Developer docs
API playgroundTry for free, no card

Search company profiles

ODOT

Full company profile

uuid00468j5

Namestring
ODOT
Legal namestring
Interstate Bridge Replacement Program
Company typeenum
Private
Founded yearstring
-
Descriptiontext

The Oregon Department of Transportation (ODOT), in partnership with the Washington State Department of Transportation (WSDOT), operates the Interstate Bridge Replacement (IBR) Program — a bi-state government infrastructure initiative to replace the aging Interstate Bridge across the Columbia River between Vancouver, Washington and Portland, Oregon. The program's core deliverable is a fixed-span replacement bridge with 116 feet of vertical navigation clearance that eliminates bridge lifts, improves seismic resilience, addresses outdated roadway elements (narrow lanes, no safety shoulders, poor sight lines), and relieves congestion along the I-5 corridor. The program also includes I-5 corridor improvements, auxiliary lanes (ramp-to-ramp connections), light rail extension across the river, and improved bicycle and pedestrian facilities.

The IBR Program's technology stack is civil infrastructure rather than software: a fixed-span bridge engineering design that serves more than 99% of river traffic without lifts, integrated multimodal corridor components (interchange improvements, auxiliary lanes, active transportation facilities), and modern seismic engineering standards. Federal regulatory assets include an Amended Record of Decision jointly issued by the Federal Highway Administration and the Federal Transit Administration on July 1, 2026, plus a U.S. Coast Guard authorization issued on January 16, 2026 confirming the fixed-span clearance. Public communications run through an official program website (interstatebridge.org), a vendor portal, an email newsletter, and broad social media presence across Twitter, Facebook, Instagram, YouTube, LinkedIn, and TikTok.

The program has no commercial revenue model; it is funded through federal and state transportation appropriations administered through public budget processes. Contracting for construction and professional services is routed through a dedicated IBR Vendor Portal. The user base is non-paying: general public commuters, freight and logistics operators moving goods through the I-5 corridor, transit users on the new light rail service, and active transportation users crossing via bicycle and pedestrian facilities. No funding rounds, private equity participation, or stock market listing are applicable given the program's status as a government entity.

Short descriptiontext

Bi-state government infrastructure program jointly run by ODOT and WSDOT to replace the aging Interstate Bridge across the Columbia River with a fixed-span, earthquake-resilient multimodal structure serving freight, transit, and drivers.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1,001–5,000
akta.pro rankint
Markets served

Serves global market

Keyword5 values
transportation infrastructure, bridge replacement, highway construction, multimodal transit, earthquake resilience
Industry1 code
1Bridges, Viaducts & Elevated Guideway Construction
CodeIMAFAFAFPrimaryYes
NAICS code2 codes
  • Highway, Street, and Bridge Construction23731
  • Support Activities for Rail Transportation4882
SIC code1 code
  • Local & Suburban Transit & Interurban Hwy Passenger Trans4100
Product category
Transportation Infrastructure
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels2 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Supply Chain, Operations, Infrastructure, Personnel, Others
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

ODOT, jointly with WSDOT, plans, designs, and is now constructing a modern, earthquake-resilient replacement Interstate Bridge across the Columbia River on the I-5 corridor between Vancouver, WA and Portland, OR. The core deliverable is a fixed-span bridge with 116 feet of vertical navigation clearance, complemented by I-5 corridor improvements (auxiliary lanes, interchange upgrades), a light rail transit extension across the river, and improved active transportation (bicycle/pedestrian) facilities.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 2 values shown
  • Elimination of bridge lifts for over 99% of river traffic
+1 more record
Product overview1 text field

The Interstate Bridge Replacement (IBR) Program is a government infrastructure initiative led by the Oregon and Washington State Departments of Transportation. Rather than a software product company, ODOT operates a portfolio of physical infrastructure programs. The core offering is the I-5 Corridor improvements featuring a replacement fixed-span bridge across the Columbia River, complemented by light rail extension and active transportation facilities. The program represents a unified infrastructure modernization effort rather than a platform-plus-modules software architecture.

Product and service5 records
1Interstate Bridge Replacement Program (IBR Program)
CategoryTransportation Infrastructure Program
Description

A bi-state government infrastructure program (ODOT and WSDOT) replacing the aging I-5 Interstate Bridge across the Columbia River with a modern, earthquake-resilient, multimodal structure connecting Vancouver, WA and Portland, OR.

2Fixed-Span Replacement Bridge
CategoryBridge Infrastructure
Description

A fixed-span bridge over the Columbia River with 116 feet of vertical navigation clearance that eliminates bridge lifts, improves safety, and strengthens earthquake resilience while continuing to serve over 99% of river traffic.

