021 and backed by Hull Street Energy, focused exclusively on developing, building, owning, and operating standalone utility-scale battery energy storage systems (BESS) in the Northeast and Mid-Atlantic United States. Its portfolio spans ISO-NE, NYISO, and PJM with a development and under-construction pipeline of approximately 4.5 GW / 18 GWh, including the Taft Project (200 MW / 800 MWh in Uxbridge, Massachusetts), Salt Cod (168 MW / 672 MWh), Energizar (250 MW / 1,000 MWh), and Lite Brite (300 MW / 1.2 GWh, currently paused). Projects use lithium iron phosphate (LFP) battery technology, sourced under a multi-year 7.2 GWh supply agreement with SK On covering 2026-2030, and are deployed in containerized or building-based installations ranging from 100 MW to 300 MW with 4-hour duration.

The company monetizes these assets through a combination of long-term bilateral offtake agreements with utilities, capacity auctions operated by ISO/RTOs (ISO-NE, NYISO, PJM), merchant exposure in wholesale energy and ancillary services markets, and project-level financing arrangements including debt, tax equity, and preferred equity. A $250 million corporate credit facility managed by HPS Investment Partners funds development expenses across the portfolio, and a $540 million project financing was closed in September 2025 for the Taft Project with a syndicate led by First Citizens Bank and Nord/LB. Flatiron generates revenue by displacing expensive peaker plants, providing grid reliability and capacity services, and enabling renewable energy integration in constrained Northeast grids.

The company pursues a sales-led, enterprise field sales GTM motion targeting utilities, grid operators, state energy programs, and landowners. Direct offtake negotiations and competitive procurement processes (such as Massachusetts's first large-scale energy storage tender in late 2025, where Flatiron won approximately 1.3 GW) are the primary commercial channels. The business is Certified B Corporation and operates offices in Denver (headquarters), Boulder, New York, and Boston, with a leadership team drawing on experience from ENGIE, GE, Fluence (via AMS), Con Edison, Goldman Sachs, National Grid, and other major energy firms.

Short descriptiontext

Flatiron Energy is a private, Hull Street Energy-backed independent power producer that develops, owns, and operates utility-scale lithium iron phosphate battery energy storage projects (100-300 MW each) serving utilities and grid operators in the Northeast and Mid-Atlantic US (ISO-NE, NYISO, PJM), with a 4.5 GW / 18 GWh development pipeline and first projects targeting commercial operation in late 2026.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
51–100
akta.pro rankint
HeadquartersDenver, United States
HQ citystring
Denver
HQ countrystring
United States
HQ regionstring
North America
Markets served

Serves global market

Offices4 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
utility-scale battery storage, energy storage development, grid-scale BESS, independent power producer, standalone energy storage
Industry5 codes
PRIMARYEUAFAAAA
Utility-Scale BESS Project Development & Ownership (IPP/Developer)
SECONDARYEUAFAAAG
BESS Operations, Maintenance & Asset Performance Management (APM)
SECONDARYEUAFAAAI
BESS Financing, Insurance & Contracting (Tax Equity, PPA/Tolling, Warranties)
SECONDARYEUAFAAAL
BESS Market Participation & Trading Services (Ancillary/Capacity/Arbitrage)
SECONDARYIMAFAHAE
Energy Storage & Microgrid Electrical Infrastructure (BESS, Controls)
Industrials, Manufacturing & Construction/Construction & Civil Engineering/Power & Utility Infrastructure Construction (T&D, Substations)
NAICS code3 codes
  • Electric Power Generation22111
  • Electric Power Generation, Transmission and Distribution2211
  • Electric Bulk Power Transmission and Control221121
SIC code2 codes
  • Cogeneration Services & Small Power Producers4991
  • Electric Services4911
Product category
Utility-Scale Battery Energy Storage
No data
GTM motion2 records

Each record includes

Type, Description, Source

Revenue model3 records
1Energy Storage Capacity Contracts
TypeSubscription Recurring
Description

Flatiron develops and operates utility-scale battery energy storage assets that provide capacity services to grid operators. Revenue is generated through long-term offtake agreements with utilities, capacity auction participation in ISO markets (ISO-NE, NYISO, PJM), and merchant exposure in wholesale electricity markets. Projects earn revenue by displacing expensive peaker plants during high-demand periods, providing grid reliability services, and enabling renewable energy integration.

flatiron.energy
2Project Development and Construction Services
TypeOne Time License
Description

The company develops battery storage projects from greenfield through construction, monetizing value through project financing, tax credit transfers, and equity returns upon commercial operation.

flatiron.energy
3Landowner Lease Arrangements
TypeManaged Services
Description

Flatiron partners with landowners to host energy storage facilities on their properties through long-term lease agreements (up to 35 years), providing landowners predictable revenue streams while Flatiron manages and optimizes the storage system.

flatiron.energy
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels4 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Technology or R&D, Operations, Personnel, Infrastructure, Marketing or Sales
Pricing details1 tier
1Landowner lease arrangements provide long-term predictable revenue for property owners hosting energy storage projects
ModelOtherBilling cadenceMulti-year contract
Notes

Lease or sell arrangements with payments beginning on Day 1, increasing as projects advance through permitting to construction. Leases can extend up to 35 years.

flatiron.energy
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Flatiron Energy develops, builds, owns, and operates standalone utility-scale battery energy storage systems (BESS) ranging from 100 MW to 300 MW with 4-hour duration in the Northeast and Mid-Atlantic US. The company delivers grid reliability, capacity, and ancillary services through long-term offtake agreements with utilities, ISO/RTO capacity auction participation (ISO-NE, NYISO, PJM), and merchant exposure in wholesale electricity markets, with a development pipeline of approximately 4.5 GW/18 GWh and a 16 GWh battery storage pipeline.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • $3.4 billion in societal benefits to the Northeast by 2030
+3 more records
Product overview1 text field

Flatiron Energy operates as an independent power producer offering a unified platform for utility-scale battery energy storage system (BESS) development, construction, and operations. The company's core offering consists of named BESS projects—including the Taft Project (200 MW/800 MWh), Salt Cod Storage (168 MW/672 MWh), Energizar (250 MW/1,000 MWh), and Lite Brite (300 MW/1.2 GWh)—supported by a corporate credit facility and equity commitments enabling portfolio growth to approximately 4.5 GW/18 GWh. Projects target grid reliability improvement in the Northeast and Mid-Atlantic US, with the company leveraging financing partnerships and battery supply agreements (including SK On for LFP batteries) to deliver projects from development through commercial operation.

Product and service5 records
1Taft Project
CategoryUtility-Scale Battery Energy Storage
Description

A 200 MW / 800 MWh battery energy storage asset located in Uxbridge, Massachusetts, designed to support eastern Massachusetts grid reliability and reach commercial operations in late 2026. It is the largest battery energy storage project in New England.

2Salt Cod Storage
CategoryUtility-Scale Battery Energy Storage
Description

A 168 MW / 672 MWh battery energy storage project proposed at the former Montaup coal-fired power plant site along the Taunton River in Somerset, Massachusetts, targeting commercial operation in Q4 2028.

3Energizar
CategoryUtility-Scale Battery Energy Storage
Description

A 250 MW / 1,000 MWh battery energy storage project awarded in Massachusetts's first large-scale energy storage tender, serving the Northeast market.

4Lite Brite
CategoryUtility-Scale Battery Energy Storage
Description

A 300 MW / 1.2 GWh battery energy storage project located in the Brighton neighborhood of Boston, Massachusetts; currently paused pending safety regulations.

5Utility-Scale BESS Development and Operations Platform
CategoryEnergy Storage Development Services
Description

Flatiron's core platform encompassing the development, construction, and long-term operation of utility-scale battery energy storage projects across the Northeast and Mid-Atlantic US, with an approximately 4.5 GW / 18 GWh portfolio and 16 GWh pipeline.

Scale indicator13 records

Each record includes

Type, Value, Description, Source

Partnership1 partner
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2025-09-03
Description

SK On signed an ESS supply contract with Flatiron Energy for 1 GWh of LFP battery storage initially, with total commitment of up to 7.2 GWh between 2026-2030. SK On is South Korea's battery unit of SK Innovation, supplying batteries to Hyundai, Kia, and Ford. Mass production of ESS-dedicated LFP batteries begins H2 2026, with conversion of Georgia EV production lines for ESS use.

Recent move8 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
TypeEmerging player
Description

AI-driven clean energy storage and software provider with utility-scale and C&I project development. Overlap in asset optimization software and IPP activities in select US markets, though primary focus has historically been C&I rather than utility-scale standalone.

TypeBroad incumbent
Description

Large-scale solar and storage developer in the US. Competes for project development, financing relationships, and talent (multiple Flatiron VPs previously held roles at Avantus). Now owned by EDP Renewables.

TypeDirect peer
Description

Independent power producer focused on standalone utility-scale battery energy storage across multiple US ISOs. Most direct comparable business model—develops, owns, and operates standalone BESS projects with similar financing structures and target customers.

TypeBroad incumbent
Description

Global BESS OEM, integrator, and increasingly a project developer/owner. Overlaps in storage technology and asset management software (competing with Flatiron's in-house platform), and competes in IPP/project finance activities in the same US markets.

TypeEmerging player
Description

Developer of long-duration iron-air battery storage systems. Comparable IPP/developer model but with different (100+ hour) duration technology; competes for similar state-level long-duration procurement contracts.

TypeDirect peer
Description

Standalone battery energy storage developer and operator with projects in ISO-NE and other US markets. Closely comparable in scale, IPP business model, and Northeast focus, including participation in Massachusetts storage tenders.

TypeDirect peer
Description

Developer and operator of utility-scale battery storage and hybrid projects in North America. Direct competitor in the standalone BESS IPP space with similar project sizes and development pipeline approach.

TypeDirect peer
Description

Urban-focused community battery energy storage developer in the NYISO market. Comparable business model but with a tighter geographic focus on the New York metro area; competes for similar Northeast urban interconnection capacity.

TypeBroad incumbent
Description

Major European-headquartered utility with significant US renewable and storage development portfolio (previously Invenergy/Innogy). Competes directly for ISO-NE/NYISO/PJM interconnection queue positions and development sites; Flatiron hired its former VP of East Development.

10ENGIE Storage
TypeBroad incumbent
Description

Global utility with North American storage and renewable development operations. Competes in similar Northeast markets and has been a training ground for multiple Flatiron senior leaders (CEO, COO, CCO all held prior roles at ENGIE or its subsidiaries).

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat6 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers4 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment4 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile3 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature3 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles14 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance1 record

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds4 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors3 records

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Flatiron Energy

Utility-Scale Battery Energy Storageflatiron.energy

Flatiron Energy is a private, Hull Street Energy-backed independent power producer that develops, owns, and operates utility-scale lithium iron phosphate battery energy storage projects (100-300 MW each) serving utilities and grid operators in the Northeast and Mid-Atlantic US (ISO-NE, NYISO, PJM), with a 4.5 GW / 18 GWh development pipeline and first projects targeting commercial operation in late 2026.

What Flatiron Energy does

Flatiron Energy LLC is a private, Boulder- and Denver-based independent power producer (IPP) founded in 2021 and backed by Hull Street Energy, focused exclusively on developing, building, owning, and operating standalone utility-scale battery energy storage systems (BESS) in the Northeast and Mid-Atlantic United States. Its portfolio spans ISO-NE, NYISO, and PJM with a development and under-construction pipeline of approximately 4.5 GW / 18 GWh, including the Taft Project (200 MW / 800 MWh in Uxbridge, Massachusetts), Salt Cod (168 MW / 672 MWh), Energizar (250 MW / 1,000 MWh), and Lite Brite (300 MW / 1.2 GWh, currently paused). Projects use lithium iron phosphate (LFP) battery technology, sourced under a multi-year 7.2 GWh supply agreement with SK On covering 2026-2030, and are deployed in containerized or building-based installations ranging from 100 MW to 300 MW with 4-hour duration.

The company monetizes these assets through a combination of long-term bilateral offtake agreements with utilities, capacity auctions operated by ISO/RTOs (ISO-NE, NYISO, PJM), merchant exposure in wholesale energy and ancillary services markets, and project-level financing arrangements including debt, tax equity, and preferred equity. A $250 million corporate credit facility managed by HPS Investment Partners funds development expenses across the portfolio, and a $540 million project financing was closed in September 2025 for the Taft Project with a syndicate led by First Citizens Bank and Nord/LB. Flatiron generates revenue by displacing expensive peaker plants, providing grid reliability and capacity services, and enabling renewable energy integration in constrained Northeast grids.

The company pursues a sales-led, enterprise field sales GTM motion targeting utilities, grid operators, state energy programs, and landowners. Direct offtake negotiations and competitive procurement processes (such as Massachusetts's first large-scale energy storage tender in late 2025, where Flatiron won approximately 1.3 GW) are the primary commercial channels. The business is Certified B Corporation and operates offices in Denver (headquarters), Boulder, New York, and Boston, with a leadership team drawing on experience from ENGIE, GE, Fluence (via AMS), Con Edison, Goldman Sachs, National Grid, and other major energy firms.

Flatiron Energy firmographics

Firmographics
Name
Flatiron Energy
Legal name
Flatiron Energy LLC
Website
https://flatiron.energy
Company type
Private
Founded year
2021
Operating status
Operating
Headcount range
51–100 employees
Short description
Flatiron Energy is a private, Hull Street Energy-backed independent power producer that develops, owns, and operates utility-scale lithium iron phosphate battery energy storage projects (100-300 MW each) serving utilities and grid operators in the Northeast and Mid-Atlantic US (ISO-NE, NYISO, PJM), with a 4.5 GW / 18 GWh development pipeline and first projects targeting commercial operation in late 2026.
Ownership category
akta.pro rank

Flatiron Energy industry classification

Industry
Product category
Utility-Scale Battery Energy Storage
NAICS
Electric Power Generation (22111), Electric Power Generation, Transmission and Distribution (2211), Electric Bulk Power Transmission and Control (221121)
SIC
Cogeneration Services & Small Power Producers (4991), Electric Services (4911)
akta.pro industry
PRIMARYEUAFAAAA
Utility-Scale BESS Project Development & Ownership (IPP/Developer)
SECONDARYEUAFAAAG
BESS Operations, Maintenance & Asset Performance Management (APM)
SECONDARYEUAFAAAI
BESS Financing, Insurance & Contracting (Tax Equity, PPA/Tolling, Warranties)
SECONDARYEUAFAAAL
BESS Market Participation & Trading Services (Ancillary/Capacity/Arbitrage)
SECONDARYIMAFAHAE
Energy Storage & Microgrid Electrical Infrastructure (BESS, Controls)
Industrials, Manufacturing & Construction/Construction & Civil Engineering/Power & Utility Infrastructure Construction (T&D, Substations)

Keywords

  • Utility-scale battery storage
  • Energy storage development
  • Grid-scale BESS
  • Independent power producer
  • Standalone energy storage

Where Flatiron Energy is headquartered

Location

Headquarters

HQ city
Denver
HQ country
United States
HQ region
North America

Offices4 records

Markets served

Flatiron Energy business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Technology or R&D, Operations, Personnel, Infrastructure, Marketing or Sales

Revenue model

  1. Energy Storage Capacity Contracts: Flatiron develops and operates utility-scale battery energy storage assets that provide capacity services to grid operators. Revenue is generated through long-term offtake agreements with utilities, capacity auction participation in ISO markets (ISO-NE, NYISO, PJM), and merchant exposure in wholesale electricity markets. Projects earn revenue by displacing expensive peaker plants during high-demand periods, providing grid reliability services, and enabling renewable energy integration.
  2. Project Development and Construction Services: The company develops battery storage projects from greenfield through construction, monetizing value through project financing, tax credit transfers, and equity returns upon commercial operation.
  3. Landowner Lease Arrangements: Flatiron partners with landowners to host energy storage facilities on their properties through long-term lease agreements (up to 35 years), providing landowners predictable revenue streams while Flatiron manages and optimizes the storage system.

Pricing tiers

ModelBillingPrice
OtherMulti-year contractLandowner lease arrangements provide long-term predictable revenue for property owners hosting energy storage projects

Go-to-market motion2 records

Distribution channels4 records

Marketing channels5 records

Flatiron Energy product offering

Product offering

Core offering

Flatiron Energy develops, builds, owns, and operates standalone utility-scale battery energy storage systems (BESS) ranging from 100 MW to 300 MW with 4-hour duration in the Northeast and Mid-Atlantic US. The company delivers grid reliability, capacity, and ancillary services through long-term offtake agreements with utilities, ISO/RTO capacity auction participation (ISO-NE, NYISO, PJM), and merchant exposure in wholesale electricity markets, with a development pipeline of approximately 4.5 GW/18 GWh and a 16 GWh battery storage pipeline.

Product overview

Flatiron Energy operates as an independent power producer offering a unified platform for utility-scale battery energy storage system (BESS) development, construction, and operations. The company's core offering consists of named BESS projects—including the Taft Project (200 MW/800 MWh), Salt Cod Storage (168 MW/672 MWh), Energizar (250 MW/1,000 MWh), and Lite Brite (300 MW/1.2 GWh)—supported by a corporate credit facility and equity commitments enabling portfolio growth to approximately 4.5 GW/18 GWh. Projects target grid reliability improvement in the Northeast and Mid-Atlantic US, with the company leveraging financing partnerships and battery supply agreements (including SK On for LFP batteries) to deliver projects from development through commercial operation.

Differentiator

Problem solved

Functional benefit

Products and services

  • Taft Project A 200 MW / 800 MWh battery energy storage asset located in Uxbridge, Massachusetts, designed to support eastern Massachusetts grid reliability and reach commercial operations in late 2026. It is the largest battery energy storage project in New England.
  • Salt Cod Storage A 168 MW / 672 MWh battery energy storage project proposed at the former Montaup coal-fired power plant site along the Taunton River in Somerset, Massachusetts, targeting commercial operation in Q4 2028.
  • Energizar A 250 MW / 1,000 MWh battery energy storage project awarded in Massachusetts's first large-scale energy storage tender, serving the Northeast market.
  • Lite Brite A 300 MW / 1.2 GWh battery energy storage project located in the Brighton neighborhood of Boston, Massachusetts; currently paused pending safety regulations.
  • Utility-Scale BESS Development and Operations Platform Flatiron's core platform encompassing the development, construction, and long-term operation of utility-scale battery energy storage projects across the Northeast and Mid-Atlantic US, with an approximately 4.5 GW / 18 GWh portfolio and 16 GWh pipeline.

Quantifiable outcome

  • $3.4 billion in societal benefits to the Northeast by 2030
  • +3 more outcomes

Companies that use Flatiron Energy

Customer profile

Named customers4 records

Segments4 records

Ideal customer profiles3 records

Flatiron Energy technology and API

Technology

Technology focussed Yes

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature3 records

Flatiron Energy partnerships and signals

Strategic signal

Partnerships

One partnership is on record.

  • SK OncoreTechnology or Integration · 3 September 2025SK On signed an ESS supply contract with Flatiron Energy for 1 GWh of LFP battery storage initially, with total commitment of up to 7.2 GWh between 2026-2030. SK On is South Korea's battery unit of SK Innovation, supplying batteries to Hyundai, Kia, and Ford. Mass production of ESS-dedicated LFP batteries begins H2 2026, with conversion of Georgia EV production lines for ESS use.

Scale indicators13 records

Recent moves8 records

Expansion highlights6 records

Flatiron Energy competitors and assessment

Company assessment

Emerging players

  • Stem Inc: AI-driven clean energy storage and software provider with utility-scale and C&I project development. Overlap in asset optimization software and IPP activities in select US markets, though primary focus has historically been C&I rather than utility-scale standalone.
  • Form Energy: Developer of long-duration iron-air battery storage systems. Comparable IPP/developer model but with different (100+ hour) duration technology; competes for similar state-level long-duration procurement contracts.

