Descriptiontext

Akkuyu Nükleer A.Ş. is the project company implementing Turkey's first nuclear power plant under a Build-Own-Operate (BOO) model — the first such arrangement in the global nuclear industry. Incorporated in Turkey on December 13, 2010 under a Russia-Turkey intergovernmental agreement dated May 12, 2010, the company is majority-owned by Rusatom Energy International JSC, a subsidiary of the Russian State Atomic Energy Corporation (Rosatom). It designs, constructs, commissions, operates, and will eventually decommission a four-unit plant on the Mediterranean coast at Büyükeceli (Gülnar), Mersin Province, each unit fitted with a VVER-1200 Generation 3+ pressurized water reactor delivering 1,200 MW for a combined 4,800 MW capacity and ~35 billion kWh/year planned output, supplying approximately 10% of Turkey's electricity demand. Core technology includes Rosatom's VVER-1200 with passive safety systems (PHRS, core melt trap, double containment, hydroaccumulators, passive hydrogen recombiners) engineered for 72+ hours of autonomous decay heat removal without operator action or external power, with a 60-year design life extendable by 20 years.

The company sells 100% of generated electricity to the Turkish national grid under long-term supply contracts governed by the intergovernmental agreement, targeting first electricity generation by end of 2026. Revenue mechanics are wholesale electricity sales under state-backed pricing, supplemented by potential consulting and technical services to future Turkish nuclear projects. Supporting capabilities include Turkey's first full-scale nuclear plant simulator (commissioned November 2023), a desalination complex (commissioned 2025), a zero-waste construction site policy (155,000+ tonnes of waste removed in 2023), and a training pipeline through Russian nuclear universities (600+ Turkish engineers targeted by 2030, 322 already employed as of 2024). The company is ISO 9001, ISO 14001, ISO 45001, and ISO 19443 certified, is a member of WANO since June 2019, and is licensed by the Turkish Nuclear Regulatory Authority (NDK) with all four units now holding construction permits and Units 1 and 2 holding commissioning permits. Akkuyu Nükleer has ~1,001-5,000 permanent employees with peak construction workforce above 34,000, ~400 Turkish supplier companies, and ~30% female workforce. The project represents an estimated ~$50B (~6% of Turkey's GDP) lifecycle contribution to the Turkish economy and will prevent ~18 million tonnes of CO2-equivalent emissions annually once fully operational.

Short descriptiontext

Akkuyu Nükleer A.Ş. constructs and operates Turkey's first nuclear power plant under a Build-Own-Operate model, delivering 4,800 MW across four VVER-1200 reactors for wholesale sale to the Turkish national grid, with first electricity targeted for end of 2026.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1,001–5,000
akta.pro rankint
HeadquartersAnkara
HQ citystring
Ankara
Markets served

Serves global market

Offices3 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
nuclear power generation, baseload electricity supply, build-own-operate infrastructure, VVER reactor operations, nuclear plant construction
Industry4 codes
1Nuclear Plant EPC & Construction
CodeEUAEAAACPrimaryYes
2Component & System Upgrades / Modernization (I&C Digital, Turbine-Generator, Balance-of-Plant)
CodeEUAKABAEPrimaryNo
3Balance-of-Plant (BOP) EPC (Turbine Island, Conventional Systems, Buildings)
CodeEUAKAAAFPrimaryNo
4Mechanical, Electrical & Piping Installation (MEP)
CodeEUAKAAAGPrimaryNo
NAICS code2 codes
  • Nuclear Electric Power Generation221113
  • Electric Power Generation, Transmission and Distribution2211
SIC code1 code
  • Water, Sewer, Pipeline, Comm & Power Line Construction1623
Product category
Nuclear Power Generation
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model2 records
1Electricity Generation and Wholesale
TypeTransaction Fee
Description

Akkuyu Nükleer operates under a Build-Own-Operate (BOO) model — the world's first such arrangement in nuclear energy. The company sells all electricity generated by the four reactors to Turkey's national electricity grid. Revenue is generated through long-term electricity supply contracts with the Turkish state. The first unit is targeted to begin producing electricity by end of 2026.

akkuyu.com
2Consulting and Technical Services
TypeProfessional Services
Description

Akkuyu Nükleer may provide technical and operational consulting services to other entities or future nuclear projects in Turkey, drawing on expertise developed during the Akkuyu project.

akkuyu.com
Marketing channels8 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Technology or R&D, Supply Chain, Personnel, Operations
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Akkuyu Nükleer designs, builds, owns, operates, and will eventually decommission Turkey's first nuclear power plant — a four-unit, 4,800 MW facility with Russian VVER-1200 (Generation 3+) reactors — and sells all generated electricity wholesale to the Turkish national grid under long-term supply contracts. The company also runs a specialized nuclear training center with the country's first full-scale reactor simulator to qualify operating personnel, and supports local industrial participation by integrating ~400 Turkish supplier companies into construction and installation works.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 6 values shown
  • Reduces Turkey's CO₂ emissions by ~18 million tonnes CO₂-equivalent per year (~3.2% of national total annual emissions)
+5 more records
Product overview1 text field

Akkuyu Nükleer is implementing Turkey's first nuclear power plant project with four VVER-1200 Generation 3+ reactors, each with 1,200 MW capacity, totaling 4,800 MW. The project operates under the Build-Own-Operate (BOO) model—the first such implementation in the global nuclear industry. The company provides nuclear power generation services, targeting 35 billion kWh annual output to meet 10% of Turkey's electricity needs. Supporting services include operator training through the first-in-Turkey full-scale simulator facility, and low-carbon energy supply contributing to Turkey's climate targets.

Product and service3 records
1Akkuyu Nuclear Power Plant (NPP)
CategoryNuclear power generation
2Wholesale Nuclear Power Generation Services
CategoryElectricity generation services
3Nuclear Operator Training and Full-Scale Simulator
CategoryNuclear training and personnel development
Description

Specialized training center for nuclear power plant operators featuring the first full-scale reactor control room simulator in Turkey, used to qualify operational personnel for the Akkuyu NPP units. Includes joint programs with Russian technical universities (NIYAUN MIFI, NIU MEI, KGEU) and Turkish universities.

Scale indicator16 records

Each record includes

Type, Value, Description, Source

Partnership10 partners
Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2026-06-04
Description

Turkey and South Korea signed a strategic cooperation agreement to develop small modular reactor (SMR) projects in Turkey and the region. The collaboration includes developing Turkey's domestic industry for global supply chain integration in nuclear, aligned with Turkey's diversification of energy sources.

2Nuclear Regulatory Authority (NDK / АЯР) of Turkey
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-05-07
Description

The Turkish Nuclear Regulatory Authority (NDK) reviews and issues all licensing, commissioning, and operational permits. In May 2026, it issued the commissioning permit for Unit 2 after reviewing over 22,000 pages of documentation. All Akkuyu activities are subject to NDK supervision and control.

akkuyu.com
3Turkish Companies (local suppliers)
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2026-01-01
Description

By end of 2023, approximately 400 Turkish companies were registered as Akkuyu suppliers. Turkish firms provide 40% of construction and installation works and supplies. Turkish companies are being invited to take equity stakes in Akkuyu Nükleer as part of ownership diversification.

akkuyu.com
4Turkish Ministry of Energy and Natural Resources
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2024-07-18
Description

The Turkish government is the primary counterpart in the intergovernmental agreement for Akkuyu NPP (signed May 12, 2010) and the main off-taker for all electricity generated. Minister Alparslan Bayraktar leads discussions on project status, Sinop NPP expansion, and Turkey's nuclear energy roadmap.

akkuyu.com
Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2023-01-01
Description

Turkish universities participate in student site visits, joint research, and the government 'Energy of Youth' program. Universities in Konya, Mersin (Mediterranean University), Diyarbakır (Dicle University), and Izmir (Ege University) have sent engineering students to the site.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2022-01-01
Description

TENMAK is a key counterpart for nuclear infrastructure development in Turkey, working alongside the Ministry of Energy and NDK on Turkey's nuclear program including Akkuyu and future nuclear projects.

Strategic tierMinorTypeOthersAnnounced on2020-10-01
Description

Rosatom (parent corporation) became a member of the UN Global Compact in October 2020. The initiative covers corporate sustainability and social responsibility aligned with 10 UN principles and 17 SDGs.

Strategic tierCoreTypeOthersAnnounced on2019-06-20
Description

AKKUYU NÜKLEER became a member of WANO in June 2019. WANO brings together over 125 nuclear operators and 460 civilian nuclear power reactors worldwide, providing peer reviews, best practice exchange, and performance benchmarking.

9Russian Technical Universities (NIYAUN MIFI, NIU MEI, KGEU, and others)
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2011-01-01
Description

Since 2011, Turkish engineers have been trained in Russia's leading nuclear and power engineering universities under a state-funded scholarship program. By 2024, 322 Turkish graduates were employed at Akkuyu. In 2023 a joint double-diploma master's program was launched with 43 Turkish students admitted in 2024. Up to 600 Turkish engineers targeted to be trained by 2030.

akkuyu.com
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2010-05-12
Description

Rosatom is the primary contractor and technology provider for the Akkuyu NPP project. Through its subsidiary Rusatom Energy International JSC (AE «РЭИН»), Rosatom holds majority ownership of Akkuyu Nükleer A.Ş. Rosatom supplies VVER-1200 reactors, all major equipment (reactor vessels, steam generators, turbogenerators), and provides operational expertise. It is the world's leading nuclear corporation with decades of reactor operating experience.

Recent move16 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

UAE state-owned nuclear project company that built and operates the Barakah plant under a similar long-term government-backed model. Directly comparable as a multi-reactor nuclear new-build delivered through an intergovernmental framework with a single national off-taker.

TypeDirect peer
Description

Korean state nuclear operator and a partner of Turkey for SMR development. Comparable as a national nuclear operator with international new-build ambitions, similar long-asset-life regulated revenue model, and a workforce of tens of thousands.

TypeDirect peer
Description

Chinese nuclear power operator running a multi-reactor fleet domestically and internationally (e.g., Hinkley Point C in the UK). Comparable as a vertically integrated nuclear operator with export technology stack and large-scale fleet economics.

TypeBroad incumbent
Description

UK subsidiary of EDF, one of the world's largest nuclear fleet operators with HPC new-build underway. Comparable as a broad incumbent nuclear utility with BOO-style long-term contract structures and significant multi-decade capex programs.

TypeDirect peer
Description

Finnish nuclear power company operating Olkiluoto with a similar consortium-ownership and long-term baseload contract structure. Directly comparable as a non-vertically-integrated nuclear IPP selling wholesale electricity under long-term take-or-pay arrangements.

TypeDirect peer
Description

Czech integrated utility operating the Dukovany and Temelín nuclear plants. Comparable as a Central European nuclear operator with multi-reactor fleet serving a single national grid, balancing baseload generation with export revenues.

TypeDirect peer
Description

Brazilian state nuclear operator running the Angra dos Reis plant. Comparable as a state-tied nuclear operator in an emerging market with single off-taker, multi-decade asset life, and ongoing fleet expansion ambitions.

TypeDirect peer
Description

Indian state-owned nuclear operator with the largest fleet under construction globally. Comparable as a national nuclear monopoly operating under government direction with multi-reactor new-build programs targeting baseload demand growth.

TypeBroad incumbent
Description

Swedish state-owned utility with significant nuclear and hydro generation. Comparable as a broad incumbent European energy major with regulated nuclear baseload and active involvement in nuclear new-build and life-extension discussions.

TypeDirect peer
Description

Chinese state nuclear corporation owning reactors and exporting Hualong One technology internationally. Comparable as a state-owned nuclear developer-operator with full EPC capabilities, international new-build projects, and government-backed financing.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers3 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment2 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature10 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles4 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance8 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Akkuyu Nükleer

Nuclear Power Generationakkuyu.com

Akkuyu Nükleer A.Ş. constructs and operates Turkey's first nuclear power plant under a Build-Own-Operate model, delivering 4,800 MW across four VVER-1200 reactors for wholesale sale to the Turkish national grid, with first electricity targeted for end of 2026.

What Akkuyu Nükleer does

Akkuyu Nükleer A.Ş. is the project company implementing Turkey's first nuclear power plant under a Build-Own-Operate (BOO) model — the first such arrangement in the global nuclear industry. Incorporated in Turkey on December 13, 2010 under a Russia-Turkey intergovernmental agreement dated May 12, 2010, the company is majority-owned by Rusatom Energy International JSC, a subsidiary of the Russian State Atomic Energy Corporation (Rosatom). It designs, constructs, commissions, operates, and will eventually decommission a four-unit plant on the Mediterranean coast at Büyükeceli (Gülnar), Mersin Province, each unit fitted with a VVER-1200 Generation 3+ pressurized water reactor delivering 1,200 MW for a combined 4,800 MW capacity and ~35 billion kWh/year planned output, supplying approximately 10% of Turkey's electricity demand. Core technology includes Rosatom's VVER-1200 with passive safety systems (PHRS, core melt trap, double containment, hydroaccumulators, passive hydrogen recombiners) engineered for 72+ hours of autonomous decay heat removal without operator action or external power, with a 60-year design life extendable by 20 years.

The company sells 100% of generated electricity to the Turkish national grid under long-term supply contracts governed by the intergovernmental agreement, targeting first electricity generation by end of 2026. Revenue mechanics are wholesale electricity sales under state-backed pricing, supplemented by potential consulting and technical services to future Turkish nuclear projects. Supporting capabilities include Turkey's first full-scale nuclear plant simulator (commissioned November 2023), a desalination complex (commissioned 2025), a zero-waste construction site policy (155,000+ tonnes of waste removed in 2023), and a training pipeline through Russian nuclear universities (600+ Turkish engineers targeted by 2030, 322 already employed as of 2024). The company is ISO 9001, ISO 14001, ISO 45001, and ISO 19443 certified, is a member of WANO since June 2019, and is licensed by the Turkish Nuclear Regulatory Authority (NDK) with all four units now holding construction permits and Units 1 and 2 holding commissioning permits. Akkuyu Nükleer has ~1,001-5,000 permanent employees with peak construction workforce above 34,000, ~400 Turkish supplier companies, and ~30% female workforce. The project represents an estimated ~$50B (~6% of Turkey's GDP) lifecycle contribution to the Turkish economy and will prevent ~18 million tonnes of CO2-equivalent emissions annually once fully operational.

Akkuyu Nükleer firmographics

Firmographics
Name
Akkuyu Nükleer
Legal name
AKKUYU NÜKLEER ANONİM ŞİRKETİ
Website
https://akkuyu.com
Company type
Private
Founded year
2010
Operating status
Operating
Headcount range
1,001–5,000 employees
Short description
Akkuyu Nükleer A.Ş. constructs and operates Turkey's first nuclear power plant under a Build-Own-Operate model, delivering 4,800 MW across four VVER-1200 reactors for wholesale sale to the Turkish national grid, with first electricity targeted for end of 2026.
Ownership category
akta.pro rank

Akkuyu Nükleer industry classification

Industry
Product category
Nuclear Power Generation
NAICS
Nuclear Electric Power Generation (221113), Electric Power Generation, Transmission and Distribution (2211)
SIC
Water, Sewer, Pipeline, Comm & Power Line Construction (1623)
akta.pro primary industry
Nuclear Plant EPC & Construction (EUAEAAAC)
akta.pro secondary industries
Component & System Upgrades / Modernization (I&C Digital, Turbine-Generator, Balance-of-Plant) (EUAKABAE), Balance-of-Plant (BOP) EPC (Turbine Island, Conventional Systems, Buildings) (EUAKAAAF), Mechanical, Electrical & Piping Installation (MEP) (EUAKAAAG)

Keywords

  • Nuclear power generation
  • Baseload electricity supply
  • Build-own-operate infrastructure
  • VVER reactor operations
  • Nuclear plant construction

Where Akkuyu Nükleer is headquartered

Location

Headquarters

HQ city
Ankara

Offices3 records

Markets served

Akkuyu Nükleer business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Technology or R&D, Supply Chain, Personnel, Operations

Revenue model

  1. Electricity Generation and Wholesale: Akkuyu Nükleer operates under a Build-Own-Operate (BOO) model — the world's first such arrangement in nuclear energy. The company sells all electricity generated by the four reactors to Turkey's national electricity grid. Revenue is generated through long-term electricity supply contracts with the Turkish state. The first unit is targeted to begin producing electricity by end of 2026.
  2. Consulting and Technical Services: Akkuyu Nükleer may provide technical and operational consulting services to other entities or future nuclear projects in Turkey, drawing on expertise developed during the Akkuyu project.

Go-to-market motion1 record

Distribution channels1 record

Marketing channels8 records

Akkuyu Nükleer product offering

Product offering

Core offering

Akkuyu Nükleer designs, builds, owns, operates, and will eventually decommission Turkey's first nuclear power plant — a four-unit, 4,800 MW facility with Russian VVER-1200 (Generation 3+) reactors — and sells all generated electricity wholesale to the Turkish national grid under long-term supply contracts. The company also runs a specialized nuclear training center with the country's first full-scale reactor simulator to qualify operating personnel, and supports local industrial participation by integrating ~400 Turkish supplier companies into construction and installation works.

Product overview

Akkuyu Nükleer is implementing Turkey's first nuclear power plant project with four VVER-1200 Generation 3+ reactors, each with 1,200 MW capacity, totaling 4,800 MW. The project operates under the Build-Own-Operate (BOO) model—the first such implementation in the global nuclear industry. The company provides nuclear power generation services, targeting 35 billion kWh annual output to meet 10% of Turkey's electricity needs. Supporting services include operator training through the first-in-Turkey full-scale simulator facility, and low-carbon energy supply contributing to Turkey's climate targets.

Differentiator

Problem solved

Functional benefit

Products and services

  • Akkuyu Nuclear Power Plant (NPP)
  • Wholesale Nuclear Power Generation Services
  • Nuclear Operator Training and Full-Scale Simulator Specialized training center for nuclear power plant operators featuring the first full-scale reactor control room simulator in Turkey, used to qualify operational personnel for the Akkuyu NPP units. Includes joint programs with Russian technical universities (NIYAUN MIFI, NIU MEI, KGEU) and Turkish universities.

Quantifiable outcome

  • Reduces Turkey's CO₂ emissions by ~18 million tonnes CO₂-equivalent per year (~3.2% of national total annual emissions)
  • +5 more outcomes

Companies that use Akkuyu Nükleer

Customer profile

Named customers3 records

Segments2 records

Ideal customer profiles1 record

Akkuyu Nükleer technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature10 records

Akkuyu Nükleer partnerships and signals

Strategic signal

Partnerships

Ten partnerships are on record, tiered minor and core.

  • Republic of Korea (SMR Cooperation)minorStrategic or Co-development Partner · 4 June 2026Turkey and South Korea signed a strategic cooperation agreement to develop small modular reactor (SMR) projects in Turkey and the region. The collaboration includes developing Turkey's domestic industry for global supply chain integration in nuclear, aligned with Turkey's diversification of energy sources.
  • Nuclear Regulatory Authority (NDK / АЯР) of TurkeycoreStrategic or Co-development Partner · 7 May 2026The Turkish Nuclear Regulatory Authority (NDK) reviews and issues all licensing, commissioning, and operational permits. In May 2026, it issued the commissioning permit for Unit 2 after reviewing over 22,000 pages of documentation. All Akkuyu activities are subject to NDK supervision and control.
  • Turkish Companies (local suppliers)coreTechnology or Integration · 1 January 2026By end of 2023, approximately 400 Turkish companies were registered as Akkuyu suppliers. Turkish firms provide 40% of construction and installation works and supplies. Turkish companies are being invited to take equity stakes in Akkuyu Nükleer as part of ownership diversification.
  • Turkish Ministry of Energy and Natural ResourcescoreStrategic or Co-development Partner · 18 July 2024The Turkish government is the primary counterpart in the intergovernmental agreement for Akkuyu NPP (signed May 12, 2010) and the main off-taker for all electricity generated. Minister Alparslan Bayraktar leads discussions on project status, Sinop NPP expansion, and Turkey's nuclear energy roadmap.
  • Turkish Universities (Konya, Mersin, Diyarbakır, Izmir)minorStrategic or Co-development Partner · 1 January 2023Turkish universities participate in student site visits, joint research, and the government 'Energy of Youth' program. Universities in Konya, Mersin (Mediterranean University), Diyarbakır (Dicle University), and Izmir (Ege University) have sent engineering students to the site.
  • TENMAK (Turkish Energy, Nuclear and Mining Research Institute)minorStrategic or Co-development Partner · 1 January 2022TENMAK is a key counterpart for nuclear infrastructure development in Turkey, working alongside the Ministry of Energy and NDK on Turkey's nuclear program including Akkuyu and future nuclear projects.
  • UN Global CompactminorOthers · 1 October 2020Rosatom (parent corporation) became a member of the UN Global Compact in October 2020. The initiative covers corporate sustainability and social responsibility aligned with 10 UN principles and 17 SDGs.
  • WANO (World Association of Nuclear Operators)coreOthers · 20 June 2019AKKUYU NÜKLEER became a member of WANO in June 2019. WANO brings together over 125 nuclear operators and 460 civilian nuclear power reactors worldwide, providing peer reviews, best practice exchange, and performance benchmarking.
  • Russian Technical Universities (NIYAUN MIFI, NIU MEI, KGEU, and others)coreStrategic or Co-development Partner · 1 January 2011Since 2011, Turkish engineers have been trained in Russia's leading nuclear and power engineering universities under a state-funded scholarship program. By 2024, 322 Turkish graduates were employed at Akkuyu. In 2023 a joint double-diploma master's program was launched with 43 Turkish students admitted in 2024. Up to 600 Turkish engineers targeted to be trained by 2030.
  • Rosatom (State Atomic Energy Corporation / Госкорпорация «Росатом»)coreStrategic or Co-development Partner · 12 May 2010Rosatom is the primary contractor and technology provider for the Akkuyu NPP project. Through its subsidiary Rusatom Energy International JSC (AE «РЭИН»), Rosatom holds majority ownership of Akkuyu Nükleer A.Ş. Rosatom supplies VVER-1200 reactors, all major equipment (reactor vessels, steam generators, turbogenerators), and provides operational expertise. It is the world's leading nuclear corporation with decades of reactor operating experience.

Scale indicators16 records

Recent moves16 records

Expansion highlights6 records

Akkuyu Nükleer competitors and assessment

Company assessment

Direct peers

  • Emirates Nuclear Energy Corporation (ENEC): UAE state-owned nuclear project company that built and operates the Barakah plant under a similar long-term government-backed model. Directly comparable as a multi-reactor nuclear new-build delivered through an intergovernmental framework with a single national off-taker.
  • Korea Hydro & Nuclear Power (KHNP): Korean state nuclear operator and a partner of Turkey for SMR development. Comparable as a national nuclear operator with international new-build ambitions, similar long-asset-life regulated revenue model, and a workforce of tens of thousands.
  • CGN Power: Chinese nuclear power operator running a multi-reactor fleet domestically and internationally (e.g., Hinkley Point C in the UK). Comparable as a vertically integrated nuclear operator with export technology stack and large-scale fleet economics.
  • Teollisuuden Voima (TVO): Finnish nuclear power company operating Olkiluoto with a similar consortium-ownership and long-term baseload contract structure. Directly comparable as a non-vertically-integrated nuclear IPP selling wholesale electricity under long-term take-or-pay arrangements.
  • ČEZ Group: Czech integrated utility operating the Dukovany and Temelín nuclear plants. Comparable as a Central European nuclear operator with multi-reactor fleet serving a single national grid, balancing baseload generation with export revenues.
  • Eletrobras Termonuclear (Eletronuclear): Brazilian state nuclear operator running the Angra dos Reis plant. Comparable as a state-tied nuclear operator in an emerging market with single off-taker, multi-decade asset life, and ongoing fleet expansion ambitions.
  • Nuclear Power Corporation of India (NPCIL): Indian state-owned nuclear operator with the largest fleet under construction globally. Comparable as a national nuclear monopoly operating under government direction with multi-reactor new-build programs targeting baseload demand growth.
  • China National Nuclear Corporation (CNNC): Chinese state nuclear corporation owning reactors and exporting Hualong One technology internationally. Comparable as a state-owned nuclear developer-operator with full EPC capabilities, international new-build projects, and government-backed financing.

Broad incumbents

  • EDF Energy: UK subsidiary of EDF, one of the world's largest nuclear fleet operators with HPC new-build underway. Comparable as a broad incumbent nuclear utility with BOO-style long-term contract structures and significant multi-decade capex programs.
  • Vattenfall: Swedish state-owned utility with significant nuclear and hydro generation. Comparable as a broad incumbent European energy major with regulated nuclear baseload and active involvement in nuclear new-build and life-extension discussions.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat5 records

Key risks6 records

Key highlights7 records

Customer concentration

Akkuyu Nükleer social profiles

Digital presence

Akkuyu Nükleer compliance and trust

Trust signal

Compliance8 records

Akkuyu Nükleer financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Akkuyu Nükleer leadership team

Management profile

Number of profiles

Profiles4 records

Akkuyu Nükleer funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Akkuyu Nükleer M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Akkuyu Nükleer

What does Akkuyu Nükleer do?

Akkuyu Nükleer designs, builds, owns, operates, and will eventually decommission Turkey's first nuclear power plant — a four-unit, 4,800 MW facility with Russian VVER-1200 (Generation 3+) reactors — and sells all generated electricity wholesale to the Turkish national grid under long-term supply contracts. The company also runs a specialized nuclear training center with the country's first full-scale reactor simulator to qualify operating personnel, and supports local industrial participation by integrating ~400 Turkish supplier companies into construction and installation works.

Is Akkuyu Nükleer a public or private company?

Akkuyu Nükleer is a private company. It is classified as corporate owned and is currently operating.

When was Akkuyu Nükleer founded?

Akkuyu Nükleer was founded in 2010. It employs 1,001 to 5,000 people.

Where is Akkuyu Nükleer based?

Akkuyu Nükleer is headquartered in Ankara.

How does Akkuyu Nükleer make money?

Two revenue lines are on record. Electricity Generation and Wholesale is the primary driver. The others are consulting and Technical Services.

Who are Akkuyu Nükleer's main competitors?

Direct peers on record are Emirates Nuclear Energy Corporation (ENEC), Korea Hydro & Nuclear Power (KHNP), CGN Power, Teollisuuden Voima (TVO), ČEZ Group, Eletrobras Termonuclear (Eletronuclear), Nuclear Power Corporation of India (NPCIL) and China National Nuclear Corporation (CNNC). Broad incumbents are EDF Energy and Vattenfall.

Does Akkuyu Nükleer have an API?

No public API is recorded for Akkuyu Nükleer.

What industry is Akkuyu Nükleer in?

Akkuyu Nükleer's product category is Nuclear Power Generation. Its primary akta.pro industry code is EUAEAAAC, Nuclear Plant EPC & Construction, with a secondary code of EUAKABAE, Component & System Upgrades / Modernization (I&C Digital, Turbine-Generator, Balance-of-Plant). Its NAICS code is 221113 and its SIC code is 1623.