Druk Hydro Energy Limited

Full company profile

uuid0049l1a

Namestring
Druk Hydro Energy Limited
Legal namestring
Druk Hydro Energy Limited
Company typeenum
Private
Founded yearint
2021
Descriptiontext

Druk Hydro Energy Limited (DHyE) is a 100% state-owned subsidiary of Druk Green Power Corporation Limited (DGPC), itself owned by Druk Holding & Investments, the commercial arm of the Royal Government of Bhutan. Incorporated on December 16, 2021, DHyE operates under a national mandate as the dedicated implementer of small hydropower projects (≤150 MW) in Bhutan. The company does not pursue commercial customers; its purpose is national energy security — developing dispatchable renewable capacity to feed Bhutan's national grid and supply reliable power to remote Dzongkhags (districts), with surplus exported to the Indian Energy Exchange.

DHyE's product is a portfolio of run-of-river hydropower assets totaling ~299.5 MW across nine projects. The Phase-I portfolio (104 MW) comprises the commissioned 18 MW Suchhu HPP in Haa (inaugurated May 15, 2025, built in a record 27 months at Nu. 2,556 million) plus the 54 MW Burgangchhu HPP in Zhemgang and the 32 MW Yungichhu HPP in Lhuentse, both targeted for completion in September 2025. The Phase-II portfolio (195 MW) includes the 90 MW Jomori HPP in Samdrup Jongkhar, the 54 MW Gamri-I & Bamukparongchhu Integrated HPP in Trashigang, the 26 MW Druk Bindu I&II HPP in Samtse, and the 25 MW Begana Integrated Multipurpose Small HPP in Thimphu, with H&M works scheduled through November 2028. The 500 kW Lunana Mini-HPP extends the portfolio into off-grid high-altitude electrification.

The technology stack is conventional run-of-river hydropower: pure river-diversion schemes with trench weirs or concrete gravity dams, surface/underground water-conductor systems, vertical-shaft Pelton turbines, surface powerhouses, and SCADA/protection systems. DHyE has built a vertically integrated in-country value chain through DGPC affiliates — BHSL for hydro-mechanical manufacturing (gates, trash racks, penstocks), Bhutan Automation & Engineering for SCADA, and Bhutanese contractors (Vajra Builders, CDCL, Rigsar) for civil works — with only electro-mechanical equipment sourced from Indian suppliers (Flovel Energy, Voith Hydro). Revenue mechanics are entirely government-mediated: project capital is provided by DHI/DGPC, electricity is handed off to the national grid, and surplus is exported. The company reported no standalone revenue and operates with just 9 employees, reflecting its role as a thin project-implementation vehicle within the DGPC group.

Short descriptiontext

Druk Hydro Energy Limited (DHyE) is Bhutan's government-owned developer of small run-of-river hydropower projects (≤150 MW), executing a ~299.5 MW pipeline across nine sites to feed the national grid and support domestic energy security under a DGPC/DHI state mandate.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1–10
akta.pro rankint
HeadquartersPhuentsholing, Bhutan
HQ citystring
Phuentsholing
HQ countrystring
Bhutan
HQ regionstring
Asia
Markets served

Serves global market

Offices7 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
small hydropower development, run-of-river power, hydropower project construction, renewable energy generation, electricity grid supply
Industry4 codes
1Hydropower EPC & Construction (Civil Works, Electromechanical)
CodeEUACAEAFPrimaryYes
2Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights)
CodeEUAMADAAPrimaryNo
3Hydropower EPC & Civil Construction (Dams, Weirs, Tunnels, Penstocks)
CodeEUAMADABPrimaryNo
4Hydropower Plant Development & Permitting (Greenfield/Brownfield)
CodeEUACAEAEPrimaryNo
NAICS code1 code
  • Hydroelectric Power Generation221111
SIC code1 code
  • Cogeneration Services & Small Power Producers4991
Product category
Hydropower Generation
Social media profiles2 records
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model2 records
1Electricity Generation and Grid Supply
TypeHardware Sales
Description

DHyE generates electricity through commissioned and future hydropower projects. The 18 MW Suchhu project generates over 75 MU annually, connected to Damdum in Samtse; summer surplus is exported into the Indian Energy Exchange. As a government-owned implementer, revenue flows through DGPC/the national utility rather than direct consumer billing. Revenue is reinvested into Phase-II project construction and returned to government shareholders.

dhye.drukgreen.bt
2Government-Funded Project Development
TypeManaged Services
Description

DHyE was incorporated as a 100% subsidiary of DGPC on December 16, 2021, with DGPC (itself owned by Druk Holding & Investments, a Bhutanese government entity) providing capital for project development. Project costs are borne by the parent and government — e.g., Suchhu built at Nu. 2,556 million; Gamri-I & Bamukparongchhu H&M works valued at ~Nu. 2,073 million; Jomori H&M works at ~Nu. 1,256 million.

dhye.drukgreen.bt
Marketing channels3 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Supply Chain, Personnel, Operations, Technology or R&D
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Druk Hydro Energy Limited (DHyE) develops, constructs, and operates small run-of-river hydropower projects (≤150 MW) across Bhutan on behalf of its parent company Druk Green Power Corporation (DGPC). The company is currently executing seven hydropower projects with a combined pipeline capacity of approximately 299.5 MW. Generated electricity is fed into Bhutan's national grid, with summer surplus exported via the Indian Energy Exchange.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • 18 MW Suchhu HPP generates 75+ MU annually, with summer surplus exported to Indian Energy Exchange
+3 more records
Product overview1 text field

Druk Hydro Energy Limited (DHyE) operates as a portfolio of independent hydropower projects rather than a unified software platform. The company develops, constructs, and operates small hydropower projects (≤150 MW) as a subsidiary of Druk Green Power Corporation. The portfolio consists of Phase-I projects including commissioned 18 MW Suchhu HPP and under-construction 54 MW Burgangchhu and 32 MW Yungichhu HPPs, plus Phase-II projects including 90 MW Jomori, 26 MW Druk Bindu I&II, 54 MW Gamri-I & Bamukparongchhu, 25 MW Begana, and 500 kW Lunana Mini-HPPs. Each project is a distinct power generation asset with civil, electro-mechanical, hydro-mechanical, and SCADA components, designed to provide localized power supply to Bhutan's Dzongkhags and contribute to national grid exports.

Product and service8 records
118 MW Suchhu Hydropower Project
CategoryHydropower Generation
Description

Commissioned run-of-river hydropower project in Sangbaykha Gewog, Haa Dzongkhag. Uses 7.43 cumecs design discharge with 273 m net head, generating approximately 76.57 GWh annually. Provides stable power to Haa Dzongkhag and exports surplus to Indian Energy Exchange.

254 MW Burgangchhu Hydropower Project
CategoryHydropower Generation
Description

Under construction run-of-river hydropower project in Nangkor Gewog, Zhemgang. Uses 13.17 cumecs design discharge with 462 m net head. Water conductor system includes 1,120 m underground pipe, 925 m surface pipe, 206 m vertical shaft, and surface powerhouse.

332 MW Yungichhu Hydropower Project
CategoryHydropower Generation
Description

Under construction run-of-river hydropower project near Onngar Village in Maedtsho Gewog, Lhuentse. Uses 7.46 cumecs design discharge with 483 m net head. Surface desilting basins and combined surface/underground water conductor system totaling over 6,000 m.

490 MW Jomori Hydropower Project
CategoryHydropower Generation
Description

Under construction standalone run-of-river hydropower project in Lauri and Serthi Gewogs, Samdrup Jongkhar. Features 45 m concrete gravity dam, 28.66 cumecs design discharge, 359 m net head, and two vertical shaft Pelton turbines generating 367.33 GWh annually.

526 MW Druk Bindu I&II Hydropower Project
CategoryHydropower Generation
Description

Under construction run-of-river hydropower project in Tendruk Gewog, Samtse Dzongkhag. Druk Bindu I generates 18 MW with 219 m net head; Druk Bindu II generates 8 MW with 99 m net head. Combined estimated cost Nu. 1,186.72 million.

654 MW Gamri-I & Bamukparongchhu Integrated Hydropower Project
CategoryHydropower Generation
Description

Under construction integrated run-of-river hydropower project in Sakteng, Trashigang. Gamri-I generates 40 MW with 605.46 m net head; Bamukparongchhu generates 14 MW with 324 m net head. Features 28 m high concrete gravity dam, shared surface powerhouse (69m x 20m x 26m), and combined annual generation of 228.34 GWh.

725 MW Begana Integrated Multipurpose Small Hydropower Project
CategoryHydropower Generation
Description

Under construction integrated multipurpose small hydropower project located in Kawang, Thimphu. Part of Phase-II small hydropower portfolio.

8500 kW Lunana Mini Hydropower Project
CategoryHydropower Generation
Description

Mini hydropower project under development in Lunana, Gasa. Small-scale project for local power generation in remote high-altitude region.

Scale indicator7 records

Each record includes

Type, Value, Description, Source

Partnership11 partners
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-07-02
Description

DHyE is a 100% subsidiary of DGPC, which is itself owned by Druk Holding & Investments (DHI), the commercial arm of the Royal Government of Bhutan. Dasho Chhewang Rinzin serves as both Managing Director of DGPC and Board Chairperson of DHyE. DHI Chairman Dasho Karma Y. Raydi presided over the DHyE–BHSL contract signing ceremony. This parent-subsidiary structure provides governance oversight, capital allocation, and strategic direction.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2023-10-18
Description

Chimi RD was awarded Site-I (Phokchiri to Zamtari) and Site-III (Tshanglari to Woongthi) access road construction for the 90 MW Jomori HPP on October 18, 2023, alongside Rigsar Construction for Site-II.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2023-10-17
Description

Hi-Tech Company Private Limited was awarded the construction of access roads to various project components of the (18+8 MW) Druk Bindu I&II HPP on October 17, 2023. Access roads are critical enabling infrastructure for project construction.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2023-05-11
Description

BHSL, a DGPC wholly-owned subsidiary, is the primary hydro-mechanical (H&M) contractor for DHyE's hydropower projects. BHSL was awarded the H&M contract for the 54 MW Gamri-I & Bamukparongchhu Integrated HPP (valued at ~Nu. 2,073 million, completion July 2028) and the 90 MW Jomori HPP (~Nu. 1,256 million, completion November 2028). BHSL also handled H&M works for the commissioned Suchhu project and was contracted for Burgangchhu HPP. Contracts cover design, manufacture, supply, testing, installation, and commissioning of all hydro-mechanical equipment including gates, trash racks, penstocks, and stoplogs. BHSL is a cornerstone of Bhutan's domestic hydropower manufacturing capacity.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2023-05-11
Description

Bhutan Automation & Engineering Limited, a DGPC-owned company, was awarded the Supervisory Control and Data Acquisition (SCADA) and Protection System contract (MP3) for the Suchhu hydropower project (contract signed May 11, 2023). BAE designed, engineered, and manufactured the SCADA system domestically — a key milestone in building Bhutan's in-country automation capabilities for hydropower assets.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2023-05-03
Description

Flovel Energy Private Limited, an Indian electro-mechanical equipment manufacturer, was awarded the Main Contract Package MP2 — Electro-Mechanical Works for the 18 MW Suchhu hydropower project (contract signed May 3, 2023). Flovel supplied turbines and generators. Notably, DHyE/DGPC handled the erection and commissioning of the electro-mechanical equipment in-house, limiting Flovel's scope to manufacturing only.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2023-05-03
Description

Voith Hydro Private Limited (India) was awarded the Main Contract Package MP2 — Electro-Mechanical Works for the 32 MW Yungichhu Hydropower Project (contract signed May 3, 2023). Voith is a major global hydro-mechanical equipment supplier.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2022-06-23
Description

Vajra Builder Private Limited, a Bhutanese contractor with registered office in Thimphu, was awarded the Main Contract Package MP1 — Civil Works for the 18 MW Suchhu hydropower project (contract signed June 23, 2022). VBPL also took up civil works for the Gamri-I & Bamukparongchhu HPP alongside Rigsar. VBPL represents Bhutanese private sector construction capacity engaged in hydropower civil works.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2022-06-23
Description

CDCL, a DHI-owned enterprise registered in Thimphu, was awarded the Main Contract Package MP1 — Civil Works for the 54 MW Burgangchhu Hydropower Project (contract signed June 23, 2022). CDCL is a government-owned construction entity engaged across multiple DHyE Phase-I projects.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2022-06-23
Description

Rigsar Construction Private Limited, a Bhutanese contractor registered in Trashigang, was awarded two contracts: (1) Main Contract Package MP1 — Civil Works for the 32 MW Yungichhu HPP (June 23, 2022), and (2) Site-II access road construction for the 90 MW Jomori HPP (October 18, 2023). RCPL is engaged in civil works across both Phase-I and Phase-II projects.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2021-10-01
Description

Bernard Gruppe, Austria, was recruited as the technical consultant providing support for the preparation of Feasibility Study Reports (FSR) for the Burgangchhu and Yungichhu hydropower projects. A team of three key experts from Bernard Gruppe, along with DGPC engineers, conducted final field assessments in October 2021.

Recent move7 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
TypeBroad incumbent
Description

SJVN (formerly Satluj Jal Vidyut Nigam) is a joint Indian-government/HP-government hydropower developer with ~2 GW operational and projects in Bhutan. State-owned, mandate-driven, hydro-focused — a structural analogue to DHyE in the same Himalayan small/mid-hydro category.

