Developer docs
API playgroundTry for free, no card

Search company profiles

phpa ii bhutan

Full company profile

uuid0053lya

Namestring
phpa ii bhutan
Legal namestring
Punatsangchhu-II Hydroelectric Project Authority
Websiteurl
phpa2.gov.bt
Company typeenum
Private
Founded yearint
2010
Descriptiontext

Punatsangchhu-II Hydroelectric Project Authority (PHPA-II) is an autonomous bilateral body established on July 30, 2010 by the Royal Government of Bhutan and the Government of India to implement a 1,020 MW run-of-river hydroelectric scheme on the Punatsangchhu river in Wangduephodrang district, Bhutan. The project comprises a 91m concrete gravity dam with 12m-diameter diversion tunnels, an 8.58 km headrace tunnel, a 31m-diameter surge shaft, an underground power house cavern at Kamechu housing six 170 MW generating units, and associated tailrace and transmission infrastructure. Construction was executed under three main civil packages (C-I Dam to M/s Jaiprakash Associates, C-II HRT to M/s Gammon India, C-III Power House to M/s Jaiprakash Associates) and eight electro-mechanical packages, with WAPCOS Limited and the Central Water Commission providing design and engineering oversight.

All six generating units were commissioned sequentially between December 27, 2024 and September 6, 2025, with the river diverted through the diversion tunnel on May 20, 2025 and overall project completion reported at 99.98% as of May 31, 2026. The Authority is staffed by 524 personnel (514 Bhutanese and 10 Indian nationals, split between deputation and contract) and is led by a Chairman from the Bhutanese Ministry of Energy and Natural Resources, a Managing Director on deputation from NHPC Limited, and a Joint Managing Director on secondment from Druk Green Power Corporation.

Revenue mechanics are anchored in a single bilateral power purchase commitment: 100% of surplus generation (4,357 GWh design annual output) is exported to India at a tariff negotiated between the two governments, with no merchant or third-party offtake. Capital is provided by the Government of India as a 30% grant and 70% loan at 10% interest, repayable in 30 equated semi-annual installments. The Authority is contractually required to dissolve within two years of commissioning, with the asset to be handed over to the Royal Government of Bhutan for subsequent operation through Druk Green Power Corporation.

Short descriptiontext

PHPA-II is a bilateral Bhutan–India autonomous authority operating the 1,020 MW Punatsangchhu-II run-of-river hydroelectric project, exporting all surplus power to India under a single inter-government framework ahead of handover to the Royal Government of Bhutan.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1–10
akta.pro rankint
HeadquartersThimphu, Bhutan
HQ citystring
Thimphu
HQ countrystring
Bhutan
HQ regionstring
Asia
Markets served

Serves global market

Offices4 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
hydroelectric power generation, run-of-river dam, bilateral infrastructure project, power export transmission, renewable energy utility
Industry3 codes
1Run-of-River Hydroelectric Generation
CodeEUACAEAAPrimaryYes
2Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension)
CodeEUACAEAGPrimaryNo
3Hydropower EPC & Construction (Civil Works, Electromechanical)
CodeEUACAEAFPrimaryNo
NAICS code3 codes
  • Hydroelectric Power Generation221111
  • Electric Power Generation, Transmission and Distribution2211
  • Utility System Construction2371
SIC code1 code
  • Heavy Construction Other Than Bldg Const - Contractors1600
Product category
Hydroelectric Power Generation
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Power Export to India
TypeTransaction Fee
Description

All surplus power from the 1,020 MW hydroelectric project is exported to India per the bilateral agreement between the Royal Government of Bhutan and Government of India. The project is funded by GoI (30% grant and 70% loan at 10% annual interest, repayable in 30 equated semi-annual installments).

phpa2.gov.bt
Cost components5 values
Infrastructure, Personnel, Supply Chain, Technology or R&D, Operations
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

PHPA-II operates the 1,020 MW Punatsangchhu-II Hydroelectric Project (PHEP-II), a run-of-the-river hydroelectric facility on the Punatsangchhu river in Wangduephodrang, Bhutan. The project comprises a concrete gravity dam, head race tunnel, underground power house with six 170 MW generating units, and associated transmission infrastructure. All surplus electricity generated is exported to India under a bilateral agreement between the Royal Government of Bhutan and the Government of India, with annual generation capacity of 4,357 GWh.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • Annual power generation capacity of 4,357 GWh
+3 more records
Product overview1 text field

