Druk Hydro Energy Limited
Druk Hydro Energy Limited (DHyE) is Bhutan's government-owned developer of small run-of-river hydropower projects (≤150 MW), executing a ~299.5 MW pipeline across nine sites to feed the national grid and support domestic energy security under a DGPC/DHI state mandate.
- Company typePrivate
- Founded2021
- HeadquartersPhuentsholing, Bhutan
- Headcount1–10
- GTM typeB2B
- OfferingServices
What Druk Hydro Energy Limited does
Druk Hydro Energy Limited (DHyE) is a 100% state-owned subsidiary of Druk Green Power Corporation Limited (DGPC), itself owned by Druk Holding & Investments, the commercial arm of the Royal Government of Bhutan. Incorporated on December 16, 2021, DHyE operates under a national mandate as the dedicated implementer of small hydropower projects (≤150 MW) in Bhutan. The company does not pursue commercial customers; its purpose is national energy security — developing dispatchable renewable capacity to feed Bhutan's national grid and supply reliable power to remote Dzongkhags (districts), with surplus exported to the Indian Energy Exchange.
DHyE's product is a portfolio of run-of-river hydropower assets totaling ~299.5 MW across nine projects. The Phase-I portfolio (104 MW) comprises the commissioned 18 MW Suchhu HPP in Haa (inaugurated May 15, 2025, built in a record 27 months at Nu. 2,556 million) plus the 54 MW Burgangchhu HPP in Zhemgang and the 32 MW Yungichhu HPP in Lhuentse, both targeted for completion in September 2025. The Phase-II portfolio (195 MW) includes the 90 MW Jomori HPP in Samdrup Jongkhar, the 54 MW Gamri-I & Bamukparongchhu Integrated HPP in Trashigang, the 26 MW Druk Bindu I&II HPP in Samtse, and the 25 MW Begana Integrated Multipurpose Small HPP in Thimphu, with H&M works scheduled through November 2028. The 500 kW Lunana Mini-HPP extends the portfolio into off-grid high-altitude electrification.
The technology stack is conventional run-of-river hydropower: pure river-diversion schemes with trench weirs or concrete gravity dams, surface/underground water-conductor systems, vertical-shaft Pelton turbines, surface powerhouses, and SCADA/protection systems. DHyE has built a vertically integrated in-country value chain through DGPC affiliates — BHSL for hydro-mechanical manufacturing (gates, trash racks, penstocks), Bhutan Automation & Engineering for SCADA, and Bhutanese contractors (Vajra Builders, CDCL, Rigsar) for civil works — with only electro-mechanical equipment sourced from Indian suppliers (Flovel Energy, Voith Hydro). Revenue mechanics are entirely government-mediated: project capital is provided by DHI/DGPC, electricity is handed off to the national grid, and surplus is exported. The company reported no standalone revenue and operates with just 9 employees, reflecting its role as a thin project-implementation vehicle within the DGPC group.
Druk Hydro Energy Limited firmographics
Firmographics- Name
- Druk Hydro Energy Limited
- Legal name
- Druk Hydro Energy Limited
- Website
- https://dhye.drukgreen.bt
- Company type
- Private
- Founded year
- 2021
- Operating status
- Operating
- Headcount range
- 1–10 employees
- Short description
- Druk Hydro Energy Limited (DHyE) is Bhutan's government-owned developer of small run-of-river hydropower projects (≤150 MW), executing a ~299.5 MW pipeline across nine sites to feed the national grid and support domestic energy security under a DGPC/DHI state mandate.
- Ownership category
- akta.pro rank
Druk Hydro Energy Limited industry classification
Industry- Product category
- Hydropower Generation
- NAICS
- Hydroelectric Power Generation (221111)
- SIC
- Cogeneration Services & Small Power Producers (4991)
- akta.pro primary industry
- Hydropower EPC & Construction (Civil Works, Electromechanical) (EUACAEAF)
- akta.pro secondary industries
- Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights) (EUAMADAA), Hydropower EPC & Civil Construction (Dams, Weirs, Tunnels, Penstocks) (EUAMADAB), Hydropower Plant Development & Permitting (Greenfield/Brownfield) (EUACAEAE)
Keywords
Where Druk Hydro Energy Limited is headquartered
LocationHeadquarters
- HQ city
- Phuentsholing
- HQ country
- Bhutan
- HQ region
- Asia
Offices7 records
Markets served
Druk Hydro Energy Limited business model
Business model- GTM type
- B2B
- Offering type
- Services
- Cost components
- Infrastructure, Supply Chain, Personnel, Operations, Technology or R&D
Revenue model
- Electricity Generation and Grid Supply: DHyE generates electricity through commissioned and future hydropower projects. The 18 MW Suchhu project generates over 75 MU annually, connected to Damdum in Samtse; summer surplus is exported into the Indian Energy Exchange. As a government-owned implementer, revenue flows through DGPC/the national utility rather than direct consumer billing. Revenue is reinvested into Phase-II project construction and returned to government shareholders.
- Government-Funded Project Development: DHyE was incorporated as a 100% subsidiary of DGPC on December 16, 2021, with DGPC (itself owned by Druk Holding & Investments, a Bhutanese government entity) providing capital for project development. Project costs are borne by the parent and government — e.g., Suchhu built at Nu. 2,556 million; Gamri-I & Bamukparongchhu H&M works valued at ~Nu. 2,073 million; Jomori H&M works at ~Nu. 1,256 million.
Go-to-market motion1 record
Distribution channels1 record
Marketing channels3 records
Druk Hydro Energy Limited product offering
Product offeringCore offering
Druk Hydro Energy Limited (DHyE) develops, constructs, and operates small run-of-river hydropower projects (≤150 MW) across Bhutan on behalf of its parent company Druk Green Power Corporation (DGPC). The company is currently executing seven hydropower projects with a combined pipeline capacity of approximately 299.5 MW. Generated electricity is fed into Bhutan's national grid, with summer surplus exported via the Indian Energy Exchange.
Product overview
Druk Hydro Energy Limited (DHyE) operates as a portfolio of independent hydropower projects rather than a unified software platform. The company develops, constructs, and operates small hydropower projects (≤150 MW) as a subsidiary of Druk Green Power Corporation. The portfolio consists of Phase-I projects including commissioned 18 MW Suchhu HPP and under-construction 54 MW Burgangchhu and 32 MW Yungichhu HPPs, plus Phase-II projects including 90 MW Jomori, 26 MW Druk Bindu I&II, 54 MW Gamri-I & Bamukparongchhu, 25 MW Begana, and 500 kW Lunana Mini-HPPs. Each project is a distinct power generation asset with civil, electro-mechanical, hydro-mechanical, and SCADA components, designed to provide localized power supply to Bhutan's Dzongkhags and contribute to national grid exports.
Differentiator
Problem solved
Functional benefit
Products and services
- 18 MW Suchhu Hydropower Project Commissioned run-of-river hydropower project in Sangbaykha Gewog, Haa Dzongkhag. Uses 7.43 cumecs design discharge with 273 m net head, generating approximately 76.57 GWh annually. Provides stable power to Haa Dzongkhag and exports surplus to Indian Energy Exchange.
- 54 MW Burgangchhu Hydropower Project Under construction run-of-river hydropower project in Nangkor Gewog, Zhemgang. Uses 13.17 cumecs design discharge with 462 m net head. Water conductor system includes 1,120 m underground pipe, 925 m surface pipe, 206 m vertical shaft, and surface powerhouse.
- 32 MW Yungichhu Hydropower Project Under construction run-of-river hydropower project near Onngar Village in Maedtsho Gewog, Lhuentse. Uses 7.46 cumecs design discharge with 483 m net head. Surface desilting basins and combined surface/underground water conductor system totaling over 6,000 m.
- 90 MW Jomori Hydropower Project Under construction standalone run-of-river hydropower project in Lauri and Serthi Gewogs, Samdrup Jongkhar. Features 45 m concrete gravity dam, 28.66 cumecs design discharge, 359 m net head, and two vertical shaft Pelton turbines generating 367.33 GWh annually.
- 26 MW Druk Bindu I&II Hydropower Project Under construction run-of-river hydropower project in Tendruk Gewog, Samtse Dzongkhag. Druk Bindu I generates 18 MW with 219 m net head; Druk Bindu II generates 8 MW with 99 m net head. Combined estimated cost Nu. 1,186.72 million.
- 54 MW Gamri-I & Bamukparongchhu Integrated Hydropower Project Under construction integrated run-of-river hydropower project in Sakteng, Trashigang. Gamri-I generates 40 MW with 605.46 m net head; Bamukparongchhu generates 14 MW with 324 m net head. Features 28 m high concrete gravity dam, shared surface powerhouse (69m x 20m x 26m), and combined annual generation of 228.34 GWh.
- 25 MW Begana Integrated Multipurpose Small Hydropower Project Under construction integrated multipurpose small hydropower project located in Kawang, Thimphu. Part of Phase-II small hydropower portfolio.
- 500 kW Lunana Mini Hydropower Project Mini hydropower project under development in Lunana, Gasa. Small-scale project for local power generation in remote high-altitude region.
Quantifiable outcome
- 18 MW Suchhu HPP generates 75+ MU annually, with summer surplus exported to Indian Energy Exchange
- +3 more outcomes
Companies that use Druk Hydro Energy Limited
Customer profileNamed customers1 record
Segments1 record
Ideal customer profiles1 record
Druk Hydro Energy Limited technology and API
TechnologyTechnology focussed No
API detail
- Has API
- No
- API docs
- API detail
Core technology
AI maturity
App detail
Feature4 records
Druk Hydro Energy Limited partnerships and signals
Strategic signalPartnerships
Eleven partnerships are on record, tiered core and minor.
- Druk Holding & Investments (DHI) / Druk Green Power Corporation (DGPC)coreDHyE is a 100% subsidiary of DGPC, which is itself owned by Druk Holding & Investments (DHI), the commercial arm of the Royal Government of Bhutan. Dasho Chhewang Rinzin serves as both Managing Director of DGPC and Board Chairperson of DHyE. DHI Chairman Dasho Karma Y. Raydi presided over the DHyE–BHSL contract signing ceremony. This parent-subsidiary structure provides governance oversight, capital allocation, and strategic direction.
- Chimi RDminorChimi RD was awarded Site-I (Phokchiri to Zamtari) and Site-III (Tshanglari to Woongthi) access road construction for the 90 MW Jomori HPP on October 18, 2023, alongside Rigsar Construction for Site-II.
- Hi-Tech Company Private LimitedminorHi-Tech Company Private Limited was awarded the construction of access roads to various project components of the (18+8 MW) Druk Bindu I&II HPP on October 17, 2023. Access roads are critical enabling infrastructure for project construction.
- Bhutan Hydropower Services Limited (BHSL)coreBHSL, a DGPC wholly-owned subsidiary, is the primary hydro-mechanical (H&M) contractor for DHyE's hydropower projects. BHSL was awarded the H&M contract for the 54 MW Gamri-I & Bamukparongchhu Integrated HPP (valued at ~Nu. 2,073 million, completion July 2028) and the 90 MW Jomori HPP (~Nu. 1,256 million, completion November 2028). BHSL also handled H&M works for the commissioned Suchhu project and was contracted for Burgangchhu HPP. Contracts cover design, manufacture, supply, testing, installation, and commissioning of all hydro-mechanical equipment including gates, trash racks, penstocks, and stoplogs. BHSL is a cornerstone of Bhutan's domestic hydropower manufacturing capacity.
- Bhutan Automation & Engineering LimitedcoreBhutan Automation & Engineering Limited, a DGPC-owned company, was awarded the Supervisory Control and Data Acquisition (SCADA) and Protection System contract (MP3) for the Suchhu hydropower project (contract signed May 11, 2023). BAE designed, engineered, and manufactured the SCADA system domestically — a key milestone in building Bhutan's in-country automation capabilities for hydropower assets.
- Flovel Energy Private Limited (India)minorFlovel Energy Private Limited, an Indian electro-mechanical equipment manufacturer, was awarded the Main Contract Package MP2 — Electro-Mechanical Works for the 18 MW Suchhu hydropower project (contract signed May 3, 2023). Flovel supplied turbines and generators. Notably, DHyE/DGPC handled the erection and commissioning of the electro-mechanical equipment in-house, limiting Flovel's scope to manufacturing only.
- Voith Hydro Private Limited (India)minorVoith Hydro Private Limited (India) was awarded the Main Contract Package MP2 — Electro-Mechanical Works for the 32 MW Yungichhu Hydropower Project (contract signed May 3, 2023). Voith is a major global hydro-mechanical equipment supplier.
- Vajra Builder Private Limited (VBPL)coreVajra Builder Private Limited, a Bhutanese contractor with registered office in Thimphu, was awarded the Main Contract Package MP1 — Civil Works for the 18 MW Suchhu hydropower project (contract signed June 23, 2022). VBPL also took up civil works for the Gamri-I & Bamukparongchhu HPP alongside Rigsar. VBPL represents Bhutanese private sector construction capacity engaged in hydropower civil works.
- Construction Development Corporation Limited (CDCL)coreCDCL, a DHI-owned enterprise registered in Thimphu, was awarded the Main Contract Package MP1 — Civil Works for the 54 MW Burgangchhu Hydropower Project (contract signed June 23, 2022). CDCL is a government-owned construction entity engaged across multiple DHyE Phase-I projects.
- Rigsar Construction Private Limited (RCPL)coreRigsar Construction Private Limited, a Bhutanese contractor registered in Trashigang, was awarded two contracts: (1) Main Contract Package MP1 — Civil Works for the 32 MW Yungichhu HPP (June 23, 2022), and (2) Site-II access road construction for the 90 MW Jomori HPP (October 18, 2023). RCPL is engaged in civil works across both Phase-I and Phase-II projects.
- Bernard Gruppe, AustriaminorBernard Gruppe, Austria, was recruited as the technical consultant providing support for the preparation of Feasibility Study Reports (FSR) for the Burgangchhu and Yungichhu hydropower projects. A team of three key experts from Bernard Gruppe, along with DGPC engineers, conducted final field assessments in October 2021.
Scale indicators7 records
Recent moves7 records
Expansion highlights6 records
Druk Hydro Energy Limited competitors and assessment
Company assessmentBroad incumbents
- SJVN Limited: SJVN (formerly Satluj Jal Vidyut Nigam) is a joint Indian-government/HP-government hydropower developer with ~2 GW operational and projects in Bhutan. State-owned, mandate-driven, hydro-focused — a structural analogue to DHyE in the same Himalayan small/mid-hydro category.
- Tata Power (Renewables / Hydro): Tata Power operates large hydropower assets in India and Bhutan (e.g., Dagachhu hydro via DGPC partnership). As a broad incumbent private utility with hydro exposure, it parallels DHyE's grid-feeding dispatchable renewable generation model, albeit across a broader portfolio.
- NHPC Limited: India's largest hydropower developer (NHPC), operating ~7 GW+ of hydro capacity across India and Bhutan (e.g., jointly with DGPC at Tala). It is the obvious broad incumbent — a state-owned utility that develops, owns, and operates hydropower projects, mirroring DHyE's mandate-driven business model at much larger scale.
- NEEPCO (North Eastern Electric Power Corporation): NEEPCO is an Indian central-government PSU focused on hydropower in India's northeastern states — geography and geopolitical context directly comparable to DHyE's Bhutanese northeast-facing projects (Trashigang, Samdrup Jongkhar), serving similar remote-grid stability use cases.
Others
- Voith Hydro: Global leader in hydro-electromechanical equipment (turbines, generators), awarded the electro-mechanical package for DHyE's 32 MW Yungichhu HPP. A category-defining equipment supplier to small-hydro developers worldwide including DHyE.
- Bhutan Automation & Engineering Limited: DGPC-owned domestic SCADA and protection system manufacturer that supplied the Suchhu project's automation suite. A peer-relevant enabling entity within the same government-controlled ecosystem of hydropower capability building in Bhutan.
- Bhutan Hydropower Services Limited (BHSL): BHSL is the DGPC-owned sister company manufacturing hydro-mechanical equipment (gates, penstocks, stoplogs) for DHyE's projects (Nu. 2,073M Gamri + Nu. 1,256M Jomori contracts). Not a competitor, but a critical in-ecosystem supplier that defines DHyE's localized execution capability.
- Flovel Energy Private Limited: Indian manufacturer of hydro turbines and generators, awarded the electro-mechanical package for DHyE's 18 MW Suchhu HPP. A regional equipment supplier serving the same small-hydro EPC market as DHyE's projects.
Direct peers
- Druk Green Power Corporation Limited (DGPC): DGPC is DHyE's 100% parent and Bhutan's principal hydropower operator (operating mega projects such as Tala, Chukha, Basochhu). They share the same owner (Royal Government of Bhutan via DHI) and the same national-mandate model for developing and operating hydropower assets in Bhutan.
- Energy Development Corporation Limited (Bhutan): EDCL is a Bhutanese DHI-owned enterprise focused on renewable energy and small/mid hydropower project development in Bhutan. As a sister entity under the same government holding, it is the closest peer in mandate, scale, and Bhutanese operating context.
Market position
Strengths4 records
Weaknesses5 records
Competitive moat4 records
Key risks6 records
Key highlights6 records
Customer concentration
Druk Hydro Energy Limited social profiles
Digital presenceDruk Hydro Energy Limited financial estimates
Financial estimateRevenue estimate
Valuation estimate
Druk Hydro Energy Limited leadership team
Management profileNumber of profiles
Profiles9 records
Druk Hydro Energy Limited funding detail
Funding detailFunding overview
Funding rounds
Investors
Funding detail is available on the Subscription and Enterprise plan.Contact sales →
Druk Hydro Energy Limited M&A and investment
M&A and investmentM&A
Investments
M&A and investment is available on the Subscription and Enterprise plan.Contact sales →
Frequently asked questions about Druk Hydro Energy Limited
What does Druk Hydro Energy Limited do?
Druk Hydro Energy Limited (DHyE) develops, constructs, and operates small run-of-river hydropower projects (≤150 MW) across Bhutan on behalf of its parent company Druk Green Power Corporation (DGPC). The company is currently executing seven hydropower projects with a combined pipeline capacity of approximately 299.5 MW. Generated electricity is fed into Bhutan's national grid, with summer surplus exported via the Indian Energy Exchange.
Is Druk Hydro Energy Limited a public or private company?
Druk Hydro Energy Limited is a private company. It is classified as state government owned and is currently operating.
When was Druk Hydro Energy Limited founded?
Druk Hydro Energy Limited was founded in 2021. It employs 1 to 10 people.
Where is Druk Hydro Energy Limited based?
Druk Hydro Energy Limited is headquartered in Phuentsholing, Bhutan, in the Asia region.
How does Druk Hydro Energy Limited make money?
Two revenue lines are on record. Electricity Generation and Grid Supply is the primary driver. The others are government-Funded Project Development.
Who are Druk Hydro Energy Limited's main competitors?
Broad incumbents on record are SJVN Limited, Tata Power (Renewables / Hydro), NHPC Limited and NEEPCO (North Eastern Electric Power Corporation). Others are Voith Hydro, Bhutan Automation & Engineering Limited, Bhutan Hydropower Services Limited (BHSL) and Flovel Energy Private Limited. Direct peers are Druk Green Power Corporation Limited (DGPC) and Energy Development Corporation Limited (Bhutan).
Does Druk Hydro Energy Limited have an API?
No public API is recorded for Druk Hydro Energy Limited.
What industry is Druk Hydro Energy Limited in?
Druk Hydro Energy Limited's product category is Hydropower Generation. Its primary akta.pro industry code is EUACAEAF, Hydropower EPC & Construction (Civil Works, Electromechanical), with a secondary code of EUAMADAA, Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights). Its NAICS code is 221111 and its SIC code is 4991.