EirGrid

Full company profile

uuid0005ymg

Namestring
EirGrid
Legal namestring
EirGrid plc
Websiteurl
eirgrid.ie
Company typeenum
Private
Founded yearint
2000
Descriptiontext

EirGrid plc is Ireland's designated Transmission System Operator (TSO), a state-owned commercial enterprise established in 2000 under the European Communities (Internal Market in Electricity) Regulations 2000 and licensed under the Electricity Act 1999. The company develops, manages, and operates Ireland's high-voltage electricity grid, balancing supply and demand in real time from National Control Centres in Dublin and Belfast (the latter operated through its wholly-owned subsidiary SONI for Northern Ireland). EirGrid's core mandate is ensuring secure, reliable electricity supply while leading the transition to 80% renewable electricity by 2030, currently integrating up to 75% of system demand from variable renewables at any moment (targeting 95%) and enabling cross-border trade through interconnectors to Great Britain (East-West, Greenlink) and France (Celtic Interconnector, 700 MW).

Short descriptiontext

EirGrid plc is Ireland's state-owned Transmission System Operator, managing the high-voltage electricity grid, balancing supply and demand in real time, and integrating renewable generation to deliver 80% renewable electricity by 2030.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
251–500
akta.pro rankint
HeadquartersDublin, Ireland
HQ citystring
Dublin
HQ countrystring
Ireland
HQ regionstring
Europe
Markets served

Serves global market

Offices3 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
electricity grid operation, transmission system operator, renewable energy integration, grid infrastructure development, wholesale electricity market
Industry5 codes
1National & Regional TSOs (ISO/RTO/Grid Operators)
CodeEUADAAAAPrimaryYes
2System Operations & Control Centers (EMS/SCADA for Transmission)
CodeEUADAAAGPrimaryNo
3HV Transmission Asset Owners (Transmission Companies/Transcos)
CodeEUADAAACPrimaryNo
4Energy Management Systems & Plant Controllers (PPC, AGC Participation, Curtailment Control)
CodeEUAMAIAIPrimaryNo
5Resource Adequacy, Capacity Expansion & Integrated Grid Planning (IRP linkages)
CodeEUADAGAIPrimaryNo
NAICS code3 codes
  • Electric Power Generation, Transmission and Distribution2211
  • Electric Bulk Power Transmission and Control221121
  • Electric Power Transmission, Control, and Distribution22112
SIC code1 code
  • Electric Services4911
Product category
Electricity Transmission Services
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model3 records
1Transmission System Operator Services
TypeOthers
Description

EirGrid operates as a regulated monopoly under a TSO licence. Revenue is derived from regulated network tariffs approved by CRU (Commission for Regulation of Utilities), which recover the costs of operating, maintaining, and developing the transmission system from electricity consumers

irishtechnews.ie
2Capacity Market Revenue
TypeSubscription Recurring
Description

EirGrid procures generation capacity through capacity auctions to ensure security of supply, with generators receiving capacity payments

cru.ie
3Interconnection Revenue
TypeUsage Based
Description

Revenue from operating interconnectors including East-West Interconnector and Greenlink Interconnector connecting Ireland to Great Britain

eirgrid.ie
Marketing channels8 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels3 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Personnel, Infrastructure, Operations, Technology or R&D, Supply Chain, Marketing or Sales
Pricing details1 tier
1Domestic household network charges portion of electricity bill
ModelUsage-basedBilling cadenceMonthly
Notes

€1 to €1.75 per month increase for households depending on investment scenario (baseline €13.8bn vs maximum €18.9bn)

irishtimes.com
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

EirGrid plc is Ireland's state-owned Transmission System Operator (TSO), licensed under the Electricity Act 1999 to plan, manage, develop, and operate the high-voltage electricity grid in real time. The company balances supply and demand 24/7 from the National Control Centre, provides grid connections for generators and large energy users, operates cross-border interconnectors to Great Britain and France, and jointly runs the all-island Single Electricity Market (SEM) via SEMO. EirGrid also leads the build-out of grid infrastructure needed to deliver Ireland's 80% renewable electricity target by 2030, including the Celtic Interconnector and South Coast offshore wind transmission.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 5 values shown
  • Enabled up to 75% of electricity from variable renewables at any one time (target 95%)
+4 more records
Product and service8 records
1Transmission System Operator Services
CategoryElectricity Transmission Operation
Description

Regulated operation, maintenance, and development of Ireland's high-voltage electricity transmission grid 24/7, including real-time balancing of supply and demand from the National Control Centre. Provided to generators, distribution system operators, and large energy users under a TSO licence with CRU-approved cost recovery.

2Capacity Market Procurement
CategoryCapacity Market Services
Description

Competitive capacity auctions procuring generation capacity to ensure security of supply, with generators receiving capacity payments via multi-year contracts. Includes the 10-year capacity contract structure used for new technologies such as long-duration storage.

3Cross-Border Interconnector Services
CategoryInterconnector Operations
Description

Operation of high-voltage interconnectors linking Ireland to Great Britain and continental Europe, including the East-West Interconnector and Greenlink Interconnector (UK), and the 700 MW Celtic Interconnector (France) being co-developed with RTE. Provides wholesale cross-border electricity trading and security of supply.

4Single Electricity Market (SEM) Operation
CategoryWholesale Electricity Market Operation
Description

Operation of the all-island wholesale electricity market through SEMO (jointly with SONI), including Day-Ahead, Intraday, and Balancing Markets. Now supports direct battery storage participation under the Scheduling and Dispatch Programme.

5Scheduling and Dispatch Programme (SDP)
CategoryWholesale Market Services
Description

New wholesale market mechanism enabling battery storage units to participate directly in the Day-Ahead, Intraday, and Balancing Markets of the Irish SEM. Replaces prior dispatch arrangements to support Ireland's low-carbon transition.

6DS3 System Services
CategorySystem Services
Description

System services programme that enables up to 75% of electricity to be generated from variable renewable sources (wind and solar) at any one time, with work ongoing to increase this to 95%. Provides ancillary services payments to providers of system stability, inertia, and reactive power.

7Low Carbon Inertia Services
CategorySystem Stability Services
Description

Procurement of synchronous condensers and long-duration electricity storage to deliver grid inertia and stability services as fossil-sourced inertia declines. Targets 500 MW of long-duration electricity storage capacity by 2030.

8Grid Connection Services
CategoryGrid Access Services
Description

Regulated transmission grid connection services for generators (wind, solar, hydro, battery, conventional) and large energy users (data centres, industrial customers) under CRU-governed connection agreements, including capacity allocation and dispatchable generation requirements for new data centres.

Scale indicator19 records

Each record includes

Type, Value, Description, Source

Partnership14 partners
Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2026-06-25
Description

Strategic partnership for CO2 Battery technology deployment. EirGrid awarded 10-year capacity contract for 23 MW/200 MWh CO2 battery project in County Offaly, the first commercial bilateral energy storage deal. Project to begin operations in 2028.

Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2026-06-23
Description

Local development partner for CO2 battery energy storage project on site of former peat-fired power plant near Rhode, County Offaly. Project developed with Energy Dome and backed by Google capacity agreement.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2026-06-01
Description

Contracted by EirGrid to provide marine mammal monitoring services for South Coast offshore wind programme. First commercial deployment of Fugro's purpose-built mooring system with underwater acoustic sensors for detecting whales, dolphins and porpoises. Builds on existing seven-year framework agreement.

Strategic tierStrategicTypeStrategic or Co-development PartnerAnnounced on2026-04-24
Description

MoU signed to explore feasibility of future electricity interconnector between Ireland and Spain. Feasibility studies to be conducted by EirGrid and Redeia (Spanish transmission company) aligning with European Commission objectives for greater interconnection between EU countries.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-12-04
Description

Selected by EirGrid to support expansion of Ireland's electricity transmission and distribution network infrastructure. Tetra Tech's energy engineers conduct geotechnical and environmental surveying using advanced cloud-based software to enable safe and sustainable construction of onshore and offshore grid infrastructure.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-10-28
Description

Selected for five-year Engineering Design, Planning and Project Management Framework (with option for additional three years) to provide technical services for high-voltage transmission infrastructure development supporting Ireland's 2030 renewable energy ambitions.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-10-20
Description

Appointed to EirGrid's engineering design, planning and project management services framework for grid development in Ireland and Northern Ireland, facilitating integration of 80% renewable energy sources and supporting Net Zero targets.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-10-13
Description

Appointed as key delivery partner for multi-billion euro programme to transform Ireland's national electricity grid. Five-year framework with three-year optional extension aimed at enhancing energy security, accelerating renewable integration, and strengthening electrical interconnections.

9Réseau de Transport d'Électricité (RTE)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Joint development of the Celtic Interconnector, a 500km subsea HVDC cable connecting Ireland's electricity grid to France. EirGrid and RTE are co-developing this first direct interconnection between Ireland and continental Europe, with 700MW transmission capacity. Project received EU Connecting Europe Facility funding.

eirgrid.ie
Strategic tierCoreTypeStrategic or Co-development Partner
Description

SONI is the transmission system operator for Northern Ireland and part of the EirGrid Group. Together they operate the Single Electricity Market (SEM) for the island of Ireland through SEMO, and jointly manage interconnection and renewable energy integration across both jurisdictions.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

ESB Networks is Ireland's Distribution System Operator (DSO), managing the lower voltage distribution system that supplies power directly to homes and businesses. EirGrid works closely with ESB Networks on grid operations, planning, and the transition to a low-carbon electricity system.

Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Completed first cable pull-in on French side of Celtic Interconnector project. Nexans is the cable manufacturer and installer for the subsea HVDC cable connecting Ireland and France.

Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Completed construction of Ar Merzher converter station in France for the Celtic Interconnector project, working with NGE on the civil engineering works.

Strategic tierMajorTypeChannel Partner/ Reseller/ Distributor
Description

Statkraft awarded contracts to Elecnor for installation of synchronous condensers in Ireland under Low Carbon Inertia Services programme led by EirGrid and SONI, supporting grid stability and renewable energy integration targets.

Recent move9 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight7 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

German TSO operating in northern and eastern Germany with a major offshore wind connection mandate. Highly comparable TSO operation in renewable-heavy region with cross-border interconnector experience.

TypeBroad incumbent
Description

US independent system operator / regional transmission organization covering 13 states. Compares as a larger incumbent performing real-time balancing and capacity markets at much greater scale, but with similar regulatory design.

TypeBroad incumbent
Description

Ireland's Distribution System Operator (DSO) managing the lower-voltage distribution network that connects EirGrid's transmission grid to end users. Partner in Ireland's grid operations and recipient of €11.4bn of the same CRU investment allowance.

TypeDirect peer
Description

Spanish TSO that signed an MoU with EirGrid in 2026 to explore an Ireland–Spain interconnector. Comparable in operating the Spanish transmission system and pioneering renewable integration at scale.

TypeDirect peer
Description

Dutch-German TSO operating one of Europe's largest high-voltage transmission networks with significant offshore wind connection programmes. Closely analogous in renewable integration challenge and cross-border interconnector portfolio.

TypeDirect peer
Description

Northern Ireland TSO and part of the EirGrid Group, jointly operating the Single Electricity Market (SEM) with EirGrid through SEMO. Sister entity performing the equivalent TSO role in Northern Ireland.

TypeDirect peer
Description

French TSO and co-developer with EirGrid of the Celtic Interconnector. Operates the high-voltage transmission grid in France with similar real-time balancing, renewable integration, and regulatory mandate.

TypeOthers
Description

Association of 39 European TSOs including EirGrid, coordinating cross-border electricity markets, grid codes, and system planning. EirGrid is a member; not a competitor but a direct industry peer institution.

TypeDirect peer
Description

UK transmission system operator and owner responsible for the high-voltage electricity network in England and Wales. Directly comparable to EirGrid in mandate, regulatory structure (RIIO price controls), and offshore wind build-out role.

TypeDirect peer
Description

Norwegian TSO operating the Nordic regional electricity grid, known for subsea interconnectors and managing a high-renewable hydro-dominated system. Comparable TSO mandate and cross-border interconnector portfolio.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat6 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers5 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment4 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile4 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
No

Docs URL, Description

Integration12 records

Each record includes

Title, Type, Description, Source

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles10 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

Subsidiaries4 records

Each record includes

Name, Acquired on, Relationship type, Type, Business focus

No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

EirGrid

Electricity Transmission Serviceseirgrid.ie

EirGrid plc is Ireland's state-owned Transmission System Operator, managing the high-voltage electricity grid, balancing supply and demand in real time, and integrating renewable generation to deliver 80% renewable electricity by 2030.

What EirGrid does

EirGrid plc is Ireland's designated Transmission System Operator (TSO), a state-owned commercial enterprise established in 2000 under the European Communities (Internal Market in Electricity) Regulations 2000 and licensed under the Electricity Act 1999. The company develops, manages, and operates Ireland's high-voltage electricity grid, balancing supply and demand in real time from National Control Centres in Dublin and Belfast (the latter operated through its wholly-owned subsidiary SONI for Northern Ireland). EirGrid's core mandate is ensuring secure, reliable electricity supply while leading the transition to 80% renewable electricity by 2030, currently integrating up to 75% of system demand from variable renewables at any moment (targeting 95%) and enabling cross-border trade through interconnectors to Great Britain (East-West, Greenlink) and France (Celtic Interconnector, 700 MW).

EirGrid firmographics

Firmographics
Name
EirGrid
Legal name
EirGrid plc
Website
https://eirgrid.ie
Company type
Private
Founded year
2000
Operating status
Operating
Headcount range
251–500 employees
Short description
EirGrid plc is Ireland's state-owned Transmission System Operator, managing the high-voltage electricity grid, balancing supply and demand in real time, and integrating renewable generation to deliver 80% renewable electricity by 2030.
Ownership category
akta.pro rank

EirGrid industry classification

Industry
Product category
Electricity Transmission Services
NAICS
Electric Power Generation, Transmission and Distribution (2211), Electric Bulk Power Transmission and Control (221121), Electric Power Transmission, Control, and Distribution (22112)
SIC
Electric Services (4911)
akta.pro primary industry
National & Regional TSOs (ISO/RTO/Grid Operators) (EUADAAAA)
akta.pro secondary industries
System Operations & Control Centers (EMS/SCADA for Transmission) (EUADAAAG), HV Transmission Asset Owners (Transmission Companies/Transcos) (EUADAAAC), Energy Management Systems & Plant Controllers (PPC, AGC Participation, Curtailment Control) (EUAMAIAI), Resource Adequacy, Capacity Expansion & Integrated Grid Planning (IRP linkages) (EUADAGAI)

Keywords

  • Electricity grid operation
  • Transmission system operator
  • Renewable energy integration
  • Grid infrastructure development
  • Wholesale electricity market

Where EirGrid is headquartered

Location

Headquarters

HQ city
Dublin
HQ country
Ireland
HQ region
Europe

Offices3 records

Markets served

EirGrid business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Personnel, Infrastructure, Operations, Technology or R&D, Supply Chain, Marketing or Sales

Revenue model

  1. Transmission System Operator Services: EirGrid operates as a regulated monopoly under a TSO licence. Revenue is derived from regulated network tariffs approved by CRU (Commission for Regulation of Utilities), which recover the costs of operating, maintaining, and developing the transmission system from electricity consumers
  2. Capacity Market Revenue: EirGrid procures generation capacity through capacity auctions to ensure security of supply, with generators receiving capacity payments
  3. Interconnection Revenue: Revenue from operating interconnectors including East-West Interconnector and Greenlink Interconnector connecting Ireland to Great Britain

Pricing tiers

ModelBillingPrice
Usage-basedMonthlyDomestic household network charges portion of electricity bill

Go-to-market motion1 record

Distribution channels3 records

Marketing channels8 records

EirGrid product offering

Product offering

Core offering

EirGrid plc is Ireland's state-owned Transmission System Operator (TSO), licensed under the Electricity Act 1999 to plan, manage, develop, and operate the high-voltage electricity grid in real time. The company balances supply and demand 24/7 from the National Control Centre, provides grid connections for generators and large energy users, operates cross-border interconnectors to Great Britain and France, and jointly runs the all-island Single Electricity Market (SEM) via SEMO. EirGrid also leads the build-out of grid infrastructure needed to deliver Ireland's 80% renewable electricity target by 2030, including the Celtic Interconnector and South Coast offshore wind transmission.

Differentiator

Problem solved

Functional benefit

Products and services

  • Transmission System Operator Services Regulated operation, maintenance, and development of Ireland's high-voltage electricity transmission grid 24/7, including real-time balancing of supply and demand from the National Control Centre. Provided to generators, distribution system operators, and large energy users under a TSO licence with CRU-approved cost recovery.
  • Capacity Market Procurement Competitive capacity auctions procuring generation capacity to ensure security of supply, with generators receiving capacity payments via multi-year contracts. Includes the 10-year capacity contract structure used for new technologies such as long-duration storage.
  • Cross-Border Interconnector Services Operation of high-voltage interconnectors linking Ireland to Great Britain and continental Europe, including the East-West Interconnector and Greenlink Interconnector (UK), and the 700 MW Celtic Interconnector (France) being co-developed with RTE. Provides wholesale cross-border electricity trading and security of supply.
  • Single Electricity Market (SEM) Operation Operation of the all-island wholesale electricity market through SEMO (jointly with SONI), including Day-Ahead, Intraday, and Balancing Markets. Now supports direct battery storage participation under the Scheduling and Dispatch Programme.
  • Scheduling and Dispatch Programme (SDP) New wholesale market mechanism enabling battery storage units to participate directly in the Day-Ahead, Intraday, and Balancing Markets of the Irish SEM. Replaces prior dispatch arrangements to support Ireland's low-carbon transition.
  • DS3 System Services System services programme that enables up to 75% of electricity to be generated from variable renewable sources (wind and solar) at any one time, with work ongoing to increase this to 95%. Provides ancillary services payments to providers of system stability, inertia, and reactive power.
  • Low Carbon Inertia Services Procurement of synchronous condensers and long-duration electricity storage to deliver grid inertia and stability services as fossil-sourced inertia declines. Targets 500 MW of long-duration electricity storage capacity by 2030.
  • Grid Connection Services Regulated transmission grid connection services for generators (wind, solar, hydro, battery, conventional) and large energy users (data centres, industrial customers) under CRU-governed connection agreements, including capacity allocation and dispatchable generation requirements for new data centres.

Quantifiable outcome

  • Enabled up to 75% of electricity from variable renewables at any one time (target 95%)
  • +4 more outcomes

Companies that use EirGrid

Customer profile

Named customers5 records

Segments4 records

Ideal customer profiles4 records

EirGrid technology and API

Technology

Technology focussed Yes

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Integration12 records

Feature4 records

EirGrid partnerships and signals

Strategic signal

Partnerships

14 partnerships are on record, tiered major, strategic and core.

  • Energy DomemajorStrategic or Co-development Partner · 25 June 2026Strategic partnership for CO2 Battery technology deployment. EirGrid awarded 10-year capacity contract for 23 MW/200 MWh CO2 battery project in County Offaly, the first commercial bilateral energy storage deal. Project to begin operations in 2028.
  • Lumcloon EnergymajorStrategic or Co-development Partner · 23 June 2026Local development partner for CO2 battery energy storage project on site of former peat-fired power plant near Rhode, County Offaly. Project developed with Energy Dome and backed by Google capacity agreement.
  • FugromajorImplementation/ SI/ Consulting Partner · 1 June 2026Contracted by EirGrid to provide marine mammal monitoring services for South Coast offshore wind programme. First commercial deployment of Fugro's purpose-built mooring system with underwater acoustic sensors for detecting whales, dolphins and porpoises. Builds on existing seven-year framework agreement.
  • Redeia (Red Electrica)strategicStrategic or Co-development Partner · 24 April 2026MoU signed to explore feasibility of future electricity interconnector between Ireland and Spain. Feasibility studies to be conducted by EirGrid and Redeia (Spanish transmission company) aligning with European Commission objectives for greater interconnection between EU countries.
  • Tetra TechmajorImplementation/ SI/ Consulting Partner · 4 December 2025Selected by EirGrid to support expansion of Ireland's electricity transmission and distribution network infrastructure. Tetra Tech's energy engineers conduct geotechnical and environmental surveying using advanced cloud-based software to enable safe and sustainable construction of onshore and offshore grid infrastructure.
  • JacobsmajorImplementation/ SI/ Consulting Partner · 28 October 2025Selected for five-year Engineering Design, Planning and Project Management Framework (with option for additional three years) to provide technical services for high-voltage transmission infrastructure development supporting Ireland's 2030 renewable energy ambitions.
  • AECOMmajorImplementation/ SI/ Consulting Partner · 20 October 2025Appointed to EirGrid's engineering design, planning and project management services framework for grid development in Ireland and Northern Ireland, facilitating integration of 80% renewable energy sources and supporting Net Zero targets.
  • Turner & Townsend (partnered with WSP)majorImplementation/ SI/ Consulting Partner · 13 October 2025Appointed as key delivery partner for multi-billion euro programme to transform Ireland's national electricity grid. Five-year framework with three-year optional extension aimed at enhancing energy security, accelerating renewable integration, and strengthening electrical interconnections.
  • Réseau de Transport d'Électricité (RTE)coreStrategic or Co-development PartnerJoint development of the Celtic Interconnector, a 500km subsea HVDC cable connecting Ireland's electricity grid to France. EirGrid and RTE are co-developing this first direct interconnection between Ireland and continental Europe, with 700MW transmission capacity. Project received EU Connecting Europe Facility funding.
  • SONI (System Operator for Northern Ireland)coreStrategic or Co-development PartnerSONI is the transmission system operator for Northern Ireland and part of the EirGrid Group. Together they operate the Single Electricity Market (SEM) for the island of Ireland through SEMO, and jointly manage interconnection and renewable energy integration across both jurisdictions.
  • ESB NetworkscoreStrategic or Co-development PartnerESB Networks is Ireland's Distribution System Operator (DSO), managing the lower voltage distribution system that supplies power directly to homes and businesses. EirGrid works closely with ESB Networks on grid operations, planning, and the transition to a low-carbon electricity system.
  • NexansmajorImplementation/ SI/ Consulting PartnerCompleted first cable pull-in on French side of Celtic Interconnector project. Nexans is the cable manufacturer and installer for the subsea HVDC cable connecting Ireland and France.
  • Siemens EnergymajorImplementation/ SI/ Consulting PartnerCompleted construction of Ar Merzher converter station in France for the Celtic Interconnector project, working with NGE on the civil engineering works.
  • StatkraftmajorChannel Partner/ Reseller/ DistributorStatkraft awarded contracts to Elecnor for installation of synchronous condensers in Ireland under Low Carbon Inertia Services programme led by EirGrid and SONI, supporting grid stability and renewable energy integration targets.

Scale indicators19 records

Recent moves9 records

Expansion highlights7 records

EirGrid competitors and assessment

Company assessment

Direct peers

  • 50Hertz Transmission: German TSO operating in northern and eastern Germany with a major offshore wind connection mandate. Highly comparable TSO operation in renewable-heavy region with cross-border interconnector experience.
  • Redeia (Red Electrica de Espana): Spanish TSO that signed an MoU with EirGrid in 2026 to explore an Ireland–Spain interconnector. Comparable in operating the Spanish transmission system and pioneering renewable integration at scale.
  • TenneT: Dutch-German TSO operating one of Europe's largest high-voltage transmission networks with significant offshore wind connection programmes. Closely analogous in renewable integration challenge and cross-border interconnector portfolio.
  • SONI (System Operator for Northern Ireland): Northern Ireland TSO and part of the EirGrid Group, jointly operating the Single Electricity Market (SEM) with EirGrid through SEMO. Sister entity performing the equivalent TSO role in Northern Ireland.
  • RTE (Reseau de Transport d'Electricite): French TSO and co-developer with EirGrid of the Celtic Interconnector. Operates the high-voltage transmission grid in France with similar real-time balancing, renewable integration, and regulatory mandate.
  • National Grid plc (UK Electricity Transmission): UK transmission system operator and owner responsible for the high-voltage electricity network in England and Wales. Directly comparable to EirGrid in mandate, regulatory structure (RIIO price controls), and offshore wind build-out role.
  • Statnett: Norwegian TSO operating the Nordic regional electricity grid, known for subsea interconnectors and managing a high-renewable hydro-dominated system. Comparable TSO mandate and cross-border interconnector portfolio.

Broad incumbents

  • PJM Interconnection: US independent system operator / regional transmission organization covering 13 states. Compares as a larger incumbent performing real-time balancing and capacity markets at much greater scale, but with similar regulatory design.
  • ESB Networks: Ireland's Distribution System Operator (DSO) managing the lower-voltage distribution network that connects EirGrid's transmission grid to end users. Partner in Ireland's grid operations and recipient of €11.4bn of the same CRU investment allowance.

Others

  • ENTSO-E (European Network of TSOs): Association of 39 European TSOs including EirGrid, coordinating cross-border electricity markets, grid codes, and system planning. EirGrid is a member; not a competitor but a direct industry peer institution.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat6 records

Key risks5 records

Key highlights7 records

Customer concentration

EirGrid social profiles

Digital presence

EirGrid financial estimates

Financial estimate

Revenue estimate

Valuation estimate

EirGrid leadership team

Management profile

Number of profiles

Profiles10 records

EirGrid subsidiaries and ownership

Company hierarchy

Subsidiaries4 records

EirGrid funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

EirGrid M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about EirGrid

What does EirGrid do?

EirGrid plc is Ireland's state-owned Transmission System Operator (TSO), licensed under the Electricity Act 1999 to plan, manage, develop, and operate the high-voltage electricity grid in real time. The company balances supply and demand 24/7 from the National Control Centre, provides grid connections for generators and large energy users, operates cross-border interconnectors to Great Britain and France, and jointly runs the all-island Single Electricity Market (SEM) via SEMO. EirGrid also leads the build-out of grid infrastructure needed to deliver Ireland's 80% renewable electricity target by 2030, including the Celtic Interconnector and South Coast offshore wind transmission.

Is EirGrid a public or private company?

EirGrid is a private company. It is classified as state government owned and is currently operating.

When was EirGrid founded?

EirGrid was founded in 2000. It employs 251 to 500 people.

Where is EirGrid based?

EirGrid is headquartered in Dublin, Ireland, in the Europe region.

How does EirGrid make money?

Three revenue lines are on record. Transmission System Operator Services are the primary driver. The others are capacity Market Revenue and interconnection Revenue.

Who are EirGrid's main competitors?

Direct peers on record are 50Hertz Transmission, Redeia (Red Electrica de Espana), TenneT, SONI (System Operator for Northern Ireland), RTE (Reseau de Transport d'Electricite), National Grid plc (UK Electricity Transmission) and Statnett. Broad incumbents are PJM Interconnection and ESB Networks. ENTSO-E (European Network of TSOs) is listed as an others.

Does EirGrid have an API?

No public API is recorded for EirGrid.

What industry is EirGrid in?

EirGrid's product category is Electricity Transmission Services. Its primary akta.pro industry code is EUADAAAA, National & Regional TSOs (ISO/RTO/Grid Operators), with a secondary code of EUADAAAG, System Operations & Control Centers (EMS/SCADA for Transmission). Its NAICS code is 2211 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
IrishtechnewsIrish students lead the charge in reducing electricity consumption as Green-Schools’ Energy Theme relaunchesAn Taisce Green-Schools is relaunching its energy theme for primary and secondary schools this academic year, with EirGrid's support. Last year, over 3,800 students and nearly 300 schools participated in workshops and energy awards. The initiative aims to encourage students to reduce energy consumption and support Ireland's 80% renewable electricity target.The CurrencyData centre power demand hits 1,000MW blackout risk safety threshold - The CurrencyData centre power demand in Ireland hit 1,000MW in June, reaching the operational safety threshold where a sudden drop risks a blackout. EirGrid warned this is the point where the grid cannot support such a shock, as data centres now account for 23% of electricity demand. New rules are coming but will take time to bed in.The Irish TimesTenth of Irish renewable electricity lost in 2025 due to grid constraintsA report by the Energy Institute found that 10% of Ireland's renewable electricity was lost in 2025 due to grid capacity constraints. Fossil fuels supplied 79.2% of total energy, with 78.2% imported, while renewables met 41% of demand. EirGrid plans to spend €6bn to upgrade 1,000km of lines.IrishtechnewsSolar energy generation increases 60% over summer monthsEirGrid data shows solar power contributed 7.7% of Ireland's fuel mix in August, with summer 2025 solar generation up 58% to 439 GWh. Solar peaks reached 1.3 GW on 24 August, surpassing previous records. Wind provided 18% of renewables, while gas accounted for 42% of electricity.Irish ExaminerSediment deposits dating back 1.5 million years found during Celtic Interconnector constructionAncient sediment deposits dating back 1.5 million years were discovered during construction of EirGrid's Celtic Interconnector in East Cork. The findings were presented at a webinar featuring archaeologists Dan Noonan and Dr Michael Walsh, who shared new insights into Ireland's ancient past.The Cool DownIreland hits solar record as renewables top 30% of July electricity supplyIreland achieved a record solar output in July, contributing to renewable energy sources supplying over 30% of the country's electricity for the month. EirGrid, the grid operator, is upgrading infrastructure to manage higher levels of variable renewable power and has approved five new wind projects adding 311MW of capacity.The Irish TimesThe Irish Times view on energy security: the grid needs strengtheningEirGrid was forced to activate emergency power plants twice this summer due to high electricity demand and solar farm shutdowns, highlighting vulnerabilities in Ireland's energy infrastructure. A report by Wind Energy Ireland indicates significant loss of wind energy capacity due to storage shortages, while fossil fuels accounted for nearly 80% of the country's energy needs in 2025. The Irish government has committed €3.5 billion to upgrade energy infrastructure between 2026 and 2030, with a focus on strengthening the grid to meet climate targets and ensure supply security.The Irish TimesSurge in demand for power forces EirGrid to switch on emergency power plant twiceEirGrid activated two emergency power plants this summer to manage electricity supply shortages caused by surging demand and reduced renewable generation. The deployments, occurring in June and during a solar eclipse in July, highlight tight grid conditions exacerbated by routine maintenance at major power stations and constrained imports from Britain.Pv-magazineIreland records 1,258 MW grid-scale solar generation peak ahead of eclipseEirGrid recorded a record-breaking grid-scale solar generation peak of 1,258 MW in Ireland on August 11, with solar accounting for approximately one-third of national electricity usage. Two days later, the historic solar eclipse caused generation to plummet to a low of 8 MW, demonstrating the volatility of renewable output while confirming grid stability.The Irish TimesEclipse threatened electricity shortage as solar power generation dipped to near zeroEirGrid activated an emergency power plant in Tarbert to prevent a potential electricity shortage during Wednesday's solar eclipse, which caused solar generation to drop to near zero. The grid operator issued a margin warning due to low wind output and high demand driven by hot weather, though the situation did not escalate to an alert stage.