PHPA-II operates the 1,020 MW Punatsangchhu-II Hydroelectric Project (PHEP-II), a run-of-the-river hydroelectric facility in Bhutan developed jointly by the Royal Government of Bhutan and Government of India. The project consists of a concrete gravity dam (C-I package), an 8.58 km head race tunnel (C-II package), and an underground power house complex (C-III package) housing six 170 MW generating units with full electro-mechanical works (EM-1 through EM-7 packages) and transmission infrastructure. The project has achieved full commissioning with all six units operational.

Product and service5 records
1Punatsangchhu-II Hydroelectric Project (PHEP-II)
CategoryHydroelectric Power Generation
Description

A 1,020 MW run-of-the-river hydroelectric project on the Punatsangchhu river in Bhutan, comprising a concrete gravity dam, head race tunnel, underground power house with six 170 MW generating units, and associated transmission infrastructure. All surplus electricity is exported to India under the bilateral agreement between the Royal Government of Bhutan and the Government of India.

2C-I Dam Package
CategoryCivil Works - Dam Construction
Description

Construction of the diversion tunnel (12m diameter, 888m length - largest in sub-continent), concrete gravity dam (91m height, 214m length), coffer dams, spillways, intake tunnels, desilting chambers (biggest in the country with 4 chambers of 420m length, 17/19m width, 24.74m height), and the first highway tunnel (1.5 km) constructed in Bhutan.

3C-II Head Race Tunnel (HRT)
CategoryCivil Works - Tunnel Construction
Description

Head race tunnel of 11m diameter and 8.58km length, the largest in the country, designed to carry design discharges of 466 Cumec, constructed with concrete lining.

4C-III Power House Complex
CategoryCivil Works - Power House Construction
Description

Underground power house cavern (236m length, 23m width, 51m height), transformer hall, surge shaft (31m diameter, 137m height - largest/deepest in the country), pressure shafts, tail race tunnel (11m diameter, 3km - biggest in the country), and associated hydro-mechanical works.

5Electro-Mechanical Works Package
CategoryElectro-Mechanical Power Generation Equipment
Description

Electro-mechanical components including six 170 MW generating units with auxiliaries, generator transformers, 420 kV gas insulated switchgear, 400 kV power cables, protection systems, air conditioning, ventilation, and fire fighting systems across eight packages (EM-1 through EM-7).

Scale indicator8 records

Each record includes

Type, Value, Description, Source

Partnership11 partners
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Bilateral agreement signed July 30, 2010 between RGoB and GoI for implementation of the 1,020 MW project. Foundation stone laid jointly by Prime Ministers of both countries. Project authority established and will be dissolved within two years after commissioning for handover to RGoB.

Strategic tierCoreTypeTechnology or Integration
Description

WAPCOS Ltd, Ministry of Water Resources, Government of India serves as design and engineering consultant to the Authority. Provides expertise from premier organizations including Central Electricity Authority, Central Water Commission, Central Water & Power Research Station, Central Soil & Materials Research Station, and Geological Survey of India.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Royal Government of Bhutan undertaking. Joint Managing Director of PHPA-II is on secondment from DGPC. DGPC serves as the parent organization for hydropower operations in Bhutan.

Strategic tierMajorTypeTechnology or Integration
Description

Government of India ministry providing technical expertise through WAPCOS Ltd. Ministry of Water Resources, River Development & Ganga Rejuvenation.

Strategic tierMajorTypeTechnology or Integration
Description

Government of India ministry providing technical expertise through WAPCOS Ltd. Ministry of Power. Member (Hydro), CEA serves as Chairman of Technical Coordination Committee.

Strategic tierMajorTypeTechnology or Integration
Description

Government of India ministry providing geological expertise through WAPCOS Ltd. Ministry of Mines.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

PHPA-II coordinates with RSPN for White Bellied Heron conservation since 2011. MoU signed November 17, 2016 for construction of WBH conservation facility at Chanchey, Tsirang. Facility handed over to RSPN on November 27, 2020.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

Letter of Understanding signed March 16, 2018 for construction of Golden Mahseer Hatchery and Conservation Facility at Harachu. Completed and handed over to DoL on March 24, 2021.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

Executing agency for compensatory afforestation program. PHPA-II executed 600 hectares of compensatory afforestation (twice the 300 hectares affected) across five districts through MoU with Gross National Happiness Commission.

10M/s Jaiprakash Associates Limited
Strategic tierMajorTypeOthers
Description

Main civil works contractor awarded June 26, 2011. Contract package C-1 includes diversion tunnel, dam, intake, desilting arrangement, and highway tunnel. Contract package C-3 includes headrace tunnel, surge shaft, power house, and tailrace tunnel.

phpa2.gov.bt
11M/s Gammon India Limited
Strategic tierMajorTypeOthers
Description

Head Race Tunnel (HRT) contractor awarded June 26, 2011 at contract amount of INR/Nu 3,983.27 million. Responsible for construction of 6,514m of the 8,514m total HRT length.

phpa2.gov.bt
Recent move8 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight4 records

Each record includes

Type, Description

Peers7 records
TypeRegional player
Description

Bhutan's state-owned transmission and distribution utility, part of the same national power ecosystem that PHPA-II feeds. Comparable as a Bhutanese state power-sector entity that interfaces with the generation infrastructure PHPA-II operates.

TypeBroad incumbent
Description

Largest Indian private-sector integrated power player with significant clean-energy generation including hydropower. Comparable as a large-scale generator participating in India's clean-energy supply mix that PHPA-II's export volumes ultimately feed.

TypeDirect peer
Description

Joint venture between GoI and Himachal Pradesh with operating hydropower assets in the Himalayas and active Bhutan projects (e.g., 1,200 MW Arun-3 in Nepal and Bhutan-India bilateral projects). Comparable as a government-backed hydropower developer executing cross-border projects in the Himalayan region.

TypeBroad incumbent
Description

India's largest hydropower developer (Navratna PSU under Ministry of Power) and the source of PHPA-II's Managing Director and Director (Technical) on deputation. Comparable as a large-scale hydroelectric operator with deep experience in Himalayan projects and bilateral project execution.

TypeOthers
Description

Central PSU that acts as a power trader and plays a role in cross-border Bhutan-India power arrangements. Comparable as a counterparty ecosystem participant in the bilateral hydropower value chain that PHPA-II feeds into.

TypeDirect peer
Description

Joint venture (NHPC + JKSPDC) implementing the 850 MW Ratle hydroelectric project on the Chenab, where PHPA-II's current MD previously served as General Manager (Civil). Comparable as a bilateral/joint-venture Himalayan run-of-river project with similar institutional and execution dynamics.

TypeDirect peer
Description

Royal Government of Bhutan undertaking that is the parent organization for hydropower operations in Bhutan and supplies the Joint Managing Director to PHPA-II. Directly comparable as Bhutan's principal hydropower asset operator with similar run-of-river fleet and India export mandate.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights5 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers2 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature6 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles5 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

phpa ii bhutan

Hydroelectric Power Generationphpa2.gov.bt

PHPA-II is a bilateral Bhutan–India autonomous authority operating the 1,020 MW Punatsangchhu-II run-of-river hydroelectric project, exporting all surplus power to India under a single inter-government framework ahead of handover to the Royal Government of Bhutan.

What phpa ii bhutan does

Punatsangchhu-II Hydroelectric Project Authority (PHPA-II) is an autonomous bilateral body established on July 30, 2010 by the Royal Government of Bhutan and the Government of India to implement a 1,020 MW run-of-river hydroelectric scheme on the Punatsangchhu river in Wangduephodrang district, Bhutan. The project comprises a 91m concrete gravity dam with 12m-diameter diversion tunnels, an 8.58 km headrace tunnel, a 31m-diameter surge shaft, an underground power house cavern at Kamechu housing six 170 MW generating units, and associated tailrace and transmission infrastructure. Construction was executed under three main civil packages (C-I Dam to M/s Jaiprakash Associates, C-II HRT to M/s Gammon India, C-III Power House to M/s Jaiprakash Associates) and eight electro-mechanical packages, with WAPCOS Limited and the Central Water Commission providing design and engineering oversight.