TypeBroad incumbent
Description

Tata Power operates large hydropower assets in India and Bhutan (e.g., Dagachhu hydro via DGPC partnership). As a broad incumbent private utility with hydro exposure, it parallels DHyE's grid-feeding dispatchable renewable generation model, albeit across a broader portfolio.

TypeBroad incumbent
Description

India's largest hydropower developer (NHPC), operating ~7 GW+ of hydro capacity across India and Bhutan (e.g., jointly with DGPC at Tala). It is the obvious broad incumbent — a state-owned utility that develops, owns, and operates hydropower projects, mirroring DHyE's mandate-driven business model at much larger scale.

TypeOthers
Description

Global leader in hydro-electromechanical equipment (turbines, generators), awarded the electro-mechanical package for DHyE's 32 MW Yungichhu HPP. A category-defining equipment supplier to small-hydro developers worldwide including DHyE.

TypeDirect peer
Description

DGPC is DHyE's 100% parent and Bhutan's principal hydropower operator (operating mega projects such as Tala, Chukha, Basochhu). They share the same owner (Royal Government of Bhutan via DHI) and the same national-mandate model for developing and operating hydropower assets in Bhutan.

TypeOthers
Description

DGPC-owned domestic SCADA and protection system manufacturer that supplied the Suchhu project's automation suite. A peer-relevant enabling entity within the same government-controlled ecosystem of hydropower capability building in Bhutan.

TypeBroad incumbent
Description

NEEPCO is an Indian central-government PSU focused on hydropower in India's northeastern states — geography and geopolitical context directly comparable to DHyE's Bhutanese northeast-facing projects (Trashigang, Samdrup Jongkhar), serving similar remote-grid stability use cases.

TypeDirect peer
Description

EDCL is a Bhutanese DHI-owned enterprise focused on renewable energy and small/mid hydropower project development in Bhutan. As a sister entity under the same government holding, it is the closest peer in mandate, scale, and Bhutanese operating context.

TypeOthers
Description

BHSL is the DGPC-owned sister company manufacturing hydro-mechanical equipment (gates, penstocks, stoplogs) for DHyE's projects (Nu. 2,073M Gamri + Nu. 1,256M Jomori contracts). Not a competitor, but a critical in-ecosystem supplier that defines DHyE's localized execution capability.

TypeOthers
Description

Indian manufacturer of hydro turbines and generators, awarded the electro-mechanical package for DHyE's 18 MW Suchhu HPP. A regional equipment supplier serving the same small-hydro EPC market as DHyE's projects.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles9 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Druk Hydro Energy Limited

Hydropower Generationdhye.drukgreen.bt

Druk Hydro Energy Limited (DHyE) is Bhutan's government-owned developer of small run-of-river hydropower projects (≤150 MW), executing a ~299.5 MW pipeline across nine sites to feed the national grid and support domestic energy security under a DGPC/DHI state mandate.

What Druk Hydro Energy Limited does

Druk Hydro Energy Limited (DHyE) is a 100% state-owned subsidiary of Druk Green Power Corporation Limited (DGPC), itself owned by Druk Holding & Investments, the commercial arm of the Royal Government of Bhutan. Incorporated on December 16, 2021, DHyE operates under a national mandate as the dedicated implementer of small hydropower projects (≤150 MW) in Bhutan. The company does not pursue commercial customers; its purpose is national energy security — developing dispatchable renewable capacity to feed Bhutan's national grid and supply reliable power to remote Dzongkhags (districts), with surplus exported to the Indian Energy Exchange.

DHyE's product is a portfolio of run-of-river hydropower assets totaling ~299.5 MW across nine projects. The Phase-I portfolio (104 MW) comprises the commissioned 18 MW Suchhu HPP in Haa (inaugurated May 15, 2025, built in a record 27 months at Nu. 2,556 million) plus the 54 MW Burgangchhu HPP in Zhemgang and the 32 MW Yungichhu HPP in Lhuentse, both targeted for completion in September 2025. The Phase-II portfolio (195 MW) includes the 90 MW Jomori HPP in Samdrup Jongkhar, the 54 MW Gamri-I & Bamukparongchhu Integrated HPP in Trashigang, the 26 MW Druk Bindu I&II HPP in Samtse, and the 25 MW Begana Integrated Multipurpose Small HPP in Thimphu, with H&M works scheduled through November 2028. The 500 kW Lunana Mini-HPP extends the portfolio into off-grid high-altitude electrification.

The technology stack is conventional run-of-river hydropower: pure river-diversion schemes with trench weirs or concrete gravity dams, surface/underground water-conductor systems, vertical-shaft Pelton turbines, surface powerhouses, and SCADA/protection systems. DHyE has built a vertically integrated in-country value chain through DGPC affiliates — BHSL for hydro-mechanical manufacturing (gates, trash racks, penstocks), Bhutan Automation & Engineering for SCADA, and Bhutanese contractors (Vajra Builders, CDCL, Rigsar) for civil works — with only electro-mechanical equipment sourced from Indian suppliers (Flovel Energy, Voith Hydro). Revenue mechanics are entirely government-mediated: project capital is provided by DHI/DGPC, electricity is handed off to the national grid, and surplus is exported. The company reported no standalone revenue and operates with just 9 employees, reflecting its role as a thin project-implementation vehicle within the DGPC group.

Druk Hydro Energy Limited firmographics

Firmographics
Name
Druk Hydro Energy Limited
Legal name
Druk Hydro Energy Limited
Website
https://dhye.drukgreen.bt
Company type
Private
Founded year
2021
Operating status
Operating
Headcount range
1–10 employees
Short description
Druk Hydro Energy Limited (DHyE) is Bhutan's government-owned developer of small run-of-river hydropower projects (≤150 MW), executing a ~299.5 MW pipeline across nine sites to feed the national grid and support domestic energy security under a DGPC/DHI state mandate.
Ownership category
akta.pro rank

Druk Hydro Energy Limited industry classification

Industry
Product category
Hydropower Generation
NAICS
Hydroelectric Power Generation (221111)
SIC
Cogeneration Services & Small Power Producers (4991)
akta.pro primary industry
Hydropower EPC & Construction (Civil Works, Electromechanical) (EUACAEAF)
akta.pro secondary industries
Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights) (EUAMADAA), Hydropower EPC & Civil Construction (Dams, Weirs, Tunnels, Penstocks) (EUAMADAB), Hydropower Plant Development & Permitting (Greenfield/Brownfield) (EUACAEAE)

Keywords

  • Small hydropower development
  • Run-of-river power
  • Hydropower project construction
  • Renewable energy generation
  • Electricity grid supply

Where Druk Hydro Energy Limited is headquartered

Location

Headquarters

HQ city
Phuentsholing
HQ country
Bhutan
HQ region
Asia

Offices7 records

Markets served

Druk Hydro Energy Limited business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Supply Chain, Personnel, Operations, Technology or R&D

Revenue model

  1. Electricity Generation and Grid Supply: DHyE generates electricity through commissioned and future hydropower projects. The 18 MW Suchhu project generates over 75 MU annually, connected to Damdum in Samtse; summer surplus is exported into the Indian Energy Exchange. As a government-owned implementer, revenue flows through DGPC/the national utility rather than direct consumer billing. Revenue is reinvested into Phase-II project construction and returned to government shareholders.
  2. Government-Funded Project Development: DHyE was incorporated as a 100% subsidiary of DGPC on December 16, 2021, with DGPC (itself owned by Druk Holding & Investments, a Bhutanese government entity) providing capital for project development. Project costs are borne by the parent and government — e.g., Suchhu built at Nu. 2,556 million; Gamri-I & Bamukparongchhu H&M works valued at ~Nu. 2,073 million; Jomori H&M works at ~Nu. 1,256 million.

Go-to-market motion1 record

Distribution channels1 record

Marketing channels3 records

Druk Hydro Energy Limited product offering

Product offering

Core offering

Druk Hydro Energy Limited (DHyE) develops, constructs, and operates small run-of-river hydropower projects (≤150 MW) across Bhutan on behalf of its parent company Druk Green Power Corporation (DGPC). The company is currently executing seven hydropower projects with a combined pipeline capacity of approximately 299.5 MW. Generated electricity is fed into Bhutan's national grid, with summer surplus exported via the Indian Energy Exchange.

Product overview

Druk Hydro Energy Limited (DHyE) operates as a portfolio of independent hydropower projects rather than a unified software platform. The company develops, constructs, and operates small hydropower projects (≤150 MW) as a subsidiary of Druk Green Power Corporation. The portfolio consists of Phase-I projects including commissioned 18 MW Suchhu HPP and under-construction 54 MW Burgangchhu and 32 MW Yungichhu HPPs, plus Phase-II projects including 90 MW Jomori, 26 MW Druk Bindu I&II, 54 MW Gamri-I & Bamukparongchhu, 25 MW Begana, and 500 kW Lunana Mini-HPPs. Each project is a distinct power generation asset with civil, electro-mechanical, hydro-mechanical, and SCADA components, designed to provide localized power supply to Bhutan's Dzongkhags and contribute to national grid exports.

Differentiator

Problem solved

Functional benefit

Products and services

  • 18 MW Suchhu Hydropower Project Commissioned run-of-river hydropower project in Sangbaykha Gewog, Haa Dzongkhag. Uses 7.43 cumecs design discharge with 273 m net head, generating approximately 76.57 GWh annually. Provides stable power to Haa Dzongkhag and exports surplus to Indian Energy Exchange.
  • 54 MW Burgangchhu Hydropower Project Under construction run-of-river hydropower project in Nangkor Gewog, Zhemgang. Uses 13.17 cumecs design discharge with 462 m net head. Water conductor system includes 1,120 m underground pipe, 925 m surface pipe, 206 m vertical shaft, and surface powerhouse.
  • 32 MW Yungichhu Hydropower Project Under construction run-of-river hydropower project near Onngar Village in Maedtsho Gewog, Lhuentse. Uses 7.46 cumecs design discharge with 483 m net head. Surface desilting basins and combined surface/underground water conductor system totaling over 6,000 m.
  • 90 MW Jomori Hydropower Project Under construction standalone run-of-river hydropower project in Lauri and Serthi Gewogs, Samdrup Jongkhar. Features 45 m concrete gravity dam, 28.66 cumecs design discharge, 359 m net head, and two vertical shaft Pelton turbines generating 367.33 GWh annually.
  • 26 MW Druk Bindu I&II Hydropower Project Under construction run-of-river hydropower project in Tendruk Gewog, Samtse Dzongkhag. Druk Bindu I generates 18 MW with 219 m net head; Druk Bindu II generates 8 MW with 99 m net head. Combined estimated cost Nu. 1,186.72 million.
  • 54 MW Gamri-I & Bamukparongchhu Integrated Hydropower Project Under construction integrated run-of-river hydropower project in Sakteng, Trashigang. Gamri-I generates 40 MW with 605.46 m net head; Bamukparongchhu generates 14 MW with 324 m net head. Features 28 m high concrete gravity dam, shared surface powerhouse (69m x 20m x 26m), and combined annual generation of 228.34 GWh.
  • 25 MW Begana Integrated Multipurpose Small Hydropower Project Under construction integrated multipurpose small hydropower project located in Kawang, Thimphu. Part of Phase-II small hydropower portfolio.
  • 500 kW Lunana Mini Hydropower Project Mini hydropower project under development in Lunana, Gasa. Small-scale project for local power generation in remote high-altitude region.

Quantifiable outcome

  • 18 MW Suchhu HPP generates 75+ MU annually, with summer surplus exported to Indian Energy Exchange
  • +3 more outcomes

Companies that use Druk Hydro Energy Limited

Customer profile

Named customers1 record

Segments1 record

Ideal customer profiles1 record

Druk Hydro Energy Limited technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

Druk Hydro Energy Limited partnerships and signals

Strategic signal

Partnerships

Eleven partnerships are on record, tiered core and minor.

  • Druk Holding & Investments (DHI) / Druk Green Power Corporation (DGPC)coreStrategic or Co-development Partner · 2 July 2026DHyE is a 100% subsidiary of DGPC, which is itself owned by Druk Holding & Investments (DHI), the commercial arm of the Royal Government of Bhutan. Dasho Chhewang Rinzin serves as both Managing Director of DGPC and Board Chairperson of DHyE. DHI Chairman Dasho Karma Y. Raydi presided over the DHyE–BHSL contract signing ceremony. This parent-subsidiary structure provides governance oversight, capital allocation, and strategic direction.
  • Chimi RDminorStrategic or Co-development Partner · 18 October 2023Chimi RD was awarded Site-I (Phokchiri to Zamtari) and Site-III (Tshanglari to Woongthi) access road construction for the 90 MW Jomori HPP on October 18, 2023, alongside Rigsar Construction for Site-II.
  • Hi-Tech Company Private LimitedminorStrategic or Co-development Partner · 17 October 2023Hi-Tech Company Private Limited was awarded the construction of access roads to various project components of the (18+8 MW) Druk Bindu I&II HPP on October 17, 2023. Access roads are critical enabling infrastructure for project construction.
  • Bhutan Hydropower Services Limited (BHSL)coreStrategic or Co-development Partner · 11 May 2023BHSL, a DGPC wholly-owned subsidiary, is the primary hydro-mechanical (H&M) contractor for DHyE's hydropower projects. BHSL was awarded the H&M contract for the 54 MW Gamri-I & Bamukparongchhu Integrated HPP (valued at ~Nu. 2,073 million, completion July 2028) and the 90 MW Jomori HPP (~Nu. 1,256 million, completion November 2028). BHSL also handled H&M works for the commissioned Suchhu project and was contracted for Burgangchhu HPP. Contracts cover design, manufacture, supply, testing, installation, and commissioning of all hydro-mechanical equipment including gates, trash racks, penstocks, and stoplogs. BHSL is a cornerstone of Bhutan's domestic hydropower manufacturing capacity.
  • Bhutan Automation & Engineering LimitedcoreStrategic or Co-development Partner · 11 May 2023Bhutan Automation & Engineering Limited, a DGPC-owned company, was awarded the Supervisory Control and Data Acquisition (SCADA) and Protection System contract (MP3) for the Suchhu hydropower project (contract signed May 11, 2023). BAE designed, engineered, and manufactured the SCADA system domestically — a key milestone in building Bhutan's in-country automation capabilities for hydropower assets.
  • Flovel Energy Private Limited (India)minorStrategic or Co-development Partner · 3 May 2023Flovel Energy Private Limited, an Indian electro-mechanical equipment manufacturer, was awarded the Main Contract Package MP2 — Electro-Mechanical Works for the 18 MW Suchhu hydropower project (contract signed May 3, 2023). Flovel supplied turbines and generators. Notably, DHyE/DGPC handled the erection and commissioning of the electro-mechanical equipment in-house, limiting Flovel's scope to manufacturing only.
  • Voith Hydro Private Limited (India)minorStrategic or Co-development Partner · 3 May 2023Voith Hydro Private Limited (India) was awarded the Main Contract Package MP2 — Electro-Mechanical Works for the 32 MW Yungichhu Hydropower Project (contract signed May 3, 2023). Voith is a major global hydro-mechanical equipment supplier.
  • Vajra Builder Private Limited (VBPL)coreStrategic or Co-development Partner · 23 June 2022Vajra Builder Private Limited, a Bhutanese contractor with registered office in Thimphu, was awarded the Main Contract Package MP1 — Civil Works for the 18 MW Suchhu hydropower project (contract signed June 23, 2022). VBPL also took up civil works for the Gamri-I & Bamukparongchhu HPP alongside Rigsar. VBPL represents Bhutanese private sector construction capacity engaged in hydropower civil works.
  • Construction Development Corporation Limited (CDCL)coreStrategic or Co-development Partner · 23 June 2022CDCL, a DHI-owned enterprise registered in Thimphu, was awarded the Main Contract Package MP1 — Civil Works for the 54 MW Burgangchhu Hydropower Project (contract signed June 23, 2022). CDCL is a government-owned construction entity engaged across multiple DHyE Phase-I projects.
  • Rigsar Construction Private Limited (RCPL)coreStrategic or Co-development Partner · 23 June 2022Rigsar Construction Private Limited, a Bhutanese contractor registered in Trashigang, was awarded two contracts: (1) Main Contract Package MP1 — Civil Works for the 32 MW Yungichhu HPP (June 23, 2022), and (2) Site-II access road construction for the 90 MW Jomori HPP (October 18, 2023). RCPL is engaged in civil works across both Phase-I and Phase-II projects.
  • Bernard Gruppe, AustriaminorStrategic or Co-development Partner · 1 October 2021Bernard Gruppe, Austria, was recruited as the technical consultant providing support for the preparation of Feasibility Study Reports (FSR) for the Burgangchhu and Yungichhu hydropower projects. A team of three key experts from Bernard Gruppe, along with DGPC engineers, conducted final field assessments in October 2021.

Scale indicators7 records

Recent moves7 records

Expansion highlights6 records

Druk Hydro Energy Limited competitors and assessment

Company assessment

Broad incumbents

  • SJVN Limited: SJVN (formerly Satluj Jal Vidyut Nigam) is a joint Indian-government/HP-government hydropower developer with ~2 GW operational and projects in Bhutan. State-owned, mandate-driven, hydro-focused — a structural analogue to DHyE in the same Himalayan small/mid-hydro category.
  • Tata Power (Renewables / Hydro): Tata Power operates large hydropower assets in India and Bhutan (e.g., Dagachhu hydro via DGPC partnership). As a broad incumbent private utility with hydro exposure, it parallels DHyE's grid-feeding dispatchable renewable generation model, albeit across a broader portfolio.
  • NHPC Limited: India's largest hydropower developer (NHPC), operating ~7 GW+ of hydro capacity across India and Bhutan (e.g., jointly with DGPC at Tala). It is the obvious broad incumbent — a state-owned utility that develops, owns, and operates hydropower projects, mirroring DHyE's mandate-driven business model at much larger scale.
  • NEEPCO (North Eastern Electric Power Corporation): NEEPCO is an Indian central-government PSU focused on hydropower in India's northeastern states — geography and geopolitical context directly comparable to DHyE's Bhutanese northeast-facing projects (Trashigang, Samdrup Jongkhar), serving similar remote-grid stability use cases.

Others

  • Voith Hydro: Global leader in hydro-electromechanical equipment (turbines, generators), awarded the electro-mechanical package for DHyE's 32 MW Yungichhu HPP. A category-defining equipment supplier to small-hydro developers worldwide including DHyE.
  • Bhutan Automation & Engineering Limited: DGPC-owned domestic SCADA and protection system manufacturer that supplied the Suchhu project's automation suite. A peer-relevant enabling entity within the same government-controlled ecosystem of hydropower capability building in Bhutan.
  • Bhutan Hydropower Services Limited (BHSL): BHSL is the DGPC-owned sister company manufacturing hydro-mechanical equipment (gates, penstocks, stoplogs) for DHyE's projects (Nu. 2,073M Gamri + Nu. 1,256M Jomori contracts). Not a competitor, but a critical in-ecosystem supplier that defines DHyE's localized execution capability.
  • Flovel Energy Private Limited: Indian manufacturer of hydro turbines and generators, awarded the electro-mechanical package for DHyE's 18 MW Suchhu HPP. A regional equipment supplier serving the same small-hydro EPC market as DHyE's projects.

Direct peers

  • Druk Green Power Corporation Limited (DGPC): DGPC is DHyE's 100% parent and Bhutan's principal hydropower operator (operating mega projects such as Tala, Chukha, Basochhu). They share the same owner (Royal Government of Bhutan via DHI) and the same national-mandate model for developing and operating hydropower assets in Bhutan.
  • Energy Development Corporation Limited (Bhutan): EDCL is a Bhutanese DHI-owned enterprise focused on renewable energy and small/mid hydropower project development in Bhutan. As a sister entity under the same government holding, it is the closest peer in mandate, scale, and Bhutanese operating context.

Market position

Strengths4 records

Weaknesses5 records

Competitive moat4 records

Key risks6 records

Key highlights6 records

Customer concentration

Druk Hydro Energy Limited social profiles

Digital presence

Druk Hydro Energy Limited financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Druk Hydro Energy Limited leadership team

Management profile

Number of profiles

Profiles9 records

Druk Hydro Energy Limited funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Druk Hydro Energy Limited M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Druk Hydro Energy Limited

What does Druk Hydro Energy Limited do?

Druk Hydro Energy Limited (DHyE) develops, constructs, and operates small run-of-river hydropower projects (≤150 MW) across Bhutan on behalf of its parent company Druk Green Power Corporation (DGPC). The company is currently executing seven hydropower projects with a combined pipeline capacity of approximately 299.5 MW. Generated electricity is fed into Bhutan's national grid, with summer surplus exported via the Indian Energy Exchange.

Is Druk Hydro Energy Limited a public or private company?

Druk Hydro Energy Limited is a private company. It is classified as state government owned and is currently operating.

When was Druk Hydro Energy Limited founded?

Druk Hydro Energy Limited was founded in 2021. It employs 1 to 10 people.

Where is Druk Hydro Energy Limited based?

Druk Hydro Energy Limited is headquartered in Phuentsholing, Bhutan, in the Asia region.

How does Druk Hydro Energy Limited make money?

Two revenue lines are on record. Electricity Generation and Grid Supply is the primary driver. The others are government-Funded Project Development.

Who are Druk Hydro Energy Limited's main competitors?

Broad incumbents on record are SJVN Limited, Tata Power (Renewables / Hydro), NHPC Limited and NEEPCO (North Eastern Electric Power Corporation). Others are Voith Hydro, Bhutan Automation & Engineering Limited, Bhutan Hydropower Services Limited (BHSL) and Flovel Energy Private Limited. Direct peers are Druk Green Power Corporation Limited (DGPC) and Energy Development Corporation Limited (Bhutan).

Does Druk Hydro Energy Limited have an API?

No public API is recorded for Druk Hydro Energy Limited.

What industry is Druk Hydro Energy Limited in?

Druk Hydro Energy Limited's product category is Hydropower Generation. Its primary akta.pro industry code is EUACAEAF, Hydropower EPC & Construction (Civil Works, Electromechanical), with a secondary code of EUAMADAA, Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights). Its NAICS code is 221111 and its SIC code is 4991.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales