Developer docs
API playgroundTry for free, no card

Search company profiles

Chesapeake Bay Bridge and Tunnel District

Full company profile

uuid003ri4f

Namestring
Chesapeake Bay Bridge and Tunnel District
Legal namestring
Chesapeake Bay Bridge and Tunnel District
Websiteurl
cbbt.com
Company typeenum
Private
Founded yearint
1964
Descriptiontext

The Chesapeake Bay Bridge and Tunnel District is a political subdivision of the Commonwealth of Virginia that owns and operates a 17.6-mile bridge-tunnel complex connecting Virginia's Eastern Shore to the mainland at Virginia Beach via U.S. Route 13. The infrastructure comprises 12 miles of low-level trestles, two one-mile tunnels (Thimble Shoal Channel and Chesapeake Channel), two bridges, almost 2 miles of causeway, four manmade islands each roughly the size of Yankee Stadium, and 5.5 miles of approach roads totaling 23 miles. The facility opened on April 15, 1964 after 42 months of construction financed entirely with $200M in revenue bonds and has since carried more than 157 million vehicles, currently exceeding 4 million crossings annually.

The District's business model is a self-sustaining toll monopoly: it charges user fees across 16 vehicle classes with seasonal peak/off-peak pricing (effective Jan 1, 2024), accepts cash, credit cards, Apple Pay, Google Pay, E-ZPass, and scrip at gated North and South toll plazas, and funds both operations and capital projects without federal, state, or local tax subsidies. Revenue is supplemented by differentiated pricing tiers — Class 1 passenger cars pay $16 off-peak / $21 peak, with a 30/30 commuter discount of $7/trip and a 24-hour return-trip discount at $6 — and by 16 commercial classes priced up to $266 for over-dimension vehicles. The District is governed by an eleven-member Commission appointed by the Governor of Virginia and operates with approximately 160 employees across toll collection, police/emergency response, capital construction, finance, and MIS.

The current strategic initiative is the Parallel Thimble Shoal Tunnel Project: a $756.9M Phase II contract awarded in 2016 to Chesapeake Tunnel Joint Venture (Dragados USA / Schiavone Construction) to bore a second tube under the Thimble Shoal Channel using Herrenknecht's 308-foot Earth Pressure Balance TBM "Chessie." Funded through 37% toll revenue bonds ($280M), 30% TIFIA loan ($227M), 29% CBBT General Fund ($220M), and 4% VTIB loan ($30M), the project achieved TBM breakthrough on January 27, 2025 after mining more than 6,300 feet, with full commissioning forecast for early 2028. The district also runs specialized community programs — Medical Toll Assistance (since 2003, with Eastern Shore Rural Health), Educational Toll Fund (since 2010, with Eastern Shore Community College Foundation), a 30/30 commuter discount, and a Birding Program on the northernmost manmade island.

Short descriptiontext

The Chesapeake Bay Bridge and Tunnel District is a Virginia political subdivision operating a 17.6-mile bridge-tunnel complex — the only direct crossing of the lower Chesapeake Bay — financed entirely by user tolls across 16 vehicle classes and currently expanding capacity via the Parallel Thimble Shoal Tunnel Project scheduled for 2028 completion.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersCape Charles, United States
HQ citystring
Cape Charles
HQ countrystring
United States
HQ regionstring
North America
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
toll road infrastructure, bridge tunnel operations, vehicle toll collection, marine transportation crossing, tunnel construction project
Industry1 code
1Ferry Terminals & Water Transit Piers
CodeTHAIALAHPrimaryYes
NAICS code2 codes
  • Coastal and Great Lakes Passenger Transportation483114
  • Water Transportation483
SIC code1 code
  • Water Transportation4400
Product category
Toll Road Infrastructure
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model2 records
1Toll Revenue
TypeTransaction Fee
Description

The CBBT generates revenue through toll collection from all vehicles crossing the 17.6-mile facility. Toll rates vary by vehicle class (Class 1-16) and season (Peak Season: May 15 - September 15, Fridays-Sundays). Discounts available through E-ZPass including 30/30 commuter program (30 trips in 30 days for $7/one-way), 24-hour return trip discount, and medical/educational assistance programs. No federal, state or local tax monies are used for operations.

cbbt.com
2Revenue Bond Financing
TypeLicensing Royalties
Description

Construction projects funded through sale of revenue bonds to private investors. Original construction (1960) was funded by $200 million in revenue bonds. Current Parallel Thimble Shoal Tunnel Project financing: 37% toll revenue bonds, 30% TIFIA loan, 29% CBBT General Fund, 4% VTIB loan.

cbbt.com
Marketing channels8 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels5 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Personnel, Operations, Technology or R&D, Marketing or Sales, Others
Pricing details12 tiers
1Class 1 - Two-axle, four-tire vehicles
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