Broad incumbents

  • Avantus (formerly 8minute Solar Energy): Large-scale solar and storage developer in the US. Competes for project development, financing relationships, and talent (multiple Flatiron VPs previously held roles at Avantus). Now owned by EDP Renewables.
  • Fluence Energy: Global BESS OEM, integrator, and increasingly a project developer/owner. Overlaps in storage technology and asset management software (competing with Flatiron's in-house platform), and competes in IPP/project finance activities in the same US markets.
  • RWE Clean Energy: Major European-headquartered utility with significant US renewable and storage development portfolio (previously Invenergy/Innogy). Competes directly for ISO-NE/NYISO/PJM interconnection queue positions and development sites; Flatiron hired its former VP of East Development.
  • ENGIE Storage: Global utility with North American storage and renewable development operations. Competes in similar Northeast markets and has been a training ground for multiple Flatiron senior leaders (CEO, COO, CCO all held prior roles at ENGIE or its subsidiaries).

Direct peers

  • Plus Power: Independent power producer focused on standalone utility-scale battery energy storage across multiple US ISOs. Most direct comparable business model—develops, owns, and operates standalone BESS projects with similar financing structures and target customers.
  • Key Capture Energy: Standalone battery energy storage developer and operator with projects in ISO-NE and other US markets. Closely comparable in scale, IPP business model, and Northeast focus, including participation in Massachusetts storage tenders.
  • Aypa Power: Developer and operator of utility-scale battery storage and hybrid projects in North America. Direct competitor in the standalone BESS IPP space with similar project sizes and development pipeline approach.
  • NineDot Energy: Urban-focused community battery energy storage developer in the NYISO market. Comparable business model but with a tighter geographic focus on the New York metro area; competes for similar Northeast urban interconnection capacity.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat6 records

Key risks7 records

Key highlights7 records

Customer concentration

Flatiron Energy compliance and trust

Trust signal

Compliance1 record

Flatiron Energy financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Flatiron Energy leadership team

Management profile

Number of profiles

Profiles14 records

Flatiron Energy funding detail

Funding detail

Funding overview

Funding rounds4 records

Investors3 records

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Flatiron Energy M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Flatiron Energy

What does Flatiron Energy do?

Flatiron Energy develops, builds, owns, and operates standalone utility-scale battery energy storage systems (BESS) ranging from 100 MW to 300 MW with 4-hour duration in the Northeast and Mid-Atlantic US. The company delivers grid reliability, capacity, and ancillary services through long-term offtake agreements with utilities, ISO/RTO capacity auction participation (ISO-NE, NYISO, PJM), and merchant exposure in wholesale electricity markets, with a development pipeline of approximately 4.5 GW/18 GWh and a 16 GWh battery storage pipeline.

Is Flatiron Energy a public or private company?

Flatiron Energy is a private company. It is classified as private equity controlled and is currently operating.

When was Flatiron Energy founded?

Flatiron Energy was founded in 2021. It employs 51 to 100 people.

Where is Flatiron Energy based?

Flatiron Energy is headquartered in Denver, United States, in the North America region.

How does Flatiron Energy make money?

Three revenue lines are on record. Energy Storage Capacity Contracts are the primary driver. The others are project Development and Construction Services and landowner Lease Arrangements.

Who are Flatiron Energy's main competitors?

Emerging players on record are Stem Inc and Form Energy. Broad incumbents are Avantus (formerly 8minute Solar Energy), Fluence Energy, RWE Clean Energy and ENGIE Storage. Direct peers are Plus Power, Key Capture Energy, Aypa Power and NineDot Energy.

Does Flatiron Energy have an API?

No public API is recorded for Flatiron Energy.

What industry is Flatiron Energy in?

Flatiron Energy's product category is Utility-Scale Battery Energy Storage. Its primary akta.pro industry code is EUAFAAAA, Utility-Scale BESS Project Development & Ownership (IPP/Developer), with a secondary code of EUAFAAAG, BESS Operations, Maintenance & Asset Performance Management (APM). Its NAICS code is 22111 and its SIC code is 4991.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
YahooSomerset ZBA approves Salt Cod battery energy storage facilitySomerset's Zoning Board of Appeals approved a battery energy storage facility on Nov. 18, subject to conditions. Developer Flatiron Energy plans to replace aging fuel tanks at the Montaup Power Plant site. The project aims to support renewable energy transition and reduce peak-demand pricing.Pulse 2.0EQT To Acquire Flatiron Energy From Hull Street EnergyEQT Transition Infrastructure agreed to acquire Flatiron Energy from Hull Street Energy, adding a U.S. battery-storage developer with a 24 GWh portfolio. The deal is expected to close in Q4 2026, and EQT plans to invest in Flatiron's workforce and expansion. Operating capacity is projected to rise from about 2 GWh in 2026 to 108 GWh in 2035.EuropaWireEQT signs deal to acquire Flatiron Energy and scale its 24 GWh US battery storage portfolioEQT Transition Infrastructure signed a definitive agreement to acquire Flatiron Energy from Hull Street Energy, expanding its utility-scale battery storage portfolio. Flatiron's portfolio totals 24 GWh, with 6 GWh of long-term contracts and 2 GWh under construction. The transaction is expected to close in Q4 2026.EsgtodayEQT to Acquire U.S. Battery Storage Developer Flatiron - ESG TodayEQT Group agreed to acquire Flatiron Energy, a Denver-based battery storage developer, from Hull Street Energy. The deal, part of EQT's Transition Infrastructure strategy, is expected to close in the fourth quarter of 2026. Flatiron will focus on expanding into new markets and improving operational capabilities.IpeEQT buys US battery storage firm Flatiron Energy from Hull Street EnergyEQT agreed to acquire US battery storage firm Flatiron Energy from Hull Street Energy, with terms undisclosed. Flatiron's portfolio expanded nearly tenfold to 24GWh since 2022, with 6GWh in long-term contracts and 2GWh under construction. The deal adds Flatiron to EQT's existing battery storage platform.Power TechnologyEQT to buy Flatiron Energy from Hull Street EnergyEQT agreed to acquire Flatiron Energy from Hull Street Energy, a battery storage developer with 24GWh of capacity. The deal, subject to conditions and regulatory approvals, is expected to close in Q4 2026. EQT plans to invest in Flatiron's personnel and operational capabilities.Hart EnergyEQT Partners to Acquire Battery Storage Developer Flatiron Energy from Hull StreetEQT Partners is acquiring battery storage developer Flatiron Energy, expanding its footprint in the U.S. power market. The deal is part of EQT's strategy to grow in the fast-growing battery storage segment.Dealroom.coEQT buys Flatiron Energy, adding 24 GWh US battery storage platform | Dealroom NewsEQT agreed to acquire Flatiron Energy, a developer and operator of utility-scale battery storage in the Eastern US. The deal adds Flatiron's 24 GWh portfolio, with 6 GWh under long-term contracts and 2 GWh in construction. EQT plans to back Flatiron's management as it expands into new markets.AktienEQT to acquire Flatiron Energy, a leading developer and operator of battery energy storage in the Eastern U.S.EQT Transition Infrastructure agreed to acquire Flatiron Energy from Hull Street Energy. Flatiron operates a 24 GWh battery portfolio across the Eastern U.S., with 6 GWh in long-term contracts and 2 GWh under construction. EQT will support Flatiron's management and expansion.PR NewswireEQT to acquire Flatiron Energy, a leading developer and operator of battery energy storage in the Eastern U.S.EQT agreed to acquire Flatiron Energy from Hull Street Energy, a developer of utility-scale battery storage in the Eastern U.S. Flatiron has expanded its portfolio to 24 GWh since 2022, with 6 GWh in long-term contracts and 2 GWh under construction. The deal is expected to close in Q4 2026.