All six generating units were commissioned sequentially between December 27, 2024 and September 6, 2025, with the river diverted through the diversion tunnel on May 20, 2025 and overall project completion reported at 99.98% as of May 31, 2026. The Authority is staffed by 524 personnel (514 Bhutanese and 10 Indian nationals, split between deputation and contract) and is led by a Chairman from the Bhutanese Ministry of Energy and Natural Resources, a Managing Director on deputation from NHPC Limited, and a Joint Managing Director on secondment from Druk Green Power Corporation.

Revenue mechanics are anchored in a single bilateral power purchase commitment: 100% of surplus generation (4,357 GWh design annual output) is exported to India at a tariff negotiated between the two governments, with no merchant or third-party offtake. Capital is provided by the Government of India as a 30% grant and 70% loan at 10% interest, repayable in 30 equated semi-annual installments. The Authority is contractually required to dissolve within two years of commissioning, with the asset to be handed over to the Royal Government of Bhutan for subsequent operation through Druk Green Power Corporation.

phpa ii bhutan firmographics

Firmographics
Name
phpa ii bhutan
Legal name
Punatsangchhu-II Hydroelectric Project Authority
Website
https://phpa2.gov.bt
Company type
Private
Founded year
2010
Operating status
Operating
Headcount range
1–10 employees
Short description
PHPA-II is a bilateral Bhutan–India autonomous authority operating the 1,020 MW Punatsangchhu-II run-of-river hydroelectric project, exporting all surplus power to India under a single inter-government framework ahead of handover to the Royal Government of Bhutan.
Ownership category
akta.pro rank

phpa ii bhutan industry classification

Industry
Product category
Hydroelectric Power Generation
NAICS
Hydroelectric Power Generation (221111), Electric Power Generation, Transmission and Distribution (2211), Utility System Construction (2371)
SIC
Heavy Construction Other Than Bldg Const - Contractors (1600)
akta.pro primary industry
Run-of-River Hydroelectric Generation (EUACAEAA)
akta.pro secondary industries
Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension) (EUACAEAG), Hydropower EPC & Construction (Civil Works, Electromechanical) (EUACAEAF)

Keywords

  • Hydroelectric power generation
  • Run-of-river dam
  • Bilateral infrastructure project
  • Power export transmission
  • Renewable energy utility

Where phpa ii bhutan is headquartered

Location

Headquarters

HQ city
Thimphu
HQ country
Bhutan
HQ region
Asia

Offices4 records

Markets served

phpa ii bhutan business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Personnel, Supply Chain, Technology or R&D, Operations

Revenue model

  1. Power Export to India: All surplus power from the 1,020 MW hydroelectric project is exported to India per the bilateral agreement between the Royal Government of Bhutan and Government of India. The project is funded by GoI (30% grant and 70% loan at 10% annual interest, repayable in 30 equated semi-annual installments).

Go-to-market motion1 record

phpa ii bhutan product offering

Product offering

Core offering

PHPA-II operates the 1,020 MW Punatsangchhu-II Hydroelectric Project (PHEP-II), a run-of-the-river hydroelectric facility on the Punatsangchhu river in Wangduephodrang, Bhutan. The project comprises a concrete gravity dam, head race tunnel, underground power house with six 170 MW generating units, and associated transmission infrastructure. All surplus electricity generated is exported to India under a bilateral agreement between the Royal Government of Bhutan and the Government of India, with annual generation capacity of 4,357 GWh.

Product overview

PHPA-II operates the 1,020 MW Punatsangchhu-II Hydroelectric Project (PHEP-II), a run-of-the-river hydroelectric facility in Bhutan developed jointly by the Royal Government of Bhutan and Government of India. The project consists of a concrete gravity dam (C-I package), an 8.58 km head race tunnel (C-II package), and an underground power house complex (C-III package) housing six 170 MW generating units with full electro-mechanical works (EM-1 through EM-7 packages) and transmission infrastructure. The project has achieved full commissioning with all six units operational.

Differentiator

Problem solved

Functional benefit

Products and services

  • Punatsangchhu-II Hydroelectric Project (PHEP-II) A 1,020 MW run-of-the-river hydroelectric project on the Punatsangchhu river in Bhutan, comprising a concrete gravity dam, head race tunnel, underground power house with six 170 MW generating units, and associated transmission infrastructure. All surplus electricity is exported to India under the bilateral agreement between the Royal Government of Bhutan and the Government of India.
  • C-I Dam Package Construction of the diversion tunnel (12m diameter, 888m length - largest in sub-continent), concrete gravity dam (91m height, 214m length), coffer dams, spillways, intake tunnels, desilting chambers (biggest in the country with 4 chambers of 420m length, 17/19m width, 24.74m height), and the first highway tunnel (1.5 km) constructed in Bhutan.
  • C-II Head Race Tunnel (HRT) Head race tunnel of 11m diameter and 8.58km length, the largest in the country, designed to carry design discharges of 466 Cumec, constructed with concrete lining.
  • C-III Power House Complex Underground power house cavern (236m length, 23m width, 51m height), transformer hall, surge shaft (31m diameter, 137m height - largest/deepest in the country), pressure shafts, tail race tunnel (11m diameter, 3km - biggest in the country), and associated hydro-mechanical works.
  • Electro-Mechanical Works Package Electro-mechanical components including six 170 MW generating units with auxiliaries, generator transformers, 420 kV gas insulated switchgear, 400 kV power cables, protection systems, air conditioning, ventilation, and fire fighting systems across eight packages (EM-1 through EM-7).

Quantifiable outcome

  • Annual power generation capacity of 4,357 GWh
  • +3 more outcomes

Companies that use phpa ii bhutan

Customer profile

Named customers2 records

Segments1 record

Ideal customer profiles1 record

phpa ii bhutan technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature6 records

phpa ii bhutan partnerships and signals

Strategic signal

Partnerships

Eleven partnerships are on record, tiered core, major and minor.

  • Royal Government of Bhutan (RGoB)coreStrategic or Co-development PartnerBilateral agreement signed July 30, 2010 between RGoB and GoI for implementation of the 1,020 MW project. Foundation stone laid jointly by Prime Ministers of both countries. Project authority established and will be dissolved within two years after commissioning for handover to RGoB.
  • WAPCOS LimitedcoreTechnology or IntegrationWAPCOS Ltd, Ministry of Water Resources, Government of India serves as design and engineering consultant to the Authority. Provides expertise from premier organizations including Central Electricity Authority, Central Water Commission, Central Water & Power Research Station, Central Soil & Materials Research Station, and Geological Survey of India.
  • Druk Green Power Corporation (DGPC)coreStrategic or Co-development PartnerRoyal Government of Bhutan undertaking. Joint Managing Director of PHPA-II is on secondment from DGPC. DGPC serves as the parent organization for hydropower operations in Bhutan.
  • Central Water Commission (CWC)majorTechnology or IntegrationGovernment of India ministry providing technical expertise through WAPCOS Ltd. Ministry of Water Resources, River Development & Ganga Rejuvenation.
  • Central Electricity Authority (CEA)majorTechnology or IntegrationGovernment of India ministry providing technical expertise through WAPCOS Ltd. Ministry of Power. Member (Hydro), CEA serves as Chairman of Technical Coordination Committee.
  • Geological Survey of India (GSI)majorTechnology or IntegrationGovernment of India ministry providing geological expertise through WAPCOS Ltd. Ministry of Mines.
  • Royal Society for Protection of Nature (RSPN)minorStrategic or Co-development PartnerPHPA-II coordinates with RSPN for White Bellied Heron conservation since 2011. MoU signed November 17, 2016 for construction of WBH conservation facility at Chanchey, Tsirang. Facility handed over to RSPN on November 27, 2020.
  • Department of Livestock (DoL)minorStrategic or Co-development PartnerLetter of Understanding signed March 16, 2018 for construction of Golden Mahseer Hatchery and Conservation Facility at Harachu. Completed and handed over to DoL on March 24, 2021.
  • Department of Forest & Park Services (DoFPs)minorStrategic or Co-development PartnerExecuting agency for compensatory afforestation program. PHPA-II executed 600 hectares of compensatory afforestation (twice the 300 hectares affected) across five districts through MoU with Gross National Happiness Commission.
  • M/s Jaiprakash Associates LimitedmajorOthersMain civil works contractor awarded June 26, 2011. Contract package C-1 includes diversion tunnel, dam, intake, desilting arrangement, and highway tunnel. Contract package C-3 includes headrace tunnel, surge shaft, power house, and tailrace tunnel.
  • M/s Gammon India LimitedmajorOthersHead Race Tunnel (HRT) contractor awarded June 26, 2011 at contract amount of INR/Nu 3,983.27 million. Responsible for construction of 6,514m of the 8,514m total HRT length.

Scale indicators8 records

Recent moves8 records

Expansion highlights4 records

phpa ii bhutan competitors and assessment

Company assessment

Regional players

  • Bhutan Power Corporation: Bhutan's state-owned transmission and distribution utility, part of the same national power ecosystem that PHPA-II feeds. Comparable as a Bhutanese state power-sector entity that interfaces with the generation infrastructure PHPA-II operates.

Broad incumbents

  • Tata Power: Largest Indian private-sector integrated power player with significant clean-energy generation including hydropower. Comparable as a large-scale generator participating in India's clean-energy supply mix that PHPA-II's export volumes ultimately feed.
  • NHPC Limited: India's largest hydropower developer (Navratna PSU under Ministry of Power) and the source of PHPA-II's Managing Director and Director (Technical) on deputation. Comparable as a large-scale hydroelectric operator with deep experience in Himalayan projects and bilateral project execution.

Direct peers

  • SJVN Limited: Joint venture between GoI and Himachal Pradesh with operating hydropower assets in the Himalayas and active Bhutan projects (e.g., 1,200 MW Arun-3 in Nepal and Bhutan-India bilateral projects). Comparable as a government-backed hydropower developer executing cross-border projects in the Himalayan region.
  • NHPC (Ratle) / Ratle Hydroelectric Power Corporation: Joint venture (NHPC + JKSPDC) implementing the 850 MW Ratle hydroelectric project on the Chenab, where PHPA-II's current MD previously served as General Manager (Civil). Comparable as a bilateral/joint-venture Himalayan run-of-river project with similar institutional and execution dynamics.
  • Druk Green Power Corporation: Royal Government of Bhutan undertaking that is the parent organization for hydropower operations in Bhutan and supplies the Joint Managing Director to PHPA-II. Directly comparable as Bhutan's principal hydropower asset operator with similar run-of-river fleet and India export mandate.

Others

  • PTC India Limited: Central PSU that acts as a power trader and plays a role in cross-border Bhutan-India power arrangements. Comparable as a counterparty ecosystem participant in the bilateral hydropower value chain that PHPA-II feeds into.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat4 records

Key risks5 records

Key highlights5 records

Customer concentration

phpa ii bhutan social profiles

Digital presence

phpa ii bhutan financial estimates

Financial estimate

Revenue estimate

Valuation estimate

phpa ii bhutan leadership team

Management profile

Number of profiles

Profiles5 records

phpa ii bhutan funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

phpa ii bhutan M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about phpa ii bhutan

What does phpa ii bhutan do?

PHPA-II operates the 1,020 MW Punatsangchhu-II Hydroelectric Project (PHEP-II), a run-of-the-river hydroelectric facility on the Punatsangchhu river in Wangduephodrang, Bhutan. The project comprises a concrete gravity dam, head race tunnel, underground power house with six 170 MW generating units, and associated transmission infrastructure. All surplus electricity generated is exported to India under a bilateral agreement between the Royal Government of Bhutan and the Government of India, with annual generation capacity of 4,357 GWh.

Is phpa ii bhutan a public or private company?

phpa ii bhutan is a private company. It is classified as state government owned and is currently operating.

When was phpa ii bhutan founded?

phpa ii bhutan was founded in 2010. It employs 1 to 10 people.

Where is phpa ii bhutan based?

phpa ii bhutan is headquartered in Thimphu, Bhutan, in the Asia region.

How does phpa ii bhutan make money?

One revenue line is on record: power Export to India.

Who are phpa ii bhutan's main competitors?

Bhutan Power Corporation is listed as a regional player. Broad incumbents are Tata Power and NHPC Limited. Direct peers are SJVN Limited, NHPC (Ratle) / Ratle Hydroelectric Power Corporation and Druk Green Power Corporation. PTC India Limited is listed as an others.

Does phpa ii bhutan have an API?

No public API is recorded for phpa ii bhutan.

What industry is phpa ii bhutan in?

phpa ii bhutan's product category is Hydroelectric Power Generation. Its primary akta.pro industry code is EUACAEAA, Run-of-River Hydroelectric Generation, with a secondary code of EUACAEAG, Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension). Its NAICS code is 221111 and its SIC code is 1600.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales