Upper Tamakoshi Hydroelectric Project

Full company profile

uuid005jhfe

Namestring
Upper Tamakoshi Hydroelectric Project
Legal namestring
Upper Tamakoshi Hydropower Limited
Websiteurl
utkhpl.org.np
Company typeenum
Private
Founded yearint
2007
Descriptiontext

Upper Tamakoshi Hydropower Limited (UTKHPL) is a Nepal-based state-promoted hydroelectric utility that owns and operates the 456 MW Upper Tamakoshi run-of-river hydroelectric power plant on the Tamakoshi River in Dolakha District. Incorporated in March 2007 by Nepal Electricity Authority (NEA), the company was established to develop one of Nepal's largest hydropower assets and has been designated a National Pride Project by the Government of Nepal. The company is listed on the Nepal Stock Exchange (ticker: UPPER), with a diversified ownership structure spanning NEA (41%), Nepal Telecom (6%), Citizens Investment Trust (2%), Rastriya Beema Sansthan (2%), general public (15%), Dolakha district residents (10%), and Employee Provident Fund/staff (24%). Approximately 35 staff support operations, headquartered in Kathmandu with field operations in Dolakha District.

The plant utilizes run-of-river hydropower technology, with major infrastructure including a headrace tunnel, surge shaft, penstock, and powerhouse equipped with six generating units. Key construction and commissioning milestones include main tunnel breakthrough in November 2017, tunnel water filling in June 2021, and trial power generation of 76 MW in July 2021. The company is also developing the Rolwaling Khola Hydroelectric Project as an adjacent expansion asset, currently in the EPC procurement phase, indicating forward pipeline activity beyond the flagship plant.

UTKHPL's business model is structurally simple: electricity generated at the Upper Tamakoshi plant is sold exclusively to NEA under a long-term Power Purchase Agreement, making NEA the sole off-taker and the company's entire revenue base. The company publishes quarterly and annual financial disclosures, with the 16th and 17th annual reports (FY 2079/80 and FY 2080/81) and the 3rd quarterly report for FY 2082/83 referenced as recent outputs. Revenue ramp is tied to completion of commissioning at the 456 MW design capacity, with all cash flow ultimately dependent on NEA's payment performance and PPA tariff terms.

Short descriptiontext

Upper Tamakoshi Hydropower Limited operates Nepal's 456 MW run-of-river hydroelectric plant on the Tamakoshi River in Dolakha District, selling all generated electricity exclusively to Nepal Electricity Authority under a sole Power Purchase Agreement.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersKathmandu, Nepal
HQ citystring
Kathmandu
HQ countrystring
Nepal
HQ regionstring
Asia
Markets served

Serves global market

Offices2 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
hydroelectric power generation, run-of-river hydropower, national grid supply, renewable energy infrastructure, power purchase agreements
Industry2 codes
PRIMARYEUAMADAE
Hydropower Operations, Maintenance & Asset Management (O&M, Spares, Performance)
SECONDARYEUAMADAA
Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights)
NAICS code1 code
  • Hydroelectric Power Generation221111
SIC code1 code
  • Electric Services4911
Product category
Hydroelectric Power Generation
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Sales
TypeSubscription Recurring
Description

The company generates hydroelectric power through the Upper Tamakoshi Hydropower Plant and sells electricity to Nepal Electricity Authority (NEA) under power purchase agreements. Revenue is generated from the sale of generated electricity to the national grid.

utkhpl.org.np
Marketing channels1 record

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components3 values
Infrastructure, Operations, Personnel
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Upper Tamakoshi Hydropower Limited operates a 456 MW run-of-river hydroelectric power plant on the Tamakoshi River in Dolakha District, Nepal. The company generates clean electricity from the river's flow and sells it wholesale to Nepal Electricity Authority (NEA) under long-term power purchase agreements. The generated electricity is then distributed through Nepal's national transmission grid to end consumers, supporting national energy security and reducing dependence on imported energy.

Differentiator
Functional benefit
Problem solved
Product overview1 text field

Upper Tamakoshi Hydropower Limited operates as a single-product hydroelectric generation company managing the 456 MW Upper Tamakoshi Hydropower Plant, Nepal's largest run-of-river hydroelectric project. The company also maintains the Rolwaling Khola Hydroelectric Project as a subsidiary development. The core offering is electricity generation and supply to Nepal's national grid, with supporting corporate functions including IPO offerings, share management, and annual financial reporting.

Product and service2 records
1Upper Tamakoshi Hydropower Plant
CategoryCore product - hydroelectric power generation
Description

A 456 MW run-of-river hydroelectric power plant located in Dolakha District, Nepal, utilizing water from the Tamakoshi River to generate clean electricity for Nepal's national grid. The plant sells all generated power wholesale to Nepal Electricity Authority (NEA) under long-term power purchase agreements.

2Rolwaling Khola Hydroelectric Project
Scale indicator3 records

Each record includes

Type, Value, Description, Source

Recent move5 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight2 records

Each record includes

Type, Description

Peers8 records
TypeBroad incumbent
Description

Norway's state-owned hydropower major — largest generator of renewable energy in Europe with ~30,000+ GWh hydro output. Provides benchmark for operational excellence, O&M cost discipline, and asset value at scale in run-of-river hydro.

TypeBroad incumbent
Description

India's largest hydropower developer (~7,000 MW operational) and central public-sector enterprise with run-of-river and storage projects. Provides benchmark for sovereign-backed hydro asset operations at much larger scale than UTKHPL.

TypeDirect peer
Description

Nepal's oldest private-sector hydropower developer with a portfolio of run-of-river projects selling to NEA. Directly comparable in business model, customer base, and regulatory environment; offers insight into private-hydro returns alongside UTKHPL's state-owned model.

TypeBroad incumbent
Description

Indian central public-sector hydropower major (formerly Satluj Jal Vidyut Nigam) with ~2,000+ MW hydro capacity across India and Nepal JV projects. Comparable as a state-aligned hydro operator with cross-border Nepal exposure and broader utility scale.

5National Hydropower Company Limited (NHCL)
TypeDirect peer
Description

Nepal hydropower operator developing multiple projects including Rasuwagadhi and other run-of-river plants, selling to NEA. Comparable scale and strategic positioning to UTKHPL within Nepal's state-linked hydro sector.

TypeDirect peer
Description

Nepal-based run-of-river hydropower operator with multiple small-hydro plants selling electricity to NEA under similar PPA structures. Same regulatory framework, customer (NEA), and business model as UTKHPL, making it the closest Nepal-listed comparable.

TypeBroad incumbent
Description

Large Indian integrated utility with significant hydropower assets in India and Bhutan. Comparable as a diversified power player with state-aligned hydro exposure; broader portfolio offers different revenue mix but similar asset class.

TypeRegional player
Description

Bhutan's state-owned hydropower operator exporting electricity to India. Comparable as a sovereign-aligned Himalayan run-of-river generator with similar export-offtake economics, though focused on India exports rather than domestic Nepal supply.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat3 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles1 record

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Upper Tamakoshi Hydroelectric Project

Hydroelectric Power Generationutkhpl.org.np

Upper Tamakoshi Hydropower Limited operates Nepal's 456 MW run-of-river hydroelectric plant on the Tamakoshi River in Dolakha District, selling all generated electricity exclusively to Nepal Electricity Authority under a sole Power Purchase Agreement.

What Upper Tamakoshi Hydroelectric Project does

Upper Tamakoshi Hydropower Limited (UTKHPL) is a Nepal-based state-promoted hydroelectric utility that owns and operates the 456 MW Upper Tamakoshi run-of-river hydroelectric power plant on the Tamakoshi River in Dolakha District. Incorporated in March 2007 by Nepal Electricity Authority (NEA), the company was established to develop one of Nepal's largest hydropower assets and has been designated a National Pride Project by the Government of Nepal. The company is listed on the Nepal Stock Exchange (ticker: UPPER), with a diversified ownership structure spanning NEA (41%), Nepal Telecom (6%), Citizens Investment Trust (2%), Rastriya Beema Sansthan (2%), general public (15%), Dolakha district residents (10%), and Employee Provident Fund/staff (24%). Approximately 35 staff support operations, headquartered in Kathmandu with field operations in Dolakha District.

The plant utilizes run-of-river hydropower technology, with major infrastructure including a headrace tunnel, surge shaft, penstock, and powerhouse equipped with six generating units. Key construction and commissioning milestones include main tunnel breakthrough in November 2017, tunnel water filling in June 2021, and trial power generation of 76 MW in July 2021. The company is also developing the Rolwaling Khola Hydroelectric Project as an adjacent expansion asset, currently in the EPC procurement phase, indicating forward pipeline activity beyond the flagship plant.

UTKHPL's business model is structurally simple: electricity generated at the Upper Tamakoshi plant is sold exclusively to NEA under a long-term Power Purchase Agreement, making NEA the sole off-taker and the company's entire revenue base. The company publishes quarterly and annual financial disclosures, with the 16th and 17th annual reports (FY 2079/80 and FY 2080/81) and the 3rd quarterly report for FY 2082/83 referenced as recent outputs. Revenue ramp is tied to completion of commissioning at the 456 MW design capacity, with all cash flow ultimately dependent on NEA's payment performance and PPA tariff terms.

Upper Tamakoshi Hydroelectric Project firmographics

Firmographics
Name
Upper Tamakoshi Hydroelectric Project
Legal name
Upper Tamakoshi Hydropower Limited
Website
https://utkhpl.org.np
Company type
Private
Founded year
2007
Operating status
Operating
Headcount range
11–50 employees
Short description
Upper Tamakoshi Hydropower Limited operates Nepal's 456 MW run-of-river hydroelectric plant on the Tamakoshi River in Dolakha District, selling all generated electricity exclusively to Nepal Electricity Authority under a sole Power Purchase Agreement.
Ownership category
akta.pro rank

Upper Tamakoshi Hydroelectric Project industry classification

Industry
Product category
Hydroelectric Power Generation
NAICS
Hydroelectric Power Generation (221111)
SIC
Electric Services (4911)
akta.pro industry
PRIMARYEUAMADAE
Hydropower Operations, Maintenance & Asset Management (O&M, Spares, Performance)
SECONDARYEUAMADAA
Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights)

Keywords

  • Hydroelectric power generation
  • Run-of-river hydropower
  • National grid supply
  • Renewable energy infrastructure
  • Power purchase agreements

Where Upper Tamakoshi Hydroelectric Project is headquartered

Location

Headquarters

HQ city
Kathmandu
HQ country
Nepal
HQ region
Asia

Offices2 records

Markets served

Upper Tamakoshi Hydroelectric Project business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel

Revenue model

  1. Electricity Sales: The company generates hydroelectric power through the Upper Tamakoshi Hydropower Plant and sells electricity to Nepal Electricity Authority (NEA) under power purchase agreements. Revenue is generated from the sale of generated electricity to the national grid.

Go-to-market motion1 record

Distribution channels1 record

Marketing channels1 record

Upper Tamakoshi Hydroelectric Project product offering

Product offering

Core offering

Upper Tamakoshi Hydropower Limited operates a 456 MW run-of-river hydroelectric power plant on the Tamakoshi River in Dolakha District, Nepal. The company generates clean electricity from the river's flow and sells it wholesale to Nepal Electricity Authority (NEA) under long-term power purchase agreements. The generated electricity is then distributed through Nepal's national transmission grid to end consumers, supporting national energy security and reducing dependence on imported energy.

Product overview

Upper Tamakoshi Hydropower Limited operates as a single-product hydroelectric generation company managing the 456 MW Upper Tamakoshi Hydropower Plant, Nepal's largest run-of-river hydroelectric project. The company also maintains the Rolwaling Khola Hydroelectric Project as a subsidiary development. The core offering is electricity generation and supply to Nepal's national grid, with supporting corporate functions including IPO offerings, share management, and annual financial reporting.

Differentiator

Problem solved

Functional benefit

Products and services

  • Upper Tamakoshi Hydropower Plant A 456 MW run-of-river hydroelectric power plant located in Dolakha District, Nepal, utilizing water from the Tamakoshi River to generate clean electricity for Nepal's national grid. The plant sells all generated power wholesale to Nepal Electricity Authority (NEA) under long-term power purchase agreements.
  • Rolwaling Khola Hydroelectric Project

Companies that use Upper Tamakoshi Hydroelectric Project

Customer profile

Named customers1 record

Segments1 record

Ideal customer profiles1 record

Upper Tamakoshi Hydroelectric Project technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Upper Tamakoshi Hydroelectric Project partnerships and signals

Strategic signal

Scale indicators3 records

Recent moves5 records

Expansion highlights2 records

Upper Tamakoshi Hydroelectric Project competitors and assessment

Company assessment

Broad incumbents

  • Statkraft AS: Norway's state-owned hydropower major — largest generator of renewable energy in Europe with ~30,000+ GWh hydro output. Provides benchmark for operational excellence, O&M cost discipline, and asset value at scale in run-of-river hydro.
  • NHPC Limited: India's largest hydropower developer (~7,000 MW operational) and central public-sector enterprise with run-of-river and storage projects. Provides benchmark for sovereign-backed hydro asset operations at much larger scale than UTKHPL.
  • SJVN Limited: Indian central public-sector hydropower major (formerly Satluj Jal Vidyut Nigam) with ~2,000+ MW hydro capacity across India and Nepal JV projects. Comparable as a state-aligned hydro operator with cross-border Nepal exposure and broader utility scale.
  • Tata Power (hydroelectric division): Large Indian integrated utility with significant hydropower assets in India and Bhutan. Comparable as a diversified power player with state-aligned hydro exposure; broader portfolio offers different revenue mix but similar asset class.

Direct peers

  • Butwal Power Company Limited (BPCL): Nepal's oldest private-sector hydropower developer with a portfolio of run-of-river projects selling to NEA. Directly comparable in business model, customer base, and regulatory environment; offers insight into private-hydro returns alongside UTKHPL's state-owned model.
  • National Hydropower Company Limited (NHCL): Nepal hydropower operator developing multiple projects including Rasuwagadhi and other run-of-river plants, selling to NEA. Comparable scale and strategic positioning to UTKHPL within Nepal's state-linked hydro sector.
  • Chilime Hydropower Company Limited: Nepal-based run-of-river hydropower operator with multiple small-hydro plants selling electricity to NEA under similar PPA structures. Same regulatory framework, customer (NEA), and business model as UTKHPL, making it the closest Nepal-listed comparable.

Regional players

  • Druk Green Power Corporation Limited: Bhutan's state-owned hydropower operator exporting electricity to India. Comparable as a sovereign-aligned Himalayan run-of-river generator with similar export-offtake economics, though focused on India exports rather than domestic Nepal supply.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat3 records

Key risks6 records

Key highlights7 records

Customer concentration

Upper Tamakoshi Hydroelectric Project social profiles

Digital presence

Upper Tamakoshi Hydroelectric Project financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Upper Tamakoshi Hydroelectric Project leadership team

Management profile

Number of profiles

Profiles1 record

Upper Tamakoshi Hydroelectric Project funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Upper Tamakoshi Hydroelectric Project M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Upper Tamakoshi Hydroelectric Project

What does Upper Tamakoshi Hydroelectric Project do?

Upper Tamakoshi Hydropower Limited operates a 456 MW run-of-river hydroelectric power plant on the Tamakoshi River in Dolakha District, Nepal. The company generates clean electricity from the river's flow and sells it wholesale to Nepal Electricity Authority (NEA) under long-term power purchase agreements. The generated electricity is then distributed through Nepal's national transmission grid to end consumers, supporting national energy security and reducing dependence on imported energy.

Is Upper Tamakoshi Hydroelectric Project a public or private company?

Upper Tamakoshi Hydroelectric Project is a private company. It is classified as state government owned and is currently operating.

When was Upper Tamakoshi Hydroelectric Project founded?

Upper Tamakoshi Hydroelectric Project was founded in 2007. It employs 11 to 50 people.

Where is Upper Tamakoshi Hydroelectric Project based?

Upper Tamakoshi Hydroelectric Project is headquartered in Kathmandu, Nepal, in the Asia region.

How does Upper Tamakoshi Hydroelectric Project make money?

One revenue line is on record: electricity Sales.

Who are Upper Tamakoshi Hydroelectric Project's main competitors?

Broad incumbents on record are Statkraft AS, NHPC Limited, SJVN Limited and Tata Power (hydroelectric division). Direct peers are Butwal Power Company Limited (BPCL), National Hydropower Company Limited (NHCL) and Chilime Hydropower Company Limited. Druk Green Power Corporation Limited is listed as a regional player.

Does Upper Tamakoshi Hydroelectric Project have an API?

No public API is recorded for Upper Tamakoshi Hydroelectric Project.

What industry is Upper Tamakoshi Hydroelectric Project in?

Upper Tamakoshi Hydroelectric Project's product category is Hydroelectric Power Generation. Its primary akta.pro industry code is EUAMADAE, Hydropower Operations, Maintenance & Asset Management (O&M, Spares, Performance), with a secondary code of EUAMADAA, Hydropower Project Development & Permitting (Greenfield, Licensing, Water Rights). Its NAICS code is 221111 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales