Descriptiontext

Engro Powergen Qadirpur Limited (EPQL) is a Pakistan-based Independent Power Project (IPP) incorporated in 2008 that operates a single 217 MW combined cycle power plant located near Qadirpur in District Ghotki, Sindh. The plant is the first facility in Pakistan to utilize permeate gas — a byproduct gas stream — as feedstock for power generation, positioning EPQL as the inaugural 'green' IPP in the Engro Energy portfolio. The company generates electricity and sells its entire output to the national grid via NTDC (National Transmission and Despatch Company) and distribution companies under long-term, NEPRA-regulated power purchase agreements; tariffs are set by NEPRA and the model is recurring subscription-style revenue backed by take-or-pay offtake commitments.

EPQL is publicly listed on the Pakistan Stock Exchange under ticker EPQL and is majority-owned by Engro Energy Limited (50.36% post the February 2026 secondary sale), a wholly owned subsidiary of Engro Corporation. Engro Energy reduced its stake from 68.89% to 50.36% by selling 60 million shares at PKR 25/share (PKR 1.5 billion total) on February 16, 2026 while retaining operational management control. The company is headquartered in Karachi (Harbor Front Building, Clifton) with a commercial office in Islamabad (Ufone Tower, Blue Area) and the physical plant in Ghotki, Sindh. Its customer base is functionally a single regulated off-taker — the Pakistani national power grid system — making it an infrastructure-style utility rather than a diversified commercial enterprise.

The business model is deterministic and asset-heavy: capacity-based electricity sales under a regulated tariff, with no product diversification, no multi-geography footprint beyond Pakistan, and no software/digital layer. EPQL's competitive posture rests on its PPA-protected offtake, its first-mover position in permeate-gas utilization, and the regulatory franchise conferred by IPP licensing and NEPRA tariff approval. Leadership is shared with sibling EEL/EPTL entities (Athar A. Khwaja as CEO, Ekta Sitani as CFO), and the company is currently oriented to long-term baseload operation rather than capacity expansion.

Short descriptiontext

Engro Powergen Qadirpur Limited (EPQL) operates a 217 MW combined cycle power plant near Qadirpur, Ghotki, Sindh, Pakistan, selling electricity to the national grid under NEPRA-regulated PPAs. It is Pakistan's first permeate-gas-based power facility and a majority-owned subsidiary of Engro Energy.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
101–250
akta.pro rankint
HeadquartersKarachi, Pakistan
HQ citystring
Karachi
HQ countrystring
Pakistan
HQ regionstring
Asia
Markets served

Serves global market

Offices2 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
power generation services, combined cycle plant, electricity generation, independent power producer, natural gas power
Industry3 codes
1Gas-Fired Power Plant Development & IPP Ownership (Greenfield/Brownfield)
CodeEUACABAIPrimaryYes
2Gas-Fired Power Plant O&M and Life-Extension/Repowering Services
CodeEUACABAJPrimaryNo
3Commercial Structuring & Offtake (PPAs, CfDs, Corporate PPAs, Merchant Strategy)
CodeEUAMAAAEPrimaryNo
NAICS code2 codes
  • Electric Power Generation22111
  • Fossil Fuel Electric Power Generation221112
SIC code2 codes
  • Cogeneration Services & Small Power Producers4991
  • Electric Services4911
Product category
Power Generation
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Generation and Sales
TypeSubscription Recurring
Description

Power generation and sale of electricity to the national grid through power purchase agreements with distribution companies

engroenergy.com
Marketing channels2 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components4 values
Operations, Supply Chain, Personnel, Infrastructure
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Engro Powergen Qadirpur Limited operates a 217 MW combined cycle power plant near Qadirpur in District Ghotki, Sindh, Pakistan. As an Independent Power Project (IPP), it generates and supplies baseload electricity to Pakistan's national grid under long-term power purchase agreements. The plant is the first green facility in Pakistan to utilize permeate gas, enabling reduced carbon emissions and supporting energy security through indigenous fuel resources.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 value
  • 217 MW of installed power generation capacity serving national grid
Product overview1 text field

Engro Powergen Qadirpur Limited (EPQL) operates as a single core product: a 217 MW combined cycle power generation facility. Established as an Independent Power Project (IPP), it is the first green facility in Pakistan to utilize permeate gas, contributing to reduced carbon emissions. The company is a subsidiary of Engro Energy Limited and operates the power plant located near Qadirpur in District Ghotki, Sindh, Pakistan. EPQL serves the energy sector by generating electricity that contributes to Pakistan's long-term energy security, powering households, industries, and improving livelihoods across communities.

Product and service1 record
1EPQL 217 MW Combined Cycle Power Generation
CategoryPower Generation
Description

A 217 MW combined cycle power generation facility and the first green facility in Pakistan to utilize permeate gas for reduced carbon emissions. Generates and supplies baseload electricity to Pakistan's national grid under long-term power purchase agreements with distribution companies, serving households, industries, and businesses across Pakistan.

Scale indicator4 records

Each record includes

Type, Value, Description, Source

Partnership1 partner
1Engro Energy Limited
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-02-16
Description

Engro Energy Limited is the parent company and majority shareholder (50.36%) of EPQL after selling 18.53% stake for Rs 1.5 billion on February 16, 2026. Engro Energy is a wholly owned subsidiary of Engro Corporation and retained management control and majority ownership of EPQL.

techjuice.pk
Recent move4 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight3 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

Pakistan's largest Independent Power Producer, listed on the PSX, operating multiple fossil-fuel and renewables IPPs selling to NTDC under PPAs — directly comparable IPP business model, customer base, and regulatory exposure to EPQL.

TypeDirect peer
Description

Listed Pakistani IPP operating a multi-fuel thermal power complex with a long-term PPA with NTDC/WAPDA; directly comparable in regulated IPP structure, dispatch profile, and exposure to NEPRA tariff decisions.

TypeDirect peer
Description

PSX-listed combined cycle IPP (200 MW) selling electricity to NTDC under a long-term PPA — very close direct peer in capacity scale, technology, customer, and regulatory framework.

TypeDirect peer
Description

PSX-listed Pakistani IPP operating a 362 MW oil-fired thermal plant selling to WAPDA/NTDC under PPA — comparable listed IPP with similar offtake and regulatory risk profile.

TypeDirect peer
Description

PSX-listed Pakistani IPP operating a 365 MW oil-fired thermal power station under PPA with NTDC — directly comparable listed IPP peer with single-asset, single-customer structure.

TypeDirect peer
Description

PSX-listed Pakistani IPP engaged in power generation with NTDC offtake; comparable in regulatory exposure and business model, though on a smaller scale than EPQL.

7Engro Powergen Thar Limited (EPTL)
TypeDirect peer
Description

Sister company under Engro Energy, operating a 660 MW lignite-based IPP in Thar Block II selling to NTDC under PPA — direct peer in ownership, offtake structure, and Engro governance, while differing on fuel type and scale.

TypeBroad incumbent
Description

Pakistan's largest vertically integrated private power utility (generation, transmission, distribution) serving Karachi — broader incumbent in the same regulated power value chain, with overlapping exposure to NEPRA and NTDC.

TypeDirect peer
Description

Pakistan IPP operating a 1,320 MW coal-fired power plant at Hub under PPA with NTDC — directly comparable large-scale IPP with identical single-customer (NTDC) offtake and NEPRA regulation.

10Fauji Fertilizer Energy (FFEL) / Fauji Kabirwala Power
TypeBroad incumbent
Description

Fauji Group's combined cycle IPP subsidiary selling to NTDC under PPA — a related listed/group-affiliated Pakistani IPP with similar technology and regulatory exposure to EPQL.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights5 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature1 record

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles5 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Engro Powergen Qadirpur

Power Generationengroenergy.com

Engro Powergen Qadirpur Limited (EPQL) operates a 217 MW combined cycle power plant near Qadirpur, Ghotki, Sindh, Pakistan, selling electricity to the national grid under NEPRA-regulated PPAs. It is Pakistan's first permeate-gas-based power facility and a majority-owned subsidiary of Engro Energy.

What Engro Powergen Qadirpur does

Engro Powergen Qadirpur Limited (EPQL) is a Pakistan-based Independent Power Project (IPP) incorporated in 2008 that operates a single 217 MW combined cycle power plant located near Qadirpur in District Ghotki, Sindh. The plant is the first facility in Pakistan to utilize permeate gas — a byproduct gas stream — as feedstock for power generation, positioning EPQL as the inaugural 'green' IPP in the Engro Energy portfolio. The company generates electricity and sells its entire output to the national grid via NTDC (National Transmission and Despatch Company) and distribution companies under long-term, NEPRA-regulated power purchase agreements; tariffs are set by NEPRA and the model is recurring subscription-style revenue backed by take-or-pay offtake commitments.

EPQL is publicly listed on the Pakistan Stock Exchange under ticker EPQL and is majority-owned by Engro Energy Limited (50.36% post the February 2026 secondary sale), a wholly owned subsidiary of Engro Corporation. Engro Energy reduced its stake from 68.89% to 50.36% by selling 60 million shares at PKR 25/share (PKR 1.5 billion total) on February 16, 2026 while retaining operational management control. The company is headquartered in Karachi (Harbor Front Building, Clifton) with a commercial office in Islamabad (Ufone Tower, Blue Area) and the physical plant in Ghotki, Sindh. Its customer base is functionally a single regulated off-taker — the Pakistani national power grid system — making it an infrastructure-style utility rather than a diversified commercial enterprise.

The business model is deterministic and asset-heavy: capacity-based electricity sales under a regulated tariff, with no product diversification, no multi-geography footprint beyond Pakistan, and no software/digital layer. EPQL's competitive posture rests on its PPA-protected offtake, its first-mover position in permeate-gas utilization, and the regulatory franchise conferred by IPP licensing and NEPRA tariff approval. Leadership is shared with sibling EEL/EPTL entities (Athar A. Khwaja as CEO, Ekta Sitani as CFO), and the company is currently oriented to long-term baseload operation rather than capacity expansion.

Engro Powergen Qadirpur firmographics

Firmographics
Name
Engro Powergen Qadirpur
Legal name
Engro Powergen Qadirpur Limited
Website
https://engroenergy.com
Company type
Public
Founded year
2008
Operating status
Operating
Headcount range
101–250 employees
Short description
Engro Powergen Qadirpur Limited (EPQL) operates a 217 MW combined cycle power plant near Qadirpur, Ghotki, Sindh, Pakistan, selling electricity to the national grid under NEPRA-regulated PPAs. It is Pakistan's first permeate-gas-based power facility and a majority-owned subsidiary of Engro Energy.
Ownership category
akta.pro rank

Engro Powergen Qadirpur industry classification

Industry
Product category
Power Generation
NAICS
Electric Power Generation (22111), Fossil Fuel Electric Power Generation (221112)
SIC
Cogeneration Services & Small Power Producers (4991), Electric Services (4911)
akta.pro primary industry
Gas-Fired Power Plant Development & IPP Ownership (Greenfield/Brownfield) (EUACABAI)
akta.pro secondary industries
Gas-Fired Power Plant O&M and Life-Extension/Repowering Services (EUACABAJ), Commercial Structuring & Offtake (PPAs, CfDs, Corporate PPAs, Merchant Strategy) (EUAMAAAE)

Keywords

  • Power generation services
  • Combined cycle plant
  • Electricity generation
  • Independent power producer
  • Natural gas power

Where Engro Powergen Qadirpur is headquartered

Location

Headquarters

HQ city
Karachi
HQ country
Pakistan
HQ region
Asia

Offices2 records

Markets served

Engro Powergen Qadirpur business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Operations, Supply Chain, Personnel, Infrastructure

Revenue model

  1. Electricity Generation and Sales: Power generation and sale of electricity to the national grid through power purchase agreements with distribution companies

Go-to-market motion1 record

Distribution channels1 record

Marketing channels2 records

Engro Powergen Qadirpur product offering

Product offering

Core offering

Engro Powergen Qadirpur Limited operates a 217 MW combined cycle power plant near Qadirpur in District Ghotki, Sindh, Pakistan. As an Independent Power Project (IPP), it generates and supplies baseload electricity to Pakistan's national grid under long-term power purchase agreements. The plant is the first green facility in Pakistan to utilize permeate gas, enabling reduced carbon emissions and supporting energy security through indigenous fuel resources.

Product overview

Engro Powergen Qadirpur Limited (EPQL) operates as a single core product: a 217 MW combined cycle power generation facility. Established as an Independent Power Project (IPP), it is the first green facility in Pakistan to utilize permeate gas, contributing to reduced carbon emissions. The company is a subsidiary of Engro Energy Limited and operates the power plant located near Qadirpur in District Ghotki, Sindh, Pakistan. EPQL serves the energy sector by generating electricity that contributes to Pakistan's long-term energy security, powering households, industries, and improving livelihoods across communities.

Differentiator

Problem solved

Functional benefit

Products and services

  • EPQL 217 MW Combined Cycle Power Generation A 217 MW combined cycle power generation facility and the first green facility in Pakistan to utilize permeate gas for reduced carbon emissions. Generates and supplies baseload electricity to Pakistan's national grid under long-term power purchase agreements with distribution companies, serving households, industries, and businesses across Pakistan.

Quantifiable outcome

  • 217 MW of installed power generation capacity serving national grid

Companies that use Engro Powergen Qadirpur

Customer profile

Named customers1 record

Segments1 record

Ideal customer profiles1 record

Engro Powergen Qadirpur technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature1 record

Engro Powergen Qadirpur partnerships and signals

Strategic signal

Partnerships

One partnership is on record.

  • Engro Energy LimitedcoreStrategic or Co-development Partner · 16 February 2026Engro Energy Limited is the parent company and majority shareholder (50.36%) of EPQL after selling 18.53% stake for Rs 1.5 billion on February 16, 2026. Engro Energy is a wholly owned subsidiary of Engro Corporation and retained management control and majority ownership of EPQL.

Scale indicators4 records

Recent moves4 records

Expansion highlights3 records

Engro Powergen Qadirpur competitors and assessment

Company assessment

Direct peers

  • Hub Power Company (HUBC): Pakistan's largest Independent Power Producer, listed on the PSX, operating multiple fossil-fuel and renewables IPPs selling to NTDC under PPAs — directly comparable IPP business model, customer base, and regulatory exposure to EPQL.
  • Kot Addu Power Company (KAPCO): Listed Pakistani IPP operating a multi-fuel thermal power complex with a long-term PPA with NTDC/WAPDA; directly comparable in regulated IPP structure, dispatch profile, and exposure to NEPRA tariff decisions.
  • Nishat Power Limited: PSX-listed combined cycle IPP (200 MW) selling electricity to NTDC under a long-term PPA — very close direct peer in capacity scale, technology, customer, and regulatory framework.
  • Lalpir Power Limited: PSX-listed Pakistani IPP operating a 362 MW oil-fired thermal plant selling to WAPDA/NTDC under PPA — comparable listed IPP with similar offtake and regulatory risk profile.
  • Pakgen Power Limited: PSX-listed Pakistani IPP operating a 365 MW oil-fired thermal power station under PPA with NTDC — directly comparable listed IPP peer with single-asset, single-customer structure.
  • Altern Energy Limited: PSX-listed Pakistani IPP engaged in power generation with NTDC offtake; comparable in regulatory exposure and business model, though on a smaller scale than EPQL.
  • Engro Powergen Thar Limited (EPTL): Sister company under Engro Energy, operating a 660 MW lignite-based IPP in Thar Block II selling to NTDC under PPA — direct peer in ownership, offtake structure, and Engro governance, while differing on fuel type and scale.
  • China Power Hub Generation Company: Pakistan IPP operating a 1,320 MW coal-fired power plant at Hub under PPA with NTDC — directly comparable large-scale IPP with identical single-customer (NTDC) offtake and NEPRA regulation.

Broad incumbents

  • K-Electric: Pakistan's largest vertically integrated private power utility (generation, transmission, distribution) serving Karachi — broader incumbent in the same regulated power value chain, with overlapping exposure to NEPRA and NTDC.
  • Fauji Fertilizer Energy (FFEL) / Fauji Kabirwala Power: Fauji Group's combined cycle IPP subsidiary selling to NTDC under PPA — a related listed/group-affiliated Pakistani IPP with similar technology and regulatory exposure to EPQL.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat4 records

Key risks5 records

Key highlights5 records

Customer concentration

Engro Powergen Qadirpur social profiles

Digital presence

Engro Powergen Qadirpur financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Engro Powergen Qadirpur leadership team

Management profile

Number of profiles

Profiles5 records

Engro Powergen Qadirpur funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Engro Powergen Qadirpur M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Engro Powergen Qadirpur

What does Engro Powergen Qadirpur do?

Engro Powergen Qadirpur Limited operates a 217 MW combined cycle power plant near Qadirpur in District Ghotki, Sindh, Pakistan. As an Independent Power Project (IPP), it generates and supplies baseload electricity to Pakistan's national grid under long-term power purchase agreements. The plant is the first green facility in Pakistan to utilize permeate gas, enabling reduced carbon emissions and supporting energy security through indigenous fuel resources.

Is Engro Powergen Qadirpur a public or private company?

Engro Powergen Qadirpur is a public company. It is classified as public and is currently operating.

When was Engro Powergen Qadirpur founded?

Engro Powergen Qadirpur was founded in 2008. It employs 101 to 250 people.

Where is Engro Powergen Qadirpur based?

Engro Powergen Qadirpur is headquartered in Karachi, Pakistan, in the Asia region.

How does Engro Powergen Qadirpur make money?

One revenue line is on record: electricity Generation and Sales.

Who are Engro Powergen Qadirpur's main competitors?

Direct peers on record are Hub Power Company (HUBC), Kot Addu Power Company (KAPCO), Nishat Power Limited, Lalpir Power Limited, Pakgen Power Limited, Altern Energy Limited, Engro Powergen Thar Limited (EPTL) and China Power Hub Generation Company. Broad incumbents are K-Electric and Fauji Fertilizer Energy (FFEL) / Fauji Kabirwala Power.

Does Engro Powergen Qadirpur have an API?

No public API is recorded for Engro Powergen Qadirpur.

What industry is Engro Powergen Qadirpur in?

Engro Powergen Qadirpur's product category is Power Generation. Its primary akta.pro industry code is EUACABAI, Gas-Fired Power Plant Development & IPP Ownership (Greenfield/Brownfield), with a secondary code of EUACABAJ, Gas-Fired Power Plant O&M and Life-Extension/Repowering Services. Its NAICS code is 22111 and its SIC code is 4991.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals