Developer docs
API playgroundTry for free, no card

Search company profiles

EGEHID

Full company profile

uuid006hia8

Namestring
EGEHID
Legal namestring
Empresa de Generación Hidroeléctrica Dominicana (EGEHID)
Websiteurl
egehid.gob.do
Company typeenum
Private
Founded yearint
2001
Descriptiontext

EGEHID (Empresa de Generación Hidroeléctrica Dominicana) is the Dominican Republic's state-owned hydroelectric generation company, established in 2001 by Law 125-01 and domiciled in Santo Domingo. It operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the Dominican Republic's electricity through the national interconnected grid (SENI) via the transmission operator ETED. The company is governed by a Board of Administration chaired by Dra. Rosa Ysabel Ruiz and led by Administrator General Ing. Rafael Salazar, operating under the supervision of the Ministry of Energy and Mines.

EGEHID's product portfolio extends well beyond electricity generation. It encompasses multi-purpose dams providing irrigation for 5,000+ hectares of cropland (Guayubín/Boca de los Ríos), potable water supply to major municipal aqueducts (Valdesia-Santo Domingo, Cibao Central, San Francisco de Macorís, Noroeste), flood control for downstream communities, and complementary solar (Brazo Derecho, Sabaneta, Tierra Nueva, Domingo Rodríguez, Sabana Yegua) and wind (Brazo Derecho Eólico, Parque Eólico Tierra Nueva) installations. It is currently executing an ambitious build-out including the US$795M Las Placetas project (204 MW — the largest in the Caribbean), the RD$6,000M Guayubín dam, and the country's first pumped-storage facility at Sabaneta I (250 MW).

The company's business model is that of a regulated state monopoly: electricity is generated and sold wholesale to the SENI at tariffs determined by the national electricity regulatory framework rather than through market-based pricing. Revenue is therefore tied to dispatch volumes, regulatory cost recovery, and Dominican fiscal capacity. Strategic direction is set by the Master Plan 2028, developed with Mott MacDonald, which targets the addition of 1,000 MW of energy storage capacity by 2034. The company is concurrently pursuing multilateral financing (Inter-American Development Bank), international engineering expertise (Mott MacDonald), and inter-institutional coordination (INDRHI, IPL, OPRET/EMT, Fundación Metrópoli) to deliver this expansion.

Short descriptiontext

EGEHID is the Dominican Republic's state-owned hydroelectric generation company, operating 27 plants with 613.81 MW of installed capacity and supplying 10-11% of national electricity through the SENI grid while delivering irrigation, potable water, and flood-control services.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1–10
akta.pro rankint
HeadquartersSanto Domingo, Dominican Republic
HQ citystring
Santo Domingo
HQ countrystring
Dominican Republic
HQ regionstring
Latin America
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
hydroelectric power generation, renewable energy utility, pumped storage hydroelectric, multi-purpose dam projects, national grid electricity supply
Industry4 codes
PRIMARYEUACAEAB
Reservoir/Impoundment Hydroelectric Generation
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)
SECONDARYEUACAEAG
Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension)
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)
SECONDARYEUACAEAF
Hydropower EPC & Construction (Civil Works, Electromechanical)
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)
SECONDARYEUAEAMAA
Utility-Scale Power Generation Asset Management
NAICS code2 codes
  • Hydroelectric Power Generation221111
  • Water Supply and Irrigation Systems22131
SIC code1 code
  • Water Supply4941
Product category
Hydroelectric Power Generation
Social media profiles3 records
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Generation and Sales
TypeSubscription Recurring
Description

EGEHID generates hydroelectric electricity and sells power to the Dominican Republic's national electrical grid. As a state-owned enterprise, revenue comes from electricity generation operations serving the national energy matrix.

egehid.gob.do
Marketing channels3 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D, Others
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

EGEHID is the Dominican Republic's state-owned hydroelectric generation enterprise that operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the country's electricity to the national interconnected grid (SENI). Beyond power generation, EGEHID manages multi-purpose dam infrastructure delivering potable water to municipal aqueducts, irrigation water for agriculture, flood control, and complementary solar and wind energy projects under its Master Plan 2028 expansion strategy.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • 613.81 MW of installed hydroelectric capacity
+3 more records
Product overview1 text field

EGEHID (Empresa de Generación Hidroeléctrica Dominicana) is the Dominican Republic's state hydroelectric company operating 27 hydroelectric plants with 613.81 MW installed capacity. The company operates a platform-plus-projects architecture consisting of core hydroelectric generation facilities, pumped storage systems (Hidrobombeo), and multi-purpose dam projects (Las Placetas, Boca de los Ríos/Guayubín, La Gina, Guaigüí). The portfolio includes complementary renewable energy projects (solar and wind), water supply services to multiple aqueducts, irrigation canal management, and a corporate social responsibility program for community development near hydroelectric complexes. The company is implementing Master Plan 2028 with strategic partner Mott MacDonald to expand capacity by 1,000 MW of energy storage by 2034.

Product and service10 records
1Hydroelectric Power Generation
CategoryPower Generation
Description

Wholesale hydroelectric electricity generation across 27 hydroelectric plants with 613.81 MW installed capacity, supplying 10-11% of the Dominican Republic's electricity to the national interconnected electrical system (SENI).

2Pumped Storage (Hidrobombeo) Systems
CategoryEnergy Storage
Description

Pumped-storage hydroelectric projects that pump water to upper reservoirs during off-peak periods and release it during peak demand to generate electricity, providing grid stability and large-scale energy storage.

3Las Placetas Hydroelectric Project
CategoryPower Generation
Description

Largest hydroelectric project in the Caribbean with 204 MW installed capacity, estimated annual production of 412 GWh of clean energy, located in the Sierra region of the Dominican Republic.

4Presa Boca de los Ríos (Guayubín) Project
CategoryMulti-purpose Water Infrastructure
Description

Dam construction on the Guayubín River in Santiago Rodríguez province providing water regulation, irrigation for 5,000 hectares of agricultural land, potable water supply, and 1.8 MW of hydroelectric generation.

5Presa La Gina Hydroelectric Project
CategoryMulti-purpose Water Infrastructure
Description

Dam construction in Peravia province on the Baní River, featuring 60m height, 11 million m³ storage capacity, and 400 kW power generation for approximately 4.0 GWh/year.

6Solar Energy Projects
CategoryRenewable Energy
Description

Photovoltaic (solar) energy generation installations including Brazo Derecho Solar, Sabaneta Solar, Tierra Nueva Solar, Domingo Rodríguez Solar, and Sabana Yegua Solar.

7Wind Energy Projects
CategoryRenewable Energy
Description

Wind energy generation installations including Brazo Derecho Eólico and Parque Eólico Tierra Nueva.

8Water Supply Services
CategoryWater Utility Services
Description

Potable water supply from EGEHID's dam reservoirs to major municipal aqueducts including Valdesia-Santo Domingo, Cibao Central, San Francisco de Macorís, and Noroeste.

9Irrigation Canal Systems
CategoryWater Utility Services
Description

Management and operation of irrigation channels including Rosa Julia de la Cruz, Nizao Najayo, Los Anones, Los Toros, Domingo Rodriguez, Magueyal, and Brazo Derecho, providing water for crop irrigation.

10Sediment Management and Rehabilitation Services
CategoryEnvironmental Infrastructure Services
Description

Environmental rehabilitation and sediment extraction services for reservoirs including Hatillo, Valdesia, Las Barias, and the Isamaná aqueduct.

Scale indicator8 records

Each record includes

Type, Value, Description, Source

Partnership7 partners
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-03-20
Description

Formal commencement of work on the 2028 Master Plan following the strategic alliance formation. Mott MacDonald providing engineering and planning expertise for Dominican Republic's hydroelectric development.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-02-25
Description

Strategic alliance between EGEHID and Mott MacDonald to develop the Master Plan 2028, a comprehensive energy planning roadmap for the Dominican Republic. The partnership involves international technical expertise for hydroelectric development strategy and infrastructure planning.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2023-02-14
Description

Inter-institutional agreement with INDRHI for seismic network modernization and data sharing. Both institutions operate seismic monitoring networks around dams and hydroelectric facilities, with shared data strengthening national seismic monitoring capabilities.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2023-02-14
Description

Academic partnership with IPL's Seismological Observatory for seismic network modernization, staff training, and research collaboration on seismic data analysis and equipment maintenance.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

EGEHID socializes hydroelectric projects from the Master Plan 2028 with BID experts, indicating consultation and potential financing discussions for renewable energy initiatives.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

Coordination with EMT for exploration of Metro expansion project to San Cristóbal, with EGEHID participating in inter-institutional agreement discussions for transportation infrastructure development.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

Urban planning advisory partnership for San Cristóbal development project, providing technical and urbanistic expertise for integrated territorial planning in coordination with transportation expansion initiatives.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers8 records
TypeDirect peer
Description

Ontario's provincially owned generator with significant hydroelectric and nuclear capacity. Comparable business model to EGEHID: state-owned fleet operator with regulated revenues and multi-decade capital expansion programs.

TypeDirect peer
Description

British Columbia's provincially owned hydroelectric utility. Direct peer to EGEHID given its state-ownership model, multi-purpose reservoir infrastructure (power + water management), and regulated single-jurisdiction monopoly structure.

TypeDirect peer
Description

Norway's state-owned hydropower operator and Europe's largest renewable generator. Directly comparable as a state-owned hydro-led utility expanding into wind, solar, and grid services in regulated markets.

TypeDirect peer
Description

Mexico's state-owned electric utility with substantial hydroelectric capacity alongside thermal and renewables. Closely mirrors EGEHID's state-owned generator model in a neighboring Latin American/Caribbean regulatory context.

TypeDirect peer
Description

Canadian provincial state-owned hydroelectric utility. Closely comparable to EGEHID as a government-owned power generator monetizing large reservoir-based hydro assets under a regulated framework, with growing wind and storage investments.

TypeDirect peer
Description

US federally owned corporation operating a large integrated hydro/thermal/renewables portfolio. Comparable to EGEHID in mission, federal ownership structure, multi-purpose dam management (power, navigation, flood control), and large capital program.

TypeDirect peer
Description

World's largest hydropower developer and operator. Relevant to EGEHID as a state-owned hydro-led group executing multi-gigawatt buildouts, with parallel wind and solar expansion under national policy mandates.

TypeBroad incumbent
Description

France's largely state-owned integrated utility with a large hydro portfolio plus nuclear and renewables. Broader incumbent comparable to EGEHID's mission, state ownership, and growing renewable-plus-storage ambitions.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers3 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment4 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile2 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles6 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

EGEHID

Hydroelectric Power Generationegehid.gob.do

EGEHID is the Dominican Republic's state-owned hydroelectric generation company, operating 27 plants with 613.81 MW of installed capacity and supplying 10-11% of national electricity through the SENI grid while delivering irrigation, potable water, and flood-control services.

What EGEHID does

EGEHID (Empresa de Generación Hidroeléctrica Dominicana) is the Dominican Republic's state-owned hydroelectric generation company, established in 2001 by Law 125-01 and domiciled in Santo Domingo. It operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the Dominican Republic's electricity through the national interconnected grid (SENI) via the transmission operator ETED. The company is governed by a Board of Administration chaired by Dra. Rosa Ysabel Ruiz and led by Administrator General Ing. Rafael Salazar, operating under the supervision of the Ministry of Energy and Mines.

EGEHID's product portfolio extends well beyond electricity generation. It encompasses multi-purpose dams providing irrigation for 5,000+ hectares of cropland (Guayubín/Boca de los Ríos), potable water supply to major municipal aqueducts (Valdesia-Santo Domingo, Cibao Central, San Francisco de Macorís, Noroeste), flood control for downstream communities, and complementary solar (Brazo Derecho, Sabaneta, Tierra Nueva, Domingo Rodríguez, Sabana Yegua) and wind (Brazo Derecho Eólico, Parque Eólico Tierra Nueva) installations. It is currently executing an ambitious build-out including the US$795M Las Placetas project (204 MW — the largest in the Caribbean), the RD$6,000M Guayubín dam, and the country's first pumped-storage facility at Sabaneta I (250 MW).

The company's business model is that of a regulated state monopoly: electricity is generated and sold wholesale to the SENI at tariffs determined by the national electricity regulatory framework rather than through market-based pricing. Revenue is therefore tied to dispatch volumes, regulatory cost recovery, and Dominican fiscal capacity. Strategic direction is set by the Master Plan 2028, developed with Mott MacDonald, which targets the addition of 1,000 MW of energy storage capacity by 2034. The company is concurrently pursuing multilateral financing (Inter-American Development Bank), international engineering expertise (Mott MacDonald), and inter-institutional coordination (INDRHI, IPL, OPRET/EMT, Fundación Metrópoli) to deliver this expansion.

EGEHID firmographics

Firmographics
Name
EGEHID
Legal name
Empresa de Generación Hidroeléctrica Dominicana (EGEHID)
Website
https://egehid.gob.do
Company type
Private
Founded year
2001
Operating status
Operating
Headcount range
1–10 employees
Short description
EGEHID is the Dominican Republic's state-owned hydroelectric generation company, operating 27 plants with 613.81 MW of installed capacity and supplying 10-11% of national electricity through the SENI grid while delivering irrigation, potable water, and flood-control services.
Ownership category
akta.pro rank

EGEHID industry classification

Industry
Product category
Hydroelectric Power Generation
NAICS
Hydroelectric Power Generation (221111), Water Supply and Irrigation Systems (22131)
SIC
Water Supply (4941)
akta.pro industry
PRIMARYEUACAEAB
Reservoir/Impoundment Hydroelectric Generation
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)
SECONDARYEUACAEAG
Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension)
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)
SECONDARYEUACAEAF
Hydropower EPC & Construction (Civil Works, Electromechanical)
Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)
SECONDARYEUAEAMAA
Utility-Scale Power Generation Asset Management

Keywords

  • Hydroelectric power generation
  • Renewable energy utility
  • Pumped storage hydroelectric
  • Multi-purpose dam projects
  • National grid electricity supply

Where EGEHID is headquartered

Location

Headquarters

HQ city
Santo Domingo
HQ country
Dominican Republic
HQ region
Latin America

Offices1 record

Markets served

EGEHID business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D, Others

Revenue model

  1. Electricity Generation and Sales: EGEHID generates hydroelectric electricity and sells power to the Dominican Republic's national electrical grid. As a state-owned enterprise, revenue comes from electricity generation operations serving the national energy matrix.

Go-to-market motion1 record

Distribution channels1 record

Marketing channels3 records

EGEHID product offering

Product offering

Core offering

EGEHID is the Dominican Republic's state-owned hydroelectric generation enterprise that operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the country's electricity to the national interconnected grid (SENI). Beyond power generation, EGEHID manages multi-purpose dam infrastructure delivering potable water to municipal aqueducts, irrigation water for agriculture, flood control, and complementary solar and wind energy projects under its Master Plan 2028 expansion strategy.

Product overview

EGEHID (Empresa de Generación Hidroeléctrica Dominicana) is the Dominican Republic's state hydroelectric company operating 27 hydroelectric plants with 613.81 MW installed capacity. The company operates a platform-plus-projects architecture consisting of core hydroelectric generation facilities, pumped storage systems (Hidrobombeo), and multi-purpose dam projects (Las Placetas, Boca de los Ríos/Guayubín, La Gina, Guaigüí). The portfolio includes complementary renewable energy projects (solar and wind), water supply services to multiple aqueducts, irrigation canal management, and a corporate social responsibility program for community development near hydroelectric complexes. The company is implementing Master Plan 2028 with strategic partner Mott MacDonald to expand capacity by 1,000 MW of energy storage by 2034.

Differentiator

Problem solved

Functional benefit

Products and services

  • Hydroelectric Power Generation Wholesale hydroelectric electricity generation across 27 hydroelectric plants with 613.81 MW installed capacity, supplying 10-11% of the Dominican Republic's electricity to the national interconnected electrical system (SENI).
  • Pumped Storage (Hidrobombeo) Systems Pumped-storage hydroelectric projects that pump water to upper reservoirs during off-peak periods and release it during peak demand to generate electricity, providing grid stability and large-scale energy storage.
  • Las Placetas Hydroelectric Project Largest hydroelectric project in the Caribbean with 204 MW installed capacity, estimated annual production of 412 GWh of clean energy, located in the Sierra region of the Dominican Republic.
  • Presa Boca de los Ríos (Guayubín) Project Dam construction on the Guayubín River in Santiago Rodríguez province providing water regulation, irrigation for 5,000 hectares of agricultural land, potable water supply, and 1.8 MW of hydroelectric generation.
  • Presa La Gina Hydroelectric Project Dam construction in Peravia province on the Baní River, featuring 60m height, 11 million m³ storage capacity, and 400 kW power generation for approximately 4.0 GWh/year.
  • Solar Energy Projects Photovoltaic (solar) energy generation installations including Brazo Derecho Solar, Sabaneta Solar, Tierra Nueva Solar, Domingo Rodríguez Solar, and Sabana Yegua Solar.
  • Wind Energy Projects Wind energy generation installations including Brazo Derecho Eólico and Parque Eólico Tierra Nueva.
  • Water Supply Services Potable water supply from EGEHID's dam reservoirs to major municipal aqueducts including Valdesia-Santo Domingo, Cibao Central, San Francisco de Macorís, and Noroeste.
  • Irrigation Canal Systems Management and operation of irrigation channels including Rosa Julia de la Cruz, Nizao Najayo, Los Anones, Los Toros, Domingo Rodriguez, Magueyal, and Brazo Derecho, providing water for crop irrigation.
  • Sediment Management and Rehabilitation Services Environmental rehabilitation and sediment extraction services for reservoirs including Hatillo, Valdesia, Las Barias, and the Isamaná aqueduct.

Quantifiable outcome

  • 613.81 MW of installed hydroelectric capacity
  • +3 more outcomes

Companies that use EGEHID

Customer profile

Named customers3 records

Segments4 records

Ideal customer profiles2 records

EGEHID technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

EGEHID partnerships and signals

Strategic signal

Partnerships

Seven partnerships are on record, tiered core and minor.

  • Mott MacDonaldcoreStrategic or Co-development Partner · 20 March 2026Formal commencement of work on the 2028 Master Plan following the strategic alliance formation. Mott MacDonald providing engineering and planning expertise for Dominican Republic's hydroelectric development.
  • Mott MacDonaldcoreStrategic or Co-development Partner · 25 February 2026Strategic alliance between EGEHID and Mott MacDonald to develop the Master Plan 2028, a comprehensive energy planning roadmap for the Dominican Republic. The partnership involves international technical expertise for hydroelectric development strategy and infrastructure planning.
  • Instituto Nacional de Recursos Hidráulicos (INDRHI)coreStrategic or Co-development Partner · 14 February 2023Inter-institutional agreement with INDRHI for seismic network modernization and data sharing. Both institutions operate seismic monitoring networks around dams and hydroelectric facilities, with shared data strengthening national seismic monitoring capabilities.
  • Instituto Politécnico Loyola (IPL)minorStrategic or Co-development Partner · 14 February 2023Academic partnership with IPL's Seismological Observatory for seismic network modernization, staff training, and research collaboration on seismic data analysis and equipment maintenance.
  • Inter-American Development Bank (BID)minorStrategic or Co-development PartnerEGEHID socializes hydroelectric projects from the Master Plan 2028 with BID experts, indicating consultation and potential financing discussions for renewable energy initiatives.
  • Empresa Metropolitana de Transporte (EMT/OPRET)minorStrategic or Co-development PartnerCoordination with EMT for exploration of Metro expansion project to San Cristóbal, with EGEHID participating in inter-institutional agreement discussions for transportation infrastructure development.
  • Fundación MetrópoliminorStrategic or Co-development PartnerUrban planning advisory partnership for San Cristóbal development project, providing technical and urbanistic expertise for integrated territorial planning in coordination with transportation expansion initiatives.

Scale indicators8 records

Recent moves6 records

Expansion highlights6 records

EGEHID competitors and assessment

Company assessment

Direct peers

  • Ontario Power Generation: Ontario's provincially owned generator with significant hydroelectric and nuclear capacity. Comparable business model to EGEHID: state-owned fleet operator with regulated revenues and multi-decade capital expansion programs.
  • BC Hydro: British Columbia's provincially owned hydroelectric utility. Direct peer to EGEHID given its state-ownership model, multi-purpose reservoir infrastructure (power + water management), and regulated single-jurisdiction monopoly structure.
  • Statkraft: Norway's state-owned hydropower operator and Europe's largest renewable generator. Directly comparable as a state-owned hydro-led utility expanding into wind, solar, and grid services in regulated markets.
  • Comisión Federal de Electricidad (CFE): Mexico's state-owned electric utility with substantial hydroelectric capacity alongside thermal and renewables. Closely mirrors EGEHID's state-owned generator model in a neighboring Latin American/Caribbean regulatory context.
  • Hydro-Québec: Canadian provincial state-owned hydroelectric utility. Closely comparable to EGEHID as a government-owned power generator monetizing large reservoir-based hydro assets under a regulated framework, with growing wind and storage investments.
  • Tennessee Valley Authority (TVA): US federally owned corporation operating a large integrated hydro/thermal/renewables portfolio. Comparable to EGEHID in mission, federal ownership structure, multi-purpose dam management (power, navigation, flood control), and large capital program.
  • China Three Gorges Corporation: World's largest hydropower developer and operator. Relevant to EGEHID as a state-owned hydro-led group executing multi-gigawatt buildouts, with parallel wind and solar expansion under national policy mandates.

Broad incumbents

  • EDF (Électricité de France): France's largely state-owned integrated utility with a large hydro portfolio plus nuclear and renewables. Broader incumbent comparable to EGEHID's mission, state ownership, and growing renewable-plus-storage ambitions.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks7 records

Key highlights7 records

Customer concentration

EGEHID social profiles

Digital presence

EGEHID financial estimates

Financial estimate

Revenue estimate

Valuation estimate

EGEHID leadership team

Management profile

Number of profiles

Profiles6 records

EGEHID funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

EGEHID M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about EGEHID

What does EGEHID do?

EGEHID is the Dominican Republic's state-owned hydroelectric generation enterprise that operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the country's electricity to the national interconnected grid (SENI). Beyond power generation, EGEHID manages multi-purpose dam infrastructure delivering potable water to municipal aqueducts, irrigation water for agriculture, flood control, and complementary solar and wind energy projects under its Master Plan 2028 expansion strategy.

Is EGEHID a public or private company?

EGEHID is a private company. It is classified as state government owned and is currently operating.

When was EGEHID founded?

EGEHID was founded in 2001. It employs 1 to 10 people.

Where is EGEHID based?

EGEHID is headquartered in Santo Domingo, Dominican Republic, in the Latin America region.

How does EGEHID make money?

One revenue line is on record: electricity Generation and Sales.

Who are EGEHID's main competitors?

Direct peers on record are Ontario Power Generation, BC Hydro, Statkraft, Comisión Federal de Electricidad (CFE), Hydro-Québec, Tennessee Valley Authority (TVA) and China Three Gorges Corporation. EDF (Électricité de France) is listed as a broad incumbent.

Does EGEHID have an API?

No public API is recorded for EGEHID.

What industry is EGEHID in?

EGEHID's product category is Hydroelectric Power Generation. Its primary akta.pro industry code is EUACAEAB, Reservoir/Impoundment Hydroelectric Generation, with a secondary code of EUACAEAG, Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension). Its NAICS code is 221111 and its SIC code is 4941.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals