Japan Power Generation
Japan Power Generation Limited is a Pakistan-based independent power producer that operated a single 135 MW diesel-fired power plant in Lahore supplying electricity exclusively to WAPDA under a government Power Purchase Agreement. The plant has been shut down since October 2012 due to ongoing contractual disputes with the sole offtaker.
- Company typePublic
- Founded1994
- HeadquartersLahore, Pakistan
- Headcount1–10
- GTM typeB2B
- OfferingServices
What Japan Power Generation does
Japan Power Generation Limited (JPGL) is a Pakistan-based independent power producer (IPP) incorporated on September 29, 1994 as a public limited company and listed on the Pakistan Stock Exchange (symbol: JPGL). The company was established under the Government of Pakistan's 1994 Energy Policy to encourage private power generation and supplies electricity exclusively to the national grid under a Power Purchase Agreement with WAPDA (Water and Power Development Authority) and an Implementation Agreement with the Government of Pakistan. The company's sole revenue stream is bulk electricity generation from a single 135 MW installed capacity (120.5 MW dependable) power plant located near Jia Bagga Railway Station, off Raiwind Road, Lahore, Pakistan, built on approximately 25 acres.
The plant is configured as 24 medium-speed four-stroke Mitsubishi diesel engines coupled to Siemens generators, each producing 5.65 MW, running on heavy furnace oil (HFO) with high-speed diesel (HSD) for start-up and shut-down. The complex includes auxiliary infrastructure such as 30-day fuel storage capacity, rail and truck decanting facilities, a fuel-testing laboratory, transmission lines, workshops, and a switchyard. The plant achieved Financial Close on January 24, 1996 and commenced commercial operations on March 14, 2000, but has been shut down since October 2012 due to disputes with WAPDA. Despite an international arbitration award on May 19, 2014 largely upholding the company's position, WAPDA challenged the ruling in local lower courts, and as of the most recent disclosures, the plant remains non-operational while being maintained in fit condition for immediate start-up.
The company operates a single-customer, single-asset business model with no diversification across customers, technologies, or geographies. Its governance structure includes board nominees from institutional shareholders (Pak Oman Investment Company, National Logistics Cell, Saudi Pak Industrial & Agricultural Investment Company) and creditors' nominees from the lending syndicate led by Faysal Bank Limited. Disclosed earnings per share of PKR (2.95) as of June 30, 2016 indicates sustained net losses, consistent with the multi-year shutdown and the absence of operating revenue. Strategic priorities described are limited to dispute resolution with WAPDA, NEPRA, and the Ministry of Water & Power to enable restart rather than expansion.
Japan Power Generation firmographics
Firmographics- Name
- Japan Power Generation
- Legal name
- Japan Power Generation Limited
- Website
- https://jpglpk.com
- Company type
- Public
- Founded year
- 1994
- Operating status
- Operating
- Headcount range
- 1–10 employees
- Short description
- Japan Power Generation Limited is a Pakistan-based independent power producer that operated a single 135 MW diesel-fired power plant in Lahore supplying electricity exclusively to WAPDA under a government Power Purchase Agreement. The plant has been shut down since October 2012 due to ongoing contractual disputes with the sole offtaker.
- Ownership category
- akta.pro rank
Japan Power Generation industry classification
Industry- Product category
- Independent Power Generation
- NAICS
- Fossil Fuel Electric Power Generation (221112), Electric Power Generation (22111)
- SIC
- Engines & Turbines (3510), Electric Services (4911)
- akta.pro primary industry
- Diesel Engine Power Plants (Medium/High-Speed Reciprocating) (EUACACAB)
- akta.pro secondary industry
- Heavy Fuel Oil (HFO) / Bunker-Fueled Power Generation (EUACACAC)
Keywords
Where Japan Power Generation is headquartered
LocationHeadquarters
- HQ city
- Lahore
- HQ country
- Pakistan
- HQ region
- Asia
Offices2 records
Markets served
Japan Power Generation business model
Business model- GTM type
- B2B
- Offering type
- Services
- Cost components
- Operations, Supply Chain, Personnel, Infrastructure, Technology or R&D
Revenue model
- Electric Power Generation and Supply: The company generates and supplies electric power to the national grid under the terms of a Power Purchase Agreement with WAPDA and an Implementation Agreement with the Government of Pakistan. Revenue is derived from long-term power purchase contracts with the national utility. The plant has been shut down since October 2012 due to disputes with WAPDA.
Pricing tiers
| Model | Billing | Price |
|---|---|---|
| Subscription | Multi-year contract | Power Purchase Agreement with WAPDA |
Go-to-market motion1 record
Distribution channels1 record
Marketing channels3 records
Japan Power Generation product offering
Product offeringCore offering
Japan Power Generation Limited operates a 135 MW diesel-based power plant using 24 medium-speed four-stroke Mitsubishi diesel engines coupled to Siemens generators. The facility generates and supplies electric power exclusively to Pakistan's national grid under a Power Purchase Agreement with WAPDA and an Implementation Agreement with the Government of Pakistan, under the framework of the 1994 Energy Policy. The plant has been shut down since October 2012 due to commercial disputes with WAPDA.
Product overview
Japan Power Generation Limited operates as a single unified power generation facility with a 135 MW installed capacity. The company operates 24 medium-speed four-stroke Mitsubishi diesel engines (5.65 MW each) coupled to Siemens generators, running on heavy furnace oil (HFO) with high-speed diesel (HSD) for startup/shutdown operations. The plant, located near Jia Bagga railway station in Lahore, Pakistan, has been shut down since October 2012 due to disputes with WAPDA, though it remains fully maintained and ready for immediate start-up. The core product offering is bulk electricity generation for supply to the national grid, supported by auxiliary infrastructure including fuel storage, testing facilities, and transmission equipment.
Differentiator
Problem solved
Functional benefit
Products and services
- Electric Power Generation Japan Power Generation Limited operates a 135 MW power plant comprising 24 medium-speed four-stroke Mitsubishi diesel engines coupled to Siemens generators, each producing 5.65 MW. The plant generates and supplies electric power to the national grid under a Power Purchase Agreement with WAPDA, addressing Pakistan's energy needs as an Independent Power Producer under the 1994 Energy Policy.
Quantifiable outcome
- 135 MW installed capacity / 120.5 MW dependable capacity
- +3 more outcomes
Companies that use Japan Power Generation
Customer profileNamed customers1 record
Segments1 record
Ideal customer profiles1 record
Japan Power Generation technology and API
TechnologyTechnology focussed No
API detail
- Has API
- No
- API docs
- API detail
Core technology
AI maturity
App detail
Feature4 records
Japan Power Generation partnerships and signals
Strategic signalPartnerships
Seven partnerships are on record, tiered core and minor.
- Mitsubishi Heavy Industries (Japan)coreMitsubishi Heavy Industries is the manufacturer of the 24 medium-speed four-stroke diesel engines that power the plant. Each engine produces 5.65 MW, totaling the 135 MW installed capacity.
- SiemenscoreSiemens manufactures the generators coupled to the Mitsubishi diesel engines, completing the power generation units.
- BDO Ebrahim & Co.coreChartered Accountants serving as the company's external auditor for financial statements.
- Naveed Zafar Ashfaq Jaffery & Co.coreFirm engaged as the company's internal auditor.
- Hameed Majeed Associates (pvt) Ltd.coreShares Registrar Office located at HM House, 7-Bank Square, Lahore. Handles share registration and transfer services.
- Faisal & PartnerscoreLegal advisory firm serving as the company's legal counsel.
- Lahore Chamber of Commerce & IndustryminorThe company holds membership with the Lahore Chamber of Commerce & Industry (Membership No. 30062-C).
Scale indicators6 records
Recent moves5 records
Expansion highlights2 records
Japan Power Generation competitors and assessment
Company assessmentDirect peers
- Engro Powergen Qadirpur Limited: Gas-fired IPP selling electricity to WAPDA under a long-term PPA in Pakistan, operating under the same IPP policy regime and providing a clean-fuel counterpart to JPGL's HFO setup.
- Saif Power Limited: Pakistani thermal IPP with a PPA-based offtake to the national grid; another small/mid-scale listed IPP comparable in regulatory framework and counterparty exposure.
- Nishat Power Limited: Pakistan-listed thermal IPP with a WAPDA PPA, comparable in size, technology class (gas/HFO), and listed-equity structure to Japan Power Generation.
- Altern Energy Limited: Pakistani gas-fired IPP selling to the national grid under a WAPDA PPA, sharing the same regulatory framework, single-customer offtake, and 1994/2002 Energy Policy lineage as Japan Power Generation.
- Laraib Energy Limited: Pakistani-listed IPP supplying electricity to the national grid under a PPA, comparable in size, listed-equity structure, and offtake-counterparty dynamics.
- Hub Power Company: Pakistan's largest IPP and a direct peer in thermal/fossil-fuel independent power generation, supplying electricity to the national grid under a PPA structure analogous to Japan Power Generation's arrangement with WAPDA.
- Attock Gen Limited: Pakistani oil-fired IPP with a WAPDA PPA, sharing the same fuel-technology and single-offtaker characteristics as Japan Power Generation.
- Kot Addu Power Company (KAPCO): Pakistani thermal IPP operating a multi-unit oil/gas-fired power plant selling to WAPDA/NTDC under a long-term PPA, with the same single-offtaker model and shutdown/dispute risk profile as Japan Power Generation.
Broad incumbents
- Wärtsilä Corporation: Global manufacturer of medium-speed diesel and dual-fuel engines used in IPP applications similar to JPGL's Mitsubishi units, providing a technology peer for evaluating engine platform economics and lifecycle considerations.
- MAN Energy Solutions: OEM of large medium-speed diesel and gas engines for power generation; comparable to Mitsubishi as a technology and service provider for the engine class underpinning Japan Power Generation's plant.
Market position
Strengths3 records
Weaknesses4 records
Competitive moat3 records
Key risks6 records
Key highlights6 records
Customer concentration
Japan Power Generation social profiles
Digital presenceJapan Power Generation financial estimates
Financial estimateRevenue estimate
Valuation estimate
Japan Power Generation leadership team
Management profileNumber of profiles
Profiles14 records
Japan Power Generation funding detail
Funding detailFunding overview
Funding rounds
Investors
Funding detail is available on the Subscription and Enterprise plan.Contact sales →
Japan Power Generation M&A and investment
M&A and investmentM&A
Investments
M&A and investment is available on the Subscription and Enterprise plan.Contact sales →
Frequently asked questions about Japan Power Generation
What does Japan Power Generation do?
Japan Power Generation Limited operates a 135 MW diesel-based power plant using 24 medium-speed four-stroke Mitsubishi diesel engines coupled to Siemens generators. The facility generates and supplies electric power exclusively to Pakistan's national grid under a Power Purchase Agreement with WAPDA and an Implementation Agreement with the Government of Pakistan, under the framework of the 1994 Energy Policy. The plant has been shut down since October 2012 due to commercial disputes with WAPDA.
Is Japan Power Generation a public or private company?
Japan Power Generation is a public company. It is classified as public and is currently operating.
When was Japan Power Generation founded?
Japan Power Generation was founded in 1994. It employs 1 to 10 people.
Where is Japan Power Generation based?
Japan Power Generation is headquartered in Lahore, Pakistan, in the Asia region.
How does Japan Power Generation make money?
One revenue line is on record: electric Power Generation and Supply.
Who are Japan Power Generation's main competitors?
Direct peers on record are Engro Powergen Qadirpur Limited, Saif Power Limited, Nishat Power Limited, Altern Energy Limited, Laraib Energy Limited, Hub Power Company, Attock Gen Limited and Kot Addu Power Company (KAPCO). Broad incumbents are Wärtsilä Corporation and MAN Energy Solutions.
Does Japan Power Generation have an API?
No public API is recorded for Japan Power Generation.
What industry is Japan Power Generation in?
Japan Power Generation's product category is Independent Power Generation. Its primary akta.pro industry code is EUACACAB, Diesel Engine Power Plants (Medium/High-Speed Reciprocating), with a secondary code of EUACACAC, Heavy Fuel Oil (HFO) / Bunker-Fueled Power Generation. Its NAICS code is 221112 and its SIC code is 3510.