Off Peak: $16.00 initial crossing; Peak Season: $21.00; Return trip within 24 hours (E-ZPass required): $6.00; 30+ trips in 30 days (E-ZPass required): $7.00

cbbt.com
2Class 2 - Class 1 vehicle towing one-axle trailer
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$22.00 initial crossing; Return trip within 24 hours (E-ZPass required): $12.00

cbbt.com
3Class 3 - Class 1 vehicle towing two-axle trailer
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$26.00

cbbt.com
4Class 4 - Class 1 vehicle towing three-axle trailer
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$31.00

cbbt.com
5Class 8 - School buses and government transit shuttles
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$1.00

cbbt.com
6Class 9 - Two-axle, six-tire vehicle over 8' height
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$23.00

cbbt.com
7Class 10 - Three-axle vehicle
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$28.00

cbbt.com
8Class 11 - Four-axle vehicle
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$37.00

cbbt.com
9Class 12 - Five-axle vehicle
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$48.00

cbbt.com
10Class 13 - Six-axle vehicle
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$57.00

cbbt.com
11Class 14 - Two-axle bus
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$40.00

cbbt.com
12Class 16 - Special over-dimension vehicles
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

$266.00; Escort fee and prior approval required

cbbt.com
GTM typeB2C
B2C
Offering typeServices
Services
Core offering1 text field

The Chesapeake Bay Bridge and Tunnel District operates a 17.6-mile bridge-tunnel complex that provides the only direct fixed transportation link between Virginia's Eastern Shore and the mainland at Virginia Beach, carrying U.S. Route 13 over and under the lower Chesapeake Bay. The facility charges tolls across 16 vehicle classes with E-ZPass, cash, credit card, Apple Pay, Google Pay, and scrip payment options, and is currently undergoing major capacity expansion through the Parallel Thimble Shoal Tunnel Project.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • Over 157 million vehicles have crossed since 1964 opening
+3 more records
Product overview1 text field

The Chesapeake Bay Bridge and Tunnel District operates a single integrated transportation infrastructure: a 17.6-mile bridge-tunnel complex that serves as the only direct link between Virginia's Eastern Shore and the mainland at Virginia Beach. The core product is the bridge-tunnel crossing itself, which includes two underwater tunnels (Thimble Shoal Channel and Chesapeake Channel), multiple bridges, low-level trestles, and four manmade islands. The facility is currently undergoing major expansion through the Parallel Thimble Shoal Tunnel Project, which will add a second tunnel at Thimble Shoal. Supporting services include toll collection (with peak/off-peak pricing and multiple discount programs including E-ZPass), a scenic overlook, rest area with welcome center, birding program, and specialty assistance services (medical toll assistance, educational toll fund, commuter discounts, and drive-across assistance for phobic travelers).

Product and service13 records
1Bridge-Tunnel Crossing Services
CategoryTransportation Infrastructure
Description

A 17.6-mile bridge-tunnel complex providing the only direct link between Virginia's Eastern Shore and the mainland at Virginia Beach. The facility spans the lower Chesapeake Bay with two underwater tunnels, multiple bridges, trestles, and manmade islands, carrying U.S. Route 13 traffic over and under the Chesapeake Bay.

2Toll Collection Services
CategoryTransportation Services
Description

Electronic and manual toll collection services across 16 vehicle classes at the North and South Toll Plazas. Accepts cash, credit cards, E-ZPass, Apple Pay, Google Pay, and scrip. Peak season pricing applies May-September. Discount programs include 30/30 commuter discount and 24-hour roundtrip discount.

3Parallel Thimble Shoal Tunnel
CategoryTransportation Infrastructure
Description

A two-lane bored tunnel under Thimble Shoal Channel, connecting Island One to Island Two. When complete (~2028), the new tunnel will carry two lanes of southbound traffic while the existing tunnel carries northbound traffic. This is the first transportation tunnel in the Mid-Atlantic region constructed using a tunnel boring machine (TBM).

4Scenic Overlook
CategoryVisitor Experience
Description

The only public stopping point along the CBBT, located at Wise Point on the southern tip of Virginia's Eastern Shore. Features a large parking area, viewing machines to magnify views, and is a popular location for sunrise and sunset photography.

5North Toll Plaza Rest Area and Welcome Center
CategoryVisitor Experience
Description

24/7 rest area with bathrooms, a Welcome Center (open 9am-5pm daily) providing travel information about the Eastern Shore, and Virginia Originals gift shop (open 9am-4pm daily). E-ZPass vending machines available on-site.

6Birding Program
CategoryVisitor Experience
Description

Wildlife observation program offering access to the northernmost manmade island for bird and waterfowl watching. Birds commonly observed include Northern Gannet, American White Pelican, Brant, King Eider, Harlequin Duck, Red-breasted Merganser, Peregrine Falcon, American Oyster-catcher, Little Gull, and Black-tailed Gull. Permits required with security escort.

7Drive-Across Assistance
CategoryTraveler Assistance
Description

Scheduled drive-across service for travelers fearful of bridges and tunnels. 24-hour advance notice requested. Customer pays one-way toll with no additional fees.

8Bicycle and RV Shuttle Service
CategoryTraveler Assistance
Description

CBBT personnel transport cyclists and their bikes across the facility. Maximum vehicle height of 13'-6" for RVs; all propane must be turned off before crossing. Vehicle inspection required.

9Medical Toll Assistance Program
CategoryAssistance Program
Description

Partnership with Eastern Shore Rural Health providing toll assistance to Eastern Shore residents needing medical services in Hampton Roads. Eligibility based on income; covers complications of pregnancy, cancer, heart illnesses and surgeries.

10Educational Toll Fund
CategoryAssistance Program
Description

Partnership with Eastern Shore Community College providing reimbursement for students commuting across CBBT for post-secondary education. Students pay $5 per round trip; program reimburses the remainder upon successful course completion.

1130/30 Commuter Discount Program
CategoryDiscount Program
Description

Commuter discount program offering $7 per one-way crossing for travelers making 30 one-way trips within 30 days using the same E-ZPass transponder. Available to Class 1 (2-axle, 4-tire) vehicles only.

12E-ZPass Account Management
CategoryAccount Services
Description

On-site E-ZPass customer service at the CBBT Administration Building (8am-4:30pm, Monday-Friday) and self-service vending machines at toll plazas. Supports Virginia E-ZPass accounts with multiple state interoperability across 18+ state networks.

13Travel Advisory Services
CategoryInformation Services
Description

Real-time traffic and weather condition updates provided via 511 Virginia, X (Twitter) @FollowTheGulls, and phone (757-331-2960). Includes wind restriction advisories and construction schedule information.

Scale indicator7 records

Each record includes

Type, Value, Description, Source

Partnership12 partners
Strategic tierFlagshipTypeTechnology or IntegrationAnnounced on2018-01-01
Description

German manufacturer that designed and built the Chessie Tunnel Boring Machine (Earth Pressure Balance TBM, 308 feet long, 43.5 feet diameter cutterhead, 3,075 US Tons). TBM named by area 6th grade students.

Strategic tierFlagshipTypeStrategic or Co-development PartnerAnnounced on2016-01-01
Description

Awarded $756,987,318 contract for Phase II of Parallel Crossing Project. Team comprises Dragados USA and Schiavone Construction Company, LLC (ACS Dragados of Spain). Responsible for tunnel boring, construction, and completion of the Parallel Thimble Shoal Tunnel.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2013-01-01
Description

Selected for conceptual study, cost estimate, mapping, geotechnical investigation, NEPA advancement, and serving as Design Manager for the Parallel Thimble Shoal Tunnel Project. Also performed design of new SCADA system.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2013-01-01
Description

Named Strategic Advisor for the Parallel Thimble Shoal Tunnel Project, providing strategic consulting services.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2013-01-01
Description

Selected to prepare an investment grade traffic and revenue forecast to support the financing of the Parallel Thimble Shoal Tunnel Project.

Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2013-01-01
Description

Selected to serve as Project Counsel for the Parallel Thimble Shoal Tunnel Project, providing legal counsel.

Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2013-01-01
Description

Selected to serve as Bond Counsel for the Parallel Thimble Shoal Tunnel Project financing.

Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2013-01-01
Description

Selected to serve as Construction Manager for the Parallel Thimble Shoal Tunnel Project.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2010-01-01
Description

Since July 2010, the Eastern Shore Community College Foundation administers the Educational Toll Fund, reimbursing students a portion of round trips across the CBBT for post-secondary education and job training.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2003-01-01
Description

Since 2003, Eastern Shore Rural Health has managed the Medical Toll Assistance Program designed to assist Eastern Shore residents in need of medical services in the Hampton Roads area. Program covers toll costs for medical appointments.

Strategic tierCoreTypeTechnology or Integration
Description

Manufactured more than 9,000 precast concrete tunnel segments (10 tons each, 5 yards of concrete per segment, 18 inches thick) for the Parallel Thimble Shoal Tunnel. Located in Chesapeake, VA.

Strategic tierMinorTypeGTM or Marketing Partner
Description

"Virginia is for Lovers" branding partnership promoting CBBT as a tourist destination on the Virginia tourism website.

Recent move11 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
1Buffalo and Fort Erie Public Bridge Authority (Peace Bridge Authority)
TypeDirect peer
Description

Public bridge authority operating the Peace Bridge crossing between the US and Canada. Comparable as a self-sustaining toll bridge authority operating a critical international crossing with bond-financed capital programs.

2Bay Area Toll Authority (BATA)
TypeDirect peer
Description

California authority overseeing toll bridges in the San Francisco Bay Area. Comparable as a regional toll bridge authority managing a portfolio of bridge crossings with bond financing and significant traffic volume.

3Mackinac Bridge Authority
TypeDirect peer
Description

Michigan state authority operating the 5-mile Mackinac Bridge, a critical Great Lakes toll crossing with similar single-crossing monopoly characteristics. Comparable as an iconic, self-funded engineering marvel with seasonal traffic and similar scale.

TypeDirect peer
Description

Consortium operating the 10-mile Øresund Bridge-Tunnel between Denmark and Sweden. Comparable as a major international bridge-tunnel complex with toll-based revenue, bond financing, and similar mega-engineering profile.

TypeDirect peer
Description

Bi-state authority operating the Delaware Memorial Bridge, a major toll bridge crossing. Directly comparable as a self-sustaining toll bridge authority operating a critical interstate crossing without competing alternatives.

6International Bridge Authority
TypeDirect peer
Description

Authority operating the International Bridge between Michigan and Ontario. Comparable as a self-funded toll bridge authority with bond financing and significant cross-border traffic.

7Monitor-Merrimac Memorial Bridge-Tunnel (operated by VDOT)
TypeRegional player
Description

Another Virginia bridge-tunnel crossing Hampton Roads. Comparable as similar infrastructure in the same region, providing additional context for the Virginia toll bridge-tunnel ecosystem.

TypeDirect peer
Description

New York authority operating seven bridges and two tunnels. Comparable as a major toll infrastructure operator with similar bond financing structure and large-scale capital construction programs.

9Hampton Roads Bridge-Tunnel (operated by VDOT)
TypeRegional player
Description

Virginia bridge-tunnel connecting Hampton and Norfolk across Hampton Roads. Comparable infrastructure in the same region, though not a separate toll authority. Represents a regional alternative transportation route.

10Lake Pontchartrain Causeway Commission
TypeDirect peer
Description

Louisiana authority operating the 24-mile Lake Pontchartrain Causeway, at one time the world's longest continuous bridge over water. Comparable as a self-funded toll bridge authority operating a critical water crossing with similar length and toll-based revenue model.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers3 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment5 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile4 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

Integration12 records

Each record includes

Title, Type, Description, Source

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles19 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance4 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Chesapeake Bay Bridge and Tunnel District

Toll Road Infrastructurecbbt.com

The Chesapeake Bay Bridge and Tunnel District is a Virginia political subdivision operating a 17.6-mile bridge-tunnel complex — the only direct crossing of the lower Chesapeake Bay — financed entirely by user tolls across 16 vehicle classes and currently expanding capacity via the Parallel Thimble Shoal Tunnel Project scheduled for 2028 completion.

What Chesapeake Bay Bridge and Tunnel District does

The Chesapeake Bay Bridge and Tunnel District is a political subdivision of the Commonwealth of Virginia that owns and operates a 17.6-mile bridge-tunnel complex connecting Virginia's Eastern Shore to the mainland at Virginia Beach via U.S. Route 13. The infrastructure comprises 12 miles of low-level trestles, two one-mile tunnels (Thimble Shoal Channel and Chesapeake Channel), two bridges, almost 2 miles of causeway, four manmade islands each roughly the size of Yankee Stadium, and 5.5 miles of approach roads totaling 23 miles. The facility opened on April 15, 1964 after 42 months of construction financed entirely with $200M in revenue bonds and has since carried more than 157 million vehicles, currently exceeding 4 million crossings annually.

The District's business model is a self-sustaining toll monopoly: it charges user fees across 16 vehicle classes with seasonal peak/off-peak pricing (effective Jan 1, 2024), accepts cash, credit cards, Apple Pay, Google Pay, E-ZPass, and scrip at gated North and South toll plazas, and funds both operations and capital projects without federal, state, or local tax subsidies. Revenue is supplemented by differentiated pricing tiers — Class 1 passenger cars pay $16 off-peak / $21 peak, with a 30/30 commuter discount of $7/trip and a 24-hour return-trip discount at $6 — and by 16 commercial classes priced up to $266 for over-dimension vehicles. The District is governed by an eleven-member Commission appointed by the Governor of Virginia and operates with approximately 160 employees across toll collection, police/emergency response, capital construction, finance, and MIS.

The current strategic initiative is the Parallel Thimble Shoal Tunnel Project: a $756.9M Phase II contract awarded in 2016 to Chesapeake Tunnel Joint Venture (Dragados USA / Schiavone Construction) to bore a second tube under the Thimble Shoal Channel using Herrenknecht's 308-foot Earth Pressure Balance TBM "Chessie." Funded through 37% toll revenue bonds ($280M), 30% TIFIA loan ($227M), 29% CBBT General Fund ($220M), and 4% VTIB loan ($30M), the project achieved TBM breakthrough on January 27, 2025 after mining more than 6,300 feet, with full commissioning forecast for early 2028. The district also runs specialized community programs — Medical Toll Assistance (since 2003, with Eastern Shore Rural Health), Educational Toll Fund (since 2010, with Eastern Shore Community College Foundation), a 30/30 commuter discount, and a Birding Program on the northernmost manmade island.

Chesapeake Bay Bridge and Tunnel District firmographics

Firmographics
Name
Chesapeake Bay Bridge and Tunnel District
Legal name
Chesapeake Bay Bridge and Tunnel District
Website
https://cbbt.com
Company type
Private
Founded year
1964
Operating status
Operating
Headcount range
11–50 employees
Short description
The Chesapeake Bay Bridge and Tunnel District is a Virginia political subdivision operating a 17.6-mile bridge-tunnel complex — the only direct crossing of the lower Chesapeake Bay — financed entirely by user tolls across 16 vehicle classes and currently expanding capacity via the Parallel Thimble Shoal Tunnel Project scheduled for 2028 completion.
Ownership category
akta.pro rank

Chesapeake Bay Bridge and Tunnel District industry classification

Industry
Product category
Toll Road Infrastructure
NAICS
Coastal and Great Lakes Passenger Transportation (483114), Water Transportation (483)
SIC
Water Transportation (4400)
akta.pro primary industry
Ferry Terminals & Water Transit Piers (THAIALAH)

Keywords

  • Toll road infrastructure
  • Bridge tunnel operations
  • Vehicle toll collection
  • Marine transportation crossing
  • Tunnel construction project

Where Chesapeake Bay Bridge and Tunnel District is headquartered

Location

Headquarters

HQ city
Cape Charles
HQ country
United States
HQ region
North America

Offices1 record

Markets served

Chesapeake Bay Bridge and Tunnel District business model

Business model
GTM type
B2C
Offering type
Services
Cost components
Infrastructure, Personnel, Operations, Technology or R&D, Marketing or Sales, Others

Revenue model

  1. Toll Revenue: The CBBT generates revenue through toll collection from all vehicles crossing the 17.6-mile facility. Toll rates vary by vehicle class (Class 1-16) and season (Peak Season: May 15 - September 15, Fridays-Sundays). Discounts available through E-ZPass including 30/30 commuter program (30 trips in 30 days for $7/one-way), 24-hour return trip discount, and medical/educational assistance programs. No federal, state or local tax monies are used for operations.
  2. Revenue Bond Financing: Construction projects funded through sale of revenue bonds to private investors. Original construction (1960) was funded by $200 million in revenue bonds. Current Parallel Thimble Shoal Tunnel Project financing: 37% toll revenue bonds, 30% TIFIA loan, 29% CBBT General Fund, 4% VTIB loan.

Pricing tiers

ModelBillingPrice
Transaction based/ take ratePay-as-you-goClass 1 - Two-axle, four-tire vehicles
Transaction based/ take ratePay-as-you-goClass 2 - Class 1 vehicle towing one-axle trailer
Transaction based/ take ratePay-as-you-goClass 3 - Class 1 vehicle towing two-axle trailer
Transaction based/ take ratePay-as-you-goClass 4 - Class 1 vehicle towing three-axle trailer
Transaction based/ take ratePay-as-you-goClass 8 - School buses and government transit shuttles
Transaction based/ take ratePay-as-you-goClass 9 - Two-axle, six-tire vehicle over 8' height
Transaction based/ take ratePay-as-you-goClass 10 - Three-axle vehicle
Transaction based/ take ratePay-as-you-goClass 11 - Four-axle vehicle
Transaction based/ take ratePay-as-you-goClass 12 - Five-axle vehicle
Transaction based/ take ratePay-as-you-goClass 13 - Six-axle vehicle
Transaction based/ take ratePay-as-you-goClass 14 - Two-axle bus
Transaction based/ take ratePay-as-you-goClass 16 - Special over-dimension vehicles

Go-to-market motion1 record

Distribution channels5 records

Marketing channels8 records

Chesapeake Bay Bridge and Tunnel District product offering

Product offering

Core offering

The Chesapeake Bay Bridge and Tunnel District operates a 17.6-mile bridge-tunnel complex that provides the only direct fixed transportation link between Virginia's Eastern Shore and the mainland at Virginia Beach, carrying U.S. Route 13 over and under the lower Chesapeake Bay. The facility charges tolls across 16 vehicle classes with E-ZPass, cash, credit card, Apple Pay, Google Pay, and scrip payment options, and is currently undergoing major capacity expansion through the Parallel Thimble Shoal Tunnel Project.

Product overview

The Chesapeake Bay Bridge and Tunnel District operates a single integrated transportation infrastructure: a 17.6-mile bridge-tunnel complex that serves as the only direct link between Virginia's Eastern Shore and the mainland at Virginia Beach. The core product is the bridge-tunnel crossing itself, which includes two underwater tunnels (Thimble Shoal Channel and Chesapeake Channel), multiple bridges, low-level trestles, and four manmade islands. The facility is currently undergoing major expansion through the Parallel Thimble Shoal Tunnel Project, which will add a second tunnel at Thimble Shoal. Supporting services include toll collection (with peak/off-peak pricing and multiple discount programs including E-ZPass), a scenic overlook, rest area with welcome center, birding program, and specialty assistance services (medical toll assistance, educational toll fund, commuter discounts, and drive-across assistance for phobic travelers).

Differentiator

Problem solved

Functional benefit

Products and services

  • Bridge-Tunnel Crossing Services A 17.6-mile bridge-tunnel complex providing the only direct link between Virginia's Eastern Shore and the mainland at Virginia Beach. The facility spans the lower Chesapeake Bay with two underwater tunnels, multiple bridges, trestles, and manmade islands, carrying U.S. Route 13 traffic over and under the Chesapeake Bay.
  • Toll Collection Services Electronic and manual toll collection services across 16 vehicle classes at the North and South Toll Plazas. Accepts cash, credit cards, E-ZPass, Apple Pay, Google Pay, and scrip. Peak season pricing applies May-September. Discount programs include 30/30 commuter discount and 24-hour roundtrip discount.
  • Parallel Thimble Shoal Tunnel A two-lane bored tunnel under Thimble Shoal Channel, connecting Island One to Island Two. When complete (~2028), the new tunnel will carry two lanes of southbound traffic while the existing tunnel carries northbound traffic. This is the first transportation tunnel in the Mid-Atlantic region constructed using a tunnel boring machine (TBM).
  • Scenic Overlook The only public stopping point along the CBBT, located at Wise Point on the southern tip of Virginia's Eastern Shore. Features a large parking area, viewing machines to magnify views, and is a popular location for sunrise and sunset photography.
  • North Toll Plaza Rest Area and Welcome Center 24/7 rest area with bathrooms, a Welcome Center (open 9am-5pm daily) providing travel information about the Eastern Shore, and Virginia Originals gift shop (open 9am-4pm daily). E-ZPass vending machines available on-site.
  • Birding Program Wildlife observation program offering access to the northernmost manmade island for bird and waterfowl watching. Birds commonly observed include Northern Gannet, American White Pelican, Brant, King Eider, Harlequin Duck, Red-breasted Merganser, Peregrine Falcon, American Oyster-catcher, Little Gull, and Black-tailed Gull. Permits required with security escort.
  • Drive-Across Assistance Scheduled drive-across service for travelers fearful of bridges and tunnels. 24-hour advance notice requested. Customer pays one-way toll with no additional fees.
  • Bicycle and RV Shuttle Service CBBT personnel transport cyclists and their bikes across the facility. Maximum vehicle height of 13'-6" for RVs; all propane must be turned off before crossing. Vehicle inspection required.
  • Medical Toll Assistance Program Partnership with Eastern Shore Rural Health providing toll assistance to Eastern Shore residents needing medical services in Hampton Roads. Eligibility based on income; covers complications of pregnancy, cancer, heart illnesses and surgeries.
  • Educational Toll Fund Partnership with Eastern Shore Community College providing reimbursement for students commuting across CBBT for post-secondary education. Students pay $5 per round trip; program reimburses the remainder upon successful course completion.
  • 30/30 Commuter Discount Program Commuter discount program offering $7 per one-way crossing for travelers making 30 one-way trips within 30 days using the same E-ZPass transponder. Available to Class 1 (2-axle, 4-tire) vehicles only.
  • E-ZPass Account Management On-site E-ZPass customer service at the CBBT Administration Building (8am-4:30pm, Monday-Friday) and self-service vending machines at toll plazas. Supports Virginia E-ZPass accounts with multiple state interoperability across 18+ state networks.
  • Travel Advisory Services Real-time traffic and weather condition updates provided via 511 Virginia, X (Twitter) @FollowTheGulls, and phone (757-331-2960). Includes wind restriction advisories and construction schedule information.

Quantifiable outcome

  • Over 157 million vehicles have crossed since 1964 opening
  • +3 more outcomes

Companies that use Chesapeake Bay Bridge and Tunnel District

Customer profile

Named customers3 records

Segments5 records

Ideal customer profiles4 records

Chesapeake Bay Bridge and Tunnel District technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Integration12 records

Feature4 records

Chesapeake Bay Bridge and Tunnel District partnerships and signals

Strategic signal

Partnerships

Twelve partnerships are on record, tiered flagship, core and minor.

  • HerrenknechtflagshipTechnology or Integration · 1 January 2018German manufacturer that designed and built the Chessie Tunnel Boring Machine (Earth Pressure Balance TBM, 308 feet long, 43.5 feet diameter cutterhead, 3,075 US Tons). TBM named by area 6th grade students.
  • Chesapeake Tunnel Joint Venture (CTJV)flagshipStrategic or Co-development Partner · 1 January 2016Awarded $756,987,318 contract for Phase II of Parallel Crossing Project. Team comprises Dragados USA and Schiavone Construction Company, LLC (ACS Dragados of Spain). Responsible for tunnel boring, construction, and completion of the Parallel Thimble Shoal Tunnel.
  • Jacobs Engineering GroupcoreStrategic or Co-development Partner · 1 January 2013Selected for conceptual study, cost estimate, mapping, geotechnical investigation, NEPA advancement, and serving as Design Manager for the Parallel Thimble Shoal Tunnel Project. Also performed design of new SCADA system.
  • Moffatt & NicholcoreStrategic or Co-development Partner · 1 January 2013Named Strategic Advisor for the Parallel Thimble Shoal Tunnel Project, providing strategic consulting services.
  • Steer Davies Gleave, Inc. (SDG)coreStrategic or Co-development Partner · 1 January 2013Selected to prepare an investment grade traffic and revenue forecast to support the financing of the Parallel Thimble Shoal Tunnel Project.
  • Nossaman LLPcoreImplementation/ SI/ Consulting Partner · 1 January 2013Selected to serve as Project Counsel for the Parallel Thimble Shoal Tunnel Project, providing legal counsel.
  • Nixon PeabodycoreImplementation/ SI/ Consulting Partner · 1 January 2013Selected to serve as Bond Counsel for the Parallel Thimble Shoal Tunnel Project financing.
  • HNTBcoreImplementation/ SI/ Consulting Partner · 1 January 2013Selected to serve as Construction Manager for the Parallel Thimble Shoal Tunnel Project.
  • Eastern Shore Community College FoundationcoreStrategic or Co-development Partner · 1 January 2010Since July 2010, the Eastern Shore Community College Foundation administers the Educational Toll Fund, reimbursing students a portion of round trips across the CBBT for post-secondary education and job training.
  • Eastern Shore Rural HealthcoreStrategic or Co-development Partner · 1 January 2003Since 2003, Eastern Shore Rural Health has managed the Medical Toll Assistance Program designed to assist Eastern Shore residents in need of medical services in the Hampton Roads area. Program covers toll costs for medical appointments.
  • CSI (Concrete Segments, Inc.)coreTechnology or IntegrationManufactured more than 9,000 precast concrete tunnel segments (10 tons each, 5 yards of concrete per segment, 18 inches thick) for the Parallel Thimble Shoal Tunnel. Located in Chesapeake, VA.
  • Virginia TourismminorGTM or Marketing Partner"Virginia is for Lovers" branding partnership promoting CBBT as a tourist destination on the Virginia tourism website.

Scale indicators7 records

Recent moves11 records

Expansion highlights5 records

Chesapeake Bay Bridge and Tunnel District competitors and assessment

Company assessment

Direct peers

  • Buffalo and Fort Erie Public Bridge Authority (Peace Bridge Authority): Public bridge authority operating the Peace Bridge crossing between the US and Canada. Comparable as a self-sustaining toll bridge authority operating a critical international crossing with bond-financed capital programs.
  • Bay Area Toll Authority (BATA): California authority overseeing toll bridges in the San Francisco Bay Area. Comparable as a regional toll bridge authority managing a portfolio of bridge crossings with bond financing and significant traffic volume.
  • Mackinac Bridge Authority: Michigan state authority operating the 5-mile Mackinac Bridge, a critical Great Lakes toll crossing with similar single-crossing monopoly characteristics. Comparable as an iconic, self-funded engineering marvel with seasonal traffic and similar scale.
  • Øresundsbro Konsortium (Øresund Bridge): Consortium operating the 10-mile Øresund Bridge-Tunnel between Denmark and Sweden. Comparable as a major international bridge-tunnel complex with toll-based revenue, bond financing, and similar mega-engineering profile.
  • Delaware River and Bay Authority: Bi-state authority operating the Delaware Memorial Bridge, a major toll bridge crossing. Directly comparable as a self-sustaining toll bridge authority operating a critical interstate crossing without competing alternatives.
  • International Bridge Authority: Authority operating the International Bridge between Michigan and Ontario. Comparable as a self-funded toll bridge authority with bond financing and significant cross-border traffic.
  • MTA Bridges and Tunnels (formerly Triborough Bridge and Tunnel Authority): New York authority operating seven bridges and two tunnels. Comparable as a major toll infrastructure operator with similar bond financing structure and large-scale capital construction programs.
  • Lake Pontchartrain Causeway Commission: Louisiana authority operating the 24-mile Lake Pontchartrain Causeway, at one time the world's longest continuous bridge over water. Comparable as a self-funded toll bridge authority operating a critical water crossing with similar length and toll-based revenue model.

Regional players

  • Monitor-Merrimac Memorial Bridge-Tunnel (operated by VDOT): Another Virginia bridge-tunnel crossing Hampton Roads. Comparable as similar infrastructure in the same region, providing additional context for the Virginia toll bridge-tunnel ecosystem.
  • Hampton Roads Bridge-Tunnel (operated by VDOT): Virginia bridge-tunnel connecting Hampton and Norfolk across Hampton Roads. Comparable infrastructure in the same region, though not a separate toll authority. Represents a regional alternative transportation route.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat5 records

Key risks6 records

Key highlights7 records

Customer concentration

Chesapeake Bay Bridge and Tunnel District social profiles

Digital presence

Chesapeake Bay Bridge and Tunnel District compliance and trust

Trust signal

Compliance4 records

Chesapeake Bay Bridge and Tunnel District financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Chesapeake Bay Bridge and Tunnel District leadership team

Management profile

Number of profiles

Profiles19 records

Chesapeake Bay Bridge and Tunnel District funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Chesapeake Bay Bridge and Tunnel District M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Chesapeake Bay Bridge and Tunnel District

What does Chesapeake Bay Bridge and Tunnel District do?

The Chesapeake Bay Bridge and Tunnel District operates a 17.6-mile bridge-tunnel complex that provides the only direct fixed transportation link between Virginia's Eastern Shore and the mainland at Virginia Beach, carrying U.S. Route 13 over and under the lower Chesapeake Bay. The facility charges tolls across 16 vehicle classes with E-ZPass, cash, credit card, Apple Pay, Google Pay, and scrip payment options, and is currently undergoing major capacity expansion through the Parallel Thimble Shoal Tunnel Project.

Is Chesapeake Bay Bridge and Tunnel District a public or private company?

Chesapeake Bay Bridge and Tunnel District is a private company. It is classified as state government owned and is currently operating.

When was Chesapeake Bay Bridge and Tunnel District founded?

Chesapeake Bay Bridge and Tunnel District was founded in 1964. It employs 11 to 50 people.

Where is Chesapeake Bay Bridge and Tunnel District based?

Chesapeake Bay Bridge and Tunnel District is headquartered in Cape Charles, United States, in the North America region.

How does Chesapeake Bay Bridge and Tunnel District make money?

Two revenue lines are on record. Toll Revenue is the primary driver. The others are revenue Bond Financing.

Who are Chesapeake Bay Bridge and Tunnel District's main competitors?

Direct peers on record are Buffalo and Fort Erie Public Bridge Authority (Peace Bridge Authority), Bay Area Toll Authority (BATA), Mackinac Bridge Authority, Øresundsbro Konsortium (Øresund Bridge), Delaware River and Bay Authority, International Bridge Authority, MTA Bridges and Tunnels (formerly Triborough Bridge and Tunnel Authority) and Lake Pontchartrain Causeway Commission. Regional players are Monitor-Merrimac Memorial Bridge-Tunnel (operated by VDOT) and Hampton Roads Bridge-Tunnel (operated by VDOT).

Does Chesapeake Bay Bridge and Tunnel District have an API?

No public API is recorded for Chesapeake Bay Bridge and Tunnel District.

What industry is Chesapeake Bay Bridge and Tunnel District in?

Chesapeake Bay Bridge and Tunnel District's product category is Toll Road Infrastructure. Its primary akta.pro industry code is THAIALAH, Ferry Terminals & Water Transit Piers. Its NAICS code is 483114 and its SIC code is 4400.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
AInvestMoody's Ratings assigns Baa2 to Chesapeake Bay Bridge & Tunnel District, VA's first tier general resolution rev refundingMoody's Ratings assigned a Baa2 credit rating to the Chesapeake Bay Bridge & Tunnel District for its first-tier general resolution refunding. This rating reflects the district's stable financial position, supported by toll revenues and a dedicated funding mechanism. The assessment indicates a moderate level of credit risk with expectations of continued ability to meet debt service requirements.EnrChesapeake Bay Bridge-Tunnel Reaches Long-Awaited Expansion MilestoneThe Chesapeake Bay Bridge-Tunnel project has reached a significant milestone with the completion of the tunnel boring machine Chessie, which mined over 6,300 feet for the new parallel tube at Thimble Shoal Channel. This expansion work is part of a larger effort to widen the 23-mile link between Virginia's mainland and Eastern Shore, which currently serves four million travelers annually.News 3 WTKR Norfolk'Chessie' the boring tunnel machine back up and running to improve CBBT travelThe Chesapeake Bay Bridge-Tunnel Authority has resumed operations of the tunnel boring machine 'Chessie' for the Parallel Thimble Shoal Tunnel Project after an eight-month delay caused by hitting an anchor. The project, which aims to add a two-lane southbound tunnel to improve traffic flow, is now targeting a completion date of August 2027. This restart allows workers to proceed with constructing the road and mechanical systems essential for the infrastructure upgrade.News 3 WTKR NorfolkParallel Thimble Shoal Tunnel Project at CBBT completion date set for 2027The Parallel Thimble Shoal Tunnel Crossing is now expected to be completed by May 2027, with the Chesapeake Joint Tunnel Venture resuming tunneling operations in February 2024 after a pause caused by the machine striking an anchor. The Chesapeake Bay Bridge Tunnel and CJTV are managing the project, which faces delays from permit issues and pandemic impacts but remains on track for its revised deadline. Construction crews are currently performing repairs and grouting while the tunnel boring machine continues at a cautious speed.ShoredailynewsNew CBBT Parallel Thimble Shoal Tunnel Crossing completion date 2027The Chesapeake Bay Bridge Tunnel Authority and the Chesapeake Joint Tunnel Venture have updated the completion date for the Parallel Thimble Shoal Tunnel Crossing to 2027, citing delays from permit issues, the pandemic, and a recent strike on a historical anchor by the tunnel boring machine. The project partners, Dragados USA and Schiavone Construction Company, are currently conducting inspections and repairs that are expected to resume operations in February 2024. Officials anticipate this specific incident will only delay final completion by approximately three months.TBM: Tunnel Business MagazineParallel Thimble Shoal Tunnel Groundbreaking HeldThe Chesapeake Bay Bridge and Tunnel Commission hosted a groundbreaking ceremony for the Parallel Thimble Shoal Tunnel on September 18. The project, awarded to Dragados–Schiavone Joint Venture for approximately $756 million, involves constructing a new two-lane bored tunnel to separate traffic flows and improve safety along US Route 13. Construction is estimated to begin in October 2017 and conclude by October 2022 using a Herrenknecht tunnel boring machine.TBM: Tunnel Business MagazineFinal Proposals Received for Parallel Thimble Shoal Tunnel ProjectThe Chesapeake Bay Bridge and Tunnel District received final technical and price proposals from three construction teams for the Parallel Thimble Shoal Tunnel Project on April 29. The bids ranged from approximately $1.01 billion to $1.09 billion, significantly exceeding the engineer's estimate of $724.4 million, with an award expected in May 2016. Due to the high costs, officials may need to adjust the project scope to reduce expenses while maintaining the goal of expanding capacity and safety.TBM: Tunnel Business Magazine$50 Million Loan Approved for Parallel Thimble Shoal Tunnel ProjectThe Commonwealth Transportation Board approved a $50 million loan from the Virginia Transportation Infrastructure Bank to finance the Chesapeake Bay Bridge-Tunnel’s Parallel Thimble Shoal Tunnel Project. This funding aims to expand capacity and improve safety for travelers by constructing an additional two-lane tunnel under the Thimble Shoal Channel. The project, currently in the procurement phase with design-build teams shortlisted, will also utilize toll revenue bonds and federal loans.