Descriptiontext

Greenlink Interconnector Limited is a privately-held energy infrastructure company that owns and operates a 500MW (504MW nominal) High Voltage Direct Current electricity interconnector linking the national grids of Ireland and Great Britain. The ~190 km route comprises approximately 160 km of submarine cable across the Irish Sea and ~30 km of underground cable (25 km in Ireland, 5 km in Wales), using two +/- 320kV power cables plus a fibre-optic monitoring cable. It connects EirGrid's Great Island 220 kV substation in County Wexford, Ireland to National Grid's Pembroke 400 kV substation in Pembrokeshire, Wales, with two converter stations of ~1.85 hectares each handling DC-to-AC conversion. The asset became operational in February 2025 and was formally launched on 16 April 2025. Headquartered in Saggart, Dublin, with a small operational team of 11-50, the company doubles interconnection capacity between Ireland and GB and can power up to 380,000 homes at full capacity.

The company sells regulated interconnector transmission capacity to electricity market participants, with access rules and charging methodology approved by Ofgem (UK) and the Commission for Regulation of Utilities (CRU) in Ireland. Capacity allocation and availability are published through Nord Pool's Urgent Market Messages platform and Elexon's BSC Insight Solutions portal under REMIT regulations. Greenlink is owned by Equitix, a European infrastructure investment platform managing ~£13.8 billion AUM across 300+ projects in 24 countries, and Baltic Cable AB, the Swedish-German interconnector operator; Mubadala invested $200 million alongside Equitix in June 2026. Revenue economics are usage-based on capacity auctioned through these regulated channels, supporting cross-border electricity trading, renewable energy export/import, and grid balancing services between the Single Electricity Market (Ireland) and BETTA (Great Britain).

Short descriptiontext

Greenlink Interconnector operates a 500MW HVDC subsea electricity interconnector linking Ireland and Great Britain, providing regulated cross-border transmission capacity to energy market participants via Ofgem- and CRU-approved access rules. Owned by Equitix, Baltic Cable AB, and Mubadala.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersSaggart, Ireland
HQ citystring
Saggart
HQ countrystring
Ireland
HQ regionstring
Europe
Markets served

Serves global market

Offices3 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
electricity transmission services, HVDC interconnector infrastructure, subsea power cables, cross-border grid interconnection, energy security infrastructure
Industry3 codes
PRIMARYEUADAAAB
Cross-Border Interconnectors & Regional Transmission Coordination
Energy, Utilities & Environment/Electric Transmission & Distribution (T&D)/Transmission System Operators (TSOs) & High-Voltage Transmission
SECONDARYEUAEABAD
HVDC Converter Stations & HVDC Transmission EPC
SECONDARYEUADAMAB
HVDC Cables & Overhead Lines (Subsea, Underground, Overhead)
NAICS code2 codes
  • Electric Bulk Power Transmission and Control221121
  • Electric Power Transmission, Control, and Distribution22112
SIC code1 code
  • Electric Services4911
Product category
Electricity Transmission Infrastructure
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Interconnector Transmission Capacity
TypeUsage Based
Description

Revenue generated from providing regulated transmission capacity access to electricity market participants. Access rules and charging methodology are approved by Ofgem (UK) and CRU (Ireland). Capacity allocation and availability published via Nord Pool and Elexon REMIT platforms.

greenlink.ie
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels3 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Supply Chain, Operations, Personnel, Technology or R&D
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Greenlink Interconnector owns and operates a 500 MW (504 MW nominal) subsea and underground electricity interconnector that links Ireland's Great Island 220 kV substation in County Wexford to National Grid's Pembroke 400 kV substation in Pembrokeshire, Wales. The asset uses High Voltage Direct Current (HVDC) technology with two +/- 320 kV cables plus a fibre-optic monitoring cable across approximately 160 km of subsea route and 30 km of underground route, enabling bidirectional power flow between the Irish and British electricity markets.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 5 values shown
  • Powers 380,000 homes
+4 more records
Product overview1 text field

Greenlink Interconnector is a single unified electricity interconnector product consisting of HVDC subsea cables, underground onshore cables, and two converter stations. The core product is the 500 MW electricity interconnector linking Ireland and Great Britain, with the converter stations converting DC to AC for connection to national grids. The fibre-optic cable enables monitoring, control, and safety communication between converter stations. The product provides bidirectional electricity flow capability for energy trading, security of supply, and renewable energy integration between the two countries.

Product and service1 record
1Greenlink Interconnector
CategoryElectricity Transmission Infrastructure
Description

A 500 MW (504 MW nominal) subsea and underground electricity interconnector connecting EirGrid's Great Island 220 kV substation in County Wexford, Ireland, to National Grid's Pembroke 400 kV substation in Pembrokeshire, Wales. Provides bidirectional electricity transmission capacity to transmission system operators and energy market participants for cross-border trading, security of supply, and renewable energy integration.

Scale indicator7 records

Each record includes

Type, Value, Description, Source

Partnership6 partners
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Ofgem is the UK gas and electricity markets regulator that approved Greenlink's Access Rules and Charging Methodology. Ofgem oversight ensures regulated access to the interconnector capacity for UK market participants.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

CRU is Ireland's independent energy regulator that approved Greenlink's Access Rules and Charging Methodology. CRU oversight ensures regulated access to the interconnector capacity for Irish market participants.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

EirGrid is Ireland's transmission system operator responsible for the electricity grid. Greenlink connects to EirGrid's Great Island substation in County Wexford, enabling cross-border electricity flows with Great Britain.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

National Grid is Great Britain's transmission system operator. Greenlink connects to National Grid's Pembroke substation in Pembrokeshire, Wales, enabling cross-border electricity flows with Ireland.

Strategic tierCoreTypeTechnology or Integration
Description

Nord Pool operates the Urgent Market Messages (UMM) platform where Greenlink publishes interconnector availability and capacity data for market transparency under REMIT regulations.

Strategic tierCoreTypeTechnology or Integration
Description

Elexon manages the Balancing and Settlement Code (BSC) Insight Solutions Portal where Greenlink publishes detailed operational data and interconnector status reports.

Recent move5 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
1Moyle Interconnector Ltd
TypeDirect peer
Description

Moyle is a 500 MW HVDC subsea interconnector between Scotland and Northern Ireland—an unusually close capacity and technology match to Greenlink and a relevant analogue for Irish-GB interconnection.

TypeBroad incumbent
Description

National Grid operates multiple UK interconnectors (IFA, BritNed via JV, IFA2, Nemo Link) connecting GB to neighboring markets. Broad incumbent comparable on interconnector operations, regulated access, and connection to the GB grid (which Greenlink uses).

TypeDirect peer
Description

BritNed is a 1 GW HVDC subsea interconnector between the UK and the Netherlands with comparable revenue model (regulated capacity auctions, dual regulator oversight). Closely comparable operational and commercial profile to Greenlink.

TypeEmerging player
Description

NeuConnect is a 1.4 GW HVDC interconnector under development between the UK and Germany. Comparable as an emerging HVDC subsea interconnection project with similar institutional investor and regulated framework profile.

5Baltic Cable AB
TypeDirect peer
Description

Baltic Cable AB owns and operates the Sweden-Germany HVDC interconnector and is a co-owner of Greenlink. It is the most directly comparable peer: same HVDC subsea business model, regulated European cross-border transmission, and shared ownership.

6ElecLink Limited
TypeDirect peer
Description

ElecLink operates a 1 GW HVDC interconnector through the Channel Tunnel between the UK and France, sharing Greenlink's regulated interconnector business model and route characteristics.

7Celtic Interconnector (EirGrid / RTE)
TypeEmerging player
Description

The Celtic Interconnector is the planned ~700 MW subsea HVDC link between Ireland and France under development by EirGrid and RTE. Comparable as an EU/Irish interconnector route with overlapping customer (EirGrid) and regulator (CRU/Ofgem-adjacent EU bodies).

8IFA (Interconnexion France-Angleterre)
TypeDirect peer
Description

IFA is a 2 GW HVDC subsea interconnector between France and England owned by National Grid and RTE. A comparable large-scale regulated HVDC subsea asset with capacity allocation via market platforms and dual-regulator oversight.

9Nemo Link Ltd
TypeDirect peer
Description

Nemo Link is a 1 GW HVDC interconnector between the UK and Belgium using similar subsea cable and converter station technology. Highly comparable in technology, ownership structure (National Grid and Elia JV), and regulated merchant-driven revenue model.

TypeBroad incumbent
Description

EirGrid is Ireland's TSO and Greenlink's grid counterparty. Broad-incumbent comparable in that it operates the wider Irish transmission system, sets access rules, and governs grid interconnection for renewable integration—the same structural adjacencies Greenlink monetizes.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers2 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile3 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles5 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance1 record

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds3 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors3 records

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Greenlink Interconnector

Electricity Transmission Infrastructuregreenlink.ie

Greenlink Interconnector operates a 500MW HVDC subsea electricity interconnector linking Ireland and Great Britain, providing regulated cross-border transmission capacity to energy market participants via Ofgem- and CRU-approved access rules. Owned by Equitix, Baltic Cable AB, and Mubadala.

What Greenlink Interconnector does

Greenlink Interconnector Limited is a privately-held energy infrastructure company that owns and operates a 500MW (504MW nominal) High Voltage Direct Current electricity interconnector linking the national grids of Ireland and Great Britain. The ~190 km route comprises approximately 160 km of submarine cable across the Irish Sea and ~30 km of underground cable (25 km in Ireland, 5 km in Wales), using two +/- 320kV power cables plus a fibre-optic monitoring cable. It connects EirGrid's Great Island 220 kV substation in County Wexford, Ireland to National Grid's Pembroke 400 kV substation in Pembrokeshire, Wales, with two converter stations of ~1.85 hectares each handling DC-to-AC conversion. The asset became operational in February 2025 and was formally launched on 16 April 2025. Headquartered in Saggart, Dublin, with a small operational team of 11-50, the company doubles interconnection capacity between Ireland and GB and can power up to 380,000 homes at full capacity.

The company sells regulated interconnector transmission capacity to electricity market participants, with access rules and charging methodology approved by Ofgem (UK) and the Commission for Regulation of Utilities (CRU) in Ireland. Capacity allocation and availability are published through Nord Pool's Urgent Market Messages platform and Elexon's BSC Insight Solutions portal under REMIT regulations. Greenlink is owned by Equitix, a European infrastructure investment platform managing ~£13.8 billion AUM across 300+ projects in 24 countries, and Baltic Cable AB, the Swedish-German interconnector operator; Mubadala invested $200 million alongside Equitix in June 2026. Revenue economics are usage-based on capacity auctioned through these regulated channels, supporting cross-border electricity trading, renewable energy export/import, and grid balancing services between the Single Electricity Market (Ireland) and BETTA (Great Britain).

Greenlink Interconnector firmographics

Firmographics
Name
Greenlink Interconnector
Legal name
Greenlink Interconnector LTD
Website
https://greenlink.ie
Company type
Private
Founded year
2020
Operating status
Operating
Headcount range
11–50 employees
Short description
Greenlink Interconnector operates a 500MW HVDC subsea electricity interconnector linking Ireland and Great Britain, providing regulated cross-border transmission capacity to energy market participants via Ofgem- and CRU-approved access rules. Owned by Equitix, Baltic Cable AB, and Mubadala.
Ownership category
akta.pro rank

Greenlink Interconnector industry classification

Industry
Product category
Electricity Transmission Infrastructure
NAICS
Electric Bulk Power Transmission and Control (221121), Electric Power Transmission, Control, and Distribution (22112)
SIC
Electric Services (4911)
akta.pro industry
PRIMARYEUADAAAB
Cross-Border Interconnectors & Regional Transmission Coordination
Energy, Utilities & Environment/Electric Transmission & Distribution (T&D)/Transmission System Operators (TSOs) & High-Voltage Transmission
SECONDARYEUAEABAD
HVDC Converter Stations & HVDC Transmission EPC
SECONDARYEUADAMAB
HVDC Cables & Overhead Lines (Subsea, Underground, Overhead)

Keywords

  • Electricity transmission services
  • HVDC interconnector infrastructure
  • Subsea power cables
  • Cross-border grid interconnection
  • Energy security infrastructure

Where Greenlink Interconnector is headquartered

Location

Headquarters

HQ city
Saggart
HQ country
Ireland
HQ region
Europe

Offices3 records

Markets served

Greenlink Interconnector business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Supply Chain, Operations, Personnel, Technology or R&D

Revenue model

  1. Interconnector Transmission Capacity: Revenue generated from providing regulated transmission capacity access to electricity market participants. Access rules and charging methodology are approved by Ofgem (UK) and CRU (Ireland). Capacity allocation and availability published via Nord Pool and Elexon REMIT platforms.

Go-to-market motion1 record

Distribution channels3 records

Marketing channels5 records

Greenlink Interconnector product offering

Product offering

Core offering

Greenlink Interconnector owns and operates a 500 MW (504 MW nominal) subsea and underground electricity interconnector that links Ireland's Great Island 220 kV substation in County Wexford to National Grid's Pembroke 400 kV substation in Pembrokeshire, Wales. The asset uses High Voltage Direct Current (HVDC) technology with two +/- 320 kV cables plus a fibre-optic monitoring cable across approximately 160 km of subsea route and 30 km of underground route, enabling bidirectional power flow between the Irish and British electricity markets.

Product overview

Greenlink Interconnector is a single unified electricity interconnector product consisting of HVDC subsea cables, underground onshore cables, and two converter stations. The core product is the 500 MW electricity interconnector linking Ireland and Great Britain, with the converter stations converting DC to AC for connection to national grids. The fibre-optic cable enables monitoring, control, and safety communication between converter stations. The product provides bidirectional electricity flow capability for energy trading, security of supply, and renewable energy integration between the two countries.

Differentiator

Problem solved

Functional benefit

Products and services

  • Greenlink Interconnector A 500 MW (504 MW nominal) subsea and underground electricity interconnector connecting EirGrid's Great Island 220 kV substation in County Wexford, Ireland, to National Grid's Pembroke 400 kV substation in Pembrokeshire, Wales. Provides bidirectional electricity transmission capacity to transmission system operators and energy market participants for cross-border trading, security of supply, and renewable energy integration.

Quantifiable outcome

  • Powers 380,000 homes
  • +4 more outcomes

Companies that use Greenlink Interconnector

Customer profile

Named customers2 records

Segments3 records

Ideal customer profiles3 records

Greenlink Interconnector technology and API

Technology

Technology focussed Yes

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

Greenlink Interconnector partnerships and signals

Strategic signal

Partnerships

Six partnerships are on record, tiered core.

  • OfgemcoreStrategic or Co-development PartnerOfgem is the UK gas and electricity markets regulator that approved Greenlink's Access Rules and Charging Methodology. Ofgem oversight ensures regulated access to the interconnector capacity for UK market participants.
  • CRU (Commission for Regulation of Utilities)coreStrategic or Co-development PartnerCRU is Ireland's independent energy regulator that approved Greenlink's Access Rules and Charging Methodology. CRU oversight ensures regulated access to the interconnector capacity for Irish market participants.
  • EirGridcoreStrategic or Co-development PartnerEirGrid is Ireland's transmission system operator responsible for the electricity grid. Greenlink connects to EirGrid's Great Island substation in County Wexford, enabling cross-border electricity flows with Great Britain.
  • National GridcoreStrategic or Co-development PartnerNational Grid is Great Britain's transmission system operator. Greenlink connects to National Grid's Pembroke substation in Pembrokeshire, Wales, enabling cross-border electricity flows with Ireland.
  • Nord PoolcoreTechnology or IntegrationNord Pool operates the Urgent Market Messages (UMM) platform where Greenlink publishes interconnector availability and capacity data for market transparency under REMIT regulations.
  • ElexoncoreTechnology or IntegrationElexon manages the Balancing and Settlement Code (BSC) Insight Solutions Portal where Greenlink publishes detailed operational data and interconnector status reports.

Scale indicators7 records

Recent moves5 records

Expansion highlights5 records

Greenlink Interconnector competitors and assessment

Company assessment

Direct peers

  • Moyle Interconnector Ltd: Moyle is a 500 MW HVDC subsea interconnector between Scotland and Northern Ireland—an unusually close capacity and technology match to Greenlink and a relevant analogue for Irish-GB interconnection.
  • BritNed Development Ltd: BritNed is a 1 GW HVDC subsea interconnector between the UK and the Netherlands with comparable revenue model (regulated capacity auctions, dual regulator oversight). Closely comparable operational and commercial profile to Greenlink.
  • Baltic Cable AB: Baltic Cable AB owns and operates the Sweden-Germany HVDC interconnector and is a co-owner of Greenlink. It is the most directly comparable peer: same HVDC subsea business model, regulated European cross-border transmission, and shared ownership.
  • ElecLink Limited: ElecLink operates a 1 GW HVDC interconnector through the Channel Tunnel between the UK and France, sharing Greenlink's regulated interconnector business model and route characteristics.
  • IFA (Interconnexion France-Angleterre): IFA is a 2 GW HVDC subsea interconnector between France and England owned by National Grid and RTE. A comparable large-scale regulated HVDC subsea asset with capacity allocation via market platforms and dual-regulator oversight.
  • Nemo Link Ltd: Nemo Link is a 1 GW HVDC interconnector between the UK and Belgium using similar subsea cable and converter station technology. Highly comparable in technology, ownership structure (National Grid and Elia JV), and regulated merchant-driven revenue model.

Broad incumbents

  • National Grid Interconnectors: National Grid operates multiple UK interconnectors (IFA, BritNed via JV, IFA2, Nemo Link) connecting GB to neighboring markets. Broad incumbent comparable on interconnector operations, regulated access, and connection to the GB grid (which Greenlink uses).
  • EirGrid plc: EirGrid is Ireland's TSO and Greenlink's grid counterparty. Broad-incumbent comparable in that it operates the wider Irish transmission system, sets access rules, and governs grid interconnection for renewable integration—the same structural adjacencies Greenlink monetizes.

Emerging players

  • NeuConnect Britain Ltd: NeuConnect is a 1.4 GW HVDC interconnector under development between the UK and Germany. Comparable as an emerging HVDC subsea interconnection project with similar institutional investor and regulated framework profile.
  • Celtic Interconnector (EirGrid / RTE): The Celtic Interconnector is the planned ~700 MW subsea HVDC link between Ireland and France under development by EirGrid and RTE. Comparable as an EU/Irish interconnector route with overlapping customer (EirGrid) and regulator (CRU/Ofgem-adjacent EU bodies).

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks7 records

Key highlights7 records

Customer concentration

Greenlink Interconnector social profiles

Digital presence

Greenlink Interconnector compliance and trust

Trust signal

Compliance1 record

Greenlink Interconnector financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Greenlink Interconnector leadership team

Management profile

Number of profiles

Profiles5 records

Greenlink Interconnector funding detail

Funding detail

Funding overview

Funding rounds3 records

Investors3 records

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Greenlink Interconnector M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Greenlink Interconnector

What does Greenlink Interconnector do?

Greenlink Interconnector owns and operates a 500 MW (504 MW nominal) subsea and underground electricity interconnector that links Ireland's Great Island 220 kV substation in County Wexford to National Grid's Pembroke 400 kV substation in Pembrokeshire, Wales. The asset uses High Voltage Direct Current (HVDC) technology with two +/- 320 kV cables plus a fibre-optic monitoring cable across approximately 160 km of subsea route and 30 km of underground route, enabling bidirectional power flow between the Irish and British electricity markets.

Is Greenlink Interconnector a public or private company?

Greenlink Interconnector is a private company. It is classified as venture growth investor backed and is currently operating.

When was Greenlink Interconnector founded?

Greenlink Interconnector was founded in 2020. It employs 11 to 50 people.

Where is Greenlink Interconnector based?

Greenlink Interconnector is headquartered in Saggart, Ireland, in the Europe region.

How does Greenlink Interconnector make money?

One revenue line is on record: interconnector Transmission Capacity.

Who are Greenlink Interconnector's main competitors?

Direct peers on record are Moyle Interconnector Ltd, BritNed Development Ltd, Baltic Cable AB, ElecLink Limited, IFA (Interconnexion France-Angleterre) and Nemo Link Ltd. Broad incumbents are National Grid Interconnectors and EirGrid plc. Emerging players are NeuConnect Britain Ltd and Celtic Interconnector (EirGrid / RTE).

Does Greenlink Interconnector have an API?

No public API is recorded for Greenlink Interconnector.

What industry is Greenlink Interconnector in?

Greenlink Interconnector's product category is Electricity Transmission Infrastructure. Its primary akta.pro industry code is EUADAAAB, Cross-Border Interconnectors & Regional Transmission Coordination, with a secondary code of EUAEABAD, HVDC Converter Stations & HVDC Transmission EPC. Its NAICS code is 221121 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
The Times of IndiaHarry Potter fans forced a $570 million power cable between UK and Ireland to be relocated since it would desecrate the 'grave' of Dobby, the elfHarry Potter fans successfully pressured the Greenlink project to relocate a $570 million power cable between the UK and Ireland, arguing that its initial route would desecrate the fictional grave of Dobby at Freshwater West beach. The developers subsequently rerouted the underground cables to avoid the site, which has become an informal memorial for fans despite being on ecologically sensitive land managed by the National Trust.Wide Open CountryFamous 'Harry Potter' Landmark Avoids Destruction After Fans' ProtestA 125-mile Greenlink interconnector cable project was rerouted to avoid destroying a beach in Wales that serves as an unofficial tribute site for the character Dobby from Harry Potter, following significant public protest. The decision prioritizes cultural tourism and fan sentiment over the original route, which would have impacted Bronze Age remains. This change highlights the economic value of the location due to its association with the film franchise.Tom's Hardware$580 million undersea cable rerouted to avoid the grave of Dobby the House Elf — company caves to fan demands to safeguard Harry Potter filming location, will instead pass by Bronze Age burial siteThe project manager for the $580 million Greenlink Connector undersea power cable rerouted the line to avoid Freshwater West in Wales after Harry Potter fans objected to it crossing the filming location of Dobby's grave. The company responsible for the project agreed to the change, shifting the cable path near Bronze Age burial sites instead of the popular tourist spot.HindustantimesHarry Potter fans force ₹5,500 crore power cable to change route over Dobby shrineThe Greenlink interconnector project, a £430 million power cable linking Britain and Ireland, has been rerouted to avoid a memorial to the character Dobby at Freshwater West beach in Wales. The decision followed significant opposition from Harry Potter fans who objected to the original plan passing through the site, which also helped planners avoid nearby Bronze Age archaeological remains.The Irish TimesHarry Potter fans force relocation of UK-Ireland undersea cable to avoid Dobby’s ‘grave’Harry Potter fans successfully pressured the Greenlink interconnector project to relocate its route, avoiding a path through Freshwater West beach in Wales where fans consider the site the 'grave' of the character Dobby. The £430 million cable connecting the UK and Ireland national grids was rerouted after project manager Simon Ludlam received hundreds of complaints following a BBC interview detailing the original plan.FolhaFãs de 'Harry Potter' fazem empresa desistir de obra sobre túmulo do elfo DobbyThe Greenlink power cable project, a £430 million interconnector linking UK and Ireland electrical networks, altered its planned route after hundreds of protests from Harry Potter fans who opposed the cable passing near Freshwater West beach in Wales, the fictional burial site of Dobby the elf. The project manager initially did not recognize the character and had to be informed of the fans' concerns, leading the company to commission an alternate route that avoids the tribute location. The new route, while bypassing Dobby's associated site, passes near Bronze Age archaeological remains, and the project is now proceeding forward.The Daily BeastHarry Potter Fans Force $580M Project to Move to Protect Character’s GraveHarry Potter fans successfully pressured Greenlink to reroute a £580 million power cable project after discovering the underground cable would pass through Dobby's fictional grave at Freshwater West beach in Pembrokeshire, Wales. The backlash, which included hundreds of angry calls from fans, prompted the project to return to planners and find an alternative route that avoids the memorial site, though it will now pass near Bronze Age remains instead. The project manager noted it was the first time the company had moved for a fictional character, and the interconnector linking the UK and Ireland will proceed with the adjusted route.IgnHarry Potter Fan Protest Diverts Power Line Planned to 'Go Straight Through' Dobby's GraveHarry Potter fans successfully campaigned to reroute a planned power line that would have disturbed Dobby's grave in Pembrokeshire, Wales. The £430 million Greenlink interconnector project was re-routed after opposition surfaced, ensuring the memorial's preservation.The IndependentHarry Potter fans force diversion of £430m giant pipeline to protect Dobby’s ‘grave’Harry Potter fans successfully caused the diversion of a £430 million energy project called Greenlink, to prevent a pipeline from crossing Dobby’s grave on a Welsh beach. The project involved laying a high-voltage cable from Wales to Ireland, and the rerouting was prompted by fan outcry over the cable passing through the shrine. The rerouted cable was completed in 2025, powering approximately 380,000 homes.ThetimesUndersea power link diverted after Harry Potter fan furoreThe Greenlink interconnector under the Irish Sea has been diverted to avoid a beach memorial dedicated to Dobby, a character from Harry Potter. This change in routing was made following public outcry from fans regarding the initial path of the undersea power link.