3I-5 Corridor Improvements
CategoryHighway Infrastructure
Description

Highway upgrades along the I-5 corridor including interchange design improvements, auxiliary lanes (ramp-to-ramp connections), wider lanes, safety shoulders, and improved sight lines to enhance safety and freight mobility.

4Light Rail Extension Across the Columbia River
CategoryTransit Infrastructure
Description

Extension of light rail transit across the Columbia River as part of the multimodal bridge design, providing travelers with additional transit options between Portland and Vancouver.

5Active Transportation Facilities
CategoryBicycle and Pedestrian Infrastructure
Description

Improved bicycle and pedestrian facilities integrated into the new bridge design to support safe active transportation crossings of the Columbia River.

Scale indicator3 records

Each record includes

Type, Value, Description, Source

Partnership4 partners
Strategic tierCoreTypeStrategic or Co-development Partner
Description

ODOT is the lead Oregon agency for the Interstate Bridge Replacement Program, working in coordination with Washington State Department of Transportation to plan and implement the modern, earthquake-resilient bridge across the Columbia River.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

WSDOT is the lead Washington state agency for the IBR Program, collaborating with ODOT to deliver the I-5 corridor improvements and replacement bridge connecting Vancouver, WA and Portland, OR.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

FHWA issued the Amended Record of Decision allowing the IBR Program to advance to construction-related activities. FHWA provides federal oversight and authorization for the interstate bridge replacement project.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

FTA co-issued the Amended Record of Decision with FHWA, providing federal transit authorization for the light rail extension component of the multimodal bridge project.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
1Massachusetts Department of Transportation (MassDOT)
TypeBroad incumbent
Description

MassDOT is an integrated state DOT that delivers highway, bridge, and transit infrastructure including multimodal corridor projects. Comparable to ODOT in combining bridge replacement with transit and active transportation elements in dense metropolitan areas.

TypeDirect peer
Description

C-TRAN provides public transit in the Vancouver, WA area and is a key partner in the IBR Program's transit and multimodal components. Comparable to ODOT/IBR as a regional transit stakeholder integrating with the light rail extension across the river.

TypeDirect peer
Description

WSDOT is the joint lead agency for the IBR Program alongside ODOT, operating Washington's statewide highway system. It is the most directly comparable peer because it co-administers this exact bridge replacement project and shares operational responsibility for the Columbia River corridor.

TypeBroad incumbent
Description

NYSDOT operates one of the largest state-owned highway and bridge networks in the U.S., including major crossings over the Hudson and East rivers. Comparable to ODOT as a state DOT with active bridge replacement programs in dense urban corridors.

TypeBroad incumbent
Description

Caltrans is the largest state DOT in the U.S., managing a vast portfolio of highway, bridge, and multimodal infrastructure projects. Comparable to ODOT as a state transportation department executing major bridge and corridor investments, but operating at much broader geographic and budgetary scale.

TypeBroad incumbent
Description

TxDOT is a major state DOT delivering large-scale highway, bridge, and corridor modernization programs across Texas. Comparable to ODOT in executing multi-billion-dollar bridge and interstate construction through federal-state partnership models.

TypeRegional player
Description

Sound Transit plans and operates light rail in the Seattle metropolitan area, executing major regional transit expansions. Comparable to the IBR Program's light rail extension component as a peer regional rail builder, though operating in a different Pacific Northwest market.

TypeEmerging player
Description

The Port Authority operates bi-state major bridges, tunnels, and transit infrastructure between New York and New Jersey. Comparable to the IBR Program as a bi-state infrastructure operator replacing aging crossings in a critical interstate corridor.

9Tri-County Metropolitan Transportation District of Oregon (TriMet)
TypeDirect peer
Description

TriMet operates the Portland-area MAX light rail system that the IBR Program will extend across the Columbia River. It is directly comparable as the receiving transit operator whose service will be expanded by the bridge program's light rail extension.

TypeBroad incumbent
Description

MTA operates the largest urban transit network in North America, including major bridges and tunnels managed alongside highway and rail assets. Comparable to the IBR Program as a multimodal bridge/transit operator in a high-volume corridor.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat3 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment4 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile3 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature3 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

ODOT

Transportation Infrastructurecolumbiarivercrossing.org

Bi-state government infrastructure program jointly run by ODOT and WSDOT to replace the aging Interstate Bridge across the Columbia River with a fixed-span, earthquake-resilient multimodal structure serving freight, transit, and drivers.

What ODOT does

The Oregon Department of Transportation (ODOT), in partnership with the Washington State Department of Transportation (WSDOT), operates the Interstate Bridge Replacement (IBR) Program — a bi-state government infrastructure initiative to replace the aging Interstate Bridge across the Columbia River between Vancouver, Washington and Portland, Oregon. The program's core deliverable is a fixed-span replacement bridge with 116 feet of vertical navigation clearance that eliminates bridge lifts, improves seismic resilience, addresses outdated roadway elements (narrow lanes, no safety shoulders, poor sight lines), and relieves congestion along the I-5 corridor. The program also includes I-5 corridor improvements, auxiliary lanes (ramp-to-ramp connections), light rail extension across the river, and improved bicycle and pedestrian facilities.

The IBR Program's technology stack is civil infrastructure rather than software: a fixed-span bridge engineering design that serves more than 99% of river traffic without lifts, integrated multimodal corridor components (interchange improvements, auxiliary lanes, active transportation facilities), and modern seismic engineering standards. Federal regulatory assets include an Amended Record of Decision jointly issued by the Federal Highway Administration and the Federal Transit Administration on July 1, 2026, plus a U.S. Coast Guard authorization issued on January 16, 2026 confirming the fixed-span clearance. Public communications run through an official program website (interstatebridge.org), a vendor portal, an email newsletter, and broad social media presence across Twitter, Facebook, Instagram, YouTube, LinkedIn, and TikTok.

The program has no commercial revenue model; it is funded through federal and state transportation appropriations administered through public budget processes. Contracting for construction and professional services is routed through a dedicated IBR Vendor Portal. The user base is non-paying: general public commuters, freight and logistics operators moving goods through the I-5 corridor, transit users on the new light rail service, and active transportation users crossing via bicycle and pedestrian facilities. No funding rounds, private equity participation, or stock market listing are applicable given the program's status as a government entity.

ODOT firmographics

Firmographics
Name
ODOT
Legal name
Interstate Bridge Replacement Program
Website
https://columbiarivercrossing.org
Company type
Private
Operating status
Operating
Headcount range
1,001–5,000 employees
Short description
Bi-state government infrastructure program jointly run by ODOT and WSDOT to replace the aging Interstate Bridge across the Columbia River with a fixed-span, earthquake-resilient multimodal structure serving freight, transit, and drivers.
Ownership category
akta.pro rank

ODOT industry classification

Industry
Product category
Transportation Infrastructure
NAICS
Highway, Street, and Bridge Construction (23731), Support Activities for Rail Transportation (4882)
SIC
Local & Suburban Transit & Interurban Hwy Passenger Trans (4100)
akta.pro primary industry
Bridges, Viaducts & Elevated Guideway Construction (IMAFAFAF)

Keywords

  • Transportation infrastructure
  • Bridge replacement
  • Highway construction
  • Multimodal transit
  • Earthquake resilience

ODOT business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Supply Chain, Operations, Infrastructure, Personnel, Others

Distribution channels2 records

Marketing channels5 records

ODOT product offering

Product offering

Core offering

ODOT, jointly with WSDOT, plans, designs, and is now constructing a modern, earthquake-resilient replacement Interstate Bridge across the Columbia River on the I-5 corridor between Vancouver, WA and Portland, OR. The core deliverable is a fixed-span bridge with 116 feet of vertical navigation clearance, complemented by I-5 corridor improvements (auxiliary lanes, interchange upgrades), a light rail transit extension across the river, and improved active transportation (bicycle/pedestrian) facilities.

Product overview

The Interstate Bridge Replacement (IBR) Program is a government infrastructure initiative led by the Oregon and Washington State Departments of Transportation. Rather than a software product company, ODOT operates a portfolio of physical infrastructure programs. The core offering is the I-5 Corridor improvements featuring a replacement fixed-span bridge across the Columbia River, complemented by light rail extension and active transportation facilities. The program represents a unified infrastructure modernization effort rather than a platform-plus-modules software architecture.

Differentiator

Problem solved

Functional benefit

Products and services

  • Interstate Bridge Replacement Program (IBR Program) A bi-state government infrastructure program (ODOT and WSDOT) replacing the aging I-5 Interstate Bridge across the Columbia River with a modern, earthquake-resilient, multimodal structure connecting Vancouver, WA and Portland, OR.
  • Fixed-Span Replacement Bridge A fixed-span bridge over the Columbia River with 116 feet of vertical navigation clearance that eliminates bridge lifts, improves safety, and strengthens earthquake resilience while continuing to serve over 99% of river traffic.
  • I-5 Corridor Improvements Highway upgrades along the I-5 corridor including interchange design improvements, auxiliary lanes (ramp-to-ramp connections), wider lanes, safety shoulders, and improved sight lines to enhance safety and freight mobility.
  • Light Rail Extension Across the Columbia River Extension of light rail transit across the Columbia River as part of the multimodal bridge design, providing travelers with additional transit options between Portland and Vancouver.
  • Active Transportation Facilities Improved bicycle and pedestrian facilities integrated into the new bridge design to support safe active transportation crossings of the Columbia River.

Quantifiable outcome

  • Elimination of bridge lifts for over 99% of river traffic
  • +1 more outcomes

Companies that use ODOT

Customer profile

Segments4 records

Ideal customer profiles3 records

ODOT technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature3 records

ODOT partnerships and signals

Strategic signal

Partnerships

Four partnerships are on record, tiered core.

  • Oregon Department of Transportation (ODOT)coreStrategic or Co-development PartnerODOT is the lead Oregon agency for the Interstate Bridge Replacement Program, working in coordination with Washington State Department of Transportation to plan and implement the modern, earthquake-resilient bridge across the Columbia River.
  • Washington State Department of Transportation (WSDOT)coreStrategic or Co-development PartnerWSDOT is the lead Washington state agency for the IBR Program, collaborating with ODOT to deliver the I-5 corridor improvements and replacement bridge connecting Vancouver, WA and Portland, OR.
  • Federal Highway Administration (FHWA)coreStrategic or Co-development PartnerFHWA issued the Amended Record of Decision allowing the IBR Program to advance to construction-related activities. FHWA provides federal oversight and authorization for the interstate bridge replacement project.
  • Federal Transit Administration (FTA)coreStrategic or Co-development PartnerFTA co-issued the Amended Record of Decision with FHWA, providing federal transit authorization for the light rail extension component of the multimodal bridge project.

Scale indicators3 records

Recent moves6 records

Expansion highlights6 records

ODOT competitors and assessment

Company assessment

Broad incumbents

  • Massachusetts Department of Transportation (MassDOT): MassDOT is an integrated state DOT that delivers highway, bridge, and transit infrastructure including multimodal corridor projects. Comparable to ODOT in combining bridge replacement with transit and active transportation elements in dense metropolitan areas.
  • New York State Department of Transportation: NYSDOT operates one of the largest state-owned highway and bridge networks in the U.S., including major crossings over the Hudson and East rivers. Comparable to ODOT as a state DOT with active bridge replacement programs in dense urban corridors.
  • California Department of Transportation (Caltrans): Caltrans is the largest state DOT in the U.S., managing a vast portfolio of highway, bridge, and multimodal infrastructure projects. Comparable to ODOT as a state transportation department executing major bridge and corridor investments, but operating at much broader geographic and budgetary scale.
  • Texas Department of Transportation (TxDOT): TxDOT is a major state DOT delivering large-scale highway, bridge, and corridor modernization programs across Texas. Comparable to ODOT in executing multi-billion-dollar bridge and interstate construction through federal-state partnership models.
  • Metropolitan Transportation Authority (MTA) - New York: MTA operates the largest urban transit network in North America, including major bridges and tunnels managed alongside highway and rail assets. Comparable to the IBR Program as a multimodal bridge/transit operator in a high-volume corridor.

Direct peers

  • Clark County Public Transportation Benefit Area Authority (C-TRAN): C-TRAN provides public transit in the Vancouver, WA area and is a key partner in the IBR Program's transit and multimodal components. Comparable to ODOT/IBR as a regional transit stakeholder integrating with the light rail extension across the river.
  • Washington State Department of Transportation (WSDOT): WSDOT is the joint lead agency for the IBR Program alongside ODOT, operating Washington's statewide highway system. It is the most directly comparable peer because it co-administers this exact bridge replacement project and shares operational responsibility for the Columbia River corridor.
  • Tri-County Metropolitan Transportation District of Oregon (TriMet): TriMet operates the Portland-area MAX light rail system that the IBR Program will extend across the Columbia River. It is directly comparable as the receiving transit operator whose service will be expanded by the bridge program's light rail extension.

Regional players

  • Sound Transit: Sound Transit plans and operates light rail in the Seattle metropolitan area, executing major regional transit expansions. Comparable to the IBR Program's light rail extension component as a peer regional rail builder, though operating in a different Pacific Northwest market.

Emerging players

  • Port Authority of New York and New Jersey: The Port Authority operates bi-state major bridges, tunnels, and transit infrastructure between New York and New Jersey. Comparable to the IBR Program as a bi-state infrastructure operator replacing aging crossings in a critical interstate corridor.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat3 records

Key risks5 records

Key highlights6 records

Customer concentration

ODOT social profiles

Digital presence

ODOT financial estimates

Financial estimate

Revenue estimate

Valuation estimate

ODOT leadership team

Management profile

Number of profiles

ODOT funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

ODOT M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about ODOT

What does ODOT do?

ODOT, jointly with WSDOT, plans, designs, and is now constructing a modern, earthquake-resilient replacement Interstate Bridge across the Columbia River on the I-5 corridor between Vancouver, WA and Portland, OR. The core deliverable is a fixed-span bridge with 116 feet of vertical navigation clearance, complemented by I-5 corridor improvements (auxiliary lanes, interchange upgrades), a light rail transit extension across the river, and improved active transportation (bicycle/pedestrian) facilities.

Is ODOT a public or private company?

ODOT is a private company. It is classified as state government owned and is currently operating.

When was ODOT founded?

ODOT was founded in -1. It employs 1,001 to 5,000 people.

Who are ODOT's main competitors?

Broad incumbents on record are Massachusetts Department of Transportation (MassDOT), New York State Department of Transportation, California Department of Transportation (Caltrans), Texas Department of Transportation (TxDOT) and Metropolitan Transportation Authority (MTA) - New York. Direct peers are Clark County Public Transportation Benefit Area Authority (C-TRAN), Washington State Department of Transportation (WSDOT) and Tri-County Metropolitan Transportation District of Oregon (TriMet). Sound Transit is listed as a regional player. Port Authority of New York and New Jersey is listed as an emerging player.

Does ODOT have an API?

No public API is recorded for ODOT.

What industry is ODOT in?

ODOT's product category is Transportation Infrastructure. Its primary akta.pro industry code is IMAFAFAF, Bridges, Viaducts & Elevated Guideway Construction. Its NAICS code is 23731 and its SIC code is 4100.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
YahooI-680 southbound to be closed for bridge construction TuesdayI-680 southbound will be closed from 7 p.m. Tuesday to 6 a.m. Wednesday for bridge construction. This is the latest shutdown for ODOT's I-680 pavement replacement project, expected to end by August 2027.The Columbus DispatchSay farewell to Getting There, hello to more construction-focused storiesThe Getting There column, which covered Franklin County roadwork, is ending after 15 months. The columnist will shift to more construction-focused stories, and the final list details upcoming ODOT closures and detours in Columbus, including I-270 and I-71 impacts.The Columbus DispatchWhat would you pay to avoid the I-70/I-71 commute in Columbus? | Getting ThereA Resume.io poll found Columbus residents would give up $2,679 of their pay to avoid driving on Interstate 70 and I-71, compared with $2,949 for Clevelanders to avoid I-90 and I-271. Ohioans averaged $2,820, while Providence commuters offered $5,977. The article also lists ODOT construction detours affecting I-70 and I-71 through late August and early September.YahooWest Broad Street LinkUS bus corridor could be delayed by 16 monthsLinkUS' West Broad Street bus rapid transit corridor could face a 16-month delay due to a 2025 ODOT traffic analysis projecting higher traffic. Construction manager CK Construction Group also projects an 11-month delay to the December 2028 opening. COTA and LinkUS are awaiting an FTA risk assessment to finalize the schedule.AxiosSnow it all: How to track Columbus plows in real timeSeveral Columbus-area communities offer interactive maps for tracking road plowing in real time, including Warrior Watch, SnowPaths, Snow Go, and Road Warriors. ODOT's OHGO map also provides daily highway conditions, including traffic, construction, and weather hazards.YahooGetting There: Front Street, Whittier Street Bridge in Brewery District reopenThe Whittier Street bridge and Front Street in Columbus's Brewery District reopened after construction, allowing clean access to Scioto Audobon Metro Park. However, the Front Street bridge over I-70 and I-71 remains under construction with completion expected in late summer 2025. ODOT also announced closures for drainage and roundabout work on State Route 315.YahooI-70 and I-71 construction around Columbus to extend into the 2030s, according to ODOTODOT's I-70/I-71 construction in Columbus will extend into the 2030s, with total cost estimated at $1.4 billion. Phase 4R/6R, started in 2022, is expected to clear by 2025-2026, while Phase 4A runs until around 2030. Completion of the entire project remains unestimated.