Descriptiontext

Hidroelektrane Na Trebisnjici (HET) is a state-owned hydroelectric power utility headquartered in Trebinje, Republika Srpska, Bosnia and Herzegovina. The company operates an integrated cascade hydropower system on the Trebišnjica river basin, currently running four operational facilities: HE Trebinje I (at the Grančarevo dam), HE Trebinje II, HE Dubrovnik, and the pumped-storage plant PHE Čapljina. HET is constructing HE Dabar (159.15 MW, three Francis turbines) as the lead asset of the "Upper Horizons of the Trebišnjica River" project, which is designed to transfer waters from Gatačko and Nevesinjsko polje through Dabarsko and Fatničko polje into the Bilećko jezero accumulation. The full system is planned to comprise seven hydroelectric power plants and five accumulation basins with a peak energy potential of approximately 3,600 GWh per year in an average wet year; built facilities currently realize around 2,777 GWh annually. Auxiliary infrastructure includes tunnels, drainage channels, a 484-meter bridge on the Trebišnjica, and an Olympic swimming pool complex at the Abazovina site.

HET's business model is that of a regulated wholesale electricity generator: all output is sold to its parent holding company, Mješoviti holding Elektroprivreda Republike Srpske (ERS), for distribution through the Republika Srpska electrical grid, with a cooperative joint-production arrangement at PHE Čapljina with EP HZHB. Electricity tariffs are not publicly disclosed and are set within the Republika Srpska energy regulatory framework. The company also performs ancillary functions: flood protection for Trebinje city (capacity of 500–600 m³/s), irrigation support for approximately 240 km² of arable land, and river habitat management including fish-stocking partnerships. HET holds ISO 9001, ISO 14001, ISO/IEC 27001, and ISO 45001 certifications, and outsources major construction work to contractors such as Integral Inženjering a.d. Laktaši and Herc Gradnja d.o.o. Bileća, with documented contracts ranging from approximately 0.69 million KM for channel maintenance to 131 million KM for the HE Dabar supply-tunnel package. The company is a joint-stock entity (a.d.) whose shares are wholly controlled by ERS, a government state entity.

Short descriptiontext

Hidroelektrane Na Trebisnjici (HET) is a state-owned hydroelectric utility in Trebinje, Republika Srpska, operating a cascade hydropower system on the Trebišnjica river basin and selling all generated electricity wholesale to its parent holding, Elektroprivreda Republike Srpske.

Operating statusenum
Operating
Ownership categoryenum
akta.pro rankint
HeadquartersTrebinje, Bosnia & Herzegovina
HQ citystring
Trebinje
HQ countrystring
Bosnia & Herzegovina
HQ regionstring
Europe
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
hydroelectric power generation, renewable energy utilities, water resource management, flood protection infrastructure, pumped storage hydro
Industry1 code
PRIMARYEUACAEAB
Reservoir/Impoundment Hydroelectric Generation
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)
NAICS code3 codes
  • Hydroelectric Power Generation221111
  • Electric Power Generation22111
  • Electric Power Transmission, Control, and Distribution22112
SIC code1 code
  • Electric Services4911
Product category
Hydroelectric Power Generation
No data
Revenue model1 record
1Electricity Generation and Distribution
TypeHardware Sales
Description

HET operates as a state-owned hydroelectric power utility generating electricity from its hydro plants and distributing power to the electrical grid of Republika Srpska. Revenue is derived from electricity sales to the national grid based on generated power output.

henatrebisnjici.com
Marketing channels3 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Operations, Personnel, Supply Chain, Others
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

HET operates an integrated multi-cascade hydroelectric power generation system on the Trebišnjica river basin, comprising four operational power plants: HE Trebinje I (at the Grančarevo dam), HE Trebinje II, HE Dubrovnik, and PHE Čapljina (pumped storage). The company produces approximately 2,777 GWh of electricity annually for sale to the Republika Srpska national grid, with HE Dabar (159.15 MW) under construction. The system also provides flood protection for Trebinje city and irrigation support for approximately 240 km² of arable land.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 2 values shown
  • Annual electricity generation of approximately 2777 GWh from existing facilities
+1 more record
Product overview1 text field

