Douglas County PUD
Douglas County PUD is a public utility company that provides reliable supply of electric energy and internet broadband services.
- Company typePrivate
- Founded1936
- HeadquartersEast Wenatchee, United States
- Headcount—
- GTM typeB2C
- OfferingServices
What Douglas County PUD does
Douglas County PUD (Public Utility District No. 1 of Douglas County) is a municipal public utility district organized under Washington State law (RCW Chapter 54), serving residential, commercial, industrial, and agricultural customers within Douglas County, Washington. The utility is governed by an elected Board of Commissioners and is not privately held. Its core generation asset is the Wells Hydroelectric Project, a run-of-river hydroelectric facility on the Columbia River with a 9,740-acre reservoir, 331,200 acre-feet gross storage capacity, and a 30-mile reservoir footprint, producing carbon-free power that exceeds county load requirements. Federal operating rights include FERC License No. 2149 and a 50-year Wells Habitat Conservation Plan running through June 20, 2054, covering salmon and steelhead protection with documented 96% 5-year average project survival for yearling spring migrants.
The utility distributes electricity through seven regulated rate schedules (General Service, Irrigation, Area Lighting, Power Delivery for large loads over 1,500 kVA, Communication Services, EV Charging, and others) and operates the Douglas County Community Network (DCCN) fiber optic system delivering business-class Ethernet up to 10 Gbps and residential broadband services, plus a Withrow Water System. Customers benefit from one of the lowest median energy burdens in the nation at 1.1%, reflecting low-cost hydroelectric generation. Auxiliary programs include CETA Energy Assistance ($10/month credit for income-qualified households) and Neighbor-to-Neighbor Assistance (up to $200 annual credit).
Recent strategic initiatives include a $7 million purchase order with Nel Hydrogen (signed April 2026) for PEM electrolyzer equipment to build the first green hydrogen plant owned and operated by a public utility at the Wells Project, targeted for first-half 2027 operations. A three-utility partnership with Chelan PUD and Grant PUD (announced April 2026) will equally share an estimated $22 million in costs to study geothermal potential in Central Washington, addressing a projected 5-gigawatt regional shortfall by 2030. The utility is structurally positioned to meet Washington's Clean Energy Transformation Act mandate of 100% renewable or non-emitting electricity by 2045.
Douglas County PUD firmographics
Firmographics- Name
- Douglas County PUD
- Legal name
- Public Utility District No. 1 of Douglas County
- Website
- https://douglaspud.org
- Company type
- Private
- Founded year
- 1936
- Operating status
- Operating
- Short description
- Douglas County PUD is a public utility company that provides reliable supply of electric energy and internet broadband services.
- Ownership category
- akta.pro rank
Douglas County PUD industry classification
Industry- Product category
- Electric Utility Services
- NAICS
- Hydroelectric Power Generation (221111), Electric Power Generation, Transmission and Distribution (2211), Electric Power Distribution (221122), Water, Sewage and Other Systems (2213)
- SIC
- Electric Services (4911), Water Supply (4941)
- akta.pro primary industry
- Public Power Districts & State/Provincial Utilities (EUADABAD)
- akta.pro secondary industry
- Pumped-Storage Hydroelectric Generation (EUACAEAC)
Keywords
Where Douglas County PUD is headquartered
LocationHeadquarters
- HQ city
- East Wenatchee
- HQ country
- United States
- HQ region
- North America
Offices2 records
Markets served
Douglas County PUD business model
Business model- GTM type
- B2C
- Offering type
- Services
- Cost components
- Infrastructure, Operations, Personnel, Others, Technology or R&D
Revenue model
- Electric Power Distribution: Revenue from providing electric power distribution services to residential, commercial, and industrial customers in Douglas County. Rates are set according to published rate schedules including Schedule 1 (General Service), Schedule 2 (Irrigation), Schedule 3 (Area Lighting), Schedule 4 (Power Delivery for large loads), and others.
- Communication Services: Provides fiber optic communication services including Ethernet, dark fiber, colocation, and internet bandwidth services to wholesale providers and end users.
- Alternative Renewable Resource Service: Optional service allowing customers to designate portion of energy from alternate renewable resources (wind and solar) at additional cost.
Pricing tiers
| Model | Billing | Price |
|---|---|---|
| Subscription | Monthly | General Service (Schedule 1) - Residential and Commercial |
| Subscription | Monthly | Irrigation Service (Schedule 2) |
| Subscription | Monthly | Area Lighting Service (Schedule 3) |
| Subscription | Annual | Power Delivery Service (Schedule 4) - Large loads over 1,500 kVA |
| Subscription | Monthly | Communication Services (Schedule 6) |
| Usage-based | Monthly | EV Charging Service (Schedule 8) |
| Other | Monthly | CETA Energy Assistance |
| Other | Annual | Neighbor-to-Neighbor Assistance |
Go-to-market motion1 record
Distribution channels1 record
Marketing channels4 records
Douglas County PUD product offering
Product offeringCore offering
Douglas County PUD generates and distributes electricity to residential, commercial, industrial, and agricultural customers in Douglas County, Washington, primarily through the Wells Hydroelectric Project on the Columbia River. The utility also delivers fiber optic broadband internet services through the Douglas County Community Network (DCCN) and provides water service through the Withrow Water System. Services are billed via published rate schedules (Schedule 1 General Service, Schedule 2 Irrigation, Schedule 3 Area Lighting, Schedule 4 Power Delivery, Schedule 6 Communications, Schedule 8 EV Charging).
Product overview
Douglas County PUD operates as a public utility district providing essential services including electric power generation and distribution (via the Wells Hydroelectric Project), fiber optic internet services through the Douglas County Community Network (DCCN), and water services. The utility offers various customer assistance programs including energy conservation rebates, CETA Energy Assistance for low-income households, and the Neighbor-to-Neighbor community assistance program. The utility recently announced a strategic initiative to produce green hydrogen using PEM electrolyzers powered by excess hydroelectric capacity, making it the first green hydrogen plant owned by a public utility.
Differentiator
Problem solved
Functional benefit
Products and services
- Electric Service (Schedule 1 General Service and other rate schedules) Power generation and distribution services provided to residential, commercial, industrial, and irrigation customers in Douglas County, Washington, sourced primarily from the Wells Hydroelectric Project. Billed under published rate schedules including Schedule 1 (General Service), Schedule 2 (Irrigation), Schedule 3 (Area Lighting), Schedule 4 (Power Delivery for large loads over 1,500 kVA), and Schedule 8 (EV Charging).
- Internet Services (DCCN - Douglas County Community Network) Fiber optic broadband and communication services offered through the Douglas County Community Network, providing residential and business internet connectivity with various speed tiers under Schedule 6. Plans include Basic Lit Ethernet (100 Mbps at $27.00/month, 1 Gbps at $54.00/month), Integrated Bandwidth (100 Mbps at $35.00/month for 5 TB, 1 Gbps at $55.00/month for 10 TB), and Business Class (100 Mbps at $143.00/month, 1 Gbps at $400.00/month, 10 Gbps at $2,000.00/month).
- Withrow Water System Water utility service provided to customers in the Withrow area of Douglas County.
- Energy Conservation Programs Residential and commercial energy efficiency programs including attic insulation rebates, appliance efficiency guidance, and conservation education to reduce customer energy consumption.
- CETA Energy Assistance Bill assistance program for low-income households meeting income eligibility requirements (at or below 80% Area Median Income or 200% Federal Poverty Level with energy burden of 6% or more of income), providing $10 monthly bill credits under the Clean Energy Transformation Act.
- Neighbor-to-Neighbor Energy Assistance Community-based energy assistance program providing annual credits up to $200 (equivalent to 20% of prior 12 months of billed electric costs) for income-qualified Douglas County residents.
- Alternative Renewable Resource Service Optional service allowing customers to designate a portion of their energy from alternate renewable resources (wind and solar) at additional cost.
- EV Charging Service (Schedule 8) Electric vehicle charging service for commercial and public use, with separate rates for customer charging stations and district-owned EV stations.
Quantifiable outcome
- 96% 5-year average project survival for yearling spring migrants
- +2 more outcomes
Companies that use Douglas County PUD
Customer profileNamed customers1 record
Segments4 records
Ideal customer profiles4 records
Douglas County PUD technology and API
TechnologyTechnology focussed No
API detail
- Has API
- No
- API docs
- API detail
Core technology
AI maturity
App detail
Feature3 records
Douglas County PUD partnerships and signals
Strategic signalPartnerships
Two partnerships are on record, tiered core and minor.
- Nel Hydrogen (Nel ASA)coreDouglas County PUD ordered approximately US$7 million in PEM electrolyzer equipment from Nel Hydrogen US (subsidiary of Nel ASA) for deployment at the Wells Hydroelectric Project. The equipment will produce renewable hydrogen by utilizing excess hydroelectric power to balance the grid. This represents the first green hydrogen plant sold by Nel that will be owned and operated by a public utility. Nel's stacks will be manufactured in Wallingford, Connecticut, with operations expected to begin in the first half of 2027.
- Chelan PUD and Grant PUDminorChelan, Douglas, and Grant PUDs in Washington state are considering a partnership to study geothermal energy potential in Central Washington. Each utility shares an equal portion of the estimated $22 million cost for geophysical surveys and below-ground research. The collaboration aims to address predicted energy shortfalls, including a projected 5-gigawatt shortfall in Washington and Oregon by 2030.
Scale indicators8 records
Recent moves5 records
Expansion highlights6 records
Douglas County PUD competitors and assessment
Company assessmentDirect peers
- Chelan County PUD: Washington State public utility district operating major run-of-river hydro assets (Rocky Reach and Rock Island dams) on the Columbia River; co-partner with Douglas PUD in the $22M Central Washington geothermal study and faces an identical regulatory and rate-setting framework, making it the closest functional peer.
- Grant County PUD: Washington PUD operating Priest Rapids and Wanapum hydro projects on the Columbia. Shares Douglas PUD's FERC licensing, CETA exposure, habitat conservation obligations, and the joint geothermal R&D partnership—an essentially identical operating model adjacent on the same river system.
- Snohomish County PUD: Washington PUD serving Snohomish County with a mix of hydro, thermal, and renewable generation plus fiber broadband—closely mirroring Douglas PUD's combination of regulated electric distribution and broadband, and similarly governed by an elected commission.
- Okanogan County PUD: Neighboring Washington PUD north of Douglas County, similarly small and rural, with comparable FERC-licensed hydro operations, low-density distribution, and a public-power governance structure.
- Franklin County PUD: Washington PUD serving Franklin County with similar mix of residential, agricultural irrigation, and large-load customers. Highly analogous customer segmentation (irrigation-heavy) and rate-schedule design as Douglas PUD.
Broad incumbents
- Seattle City Light: Municipal electric utility of the City of Seattle operatingBoundary, Skagit, and Cedar Falls hydropower, distributing to a large urban service territory. Comparable as a Washington hydro-based municipal utility, but materially larger and more urbanized than Douglas PUD.
- Tacoma Public Utilities: Tacoma's municipal light & power division operates Cushman and Nisqually hydro projects and provides electric, water, and rail services. Overlaps with Douglas PUD on hydro generation, fiber-adjacent offerings, and a non-profit public-power structure, though within a much larger service area.
- Avista Corporation: Investor-owned utility serving eastern Washington and northern Idaho with hydro, thermal, and growing renewables. Comparable on geography and hydro heritage but differs on private ownership, profit motive, and broader service area.
Others
- Bonneville Power Administration: Federal agency that markets power from federal Columbia River dams and is Douglas PUD's regional wholesale counterparty and transmission provider. Not a competitor, but central to the operating environment, FERC framework, and surplus-power monetization that Douglas PUD relies on.
Regional players
- Sacramento Municipal Utility District (SMUD): California's large community-owned electric utility with diversified generation including hydro and significant renewable investments. Similar public-power model and clean-energy mandate, but operates in a different geography, regulatory regime, and scale.
Market position
Strengths5 records
Weaknesses5 records
Competitive moat5 records
Key risks6 records
Key highlights7 records
Customer concentration
Douglas County PUD social profiles
Digital presenceDouglas County PUD financial estimates
Financial estimateRevenue estimate
Valuation estimate
Douglas County PUD leadership team
Management profileNumber of profiles
Douglas County PUD funding detail
Funding detailFunding overview
Funding rounds
Investors
Funding detail is available on the Subscription and Enterprise plan.Contact sales →
Douglas County PUD M&A and investment
M&A and investmentM&A
Investments
M&A and investment is available on the Subscription and Enterprise plan.Contact sales →
Frequently asked questions about Douglas County PUD
What does Douglas County PUD do?
Douglas County PUD generates and distributes electricity to residential, commercial, industrial, and agricultural customers in Douglas County, Washington, primarily through the Wells Hydroelectric Project on the Columbia River. The utility also delivers fiber optic broadband internet services through the Douglas County Community Network (DCCN) and provides water service through the Withrow Water System. Services are billed via published rate schedules (Schedule 1 General Service, Schedule 2 Irrigation, Schedule 3 Area Lighting, Schedule 4 Power Delivery, Schedule 6 Communications, Schedule 8 EV Charging).
Is Douglas County PUD a public or private company?
Douglas County PUD is a private company. It is classified as state government owned and is currently operating.
When was Douglas County PUD founded?
Douglas County PUD was founded in 1936.
Where is Douglas County PUD based?
Douglas County PUD is headquartered in East Wenatchee, United States, in the North America region.
How does Douglas County PUD make money?
Three revenue lines are on record. Electric Power Distribution is the primary driver. The others are communication Services and alternative Renewable Resource Service.
Who are Douglas County PUD's main competitors?
Direct peers on record are Chelan County PUD, Grant County PUD, Snohomish County PUD, Okanogan County PUD and Franklin County PUD. Broad incumbents are Seattle City Light, Tacoma Public Utilities and Avista Corporation. Bonneville Power Administration is listed as an others. Sacramento Municipal Utility District (SMUD) is listed as a regional player.
Does Douglas County PUD have an API?
No public API is recorded for Douglas County PUD.
What industry is Douglas County PUD in?
Douglas County PUD's product category is Electric Utility Services. Its primary akta.pro industry code is EUADABAD, Public Power Districts & State/Provincial Utilities, with a secondary code of EUACAEAC, Pumped-Storage Hydroelectric Generation. Its NAICS code is 221111 and its SIC code is 4911.