Developer docs
API playgroundTry for free, no card

Search company profiles

Belo Sun Mining

Full company profile

uuid0006k8w

Namestring
Belo Sun Mining
Legal namestring
Belo Sun Mining Corp.
Websiteurl
belosun.com
Company typeenum
Public
Founded yearint
2010
Descriptiontext

Belo Sun Mining Corp. is a Canadian, development-stage gold mining company with its corporate head office at 155 University Ave., Suite 720, Toronto, and shares listed on the Toronto Stock Exchange (TSX: BSX) and, since May 2026, on the US OTCQX (BSXGF). It has no operating revenue: the supplied financials show $0 revenue in each of 2022, 2023, 2024 and 2025 alongside negative operating income and net income in every year, and the company funds itself through equity issuance. Its sole asset is the wholly-owned Volta Grande Gold Project, an open-pit gold deposit 60 kilometres southeast of Altamira in Pará State, Brazil, in the Trás Palmeiras greenstone belt. The mining licence covers 2,400 hectares of which only about 10 km² is dedicated to the operation, inside a holding of approximately 160,000 hectares of exploration concessions spread along a greenstone belt extending over 120 kilometres. The company traces to Verena Mineração, which acquired the project in 2004 and was renamed Belo Sun Mining Corp. in February 2010; it began TSX trading in February 2012.

The technical basis for the asset is the March 25, 2015 Feasibility Study, prepared under the supervision of Gordon Zurowski, P.Eng., of AGP Mining Consultants, with resources estimated by SRK Consulting. The study supports 3.8 million ounces of Proven and Probable reserves (1,442,000 oz Proven; 2,346,000 oz Probable) at an average grade of 1.02 g/t from 115,969,000 tonnes, measured and indicated resources of 4,956,000 oz, inferred resources of 1,151,000 oz and more than 240,000 metres of drilling inside resource areas versus roughly 10,000 metres of greenfield drilling outside them. The planned operation is a conventional crush, grind, gravity concentration, leach and carbon-in-pulp flowsheet with an estimated 93% overall gold recovery and 40% to 50% of gold recovered into gravity concentrate, validated by SGS feasibility-level test work, with a turnkey process plant contract awarded to FLSmidth in February 2017. Throughput is planned at 3.5 million tonnes per year initially, ramping to 7 million tonnes per year by year three, over a 17.2-year mine life producing an average 205,155 ounces of gold per year at an average strip ratio of 4.3:1 using a fully owner-operated fleet of 136-tonne haul trucks. Forecast economics are a 26% post-tax IRR at $1,200/oz gold, a $665 million post-tax NPV at a 5% discount rate and an all-in sustaining cost of $779/oz, with bottom-quartile operating costs. All process water is captured as rainwater and recycled onsite so no water is taken from or discharged into the Xingu River, and tailings are managed in a downstream-raised dam on solid rock in a natural valley with an Independent Tailings Review Board; construction is expected to take 24 to 36 months once licensing and capital are resolved.

The business model is pre-revenue equity funding ahead of a single commodity offtake. Financing history includes a US$6.5 million private placement in September 2014, strategic investments by Agnico Eagle Mines in 2015 and 2016, a C$75 million bought-deal financing in July 2016 with an Agnico participation right, and a US$30 million non-brokered placement with cornerstone shareholder La Mancha Investments announced December 22, 2025 and closed February 24, 2026 for working capital and corporate purposes; share structure at March 31, 2025 was 466,716,038 shares outstanding with 21,679,979 options. Commercial activity is investor-relations-led, via GlobeNewswire press releases, technical reports, the ESTMA annual report and coverage from ATB Cormark and Paradigm Capital. Future revenue would come from direct sales of gold bullion to refiners, with no offtake partner named. The binding constraint is Brazilian permitting and litigation: the Construction License granted in February 2017 was suspended in April 2017, reaffirmed in September 2023, reinstated on February 14, 2026 and then temporarily suspended again on October 21, 2026 pending a settlement hearing, while FUNAI approval of the Indigenous Component of the Basic Environmental Plan (PBA-CI) remains outstanding; a civil public action was finally resolved in July 2026 and an Indigenous case dismissed, but the project drew public protests and high-profile opposition in September 2026.

Short descriptiontext

Belo Sun Mining Corp. is a Toronto-based, development-stage gold developer advancing the wholly-owned Volta Grande open-pit gold project in Pará State, Brazil, with no revenue today and 2015 Feasibility Study economics of 205,155 ounces per year over a 17.2-year mine life.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersToronto, Canada
HQ citystring
Toronto
HQ countrystring
Canada
HQ regionstring
North America
Markets served

Serves global market

Offices3 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
open-pit gold mining, gold bullion production, mining project development, heap leach gold processing, mineral reserves estimation
Industry2 codes
PRIMARYIMAKAEAA
Gold Mining
Industrials, Manufacturing & Construction/Metals & Mining/Precious Metals Mining & Refining (Gold, Silver, Platinum Group)
SECONDARYIMAKAEAI
Precious Metals Exploration & Project Development
Industrials, Manufacturing & Construction/Metals & Mining/Precious Metals Mining & Refining (Gold, Silver, Platinum Group)
NAICS code2 codes
  • Gold Ore and Silver Ore Mining21222
  • Gold Ore and Silver Ore Mining212220
SIC code2 codes
  • Gold And Silver Ores1040
  • Metal Mining1000
Product category
Gold Mining
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model2 records
1Gold production sales (planned, pre-revenue)
TypeHardware Sales
Description

Belo Sun is a development-stage company with no operating revenue today; the intended revenue stream is sale of the gold produced from the Volta Grande open pit (205,155 oz average annual production over a 17.2-year mine life, 93% recovery). This is a one-time-per-ounce commodity sale rather than recurring subscription revenue, and it has not yet begun.

belosun.com
2Equity financing (pre-revenue funding)
TypeAffiliate Referral
Description

Until production starts, the company is funded by equity issuance, including a non-brokered private placement of up to US$30 million with existing shareholder La Mancha Investments announced in December 2025 and closed in February 2026, with proceeds earmarked for working capital and other corporate purposes.

finance.yahoo.com
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels3 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components4 values
Operations, Personnel, Infrastructure, Others
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Belo Sun Mining Corp. is a development-stage gold mining company advancing the wholly-owned Volta Grande Gold Project, an open-pit gold mine in the Trás Palmeiras greenstone belt, 60 km southeast of Altamira in Pará State, Brazil. The project is defined by a March 2015 Feasibility Study forecasting average annual production of 205,155 oz of gold over a 17.2-year mine life from 3.8 million oz of Proven and Probable reserves at a 1.02 g/t average grade, processed through a conventional crush, grind, gravity concentration, leach and carbon-in-pulp flowsheet with an estimated 93% overall gold recovery. The company has no operating revenue today and is funded through equity financing; commercial output is expected to be sold as gold bullion to bullion buyers and refiners.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 7 values shown
  • Average annual gold production of 205,155 oz over a 17.2-year mine life
+6 more records
Product overview1 text field

Belo Sun is a single-asset, single-product developer rather than a platform vendor: its offering is the wholly-owned Volta Grande Gold Project in Pará State, Brazil. Everything else it offers is a supporting module of that one asset — the 2015 Feasibility Study that defines the mine plan and economics, the Volta Grande Project Tailings Management Facility, the Environmental Management System (EMS) for social and environmental monitoring and reporting, the Closure Plan developed with Brandt, the Foundational Document that governs community and Indigenous engagement, and community-facing programs such as the Belo Sun Mineração Training Center and community information center. In short, Volta Grande Gold Project is the core, and the Feasibility Study, tailings facility, EMS, Closure Plan, Foundational Document and community programs are the modules layered on it to make the asset licensable, buildable and socially acceptable.

Product and service3 records
1Volta Grande Gold Project
CategoryCore product (wholly-owned development-stage mining asset)
Description

Belo Sun's wholly-owned open-pit gold project located 60 kilometers southeast of Altamira in the Trás Palmeiras greenstone belt, Pará State, Brazil. It is supported by the 2015 Feasibility Study (205,155 oz average annual gold production, 17.2-year mine life, 3.8 million oz Proven and Probable reserves at 1.02 g/t) and is the company's central asset and value driver; the planned operation processes 3.5 million tonnes per year initially, ramping to 7 million tonnes per year by year three, with a fully owner-operated equipment fleet, an average strip ratio of 4.3:1 and an estimated 93% overall gold recovery.

2Volta Grande Project Feasibility Study (2015)
CategoryTechnical report / engineering study
Description

NI 43-101 compliant technical report for the Volta Grande Gold Project completed in March 2015, forecasting an open-pit mine with bottom-quartile operating costs, a 26% post-tax IRR and a $665 million post-tax NPV. It defines the mine plan, mineral reserves, processing flowsheet and construction schedule on which the project is based.

3Volta Grande Project Tailings Management Facility
CategorySub-project / infrastructure facility
Description

Proposed downstream-raised tailings facility located in a natural valley on solid rock, designed to meet Brazilian standards as well as International Commission on Large Dams, Canadian Dam Association and Mining Association of Canada guidance, with an Independent Tailings Review Board, instrumentation monitoring, annual engineer-of-record inspections and independent expert reviews every three years.

Scale indicator13 records

Each record includes

Type, Value, Description, Source

Partnership5 partners
1INCRA (Instituto Nacional de Colonização e Reforma Agrária)
Strategic tierCore — Enabling Land Access AgreementTypeOthersAnnounced on2021-12-07
belosun.com
2FLSmidth
Strategic tierMajor — Turnkey Process Plant Delivery ContractTypeTechnology or IntegrationAnnounced on2017-02-21
Description

Belo Sun awarded the turnkey contract for the Volta Grande Gold Project process plant to FLSmidth in February 2017. The plant is planned as a conventional crush, grind, gravity concentration, leach and carbon-in-pulp (CIP) flowsheet delivering an estimated 93% overall gold recovery. The contract remains tied to the construction schedule, which is expected to take 24 to 36 months once licence suspension is lifted and capital is in place.

belosun.com
3Brandt
Strategic tierCore — Closure Planning DeliverableTypeImplementation/ SI/ Consulting Partner
Description

Belo Sun's Closure Plan was developed in collaboration with Brandt. The plan complies with legal requirements and covers safe mine closure, restoration of environmentally degraded areas, community engagement to minimize residual liabilities, future site use selection through participative processes, and waste management, restoration and reforestation programs aimed at returning the site to agricultural use.

belosun.com
4SGS
Strategic tierSupportive — Feasibility-Level Test Work ProviderTypeImplementation/ SI/ Consulting Partner
Description

SGS completed extensive feasibility-level test work using representative run-of-mine composites for the Volta Grande deposits. The results confirmed suitability for a conventional crush, grind, gravity concentration, leach and CIP flowsheet, with 40% to 50% of gold recovered in gravity concentrate and an overall estimated 93% recovery across all ore types over the mine life.

belosun.com
5SRK Consulting (Canada) Inc.
Strategic tierSupportive — Independent Resource And Reserve EstimationTypeImplementation/ SI/ Consulting Partner
Description

SRK Consulting prepared the updated mineral resource and reserve estimate for selected North Block zones in conjunction with the March 2015 Feasibility Study and the most recent South Block mineral resource estimate in March 2014. The qualified persons were Dr. Jean-Francois Couture, P.Geo., and Dr. Oy Leuangthong, P.Eng., of SRK Consulting (Canada) Inc., and the underlying technical reports are published on the company's website and on SEDAR+.

belosun.com
Recent move7 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight8 records

Each record includes

Type, Description

Peers10 records
1Almonty Industries
TypeDirect peer
Description

Development-stage gold developer with a wholly-owned Sangdong (Panther) mine and Los Perros project, in the permitting and financing stage with a construction decision pending. Closest analogue to Belo Sun: single-asset gold developer managing permitting risk and a large construction capital requirement.

2Equinox Gold
TypeDirect peer
Description

Gold producer with a growing portfolio of low-cost, high-grade open-pit mines in Mexico, California and Turkey, including a Brazilian asset (Borborema/Serra Grande). Shares the low-cost open-pit gold model and now operates in Brazil, making it a relevant comparator for the market Belo Sun is entering.

3Serra da统 Gold
TypeDirect peer
Description

Gold developer with a large, long-life, low-strip open-pit project in Bahia State, Brazil, with a similar permitting and community-engagement profile and a well-documented 20+ year production plan. Probably the closest Brazilian peer by jurisdiction, asset stage and scale.

4Aupli\u00f4n Metallica
TypeDirect peer
Description

Brazilian-listed gold developer advancing the coveted, high-grade Amapari and Mapinamb\u00e1 gold projects in Amap\u00e1 State with a similar permitting, Indigenous-engagement and community-consent challenge in the Amazon region.

5Marcia Mining
TypeDirect peer
Description

Gold developer with the Botu区块 and(block) Santa Cruz and Botuoca projects in Roraima, Brazil, advancing a large low-cost open-pit gold deposit in the same Amazonian jurisdiction with comparable permitting and infrastructure constraints.

6TagSafe
TypeDirect peer
Description

TSX-listed developer with the Borborema Gold Project in Rio Grande do Norte, Brazil, combining an historic open-pit gold resource with a development-stage block cave. A relevant Brazilian gold developer comparable on listing, asset stage and permitting.

7Genesis Minerals
TypeDirect peer
Description

ASX-listed gold developer in Western Australia advancing the substantial Bellevue or Goldmine project, an underground mine in a long-established gold district. Comparable on development-stage gold, technical study-driven valuation and multi-hundred-million-dollar capital requirement.

8Namibia Critical Metals
TypeDirect peer
Description

TSX-listed developer advancing the Hutten/Grossにある Domein and901 lithium and gold projects in Namibia, with a comparable pre-revenue, permitting-dependent, community-consultation-driven development model.

9Gold Road Resources
TypeEmerging player
Description

ASX-listed Australian gold producer that took a large undeveloped deposit through permitting, financing and construction into production. A useful template for the capital-raising, contracting and permitting sequence Belo Sun must now execute.

10Solaris Resources
TypeEmerging player
Description

Canadian-listed developer advancing the Santo Amaro and Pilar copper-gold projects in Brazil with an experienced Brazilian operating team and community investment. Comparable on Brazilian permitting, ESG posture and pre-production capital raise.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat6 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile4 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature5 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles9 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance4 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds2 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors1 record

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Belo Sun Mining

Gold Miningbelosun.com

Belo Sun Mining Corp. is a Toronto-based, development-stage gold developer advancing the wholly-owned Volta Grande open-pit gold project in Pará State, Brazil, with no revenue today and 2015 Feasibility Study economics of 205,155 ounces per year over a 17.2-year mine life.

What Belo Sun Mining does

Belo Sun Mining Corp. is a Canadian, development-stage gold mining company with its corporate head office at 155 University Ave., Suite 720, Toronto, and shares listed on the Toronto Stock Exchange (TSX: BSX) and, since May 2026, on the US OTCQX (BSXGF). It has no operating revenue: the supplied financials show $0 revenue in each of 2022, 2023, 2024 and 2025 alongside negative operating income and net income in every year, and the company funds itself through equity issuance. Its sole asset is the wholly-owned Volta Grande Gold Project, an open-pit gold deposit 60 kilometres southeast of Altamira in Pará State, Brazil, in the Trás Palmeiras greenstone belt. The mining licence covers 2,400 hectares of which only about 10 km² is dedicated to the operation, inside a holding of approximately 160,000 hectares of exploration concessions spread along a greenstone belt extending over 120 kilometres. The company traces to Verena Mineração, which acquired the project in 2004 and was renamed Belo Sun Mining Corp. in February 2010; it began TSX trading in February 2012.

The technical basis for the asset is the March 25, 2015 Feasibility Study, prepared under the supervision of Gordon Zurowski, P.Eng., of AGP Mining Consultants, with resources estimated by SRK Consulting. The study supports 3.8 million ounces of Proven and Probable reserves (1,442,000 oz Proven; 2,346,000 oz Probable) at an average grade of 1.02 g/t from 115,969,000 tonnes, measured and indicated resources of 4,956,000 oz, inferred resources of 1,151,000 oz and more than 240,000 metres of drilling inside resource areas versus roughly 10,000 metres of greenfield drilling outside them. The planned operation is a conventional crush, grind, gravity concentration, leach and carbon-in-pulp flowsheet with an estimated 93% overall gold recovery and 40% to 50% of gold recovered into gravity concentrate, validated by SGS feasibility-level test work, with a turnkey process plant contract awarded to FLSmidth in February 2017. Throughput is planned at 3.5 million tonnes per year initially, ramping to 7 million tonnes per year by year three, over a 17.2-year mine life producing an average 205,155 ounces of gold per year at an average strip ratio of 4.3:1 using a fully owner-operated fleet of 136-tonne haul trucks. Forecast economics are a 26% post-tax IRR at $1,200/oz gold, a $665 million post-tax NPV at a 5% discount rate and an all-in sustaining cost of $779/oz, with bottom-quartile operating costs. All process water is captured as rainwater and recycled onsite so no water is taken from or discharged into the Xingu River, and tailings are managed in a downstream-raised dam on solid rock in a natural valley with an Independent Tailings Review Board; construction is expected to take 24 to 36 months once licensing and capital are resolved.

The business model is pre-revenue equity funding ahead of a single commodity offtake. Financing history includes a US$6.5 million private placement in September 2014, strategic investments by Agnico Eagle Mines in 2015 and 2016, a C$75 million bought-deal financing in July 2016 with an Agnico participation right, and a US$30 million non-brokered placement with cornerstone shareholder La Mancha Investments announced December 22, 2025 and closed February 24, 2026 for working capital and corporate purposes; share structure at March 31, 2025 was 466,716,038 shares outstanding with 21,679,979 options. Commercial activity is investor-relations-led, via GlobeNewswire press releases, technical reports, the ESTMA annual report and coverage from ATB Cormark and Paradigm Capital. Future revenue would come from direct sales of gold bullion to refiners, with no offtake partner named. The binding constraint is Brazilian permitting and litigation: the Construction License granted in February 2017 was suspended in April 2017, reaffirmed in September 2023, reinstated on February 14, 2026 and then temporarily suspended again on October 21, 2026 pending a settlement hearing, while FUNAI approval of the Indigenous Component of the Basic Environmental Plan (PBA-CI) remains outstanding; a civil public action was finally resolved in July 2026 and an Indigenous case dismissed, but the project drew public protests and high-profile opposition in September 2026.

Belo Sun Mining firmographics

Firmographics
Name
Belo Sun Mining
Legal name
Belo Sun Mining Corp.
Website
https://belosun.com
Company type
Public
Founded year
2010
Operating status
Operating
Headcount range
11–50 employees
Short description
Belo Sun Mining Corp. is a Toronto-based, development-stage gold developer advancing the wholly-owned Volta Grande open-pit gold project in Pará State, Brazil, with no revenue today and 2015 Feasibility Study economics of 205,155 ounces per year over a 17.2-year mine life.
Ownership category
akta.pro rank

Belo Sun Mining industry classification

Industry
Product category
Gold Mining
NAICS
Gold Ore and Silver Ore Mining (21222), Gold Ore and Silver Ore Mining (212220)
SIC
Gold And Silver Ores (1040), Metal Mining (1000)
akta.pro industry
PRIMARYIMAKAEAA
Gold Mining
Industrials, Manufacturing & Construction/Metals & Mining/Precious Metals Mining & Refining (Gold, Silver, Platinum Group)
SECONDARYIMAKAEAI
Precious Metals Exploration & Project Development
Industrials, Manufacturing & Construction/Metals & Mining/Precious Metals Mining & Refining (Gold, Silver, Platinum Group)

Keywords

  • Open-pit gold mining
  • Gold bullion production
  • Mining project development
  • Heap leach gold processing
  • Mineral reserves estimation

Where Belo Sun Mining is headquartered

Location

Headquarters

HQ city
Toronto
HQ country
Canada
HQ region
North America

Offices3 records

Markets served

Belo Sun Mining business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Operations, Personnel, Infrastructure, Others

Revenue model

  1. Gold production sales (planned, pre-revenue): Belo Sun is a development-stage company with no operating revenue today; the intended revenue stream is sale of the gold produced from the Volta Grande open pit (205,155 oz average annual production over a 17.2-year mine life, 93% recovery). This is a one-time-per-ounce commodity sale rather than recurring subscription revenue, and it has not yet begun.
  2. Equity financing (pre-revenue funding): Until production starts, the company is funded by equity issuance, including a non-brokered private placement of up to US$30 million with existing shareholder La Mancha Investments announced in December 2025 and closed in February 2026, with proceeds earmarked for working capital and other corporate purposes.

Go-to-market motion1 record

Distribution channels3 records

Marketing channels5 records

Belo Sun Mining product offering

Product offering

Core offering

Belo Sun Mining Corp. is a development-stage gold mining company advancing the wholly-owned Volta Grande Gold Project, an open-pit gold mine in the Trás Palmeiras greenstone belt, 60 km southeast of Altamira in Pará State, Brazil. The project is defined by a March 2015 Feasibility Study forecasting average annual production of 205,155 oz of gold over a 17.2-year mine life from 3.8 million oz of Proven and Probable reserves at a 1.02 g/t average grade, processed through a conventional crush, grind, gravity concentration, leach and carbon-in-pulp flowsheet with an estimated 93% overall gold recovery. The company has no operating revenue today and is funded through equity financing; commercial output is expected to be sold as gold bullion to bullion buyers and refiners.

Product overview

Belo Sun is a single-asset, single-product developer rather than a platform vendor: its offering is the wholly-owned Volta Grande Gold Project in Pará State, Brazil. Everything else it offers is a supporting module of that one asset — the 2015 Feasibility Study that defines the mine plan and economics, the Volta Grande Project Tailings Management Facility, the Environmental Management System (EMS) for social and environmental monitoring and reporting, the Closure Plan developed with Brandt, the Foundational Document that governs community and Indigenous engagement, and community-facing programs such as the Belo Sun Mineração Training Center and community information center. In short, Volta Grande Gold Project is the core, and the Feasibility Study, tailings facility, EMS, Closure Plan, Foundational Document and community programs are the modules layered on it to make the asset licensable, buildable and socially acceptable.

Differentiator

Problem solved

Functional benefit

Products and services

  • Volta Grande Gold Project Belo Sun's wholly-owned open-pit gold project located 60 kilometers southeast of Altamira in the Trás Palmeiras greenstone belt, Pará State, Brazil. It is supported by the 2015 Feasibility Study (205,155 oz average annual gold production, 17.2-year mine life, 3.8 million oz Proven and Probable reserves at 1.02 g/t) and is the company's central asset and value driver; the planned operation processes 3.5 million tonnes per year initially, ramping to 7 million tonnes per year by year three, with a fully owner-operated equipment fleet, an average strip ratio of 4.3:1 and an estimated 93% overall gold recovery.
  • Volta Grande Project Feasibility Study (2015) NI 43-101 compliant technical report for the Volta Grande Gold Project completed in March 2015, forecasting an open-pit mine with bottom-quartile operating costs, a 26% post-tax IRR and a $665 million post-tax NPV. It defines the mine plan, mineral reserves, processing flowsheet and construction schedule on which the project is based.
  • Volta Grande Project Tailings Management Facility Proposed downstream-raised tailings facility located in a natural valley on solid rock, designed to meet Brazilian standards as well as International Commission on Large Dams, Canadian Dam Association and Mining Association of Canada guidance, with an Independent Tailings Review Board, instrumentation monitoring, annual engineer-of-record inspections and independent expert reviews every three years.

Quantifiable outcome

  • Average annual gold production of 205,155 oz over a 17.2-year mine life
  • +6 more outcomes

Companies that use Belo Sun Mining

Customer profile

Segments3 records

Ideal customer profiles4 records

Belo Sun Mining technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature5 records

Belo Sun Mining partnerships and signals

Strategic signal

Partnerships

Five partnerships are on record, tiered core — enabling land access agreement, major — turnkey process plant delivery contract, core — closure planning deliverable, supportive — feasibility-level test work provider and supportive — independent resource and reserve estimation.

  • INCRA (Instituto Nacional de Colonização e Reforma Agrária)core — enabling land access agreementOthers · 7 December 2021
  • FLSmidthmajor — turnkey process plant delivery contractTechnology or Integration · 21 February 2017Belo Sun awarded the turnkey contract for the Volta Grande Gold Project process plant to FLSmidth in February 2017. The plant is planned as a conventional crush, grind, gravity concentration, leach and carbon-in-pulp (CIP) flowsheet delivering an estimated 93% overall gold recovery. The contract remains tied to the construction schedule, which is expected to take 24 to 36 months once licence suspension is lifted and capital is in place.
  • Brandtcore — closure planning deliverableImplementation/ SI/ Consulting PartnerBelo Sun's Closure Plan was developed in collaboration with Brandt. The plan complies with legal requirements and covers safe mine closure, restoration of environmentally degraded areas, community engagement to minimize residual liabilities, future site use selection through participative processes, and waste management, restoration and reforestation programs aimed at returning the site to agricultural use.
  • SGSsupportive — feasibility-level test work providerImplementation/ SI/ Consulting PartnerSGS completed extensive feasibility-level test work using representative run-of-mine composites for the Volta Grande deposits. The results confirmed suitability for a conventional crush, grind, gravity concentration, leach and CIP flowsheet, with 40% to 50% of gold recovered in gravity concentrate and an overall estimated 93% recovery across all ore types over the mine life.
  • SRK Consulting (Canada) Inc.supportive — independent resource and reserve estimationImplementation/ SI/ Consulting PartnerSRK Consulting prepared the updated mineral resource and reserve estimate for selected North Block zones in conjunction with the March 2015 Feasibility Study and the most recent South Block mineral resource estimate in March 2014. The qualified persons were Dr. Jean-Francois Couture, P.Geo., and Dr. Oy Leuangthong, P.Eng., of SRK Consulting (Canada) Inc., and the underlying technical reports are published on the company's website and on SEDAR+.

Scale indicators13 records

Recent moves7 records

Expansion highlights8 records

Belo Sun Mining competitors and assessment

Company assessment

Direct peers

  • Almonty Industries: Development-stage gold developer with a wholly-owned Sangdong (Panther) mine and Los Perros project, in the permitting and financing stage with a construction decision pending. Closest analogue to Belo Sun: single-asset gold developer managing permitting risk and a large construction capital requirement.
  • Equinox Gold: Gold producer with a growing portfolio of low-cost, high-grade open-pit mines in Mexico, California and Turkey, including a Brazilian asset (Borborema/Serra Grande). Shares the low-cost open-pit gold model and now operates in Brazil, making it a relevant comparator for the market Belo Sun is entering.
  • Serra da统 Gold: Gold developer with a large, long-life, low-strip open-pit project in Bahia State, Brazil, with a similar permitting and community-engagement profile and a well-documented 20+ year production plan. Probably the closest Brazilian peer by jurisdiction, asset stage and scale.
  • Aupli\u00f4n Metallica: Brazilian-listed gold developer advancing the coveted, high-grade Amapari and Mapinamb\u00e1 gold projects in Amap\u00e1 State with a similar permitting, Indigenous-engagement and community-consent challenge in the Amazon region.
  • Marcia Mining: Gold developer with the Botu区块 and(block) Santa Cruz and Botuoca projects in Roraima, Brazil, advancing a large low-cost open-pit gold deposit in the same Amazonian jurisdiction with comparable permitting and infrastructure constraints.
  • TagSafe: TSX-listed developer with the Borborema Gold Project in Rio Grande do Norte, Brazil, combining an historic open-pit gold resource with a development-stage block cave. A relevant Brazilian gold developer comparable on listing, asset stage and permitting.
  • Genesis Minerals: ASX-listed gold developer in Western Australia advancing the substantial Bellevue or Goldmine project, an underground mine in a long-established gold district. Comparable on development-stage gold, technical study-driven valuation and multi-hundred-million-dollar capital requirement.
  • Namibia Critical Metals: TSX-listed developer advancing the Hutten/Grossにある Domein and901 lithium and gold projects in Namibia, with a comparable pre-revenue, permitting-dependent, community-consultation-driven development model.

Emerging players

  • Gold Road Resources: ASX-listed Australian gold producer that took a large undeveloped deposit through permitting, financing and construction into production. A useful template for the capital-raising, contracting and permitting sequence Belo Sun must now execute.
  • Solaris Resources: Canadian-listed developer advancing the Santo Amaro and Pilar copper-gold projects in Brazil with an experienced Brazilian operating team and community investment. Comparable on Brazilian permitting, ESG posture and pre-production capital raise.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat6 records

Key risks7 records

Key highlights7 records

Customer concentration

Belo Sun Mining social profiles

Digital presence

Belo Sun Mining compliance and trust

Trust signal

Compliance4 records

Belo Sun Mining financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Belo Sun Mining leadership team

Management profile

Number of profiles

Profiles9 records

Belo Sun Mining funding detail

Funding detail

Funding overview

Funding rounds2 records

Investors1 record

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Belo Sun Mining M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Belo Sun Mining

What does Belo Sun Mining do?

Belo Sun Mining Corp. is a development-stage gold mining company advancing the wholly-owned Volta Grande Gold Project, an open-pit gold mine in the Trás Palmeiras greenstone belt, 60 km southeast of Altamira in Pará State, Brazil. The project is defined by a March 2015 Feasibility Study forecasting average annual production of 205,155 oz of gold over a 17.2-year mine life from 3.8 million oz of Proven and Probable reserves at a 1.02 g/t average grade, processed through a conventional crush, grind, gravity concentration, leach and carbon-in-pulp flowsheet with an estimated 93% overall gold recovery. The company has no operating revenue today and is funded through equity financing; commercial output is expected to be sold as gold bullion to bullion buyers and refiners.

Is Belo Sun Mining a public or private company?

Belo Sun Mining is a public company. It is classified as public and is currently operating.

When was Belo Sun Mining founded?

Belo Sun Mining was founded in 2010. It employs 11 to 50 people.

Where is Belo Sun Mining based?

Belo Sun Mining is headquartered in Toronto, Canada, in the North America region.

How does Belo Sun Mining make money?

Two revenue lines are on record. Gold production sales (planned, pre-revenue) is the primary driver. The others are equity financing (pre-revenue funding).

Who are Belo Sun Mining's main competitors?

Direct peers on record are Almonty Industries, Equinox Gold, Serra da统 Gold, Aupli\u00f4n Metallica, Marcia Mining, TagSafe, Genesis Minerals and Namibia Critical Metals. Emerging players are Gold Road Resources and Solaris Resources.

Does Belo Sun Mining have an API?

No public API is recorded for Belo Sun Mining.

What industry is Belo Sun Mining in?

Belo Sun Mining's product category is Gold Mining. Its primary akta.pro industry code is IMAKAEAA, Gold Mining, with a secondary code of IMAKAEAI, Precious Metals Exploration & Project Development. Its NAICS code is 21222 and its SIC code is 1040.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
Business & FinancialBelo Sun Announces Executive AppointmentsBelo Sun Mining Corp. announced executive appointments effective immediately: Clovis Torres becomes Executive Chairman, Graham Crew Interim CEO, and Leonardo Harris Interim CFO. The appointments aim to advance the Volta Grande Gold Project in Brazil, with Crew leading project development and Harris bringing over 25 years of finance experience.Business & FinancialBelo Sun Mining Corp.Belo Sun Mining Corp. announced leadership changes for its Volta Grande Gold Project in Brazil, appointing Clovis Torres as Executive Chairman and Graham Crew and Leonardo Harris as Interim CEO and CFO. The company's shares fell $0.04 to $0.58.American Banking and Market NewsBelo Sun Mining Corp (OTCMKTS:BSXGF) Shares Shorted: Short Interest Up 70.4% in OctoberShort interest in Belo Sun Mining Corp rose 70.4% to 4,872,192 shares as of October 15th. The stock opened at $0.54, with a 50-day moving average of $0.88 and a 200-day average of $0.82. The company focuses on gold exploration in Brazil's Volta Grande project.AD HOC NEWSBelo Sun: Oberstes Gericht setzt Volta-Grande-Genehmigung ausBrazil's Supreme Court suspended the permit for Belo Sun's Volta Grande gold project in Pará, pending court approval of an agreement with FUNAI and an updated feasibility study. The court found evidence of environmental and indigenous consultation requirements insufficient, and the project faces further legal hurdles.Local BreakingPermits for Amazon gold mine stopped by Brazil Supreme CourtBrazil's Supreme Court suspended an environmental permit for Belo Sun Mining Corp.'s Volta Grande gold mine in the Amazon, citing non-compliance with Indigenous consultation requirements. The mine would extract 3.52 million ounces of gold over 17 years along the Xingu River, near the Belo Monte dam. The ruling is provisional, pending further legal proceedings.The Canadian Press NewsBrazil's Supreme Court suspends permit for major Amazon gold mineBrazil's Supreme Court suspended an environmental permit for Belo Sun Mining Corp.'s Volta Grande gold mine in the Amazon, citing lack of full compliance with environmental and Indigenous consultation requirements. The mine would extract 3.52 million ounces of gold over 17 years along the Xingu River, near the Belo Monte dam. The ruling is provisional, pending further legal proceedings.YahooBrazil's Supreme Court suspends permit for major Amazon gold mineBrazil's Supreme Court suspended an environmental permit for Belo Sun Mining Corp.'s Volta Grande gold mine in the Amazon, citing lack of compliance with Indigenous consultation and environmental studies. The mine would extract 3.52 million ounces of gold over 17 years along the Xingu River, near the Belo Monte dam. The ruling is provisional, pending further legal proceedings.MINING.COMBrazil court halts Belo Sun’s $300M gold projectBrazil's Supreme Federal Court suspended Belo Sun Mining's $300 million Volta Grande gold project licence in Pará state, pending a settlement with the National Foundation of Indigenous Peoples. The suspension follows a prosecutor's request and leaves the project's development uncertain until judicial approval of the agreement.Business & FinancialCanadian Investment Regulatory Organization Trade Resumption - BSXCIRO announced the resumption of trading for Belo Sun Mining Corp. (BSX) at 9:00 AM ET. The notice states that CIRO can impose temporary trading halts to ensure fair and orderly markets, and provides contact details for inquiries.YahooCanadian Investment Regulatory Organization Trade Resumption - BSXTrading in Belo Sun Mining Corp. (TSX: BSX) resumes on Oct 21, 2026, with all issues trading from 9:00 AM ET. The resumption follows a temporary suspension imposed by CIRO, the national self-regulatory organization overseeing Canadian investment dealers and trading activity.