Hidroelektrane Na Trebisnjici (HET) operates an integrated hydroelectric power system comprising four operational power plants: HE Trebinje I (at the Grančarevo dam), HE Trebinje II, HE Dubrovnik, and PHE Čapljina (pumped storage). The system harnesses the Trebišnjica River's hydro potential across multiple elevations. Currently under development is HE Dabar as part of the 'Upper Horizons' project. The company also manages associated infrastructure including water channels, tunnels, bridges, and the Grancarevo dam, along with community facilities such as an Olympic swimming pool. The company holds ISO 9001, ISO 14001, ISO 27001, and ISO 45001 certifications.

Product and service5 records
1HE Trebinje I (Hydroelectric Power Plant Trebinje 1)
CategoryHydroelectric Power Generation
Description

Primary hydroelectric power plant at the Grančarevo dam on the Trebišnjica River, representing the most significant facility in the HET hydroelectric system. Generates power as part of the integrated cascade system for the Republika Srpska national grid.

2HE Trebinje II (Hydroelectric Power Plant Trebinje 2)
CategoryHydroelectric Power Generation
Description

Secondary hydroelectric power plant in the HET system, operating in conjunction with HE Trebinje I as part of the multi-cascade arrangement on the Trebišnjica river basin.

3HE Dubrovnik (Hydroelectric Power Plant Dubrovnik)
CategoryHydroelectric Power Generation
Description

Hydroelectric power plant in the Dubrovnik area, part of the integrated HET hydroelectric system on the Trebišnjica river.

4PHE Čapljina (Pumped Storage Hydroelectric Power Plant Čapljina)
CategoryEnergy Storage and Grid Stabilization
Description

Pumped storage hydroelectric power plant enabling energy storage and grid stabilization through water pumping and generation cycles. Operates in coordination with HE Trebinje 2 for regulated water release.

5HE Dabar (Hydroelectric Power Plant Dabar)
CategoryHydroelectric Power Generation
Description

Hydroelectric power plant under construction as part of the 'Upper Horizons of the Trebišnjica River' project, with 3 Francis turbines totaling 159.15 MW capacity, transferring waters from Gatačko and Nevesinjsko polje to Bilećko jezero accumulation.

Scale indicator7 records

Each record includes

Type, Value, Description, Source

Partnership9 partners
1Bejat plus d.o.o. and Apis d.o.o. Trebinje
Strategic tierMinorTypeImplementation/ SI/ Consulting PartnerAnnounced on2016-11-07
Description

Contractors for maintenance work on HE Čapljina supply channel with contract value of 687,052.23 KM without VAT.

henatrebisnjici.com
Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2016-03-17
Description

Main contractor for HE Dabar construction project, specifically for the intake tunnel, inlet structure, and access tunnels, with a contract value of 131 million KM. Signed agreement on March 17, 2016.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2014-09-08
Description

Contractor for Bilećko polje drainage channel and tunnel construction with contract value of 7,632,290.93 KM without VAT.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Cooperative agreement for joint production at PHE Čapljina. HET coordinates regulated water release from HE Trebinje 2 to PHE Čapljina according to the needs of the Republika Srpska and Herzegovina-Neretva Canton electrical energy systems.

Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Contractor for bridge construction over Trebišnjica river as part of eastern bypass project. Bridge project value approximately 10.5 million KM.

6Herc Gradnja doo Bileća
Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Contractor for Ćatovića Kraka regulation works project worth 2.14 million KM, focused on flood risk reduction in Trebinje city.

henatrebisnjici.com
Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Consortium of construction companies building the Olympic Swimming Pool complex at Abazovina site with contracted value of 8.8 million KM.

Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Joint contractors for channel construction through Fatničko polje with total contract value of 8,025,222.92 KM including VAT.

9Sportsko-ribolovno društvo Ribar d.o.o.
Strategic tierMinorTypeStrategic or Co-development Partner
Description

Partnership for fish stocking and river habitat management programs, including regular restocking of trout populations in Sušica, Trebišnjica, and Goričko jezero.

henatrebisnjici.com
Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight4 records

Each record includes

Type, Description

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles2 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance4 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Hidroelektrane Na Trebisnjici

Hydroelectric Power Generationhenatrebisnjici.com

Hidroelektrane Na Trebisnjici (HET) is a state-owned hydroelectric utility in Trebinje, Republika Srpska, operating a cascade hydropower system on the Trebišnjica river basin and selling all generated electricity wholesale to its parent holding, Elektroprivreda Republike Srpske.

What Hidroelektrane Na Trebisnjici does

Hidroelektrane Na Trebisnjici (HET) is a state-owned hydroelectric power utility headquartered in Trebinje, Republika Srpska, Bosnia and Herzegovina. The company operates an integrated cascade hydropower system on the Trebišnjica river basin, currently running four operational facilities: HE Trebinje I (at the Grančarevo dam), HE Trebinje II, HE Dubrovnik, and the pumped-storage plant PHE Čapljina. HET is constructing HE Dabar (159.15 MW, three Francis turbines) as the lead asset of the "Upper Horizons of the Trebišnjica River" project, which is designed to transfer waters from Gatačko and Nevesinjsko polje through Dabarsko and Fatničko polje into the Bilećko jezero accumulation. The full system is planned to comprise seven hydroelectric power plants and five accumulation basins with a peak energy potential of approximately 3,600 GWh per year in an average wet year; built facilities currently realize around 2,777 GWh annually. Auxiliary infrastructure includes tunnels, drainage channels, a 484-meter bridge on the Trebišnjica, and an Olympic swimming pool complex at the Abazovina site.

HET's business model is that of a regulated wholesale electricity generator: all output is sold to its parent holding company, Mješoviti holding Elektroprivreda Republike Srpske (ERS), for distribution through the Republika Srpska electrical grid, with a cooperative joint-production arrangement at PHE Čapljina with EP HZHB. Electricity tariffs are not publicly disclosed and are set within the Republika Srpska energy regulatory framework. The company also performs ancillary functions: flood protection for Trebinje city (capacity of 500–600 m³/s), irrigation support for approximately 240 km² of arable land, and river habitat management including fish-stocking partnerships. HET holds ISO 9001, ISO 14001, ISO/IEC 27001, and ISO 45001 certifications, and outsources major construction work to contractors such as Integral Inženjering a.d. Laktaši and Herc Gradnja d.o.o. Bileća, with documented contracts ranging from approximately 0.69 million KM for channel maintenance to 131 million KM for the HE Dabar supply-tunnel package. The company is a joint-stock entity (a.d.) whose shares are wholly controlled by ERS, a government state entity.

Hidroelektrane Na Trebisnjici firmographics

Firmographics
Name
Hidroelektrane Na Trebisnjici
Legal name
ZP "Hidroelektrane na Trebišnjici" a.d. Trebinje
Website
https://henatrebisnjici.com
Company type
Private
Founded year
1967
Operating status
Operating
Short description
Hidroelektrane Na Trebisnjici (HET) is a state-owned hydroelectric utility in Trebinje, Republika Srpska, operating a cascade hydropower system on the Trebišnjica river basin and selling all generated electricity wholesale to its parent holding, Elektroprivreda Republike Srpske.
Ownership category
akta.pro rank

Hidroelektrane Na Trebisnjici industry classification

Industry
Product category
Hydroelectric Power Generation
NAICS
Hydroelectric Power Generation (221111), Electric Power Generation (22111), Electric Power Transmission, Control, and Distribution (22112)
SIC
Electric Services (4911)
akta.pro industry
PRIMARYEUACAEAB
Reservoir/Impoundment Hydroelectric Generation
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)

Keywords

  • Hydroelectric power generation
  • Renewable energy utilities
  • Water resource management
  • Flood protection infrastructure
  • Pumped storage hydro

Where Hidroelektrane Na Trebisnjici is headquartered

Location

Headquarters

HQ city
Trebinje
HQ country
Bosnia & Herzegovina
HQ region
Europe

Offices1 record

Markets served

Hidroelektrane Na Trebisnjici business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Supply Chain, Others

Revenue model

  1. Electricity Generation and Distribution: HET operates as a state-owned hydroelectric power utility generating electricity from its hydro plants and distributing power to the electrical grid of Republika Srpska. Revenue is derived from electricity sales to the national grid based on generated power output.

Distribution channels1 record

Marketing channels3 records

Hidroelektrane Na Trebisnjici product offering

Product offering

Core offering

HET operates an integrated multi-cascade hydroelectric power generation system on the Trebišnjica river basin, comprising four operational power plants: HE Trebinje I (at the Grančarevo dam), HE Trebinje II, HE Dubrovnik, and PHE Čapljina (pumped storage). The company produces approximately 2,777 GWh of electricity annually for sale to the Republika Srpska national grid, with HE Dabar (159.15 MW) under construction. The system also provides flood protection for Trebinje city and irrigation support for approximately 240 km² of arable land.

Product overview

Hidroelektrane Na Trebisnjici (HET) operates an integrated hydroelectric power system comprising four operational power plants: HE Trebinje I (at the Grančarevo dam), HE Trebinje II, HE Dubrovnik, and PHE Čapljina (pumped storage). The system harnesses the Trebišnjica River's hydro potential across multiple elevations. Currently under development is HE Dabar as part of the 'Upper Horizons' project. The company also manages associated infrastructure including water channels, tunnels, bridges, and the Grancarevo dam, along with community facilities such as an Olympic swimming pool. The company holds ISO 9001, ISO 14001, ISO 27001, and ISO 45001 certifications.

Differentiator

Problem solved

Functional benefit

Products and services

  • HE Trebinje I (Hydroelectric Power Plant Trebinje 1) Primary hydroelectric power plant at the Grančarevo dam on the Trebišnjica River, representing the most significant facility in the HET hydroelectric system. Generates power as part of the integrated cascade system for the Republika Srpska national grid.
  • HE Trebinje II (Hydroelectric Power Plant Trebinje 2) Secondary hydroelectric power plant in the HET system, operating in conjunction with HE Trebinje I as part of the multi-cascade arrangement on the Trebišnjica river basin.
  • HE Dubrovnik (Hydroelectric Power Plant Dubrovnik) Hydroelectric power plant in the Dubrovnik area, part of the integrated HET hydroelectric system on the Trebišnjica river.
  • PHE Čapljina (Pumped Storage Hydroelectric Power Plant Čapljina) Pumped storage hydroelectric power plant enabling energy storage and grid stabilization through water pumping and generation cycles. Operates in coordination with HE Trebinje 2 for regulated water release.
  • HE Dabar (Hydroelectric Power Plant Dabar) Hydroelectric power plant under construction as part of the 'Upper Horizons of the Trebišnjica River' project, with 3 Francis turbines totaling 159.15 MW capacity, transferring waters from Gatačko and Nevesinjsko polje to Bilećko jezero accumulation.

Quantifiable outcome

  • Annual electricity generation of approximately 2777 GWh from existing facilities
  • +1 more outcomes

Companies that use Hidroelektrane Na Trebisnjici

Customer profile

Named customers1 record

Segments1 record

Ideal customer profiles1 record

Hidroelektrane Na Trebisnjici technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

Hidroelektrane Na Trebisnjici partnerships and signals

Strategic signal

Partnerships

Nine partnerships are on record, tiered minor, core and major.

  • Bejat plus d.o.o. and Apis d.o.o. TrebinjeminorImplementation/ SI/ Consulting Partner · 7 November 2016Contractors for maintenance work on HE Čapljina supply channel with contract value of 687,052.23 KM without VAT.
  • Integral Inženjering a.d. LaktašicoreImplementation/ SI/ Consulting Partner · 17 March 2016Main contractor for HE Dabar construction project, specifically for the intake tunnel, inlet structure, and access tunnels, with a contract value of 131 million KM. Signed agreement on March 17, 2016.
  • Integral Inženjering a.d. LaktašimajorImplementation/ SI/ Consulting Partner · 8 September 2014Contractor for Bilećko polje drainage channel and tunnel construction with contract value of 7,632,290.93 KM without VAT.
  • Elektroprivreda HZHB (EP HZHB)coreStrategic or Co-development PartnerCooperative agreement for joint production at PHE Čapljina. HET coordinates regulated water release from HE Trebinje 2 to PHE Čapljina according to the needs of the Republika Srpska and Herzegovina-Neretva Canton electrical energy systems.
  • Integral Inženjering a.d. LaktašimajorImplementation/ SI/ Consulting PartnerContractor for bridge construction over Trebišnjica river as part of eastern bypass project. Bridge project value approximately 10.5 million KM.
  • Herc Gradnja doo BilećamajorImplementation/ SI/ Consulting PartnerContractor for Ćatovića Kraka regulation works project worth 2.14 million KM, focused on flood risk reduction in Trebinje city.
  • Integral Inženjering a.d. Laktaši – Integra Inženjering d.o.o. Banja Luka – Herc Gradnja doo Bileća (Consortium)majorImplementation/ SI/ Consulting PartnerConsortium of construction companies building the Olympic Swimming Pool complex at Abazovina site with contracted value of 8.8 million KM.
  • Integral Inžinjering a.d. Laktaši and Prijedor Putevi a.d. PrijedormajorImplementation/ SI/ Consulting PartnerJoint contractors for channel construction through Fatničko polje with total contract value of 8,025,222.92 KM including VAT.
  • Sportsko-ribolovno društvo Ribar d.o.o.minorStrategic or Co-development PartnerPartnership for fish stocking and river habitat management programs, including regular restocking of trout populations in Sušica, Trebišnjica, and Goričko jezero.

Scale indicators7 records

Recent moves6 records

Expansion highlights4 records

Hidroelektrane Na Trebisnjici competitors and assessment

Company assessment

Market position

Strengths5 records

Weaknesses5 records

Competitive moat4 records

Key risks6 records

Customer concentration

Hidroelektrane Na Trebisnjici compliance and trust

Trust signal

Compliance4 records

Hidroelektrane Na Trebisnjici financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Hidroelektrane Na Trebisnjici leadership team

Management profile

Number of profiles

Profiles2 records

Hidroelektrane Na Trebisnjici funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Hidroelektrane Na Trebisnjici M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Hidroelektrane Na Trebisnjici

What does Hidroelektrane Na Trebisnjici do?

HET operates an integrated multi-cascade hydroelectric power generation system on the Trebišnjica river basin, comprising four operational power plants: HE Trebinje I (at the Grančarevo dam), HE Trebinje II, HE Dubrovnik, and PHE Čapljina (pumped storage). The company produces approximately 2,777 GWh of electricity annually for sale to the Republika Srpska national grid, with HE Dabar (159.15 MW) under construction. The system also provides flood protection for Trebinje city and irrigation support for approximately 240 km² of arable land.

Is Hidroelektrane Na Trebisnjici a public or private company?

Hidroelektrane Na Trebisnjici is a private company. It is classified as state government owned and is currently operating.

When was Hidroelektrane Na Trebisnjici founded?

Hidroelektrane Na Trebisnjici was founded in 1967.

Where is Hidroelektrane Na Trebisnjici based?

Hidroelektrane Na Trebisnjici is headquartered in Trebinje, Bosnia & Herzegovina, in the Europe region.

How does Hidroelektrane Na Trebisnjici make money?

One revenue line is on record: electricity Generation and Distribution.

Does Hidroelektrane Na Trebisnjici have an API?

No public API is recorded for Hidroelektrane Na Trebisnjici.

What industry is Hidroelektrane Na Trebisnjici in?

Hidroelektrane Na Trebisnjici's product category is Hydroelectric Power Generation. Its primary akta.pro industry code is EUACAEAB, Reservoir/Impoundment Hydroelectric Generation. Its NAICS code is 221111 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales