MVA Ingolstadt
MVA Ingolstadt is a municipal waste-to-energy plant operated as a German public-law Zweckverband, serving ~990,000 inhabitants across six Bavarian districts with thermal waste treatment, cogenerated electricity, and district heating via three incineration lines.
- Company typePrivate
- Founded1977
- HeadquartersIngolstadt, Germany
- Headcount1–10
- GTM typeB2B
- OfferingServices
What MVA Ingolstadt does
MVA Ingolstadt (Müllverwertungsanlage Ingolstadt) is a municipal waste-to-energy plant operated as a Zweckverband — a special-purpose association under German public law — owned jointly by the City of Ingolstadt and five surrounding Bavarian districts (Eichstätt, Neuburg-Schrobenhausen, Kelheim, Pfaffenhofen, Roth). Founded in 1977 and located at Am Mailinger Bach 141 in Ingolstadt, the facility serves the thermal waste-disposal needs of approximately 760,000 inhabitants in its core membership area and roughly 990,000 inhabitants when contracted volumes from Landkreis Erding and Landkreis Garmisch-Partenkirchen are included.
The core asset is three incineration lines: Lines I and II (each 12 t/h, commissioned 1996 with MARTIN Rückschub-Rost reverse-acting grate technology and automated camera-guided combustion control) and Line III (8 t/h, retained as reserve and peak-load). Steam is generated at 40 bar and 400°C and routed to a cogeneration system comprising an extraction-condensing turbine (~18 MW electrical) and a 50 MW thermal district-heating network serving Stadtwerke Ingolstadt, Audi AG (since 2004), municipal facilities, and ~40,000 households. Flue gas is treated via a four-stage system — fabric filter with activated coke, three-stage countercurrent scrubber for HCl/SO2/HF, SCR DeNOx with ammonia, and continuous emissions monitoring — achieving 98-99.7% removal efficiency. An associated landfill (Deponie Eberstetten II) accepts specialty streams including asbestos and artificial mineral fibers. Annual production is approximately 80,000 MWh of electricity and 140,000 MWh of district heat, displacing ~36 million m³ of natural gas and saving ~26,800 tonnes of CO₂.
The business model rests on three revenue streams: (1) gate fees for thermal waste treatment priced per tonne (~€90/t baseline, with premium specialty rates of €103/t asbestos and €257/t mineral fibers, and a €10 flat rate for small private deliveries); (2) electricity sales to the public grid; and (3) district-heat supply under long-term contracts. Distribution is hybrid: contracted haulers deliver municipal waste from the six member districts; private individuals book appointments via the Terminland online portal; and commercial/industrial customers coordinate directly with the Stoffstrom department. The Zweckverband structure provides a captive demand base via statutory municipal membership, and German landfill-prohibition law ensures a non-substitutable service mandate for the catchment. The facility holds EMAS certification (2025-2028) and consecutive Entsorgungsfachbetrieb certifications, is GDPR-compliant, and is led by Geschäftsleiter Robert Meisner (appointed 2023) under Chairman Dr. Michael Kern.
MVA Ingolstadt firmographics
Firmographics- Name
- MVA Ingolstadt
- Legal name
- Zweckverband Müllverwertungsanlage Ingolstadt
- Website
- https://mva-ingolstadt.de
- Company type
- Private
- Founded year
- 1977
- Operating status
- Operating
- Headcount range
- 1–10 employees
- Short description
- MVA Ingolstadt is a municipal waste-to-energy plant operated as a German public-law Zweckverband, serving ~990,000 inhabitants across six Bavarian districts with thermal waste treatment, cogenerated electricity, and district heating via three incineration lines.
- Ownership category
- akta.pro rank
MVA Ingolstadt industry classification
Industry- Product category
- Waste-to-Energy Services
- NAICS
- Solid Waste Combustors and Incinerators (562213), Hazardous Waste Treatment and Disposal (562211), Waste Treatment and Disposal (56221), Solid Waste Landfill (562212)
- SIC
- Refuse Systems (4953), Hazardous Waste Management (4955), Cogeneration Services & Small Power Producers (4991)
- akta.pro primary industry
- Subtitle: Waste Treatment & Disposal — Sub-industries (L4) (EUAIACAA)
- akta.pro secondary industries
- Municipal Solid Waste (MSW) Incineration & Energy Recovery (EUACAIAA), Industrial Hazardous Waste Services (Manufacturing, Refineries, Metals, Automotive) (EUAIAFAG)
Keywords
Where MVA Ingolstadt is headquartered
LocationHeadquarters
- HQ city
- Ingolstadt
- HQ country
- Germany
- HQ region
- Europe
Offices1 record
Markets served
MVA Ingolstadt business model
Business model- GTM type
- B2B
- Offering type
- Services
- Cost components
- Operations, Personnel, Infrastructure, Technology or R&D, Supply Chain
Revenue model
- Waste Treatment Services: Fees charged for thermal waste treatment based on weight and type of waste. Private customers pay fixed fees (e.g., 9 EUR per 100 kg, or 10 EUR flat rate for small deliveries). Commercial customers have negotiated rates. The facility operates as a municipal Zweckverband (special-purpose association) with member municipalities paying for regional waste disposal services.
- Energy Sales: Sale of electricity generated from waste combustion to the public grid (~80,000 MWh annually) and district heating to municipal network (~140,000 MWh annually).
- District Heating: Thermal energy supplied to citywide district heating network serving multiple customers including Audi, city facilities, and residential areas.
Pricing tiers
| Model | Billing | Price |
|---|---|---|
| Unit Pricing | Pay-as-you-go | Private small delivery (up to 100 kg or standard car boot) |
| Unit Pricing | Pay-as-you-go | Standard weight-based pricing |
| Unit Pricing | Pay-as-you-go | Deponie Eberstetten - Asbestos |
| Unit Pricing | Pay-as-you-go | Deponie Eberstetten - Artificial Mineral Fibers |
Go-to-market motion2 records
Distribution channels3 records
Marketing channels5 records
MVA Ingolstadt product offering
Product offeringCore offering
MVA Ingolstadt operates a municipal waste-to-energy plant that thermally treats approximately 700 tonnes of residual waste per day across three incineration lines, generating electricity (~80,000 MWh/year) and district heating (~140,000 MWh/year) through cogeneration. The facility, organized as a Zweckverband (municipal special-purpose association), also operates the Eberstetten landfill and offers private and commercial waste delivery services for the Ingolstadt region of Bavaria.
Product overview
MVA Ingolstadt operates as a municipal waste-to-energy plant (Müllverwertungsanlage) with three incineration lines and an associated landfill. The facility is organized as a Zweckverband (municipal association) serving approximately 760,000 residents across six districts. The core offering consists of thermal waste treatment via Lines 1 and 2 (each 12 t/h, commissioned 1996) and Line 3 (8 t/h, reserve capacity), generating electricity and district heating through cogeneration. Supporting infrastructure includes multi-stage flue gas cleaning, the Eberstetten landfill for special waste, and online appointment services for private and commercial waste delivery. Plant tours and environmental education programs complement the operational services.
Differentiator
Problem solved
Functional benefit
Products and services
- Municipal Waste Treatment (Thermische Abfallbehandlung) Thermal treatment of municipal solid waste for the six-member Zweckverband (City of Ingolstadt plus five Bavarian Landkreise) covering ~760,000-990,000 inhabitants, with capacity of ~700 tonnes/day across three incineration lines. Includes regulated disposal of municipal residual waste, bulky waste, and special waste streams.
- Electricity Generation and Sale (Stromerzeugung) Cogeneration of electricity from waste combustion via extraction-condensing turbine (~18 MW for Lines 1 and 2; 6.7 MW generator for Line 3), producing approximately 80,000 MWh/year equivalent to the electricity needs of ~17,000 households in the Ingolstadt region. Electricity is sold to the public grid in cooperation with Stadtwerke Ingolstadt.
- District Heating Supply (Fernwärme) Cogenerated thermal energy supplied to the Ingolstadt district heating network at flow temperature 130°C and return 70°C, providing up to 50 MW thermal capacity and approximately 140,000 MWh/year — equivalent to the heating needs of ~40,000 well-insulated single-family homes and displacing ~36 million m³ of natural gas annually. Connected customers include Audi AG, Fachhochschule, Klinikum, Theater, and municipal facilities. Distribution is operated via Stadtwerke Ingolstadt.
- Private Waste Delivery (Privatanlieferung)
Quantifiable outcome
- Emissions significantly below legal limits (TÜV-certified); dust/salt/heavy metal removal 98-99.7%; dioxin emissions at detection limit
- +4 more outcomes
Companies that use MVA Ingolstadt
Customer profileNamed customers5 records
Segments3 records
Ideal customer profiles3 records
MVA Ingolstadt technology and API
TechnologyTechnology focussed No
API detail
- Has API
- No
- API docs
- API detail
Core technology
AI maturity
App detail
Feature4 records
MVA Ingolstadt partnerships and signals
Strategic signalPartnerships
One partnership is on record.
- MARTIN GmbH für Umwelt- und EnergietechnikcoreGeneral contractor for construction of incineration lines 1 and 2 (2x12 t/h capacity) completed in 1996. MARTIN also supplied the Los I (combustion and boiler) components. The partnership leverages MARTIN's proven Rückschub-Rost technology for municipal waste combustion.
Scale indicators8 records
Recent moves7 records
Expansion highlights5 records
MVA Ingolstadt competitors and assessment
Company assessmentBroad incumbents
- EEW Energy from Waste: Largest waste-to-energy operator in Germany with 18 facilities across Europe, now part of PreZero (Schwarz Group). Directly comparable technology stack and customer base, but operates as commercial entity across multiple regions rather than single-site Zweckverband.
- Remondis GmbH: Germany's largest private waste management company operating multiple WtE plants and waste treatment facilities. Same underlying business (thermal waste treatment, energy recovery) but as a commercial operator across many sites and waste streams.
- Veolia Umweltservice West GmbH: German subsidiary of global environmental services group operating WtE plants and waste management infrastructure. Comparable technology and customers but as a multinational commercial operator rather than a single-site municipal entity.
- MVV Energie AG: German energy utility headquartered in Mannheim operating WtE plants (e.g., in Mannheim and Offenbach) with district heating networks. Comparable WtE-plus-district-heating business model but as a listed commercial utility rather than a public Zweckverband.
Direct peers
- Müllheizkraftwerk Hamburg (MHKW Hamburg / Stadtreinigung Hamburg): Hamburg's municipal waste incinerator operated by Stadtreinigung Hamburg, generating district heating and electricity. Comparable German municipal WtE model with cogeneration and emissions control focus, though serving a larger urban population.
- AVR Frankfurt (Abfallverwertungsanlage Rhein-Main): Waste-to-energy plant serving the Frankfurt/Rhine-Main region with cogeneration, similar scale (~700 t/day range). Same German regulatory environment and MSW incineration + district heating business model.
- Zweckverband Abfallwirtschaft Region Hannover (aha): Regional waste management Zweckverband in Hannover operating WtE and related infrastructure. Same public-law Zweckverband structure and German municipal WtE operating model, providing structural comparability beyond just technology.
- MHKW München (Müllheizkraftwerk München): Operates three incineration lines in Munich serving the Bavarian capital region with combined heat and power output. Closest geographic and structural peer — same German municipal WtE model, comparable scale, overlapping customer base characteristics.
Regional players
- Kraftwerks- und Anlagenbetriebsgesellschaft mbH (KAG) - Heizkraftwerk Nord / BSR Berlin: Berlin's municipal waste management operator with WtE capacity. Comparable large German municipal WtE model, but operates in the Berlin/Brandenburg region and serves a much larger urban population.
- Abfallverbrennungsanlage Köln (AVAK): Cologne's municipal waste incinerator operated by AVG Köln. Same German WtE+CHP business model serving a large regional population, though geographically distant from Bavaria.
Market position
Strengths4 records
Weaknesses4 records
Competitive moat4 records
Key risks5 records
Key highlights7 records
Customer concentration
MVA Ingolstadt social profiles
Digital presenceMVA Ingolstadt compliance and trust
Trust signalCompliance3 records
MVA Ingolstadt financial estimates
Financial estimateRevenue estimate
Valuation estimate
MVA Ingolstadt leadership team
Management profileNumber of profiles
Profiles10 records
MVA Ingolstadt funding detail
Funding detailFunding overview
Funding rounds
Investors
Funding detail is available on the Subscription and Enterprise plan.Contact sales →
MVA Ingolstadt M&A and investment
M&A and investmentM&A
Investments
M&A and investment is available on the Subscription and Enterprise plan.Contact sales →
Frequently asked questions about MVA Ingolstadt
What does MVA Ingolstadt do?
MVA Ingolstadt operates a municipal waste-to-energy plant that thermally treats approximately 700 tonnes of residual waste per day across three incineration lines, generating electricity (~80,000 MWh/year) and district heating (~140,000 MWh/year) through cogeneration. The facility, organized as a Zweckverband (municipal special-purpose association), also operates the Eberstetten landfill and offers private and commercial waste delivery services for the Ingolstadt region of Bavaria.
Is MVA Ingolstadt a public or private company?
MVA Ingolstadt is a private company. It is classified as state government owned and is currently operating.
When was MVA Ingolstadt founded?
MVA Ingolstadt was founded in 1977. It employs 1 to 10 people.
Where is MVA Ingolstadt based?
MVA Ingolstadt is headquartered in Ingolstadt, Germany, in the Europe region.
How does MVA Ingolstadt make money?
Three revenue lines are on record. Waste Treatment Services are the primary driver. The others are energy Sales and district Heating.
Who are MVA Ingolstadt's main competitors?
Broad incumbents on record are EEW Energy from Waste, Remondis GmbH, Veolia Umweltservice West GmbH and MVV Energie AG. Direct peers are Müllheizkraftwerk Hamburg (MHKW Hamburg / Stadtreinigung Hamburg), AVR Frankfurt (Abfallverwertungsanlage Rhein-Main), Zweckverband Abfallwirtschaft Region Hannover (aha) and MHKW München (Müllheizkraftwerk München). Regional players are Kraftwerks- und Anlagenbetriebsgesellschaft mbH (KAG) - Heizkraftwerk Nord / BSR Berlin and Abfallverbrennungsanlage Köln (AVAK).
Does MVA Ingolstadt have an API?
No public API is recorded for MVA Ingolstadt.
What industry is MVA Ingolstadt in?
MVA Ingolstadt's product category is Waste-to-Energy Services. Its primary akta.pro industry code is EUAIACAA, Subtitle: Waste Treatment & Disposal — Sub-industries (L4), with a secondary code of EUACAIAA, Municipal Solid Waste (MSW) Incineration & Energy Recovery. Its NAICS code is 562213 and its SIC code is 4953.