Copelouzos Group

Full company profile

uuid0006ycj

Namestring
Copelouzos Group
Legal namestring
COPELOUZOS GROUP
Websiteurl
copelouzos.gr
Company typeenum
Private
Founded yearint
1972
Descriptiontext

Copelouzos Group is a privately-held Greek diversified conglomerate founded in 1972 and headquartered in Maroussi, Athens, operating across energy, infrastructure, construction, real estate, and out-of-home advertising. Its energy platform spans renewable generation (2,730 MW under development and 488 MW operational through ELICA Group), natural gas supply (PROMETHEUS GAS, ~1 BCM annually), electricity trading across five countries (NECO, ~650 GWh/year), electricity supply to medium-voltage consumers (NOVAERA, 300 MW license), and battery energy storage (825 MW licensed across five Greek sites). It is also developing the flagship GREGY Egypt-Greece electrical interconnector — a 3,000 MW submarine cable project backed by EUR 4.2 billion in planned investment and 8.5 GW of supporting renewable generation in Egypt — and is constructing an 840 MW combined-cycle gas turbine plant in Alexandroupolis (EUR 400 million, hydrogen-capable up to 50%) for Q2 2027 commissioning.

The Group participates in critical Greek infrastructure through long-duration concessions: it is the only Greek private shareholder in Athens International Airport (concession extended in 2019 for EUR 1.403 billion), co-owns Fraport Greece with Fraport AG (14 regional airports under a 40-year concession secured in 2017 for EUR 1.53 billion), and holds a consortium stake in DESFA, the Greek Natural Gas Transmission System Operator (66% acquired in 2018 for EUR 535 million alongside Snam, Enagas, and Fluxys). Construction, facility management, and energy services are operated through REDEX (with an EUR 90 million construction pipeline and ~480,000 sqm under active facility management), while out-of-home advertising runs through Interbus, which holds exclusive rights across 16 Greek airports reaching 81 million passengers. Real estate operations span over 75,000 sqm of commercial and 55,000 sqm of premium residential property.

Revenue mechanics span regulated infrastructure concessions, transactional gas and electricity trading, project-based construction contracts (EPC), and advertising. Pricing is generally not publicly disclosed; energy supply tariffs are negotiated bilaterally, concession economics are governed by long-term regulatory frameworks, and construction contracts are project-specific. The Group serves a mix of national utilities, industrial and commercial energy consumers, the Greek government, airport operators, and premium real estate tenants. Leadership rests with Founder Dimitris Chr. Copelouzos, CEO Christos D. Copelouzos, and unit heads including Nikolaos Symeonidis (General Manager), John Karydas (CEO of RES & Energy Storage / GREGY), and Thomas Acheimastos (Vice President).

Short descriptiontext

Copelouzos Group is a privately-held Greek diversified conglomerate founded in 1972 that operates across renewable and conventional energy, electricity trading, natural gas, airport and energy infrastructure concessions, construction, real estate, and out-of-home advertising, serving utilities, industrial consumers, and the Greek government.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
101–250
akta.pro rankint
HeadquartersFilothéi, Greece
HQ citystring
Filothéi
HQ countrystring
Greece
HQ regionstring
Europe
Markets served

Serves global market

Offices2 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
renewable energy infrastructure, natural gas supply, electricity trading, infrastructure concessions, construction services
NAICS code2 codes
  • Support Activities for Transportation488
  • Freight Transportation Arrangement48851
SIC code1 code
  • Arrangement Of Transportation Of Freight & Cargo4731
Product category
Energy Infrastructure and Conglomerate Investment
Social media profiles1 record
GTM motion2 records

Each record includes

Type, Description, Source

Revenue model7 records
1Natural Gas Trading and Supply
TypeTransaction Fee
Description

Supply of natural gas to the Greek market with annual sales of approximately 1 BCM. The company PROMITHEAS GAS holds a leading position in the Greek natural gas market since 2016.

copelouzos.gr
2Electricity Trading
TypeTransaction Fee
Description

Electricity trading through NECO S.A. with cross-border trade operations across 5 countries. Sales of approximately 650 GWh per year.

copelouzos.gr
3Electricity Supply
TypeSubscription Recurring
Description

Supply of electricity to medium voltage consumers within the Greek Interconnected Power System through NOVAERA ENERGY S.A. with 300 MW license.

copelouzos.gr
4Construction and Engineering Services
TypeOne Time License
Description

Construction and EPC services for energy projects, building construction, and facility management through DAMCO ENERGY and REDEX subsidiaries. Construction pipeline of EUR 90 million.

copelouzos.gr
5Renewable Energy Generation
TypeSubscription Recurring
Description

Generation of renewable energy from wind farms, photovoltaic parks, and hydroelectric plants. Portfolio includes 2,730 MW under development and 488 MW under construction/operation.

copelouzos.gr
6Out-of-Home Advertising
TypeAdvertising
Description

Advertising services at airports and public transport through INTERBUS, reaching 81 million airport passengers annually.

copelouzos.gr
7Power Generation Equipment Rental
TypeUsage Based
Description

Rental of generating sets for peak load coverage and emergency needs, with over 600 MW of leased capacity.

copelouzos.gr
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels5 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D, Marketing or Sales
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Copelouzos Group is a Greek diversified infrastructure investor that develops, owns, and operates energy assets (renewable generation, natural gas supply, electricity trading, battery storage, the GREGY Egypt-Greece submarine interconnector, and an 820 MW CCGT plant), infrastructure concessions (14 regional airports via Fraport Greece, Athens International Airport, DESFA gas transmission), construction and facility management (REDEX), real estate, and out-of-home advertising (Interbus). The Group serves utilities, industrial and commercial energy consumers, government entities, and commercial tenants through wholly-owned subsidiaries and joint ventures.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 7 values shown
  • 3,000 MW of green electricity transfer capacity from Egypt to Europe
+6 more records
Product overview1 text field

Copelouzos Group is a diversified Greek business organization and infrastructure investor operating across multiple sectors including energy (renewable energy, natural gas, conventional power, electricity trading/supply, electrical interconnection), construction and facility management, real estate, out-of-home advertising, and infrastructure concessions (airports, ports, exhibition centers). The Group operates through numerous subsidiaries including ELICA GROUP (renewable energy sources and energy storage), DAMCO ENERGY S.A. (energy projects, equipment, LNG infrastructure), PROMETHEUS GAS S.A. (natural gas), NECO S.A. and NOVAERA ENERGY (electricity trading and supply), ELICA INTERCONNECTOR S.M. S.A. (GREGY Egypt-Greece electrical interconnector), REDEX S.A. (construction, facility management, energy services), Interbus S.A. (out-of-home advertising), and holds investments in Athens International Airport, Greek Regional Airports via Fraport Greece, and DESFA natural gas transmission system.

Product and service19 records
1GREGY Egypt-Greece Electrical Interconnector
CategoryInfrastructure Project — Electrical Interconnection
Description

Submarine electrical interconnection project linking Egypt directly to mainland Greece with 3,000 MW capacity for transporting green electricity. The EUR 4.2 billion project includes 8.5 GW of renewable energy projects in Egypt (75% wind, 25% solar) to supply the interconnector, enabling bi-directional power transmission and positioning the Vertical Electricity Corridor for the Three Seas Initiative countries.

2Real Estate Portfolio
CategoryReal Estate / Asset Management
Description

Copelouzos Group owns and manages a diversified portfolio of premium commercial and residential real estate in Greece, including office buildings on major roads and luxury properties in island locations. Tenants include Dupont Greece, the Hellenic Association of Pharmaceutical Companies (SFEE), and Foreign Embassies in Greece.

3Interbus Out-of-Home Advertising
CategoryOut-of-Home Advertising
Description

Number one company in Greece for advertising in airports and public transport networks. Operates in 16 airports addressing 81 million passengers and manages over 1,970 vehicles and trains with advertising spaces. Holds exclusive advertising rights at Athens International Airport, 14 Fraport Greece regional airports, and Piraeus Port.

4REDEX Facility Management
CategoryFacility Management Services
Description

Technical management and operations for building facilities and networks across Greece, covering approximately 480,000 sqm of active building contract installations with 80 MW of installed equipment power. Services include flexible maintenance programs and intelligent building management systems for office buildings, retail, industrial and residential properties.

5Battery Energy Storage Systems (BESS)
CategoryEnergy Storage Infrastructure
Description

Central battery energy storage stations with total capacity of 825 MW across 5 production licenses. Includes 225 MW in Alexandroupolis, 150 MW in Patras, 300 MW in Kozani, 50 MW in Boeotia, and 50 MW in Magnesia. First entity in Greece to receive production licenses for BESS stations.

6Alexandroupolis CCGT Power Plant
CategoryConventional Power Generation
Description

820-840 MW combined cycle gas turbine power plant under construction in Alexandroupolis Industrial Area with EUR 400 million investment. Equipment is capable of hydrogen combustion up to 50%, supporting Greece's energy security and transition to green energy. Expected commercial operation in Q2 2027.

7PROMETHEUS GAS Natural Gas Supply
CategoryNatural Gas Supply and Infrastructure
Description

Leading natural gas supplier in the Greek market with annual sales of approximately 1 BCM. Handles natural gas import and sales, with constructed infrastructure of over 1,000 km of high-pressure gas transmission pipelines and 340 km of medium and low-pressure distribution pipelines. Has held a leading position in the Greek natural gas market since 1991.

8NECO Electricity Trading
CategoryElectricity Trading
Description

Joint venture with Bulgarian NEK EAD for electricity trading and cross-border trade. Over 24 years of operation with sales of approximately 650 GWh per year across 5 countries. Actively developing hydropower stations and wind parks in Bulgaria. Holds a 450 MW electricity trading license.

9NOVAERA ENERGY Electricity Supply
CategoryElectricity Supply
Description

Wholly-owned subsidiary supplying electricity to Medium Voltage consumers within the Greek Interconnected Power System. 16 years of operation with 300 MW electricity supply license and annual sales of 300,000 MWh.

10ELICA Renewable Energy Sources
CategoryRenewable Energy Generation
Description

Development of renewable energy through the ELICA Group, with 2,730 MW portfolio under development and 488 MW of RES projects constructed and operational. Activities include wind parks, offshore wind farms, photovoltaic parks, and hydroelectric stations in Greece and the Balkans. Annual renewable energy production of 1,300 GWh.

11DAMCO ENERGY Generating Sets and Power Projects
CategoryEnergy Project Construction and Equipment Supply
Description

Sales, installation, and rental of generating sets with over 600 MW of leased generating capacity, plus construction of energy projects including hydroelectric, diesel-fired, lignite-fired, and combined-cycle plants. Specialized in LNG FSRU infrastructure development. ISO 9001/14001/45001 certified since 2021.

12DAMCO ENERGY Floating LNG Infrastructure
CategoryLNG Infrastructure Engineering
Description

Proven experience in design, engineering, and licensing of Floating Liquefied Natural Gas Storage and Regasification Units (LNG FSRU) and onshore and offshore natural gas transmission systems, including market research, feasibility studies, risk assessment, and licensing.

13REDEX Construction Services
CategoryConstruction and Building Services
Description

Construction, reconstruction, renovation, and modification of buildings, offices, hotels, stores and business premises. Over 250,000 sqm of constructed/reconstructed surfaces, 12 simultaneous construction sites in Greece and abroad. EUR 90 million construction revenue. Clients include DHL Greece, Leroy Merlin, Makedonia Palace Hotel, One & Only Kea Resort, Milos Cove, St. Catherine's British School, and HYGEIA Group.

14REDEX Energy Services
CategoryEnergy Efficiency Services
Description

Advanced technology solutions for lower energy consumption and maintenance costs. Achieved 26,300 tonnes CO2 reduction in the last 5 years with 36.8 million kWh total energy savings. Offers 'pay-as-you-save' solutions based on internationally recognized standards and has received 7 Energy Mastering Awards.

15Greek Regional Airports (Fraport Greece)
CategoryAirport Infrastructure Concession
Description

Co-owned with Fraport AG under a 40-year concession to operate, maintain, and develop 14 Greek regional airports. Concession fee of EUR 1.53 billion paid to HRADF with EUR 400 million capex invested within first 4 years. Airports serve 36 million passengers (2024) and contribute an estimated EUR 300+ million annually to Greek GDP.

16Athens International Airport (AIA) Investment
CategoryAirport Infrastructure Investment
Description

Copelouzos Group is the only Greek private shareholder in Athens International Airport 'Eleftherios Venizelos'. Airport serves 31.9 million passengers with 283,000 aircraft movements (2025). Concession agreement extended in 2019 for EUR 1.403 billion. Won Best Airport Routes Europe 2019, ACI Best Airport Customer Satisfaction Award 2019, and Skytrax Best Airport in Southeastern Europe 2018.

17DESFA Hellenic Gas Transmission System
CategoryNatural Gas Transmission Infrastructure
Description

Through SENFLUGA ENERGY INFRASTRUCTURE HOLDINGS S.A., the Group holds a stake in DESFA (Hellenic Gas Transmission System Operator). DESFA operates the National Natural Gas System with 512 km main pipeline and branches totaling 953.2 km, plus LNG terminal at Revithoussa with 225,000 m3 storage capacity. Stake acquired for EUR 535 million in consortium with Snam, Enagás, and Fluxys.

18Piritium and Silcio Photovoltaic Manufacturing
CategoryPhotovoltaic Manufacturing
Description

Two factories in the Patras industrial area producing photovoltaic products through subsidiaries Piritium A.E. and Silcio A.E. Piritium produces approximately 33 MWp of polycrystalline silicon wafers; Silcio has capacity for 30 MWp cells and 24 MWp modules.

19Metropolitan Expo Exhibition Center
CategoryExhibition Center Concession
Description

Concession holding in the exhibition centers sector through the Group's infrastructure investments portfolio, serving the exhibition and conference market in Greece.

Scale indicator24 records

Each record includes

Type, Value, Description, Source

Partnership12 partners
1Senfluga Energy Infrastructure Holdings S.A.
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2018-01-01
Description

Consortium led by Copelouzos Group (via DAMCO ENERGY) and three major European gas operators (Snam, Enagas, Fluxys) acquired 66% stake in DESFA (Greek Natural Gas Transmission System Operator) for EUR 535 million.

copelouzos.gr
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2017-01-01
Description

Joint venture between German airport operator Fraport AG and Copelouzos Group to operate, maintain, and develop 14 Greek regional airports under a 40-year concession. Concession fee EUR 1.53 billion paid to HRADF. Investment of EUR 400 million within first 4 years.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2010-01-01
Description

Wholly-owned subsidiary of Copelouzos Group established for electricity supply to medium voltage consumers within the Greek Interconnected Power System. Holds 300 MW supply license.

4NECO S.A. (Joint venture with NEK EAD - Bulgarian Public Electric Power Company)
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2002-01-01
Description

Joint company established in Athens for electricity trading and cross-border trade with 5 countries. Operating for 24 years with sales of approximately 650 GWh per year.

copelouzos.gr
Strategic tierMinorTypeStrategic or Co-development Partner
Description

Italian energy group collaborating on energy projects and infrastructure development.

6Snam S.p.A.
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Italian energy infrastructure company co-investing in DESFA through Senfluga consortium. Also shareholder in TAP pipeline.

copelouzos.gr
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Spanish energy company co-investing in DESFA through Senfluga consortium. Also shareholder in TAP pipeline.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Belgian gas infrastructure group co-investing in DESFA through Senfluga consortium. Also shareholder in TAP pipeline.

9China Energy Investment Corporation Ltd.
Strategic tierMinorTypeStrategic or Co-development Partner
Description

Chinese state-owned energy corporation collaborating on energy projects and investments.

copelouzos.gr
10Egyptian Electricity Holding Company
Strategic tierCoreTypeStrategic or Co-development Partner
Description

State-owned Egyptian electricity company partnering on the GREGY interconnector project to develop renewable energy projects in Egypt and establish electrical connection with Greece.

copelouzos.gr
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Subsidiary company of Copelouzos Group developing the GREGY electrical interconnector between Egypt and Greece with 3,000 MW capacity.

12Elica Group (Renewable Energy Companies)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Elica Group companies developing renewable energy projects including wind farms, photovoltaic parks, hydroelectric plants, offshore wind, and battery energy storage systems.

copelouzos.gr
Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
1Public Power Corporation (PPC)
TypeDirect peer
Description

Greece's incumbent electricity generator and supplier and the dominant counterparty in the Greek power market. Direct peer to Copelouzos in electricity generation (lignite, gas, renewables), supply (NOVAERA ENERGY competes for medium-voltage customers) and renewable development.

2GEK Terna
TypeDirect peer
Description

Greek construction and energy conglomerate with concessions in motorways, real estate, power generation and renewable energy. Closest comparable Greek diversified infrastructure model with overlapping energy, construction and concession portfolios.

3Mytilineos (Metlen Energy & Metals)
TypeDirect peer
Description

Greek industrial and energy conglomerate combining metals (aluminium), energy (gas-fired and renewables), and EPC services. Highly comparable diversified model with energy infrastructure and construction overlap.

TypeDirect peer
Description

Greek integrated energy major active in refining, fuel supply, natural gas (DEPA/EPIC), and renewables. Peer in the Greek energy market across hydrocarbons, trading and downstream supply.

TypeDirect peer
Description

Pure-play Greek renewables independent power producer with wind, hydro, solar and battery storage assets. Direct peer to Copelouzos' ELICA Group renewables portfolio and 825 MW BESS pipeline.

TypeDirect peer
Description

German airport operator and Copelouzos' JV partner in Fraport Greece. Direct peer in the Greek regional airports concession business (where Fraport AG is the operational lead) and globally comparable in airport operation/management.

TypeBroad incumbent
Description

Italian multinational utility and one of Europe's largest renewable operators. Copelouzos' listed 'minor' partner in Greek energy projects and a broader peer in power generation, grids and energy transition strategy.

TypeDirect peer
Description

Greek construction and infrastructure group with concessions in motorways, real estate and energy projects. Peer to REDEX in large-scale Greek construction and EPC services for industrial clients.

9ElvalHalcor
TypeEmerging player
Description

Greek industrial conglomerate (aluminium, copper and rolled products). Comparable as a Greek family-controlled diversified industrial platform with energy adjacency, though less directly overlapping in power generation.

TypeEmerging player
Description

Greek construction and infrastructure group active in buildings, motorways, energy and PPP projects. Peer to REDEX in domestic construction and a partial peer in energy infrastructure builds.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers15 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment6 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile5 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles5 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

Subsidiaries11 records

Each record includes

Name, Acquired on, Relationship type, Type, Business focus

Compliance3 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Copelouzos Group

Energy Infrastructure and Conglomerate Investmentcopelouzos.gr

Copelouzos Group is a privately-held Greek diversified conglomerate founded in 1972 that operates across renewable and conventional energy, electricity trading, natural gas, airport and energy infrastructure concessions, construction, real estate, and out-of-home advertising, serving utilities, industrial consumers, and the Greek government.

What Copelouzos Group does

Copelouzos Group is a privately-held Greek diversified conglomerate founded in 1972 and headquartered in Maroussi, Athens, operating across energy, infrastructure, construction, real estate, and out-of-home advertising. Its energy platform spans renewable generation (2,730 MW under development and 488 MW operational through ELICA Group), natural gas supply (PROMETHEUS GAS, ~1 BCM annually), electricity trading across five countries (NECO, ~650 GWh/year), electricity supply to medium-voltage consumers (NOVAERA, 300 MW license), and battery energy storage (825 MW licensed across five Greek sites). It is also developing the flagship GREGY Egypt-Greece electrical interconnector — a 3,000 MW submarine cable project backed by EUR 4.2 billion in planned investment and 8.5 GW of supporting renewable generation in Egypt — and is constructing an 840 MW combined-cycle gas turbine plant in Alexandroupolis (EUR 400 million, hydrogen-capable up to 50%) for Q2 2027 commissioning.

The Group participates in critical Greek infrastructure through long-duration concessions: it is the only Greek private shareholder in Athens International Airport (concession extended in 2019 for EUR 1.403 billion), co-owns Fraport Greece with Fraport AG (14 regional airports under a 40-year concession secured in 2017 for EUR 1.53 billion), and holds a consortium stake in DESFA, the Greek Natural Gas Transmission System Operator (66% acquired in 2018 for EUR 535 million alongside Snam, Enagas, and Fluxys). Construction, facility management, and energy services are operated through REDEX (with an EUR 90 million construction pipeline and ~480,000 sqm under active facility management), while out-of-home advertising runs through Interbus, which holds exclusive rights across 16 Greek airports reaching 81 million passengers. Real estate operations span over 75,000 sqm of commercial and 55,000 sqm of premium residential property.

Revenue mechanics span regulated infrastructure concessions, transactional gas and electricity trading, project-based construction contracts (EPC), and advertising. Pricing is generally not publicly disclosed; energy supply tariffs are negotiated bilaterally, concession economics are governed by long-term regulatory frameworks, and construction contracts are project-specific. The Group serves a mix of national utilities, industrial and commercial energy consumers, the Greek government, airport operators, and premium real estate tenants. Leadership rests with Founder Dimitris Chr. Copelouzos, CEO Christos D. Copelouzos, and unit heads including Nikolaos Symeonidis (General Manager), John Karydas (CEO of RES & Energy Storage / GREGY), and Thomas Acheimastos (Vice President).

Copelouzos Group firmographics

Firmographics
Name
Copelouzos Group
Legal name
COPELOUZOS GROUP
Website
https://copelouzos.gr
Company type
Private
Founded year
1972
Operating status
Operating
Headcount range
101–250 employees
Short description
Copelouzos Group is a privately-held Greek diversified conglomerate founded in 1972 that operates across renewable and conventional energy, electricity trading, natural gas, airport and energy infrastructure concessions, construction, real estate, and out-of-home advertising, serving utilities, industrial consumers, and the Greek government.
Ownership category
akta.pro rank

Where Copelouzos Group is headquartered

Location

Headquarters

HQ city
Filothéi
HQ country
Greece
HQ region
Europe

Offices2 records

Markets served

Copelouzos Group business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D, Marketing or Sales

Revenue model

  1. Natural Gas Trading and Supply: Supply of natural gas to the Greek market with annual sales of approximately 1 BCM. The company PROMITHEAS GAS holds a leading position in the Greek natural gas market since 2016.
  2. Electricity Trading: Electricity trading through NECO S.A. with cross-border trade operations across 5 countries. Sales of approximately 650 GWh per year.
  3. Electricity Supply: Supply of electricity to medium voltage consumers within the Greek Interconnected Power System through NOVAERA ENERGY S.A. with 300 MW license.
  4. Construction and Engineering Services: Construction and EPC services for energy projects, building construction, and facility management through DAMCO ENERGY and REDEX subsidiaries. Construction pipeline of EUR 90 million.
  5. Renewable Energy Generation: Generation of renewable energy from wind farms, photovoltaic parks, and hydroelectric plants. Portfolio includes 2,730 MW under development and 488 MW under construction/operation.
  6. Out-of-Home Advertising: Advertising services at airports and public transport through INTERBUS, reaching 81 million airport passengers annually.
  7. Power Generation Equipment Rental: Rental of generating sets for peak load coverage and emergency needs, with over 600 MW of leased capacity.

Go-to-market motion2 records

Distribution channels5 records

Marketing channels5 records

Copelouzos Group product offering

Product offering

Core offering

Copelouzos Group is a Greek diversified infrastructure investor that develops, owns, and operates energy assets (renewable generation, natural gas supply, electricity trading, battery storage, the GREGY Egypt-Greece submarine interconnector, and an 820 MW CCGT plant), infrastructure concessions (14 regional airports via Fraport Greece, Athens International Airport, DESFA gas transmission), construction and facility management (REDEX), real estate, and out-of-home advertising (Interbus). The Group serves utilities, industrial and commercial energy consumers, government entities, and commercial tenants through wholly-owned subsidiaries and joint ventures.

Product overview

Copelouzos Group is a diversified Greek business organization and infrastructure investor operating across multiple sectors including energy (renewable energy, natural gas, conventional power, electricity trading/supply, electrical interconnection), construction and facility management, real estate, out-of-home advertising, and infrastructure concessions (airports, ports, exhibition centers). The Group operates through numerous subsidiaries including ELICA GROUP (renewable energy sources and energy storage), DAMCO ENERGY S.A. (energy projects, equipment, LNG infrastructure), PROMETHEUS GAS S.A. (natural gas), NECO S.A. and NOVAERA ENERGY (electricity trading and supply), ELICA INTERCONNECTOR S.M. S.A. (GREGY Egypt-Greece electrical interconnector), REDEX S.A. (construction, facility management, energy services), Interbus S.A. (out-of-home advertising), and holds investments in Athens International Airport, Greek Regional Airports via Fraport Greece, and DESFA natural gas transmission system.

Differentiator

Problem solved

Functional benefit

Products and services

  • GREGY Egypt-Greece Electrical Interconnector Submarine electrical interconnection project linking Egypt directly to mainland Greece with 3,000 MW capacity for transporting green electricity. The EUR 4.2 billion project includes 8.5 GW of renewable energy projects in Egypt (75% wind, 25% solar) to supply the interconnector, enabling bi-directional power transmission and positioning the Vertical Electricity Corridor for the Three Seas Initiative countries.
  • Real Estate Portfolio Copelouzos Group owns and manages a diversified portfolio of premium commercial and residential real estate in Greece, including office buildings on major roads and luxury properties in island locations. Tenants include Dupont Greece, the Hellenic Association of Pharmaceutical Companies (SFEE), and Foreign Embassies in Greece.
  • Interbus Out-of-Home Advertising Number one company in Greece for advertising in airports and public transport networks. Operates in 16 airports addressing 81 million passengers and manages over 1,970 vehicles and trains with advertising spaces. Holds exclusive advertising rights at Athens International Airport, 14 Fraport Greece regional airports, and Piraeus Port.
  • REDEX Facility Management Technical management and operations for building facilities and networks across Greece, covering approximately 480,000 sqm of active building contract installations with 80 MW of installed equipment power. Services include flexible maintenance programs and intelligent building management systems for office buildings, retail, industrial and residential properties.
  • Battery Energy Storage Systems (BESS) Central battery energy storage stations with total capacity of 825 MW across 5 production licenses. Includes 225 MW in Alexandroupolis, 150 MW in Patras, 300 MW in Kozani, 50 MW in Boeotia, and 50 MW in Magnesia. First entity in Greece to receive production licenses for BESS stations.
  • Alexandroupolis CCGT Power Plant 820-840 MW combined cycle gas turbine power plant under construction in Alexandroupolis Industrial Area with EUR 400 million investment. Equipment is capable of hydrogen combustion up to 50%, supporting Greece's energy security and transition to green energy. Expected commercial operation in Q2 2027.
  • PROMETHEUS GAS Natural Gas Supply Leading natural gas supplier in the Greek market with annual sales of approximately 1 BCM. Handles natural gas import and sales, with constructed infrastructure of over 1,000 km of high-pressure gas transmission pipelines and 340 km of medium and low-pressure distribution pipelines. Has held a leading position in the Greek natural gas market since 1991.
  • NECO Electricity Trading Joint venture with Bulgarian NEK EAD for electricity trading and cross-border trade. Over 24 years of operation with sales of approximately 650 GWh per year across 5 countries. Actively developing hydropower stations and wind parks in Bulgaria. Holds a 450 MW electricity trading license.
  • NOVAERA ENERGY Electricity Supply Wholly-owned subsidiary supplying electricity to Medium Voltage consumers within the Greek Interconnected Power System. 16 years of operation with 300 MW electricity supply license and annual sales of 300,000 MWh.
  • ELICA Renewable Energy Sources Development of renewable energy through the ELICA Group, with 2,730 MW portfolio under development and 488 MW of RES projects constructed and operational. Activities include wind parks, offshore wind farms, photovoltaic parks, and hydroelectric stations in Greece and the Balkans. Annual renewable energy production of 1,300 GWh.
  • DAMCO ENERGY Generating Sets and Power Projects Sales, installation, and rental of generating sets with over 600 MW of leased generating capacity, plus construction of energy projects including hydroelectric, diesel-fired, lignite-fired, and combined-cycle plants. Specialized in LNG FSRU infrastructure development. ISO 9001/14001/45001 certified since 2021.
  • DAMCO ENERGY Floating LNG Infrastructure Proven experience in design, engineering, and licensing of Floating Liquefied Natural Gas Storage and Regasification Units (LNG FSRU) and onshore and offshore natural gas transmission systems, including market research, feasibility studies, risk assessment, and licensing.
  • REDEX Construction Services Construction, reconstruction, renovation, and modification of buildings, offices, hotels, stores and business premises. Over 250,000 sqm of constructed/reconstructed surfaces, 12 simultaneous construction sites in Greece and abroad. EUR 90 million construction revenue. Clients include DHL Greece, Leroy Merlin, Makedonia Palace Hotel, One & Only Kea Resort, Milos Cove, St. Catherine's British School, and HYGEIA Group.
  • REDEX Energy Services Advanced technology solutions for lower energy consumption and maintenance costs. Achieved 26,300 tonnes CO2 reduction in the last 5 years with 36.8 million kWh total energy savings. Offers 'pay-as-you-save' solutions based on internationally recognized standards and has received 7 Energy Mastering Awards.
  • Greek Regional Airports (Fraport Greece) Co-owned with Fraport AG under a 40-year concession to operate, maintain, and develop 14 Greek regional airports. Concession fee of EUR 1.53 billion paid to HRADF with EUR 400 million capex invested within first 4 years. Airports serve 36 million passengers (2024) and contribute an estimated EUR 300+ million annually to Greek GDP.
  • Athens International Airport (AIA) Investment Copelouzos Group is the only Greek private shareholder in Athens International Airport 'Eleftherios Venizelos'. Airport serves 31.9 million passengers with 283,000 aircraft movements (2025). Concession agreement extended in 2019 for EUR 1.403 billion. Won Best Airport Routes Europe 2019, ACI Best Airport Customer Satisfaction Award 2019, and Skytrax Best Airport in Southeastern Europe 2018.
  • DESFA Hellenic Gas Transmission System Through SENFLUGA ENERGY INFRASTRUCTURE HOLDINGS S.A., the Group holds a stake in DESFA (Hellenic Gas Transmission System Operator). DESFA operates the National Natural Gas System with 512 km main pipeline and branches totaling 953.2 km, plus LNG terminal at Revithoussa with 225,000 m3 storage capacity. Stake acquired for EUR 535 million in consortium with Snam, Enagás, and Fluxys.
  • Piritium and Silcio Photovoltaic Manufacturing Two factories in the Patras industrial area producing photovoltaic products through subsidiaries Piritium A.E. and Silcio A.E. Piritium produces approximately 33 MWp of polycrystalline silicon wafers; Silcio has capacity for 30 MWp cells and 24 MWp modules.
  • Metropolitan Expo Exhibition Center Concession holding in the exhibition centers sector through the Group's infrastructure investments portfolio, serving the exhibition and conference market in Greece.

Quantifiable outcome

  • 3,000 MW of green electricity transfer capacity from Egypt to Europe
  • +6 more outcomes

Companies that use Copelouzos Group

Customer profile

Named customers15 records

Segments6 records

Ideal customer profiles5 records

Copelouzos Group technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

Copelouzos Group partnerships and signals

Strategic signal

Partnerships

Twelve partnerships are on record, tiered core and minor.

  • Senfluga Energy Infrastructure Holdings S.A.coreStrategic or Co-development Partner · 1 January 2018Consortium led by Copelouzos Group (via DAMCO ENERGY) and three major European gas operators (Snam, Enagas, Fluxys) acquired 66% stake in DESFA (Greek Natural Gas Transmission System Operator) for EUR 535 million.
  • Fraport Greece (Fraport AG + Copelouzos Group)coreStrategic or Co-development Partner · 1 January 2017Joint venture between German airport operator Fraport AG and Copelouzos Group to operate, maintain, and develop 14 Greek regional airports under a 40-year concession. Concession fee EUR 1.53 billion paid to HRADF. Investment of EUR 400 million within first 4 years.
  • NOVAERA ENERGY S.A.coreStrategic or Co-development Partner · 1 January 2010Wholly-owned subsidiary of Copelouzos Group established for electricity supply to medium voltage consumers within the Greek Interconnected Power System. Holds 300 MW supply license.
  • NECO S.A. (Joint venture with NEK EAD - Bulgarian Public Electric Power Company)coreStrategic or Co-development Partner · 1 January 2002Joint company established in Athens for electricity trading and cross-border trade with 5 countries. Operating for 24 years with sales of approximately 650 GWh per year.
  • ENEL S.p.A.minorStrategic or Co-development PartnerItalian energy group collaborating on energy projects and infrastructure development.
  • Snam S.p.A.coreStrategic or Co-development PartnerItalian energy infrastructure company co-investing in DESFA through Senfluga consortium. Also shareholder in TAP pipeline.
  • Enagás S.A.coreStrategic or Co-development PartnerSpanish energy company co-investing in DESFA through Senfluga consortium. Also shareholder in TAP pipeline.
  • Fluxys S.A.coreStrategic or Co-development PartnerBelgian gas infrastructure group co-investing in DESFA through Senfluga consortium. Also shareholder in TAP pipeline.
  • China Energy Investment Corporation Ltd.minorStrategic or Co-development PartnerChinese state-owned energy corporation collaborating on energy projects and investments.
  • Egyptian Electricity Holding CompanycoreStrategic or Co-development PartnerState-owned Egyptian electricity company partnering on the GREGY interconnector project to develop renewable energy projects in Egypt and establish electrical connection with Greece.
  • ELICA INTERCONNECTOR S.M. S.A.coreStrategic or Co-development PartnerSubsidiary company of Copelouzos Group developing the GREGY electrical interconnector between Egypt and Greece with 3,000 MW capacity.
  • Elica Group (Renewable Energy Companies)coreStrategic or Co-development PartnerElica Group companies developing renewable energy projects including wind farms, photovoltaic parks, hydroelectric plants, offshore wind, and battery energy storage systems.

Scale indicators24 records

Recent moves6 records

Expansion highlights6 records

Copelouzos Group competitors and assessment

Company assessment

Direct peers

  • Public Power Corporation (PPC): Greece's incumbent electricity generator and supplier and the dominant counterparty in the Greek power market. Direct peer to Copelouzos in electricity generation (lignite, gas, renewables), supply (NOVAERA ENERGY competes for medium-voltage customers) and renewable development.
  • GEK Terna: Greek construction and energy conglomerate with concessions in motorways, real estate, power generation and renewable energy. Closest comparable Greek diversified infrastructure model with overlapping energy, construction and concession portfolios.
  • Mytilineos (Metlen Energy & Metals): Greek industrial and energy conglomerate combining metals (aluminium), energy (gas-fired and renewables), and EPC services. Highly comparable diversified model with energy infrastructure and construction overlap.
  • Hellenic Petroleum (HELPE / Motor Oil Hellas): Greek integrated energy major active in refining, fuel supply, natural gas (DEPA/EPIC), and renewables. Peer in the Greek energy market across hydrocarbons, trading and downstream supply.
  • Terna Energy: Pure-play Greek renewables independent power producer with wind, hydro, solar and battery storage assets. Direct peer to Copelouzos' ELICA Group renewables portfolio and 825 MW BESS pipeline.
  • Fraport AG: German airport operator and Copelouzos' JV partner in Fraport Greece. Direct peer in the Greek regional airports concession business (where Fraport AG is the operational lead) and globally comparable in airport operation/management.
  • Aktor (Ellaktor Group): Greek construction and infrastructure group with concessions in motorways, real estate and energy projects. Peer to REDEX in large-scale Greek construction and EPC services for industrial clients.

Broad incumbents

  • ENEL S.p.A. Italian multinational utility and one of Europe's largest renewable operators. Copelouzos' listed 'minor' partner in Greek energy projects and a broader peer in power generation, grids and energy transition strategy.

Emerging players

  • ElvalHalcor: Greek industrial conglomerate (aluminium, copper and rolled products). Comparable as a Greek family-controlled diversified industrial platform with energy adjacency, though less directly overlapping in power generation.
  • AVAX Group: Greek construction and infrastructure group active in buildings, motorways, energy and PPP projects. Peer to REDEX in domestic construction and a partial peer in energy infrastructure builds.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks6 records

Key highlights7 records

Customer concentration

Copelouzos Group social profiles

Digital presence

Copelouzos Group compliance and trust

Trust signal

Compliance3 records

Copelouzos Group financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Copelouzos Group leadership team

Management profile

Number of profiles

Profiles5 records

Copelouzos Group subsidiaries and ownership

Company hierarchy

Subsidiaries11 records

Copelouzos Group funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Copelouzos Group M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Copelouzos Group

What does Copelouzos Group do?

Copelouzos Group is a Greek diversified infrastructure investor that develops, owns, and operates energy assets (renewable generation, natural gas supply, electricity trading, battery storage, the GREGY Egypt-Greece submarine interconnector, and an 820 MW CCGT plant), infrastructure concessions (14 regional airports via Fraport Greece, Athens International Airport, DESFA gas transmission), construction and facility management (REDEX), real estate, and out-of-home advertising (Interbus). The Group serves utilities, industrial and commercial energy consumers, government entities, and commercial tenants through wholly-owned subsidiaries and joint ventures.

Is Copelouzos Group a public or private company?

Copelouzos Group is a private company. It is classified as family owned and is currently operating.

When was Copelouzos Group founded?

Copelouzos Group was founded in 1972. It employs 101 to 250 people.

Where is Copelouzos Group based?

Copelouzos Group is headquartered in Filothéi, Greece, in the Europe region.

How does Copelouzos Group make money?

Seven revenue lines are on record. Natural Gas Trading and Supply is the primary driver. The others are electricity Trading, electricity Supply, construction and Engineering Services, renewable Energy Generation, out-of-Home Advertising and power Generation Equipment Rental.

Who are Copelouzos Group's main competitors?

Direct peers on record are Public Power Corporation (PPC), GEK Terna, Mytilineos (Metlen Energy & Metals), Hellenic Petroleum (HELPE / Motor Oil Hellas), Terna Energy, Fraport AG and Aktor (Ellaktor Group). ENEL S.p.A. is listed as a broad incumbent. Emerging players are ElvalHalcor and AVAX Group.

Does Copelouzos Group have an API?

No public API is recorded for Copelouzos Group.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
GreekreporterGreece Connects Santorini and Southern Cyclades to Mainland Power GridThe power interconnection of Santorini has been successfully completed, marking a significant step toward the island's integration into Greece's national high-voltage grid. Through Copelouzou Group and its joint venture with China's Xian Electric Engineering, the project enhances energy security and aims to decommission polluting local power stations, benefiting the environment and reducing costs for consumers. Full energization of the link is anticipated by early autumn, with plans to connect additional islands in the Southern Cyclades soon afterward.WikipediaMykonos Airport: Difference between revisionsMykonos-Manto Mavrogenous Airport is an international airport on the Greek island of Mykonos, located 4 kilometres from the town, serving domestic and European destinations as a popular leisure destination. In December 2015, the privatization of Mykonos International Airport along with 13 other regional Greek airports was finalized through an agreement between the Fraport AG/Copelouzos Group joint venture and Greece's state privatization fund HRADF, with Fraport assuming management from April 11, 2017 under a 40-year operating concession.Capital.grΗ σημασία της ηλεκτρικής διασύνδεσης Αιγύπτου–Ελλάδας στο Επιστημονικό Συνέδριο του Πανεπιστημίου Λευκωσίας και του ΙΕΝΕThe GREGY electrical interconnector project, which will link Egypt directly to mainland Greece with 3,000 MW of green electricity capacity, was presented at a scientific conference organized by the University of Nicosia and the Institute of Energy for Southeast Europe (ΙΕΝΕ). The Kopelouzos Group is developing 8.5 GW of new renewable energy projects in Egypt (75% wind, 25% solar) to supply this interconnector. On June 17, 2026, the US Senate Foreign Relations Committee approved bipartisan bill S.4443, which explicitly recognizes GREGY as critical infrastructure for European energy security and connectivity between India, the Gulf, and Europe via the Eastern Mediterranean.GlobeNewswireDGAP-Adhoc: Fraport AG Frankfurt Airport ServicesFraport AG and its Greek partner Copelouzos Group were selected as preferred investors in a 40-year operating concession for 14 regional airports in Greece. The total purchase price is €1,234 million, with closing expected in autumn 2015. The operating company is expected to generate over €180 million in revenue in 2016.