EGEHID
EGEHID is the Dominican Republic's state-owned hydroelectric generation company, operating 27 plants with 613.81 MW of installed capacity and supplying 10-11% of national electricity through the SENI grid while delivering irrigation, potable water, and flood-control services.
- Company typePrivate
- Founded2001
- HeadquartersSanto Domingo, Dominican Republic
- Headcount1–10
- GTM typeB2B
- OfferingServices
What EGEHID does
EGEHID (Empresa de Generación Hidroeléctrica Dominicana) is the Dominican Republic's state-owned hydroelectric generation company, established in 2001 by Law 125-01 and domiciled in Santo Domingo. It operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the Dominican Republic's electricity through the national interconnected grid (SENI) via the transmission operator ETED. The company is governed by a Board of Administration chaired by Dra. Rosa Ysabel Ruiz and led by Administrator General Ing. Rafael Salazar, operating under the supervision of the Ministry of Energy and Mines.
EGEHID's product portfolio extends well beyond electricity generation. It encompasses multi-purpose dams providing irrigation for 5,000+ hectares of cropland (Guayubín/Boca de los Ríos), potable water supply to major municipal aqueducts (Valdesia-Santo Domingo, Cibao Central, San Francisco de Macorís, Noroeste), flood control for downstream communities, and complementary solar (Brazo Derecho, Sabaneta, Tierra Nueva, Domingo Rodríguez, Sabana Yegua) and wind (Brazo Derecho Eólico, Parque Eólico Tierra Nueva) installations. It is currently executing an ambitious build-out including the US$795M Las Placetas project (204 MW — the largest in the Caribbean), the RD$6,000M Guayubín dam, and the country's first pumped-storage facility at Sabaneta I (250 MW).
The company's business model is that of a regulated state monopoly: electricity is generated and sold wholesale to the SENI at tariffs determined by the national electricity regulatory framework rather than through market-based pricing. Revenue is therefore tied to dispatch volumes, regulatory cost recovery, and Dominican fiscal capacity. Strategic direction is set by the Master Plan 2028, developed with Mott MacDonald, which targets the addition of 1,000 MW of energy storage capacity by 2034. The company is concurrently pursuing multilateral financing (Inter-American Development Bank), international engineering expertise (Mott MacDonald), and inter-institutional coordination (INDRHI, IPL, OPRET/EMT, Fundación Metrópoli) to deliver this expansion.
EGEHID firmographics
Firmographics- Name
- EGEHID
- Legal name
- Empresa de Generación Hidroeléctrica Dominicana (EGEHID)
- Website
- https://egehid.gob.do
- Company type
- Private
- Founded year
- 2001
- Operating status
- Operating
- Headcount range
- 1–10 employees
- Short description
- EGEHID is the Dominican Republic's state-owned hydroelectric generation company, operating 27 plants with 613.81 MW of installed capacity and supplying 10-11% of national electricity through the SENI grid while delivering irrigation, potable water, and flood-control services.
- Ownership category
- akta.pro rank
EGEHID industry classification
Industry- Product category
- Hydroelectric Power Generation
- NAICS
- Hydroelectric Power Generation (221111), Water Supply and Irrigation Systems (22131)
- SIC
- Water Supply (4941)
- akta.pro industry
- Reservoir/Impoundment Hydroelectric GenerationEnergy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension)Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)Hydropower EPC & Construction (Civil Works, Electromechanical)Energy, Utilities & Environment/Electric Power Generation/Hydroelectric Power Generation (Large & Small Hydro)Utility-Scale Power Generation Asset ManagementEnergy, Utilities & Environment/Energy Infrastructure & Services (EPC, O&M, Field Services)/Energy Infrastructure Asset Management
Keywords
Where EGEHID is headquartered
LocationHeadquarters
- HQ city
- Santo Domingo
- HQ country
- Dominican Republic
- HQ region
- Latin America
Offices1 record
Markets served
EGEHID business model
Business model- GTM type
- B2B
- Offering type
- Services
- Cost components
- Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D, Others
Revenue model
- Electricity Generation and Sales: EGEHID generates hydroelectric electricity and sells power to the Dominican Republic's national electrical grid. As a state-owned enterprise, revenue comes from electricity generation operations serving the national energy matrix.
Go-to-market motion1 record
Distribution channels1 record
Marketing channels3 records
EGEHID product offering
Product offeringCore offering
EGEHID is the Dominican Republic's state-owned hydroelectric generation enterprise that operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the country's electricity to the national interconnected grid (SENI). Beyond power generation, EGEHID manages multi-purpose dam infrastructure delivering potable water to municipal aqueducts, irrigation water for agriculture, flood control, and complementary solar and wind energy projects under its Master Plan 2028 expansion strategy.
Product overview
EGEHID (Empresa de Generación Hidroeléctrica Dominicana) is the Dominican Republic's state hydroelectric company operating 27 hydroelectric plants with 613.81 MW installed capacity. The company operates a platform-plus-projects architecture consisting of core hydroelectric generation facilities, pumped storage systems (Hidrobombeo), and multi-purpose dam projects (Las Placetas, Boca de los Ríos/Guayubín, La Gina, Guaigüí). The portfolio includes complementary renewable energy projects (solar and wind), water supply services to multiple aqueducts, irrigation canal management, and a corporate social responsibility program for community development near hydroelectric complexes. The company is implementing Master Plan 2028 with strategic partner Mott MacDonald to expand capacity by 1,000 MW of energy storage by 2034.
Differentiator
Problem solved
Functional benefit
Products and services
- Hydroelectric Power Generation Wholesale hydroelectric electricity generation across 27 hydroelectric plants with 613.81 MW installed capacity, supplying 10-11% of the Dominican Republic's electricity to the national interconnected electrical system (SENI).
- Pumped Storage (Hidrobombeo) Systems Pumped-storage hydroelectric projects that pump water to upper reservoirs during off-peak periods and release it during peak demand to generate electricity, providing grid stability and large-scale energy storage.
- Las Placetas Hydroelectric Project Largest hydroelectric project in the Caribbean with 204 MW installed capacity, estimated annual production of 412 GWh of clean energy, located in the Sierra region of the Dominican Republic.
- Presa Boca de los Ríos (Guayubín) Project Dam construction on the Guayubín River in Santiago Rodríguez province providing water regulation, irrigation for 5,000 hectares of agricultural land, potable water supply, and 1.8 MW of hydroelectric generation.
- Presa La Gina Hydroelectric Project Dam construction in Peravia province on the Baní River, featuring 60m height, 11 million m³ storage capacity, and 400 kW power generation for approximately 4.0 GWh/year.
- Solar Energy Projects Photovoltaic (solar) energy generation installations including Brazo Derecho Solar, Sabaneta Solar, Tierra Nueva Solar, Domingo Rodríguez Solar, and Sabana Yegua Solar.
- Wind Energy Projects Wind energy generation installations including Brazo Derecho Eólico and Parque Eólico Tierra Nueva.
- Water Supply Services Potable water supply from EGEHID's dam reservoirs to major municipal aqueducts including Valdesia-Santo Domingo, Cibao Central, San Francisco de Macorís, and Noroeste.
- Irrigation Canal Systems Management and operation of irrigation channels including Rosa Julia de la Cruz, Nizao Najayo, Los Anones, Los Toros, Domingo Rodriguez, Magueyal, and Brazo Derecho, providing water for crop irrigation.
- Sediment Management and Rehabilitation Services Environmental rehabilitation and sediment extraction services for reservoirs including Hatillo, Valdesia, Las Barias, and the Isamaná aqueduct.
Quantifiable outcome
- 613.81 MW of installed hydroelectric capacity
- +3 more outcomes
Companies that use EGEHID
Customer profileNamed customers3 records
Segments4 records
Ideal customer profiles2 records
EGEHID technology and API
TechnologyTechnology focussed No
API detail
- Has API
- No
- API docs
- API detail
Core technology
AI maturity
App detail
EGEHID partnerships and signals
Strategic signalPartnerships
Seven partnerships are on record, tiered core and minor.
- Mott MacDonaldcoreFormal commencement of work on the 2028 Master Plan following the strategic alliance formation. Mott MacDonald providing engineering and planning expertise for Dominican Republic's hydroelectric development.
- Mott MacDonaldcoreStrategic alliance between EGEHID and Mott MacDonald to develop the Master Plan 2028, a comprehensive energy planning roadmap for the Dominican Republic. The partnership involves international technical expertise for hydroelectric development strategy and infrastructure planning.
- Instituto Nacional de Recursos Hidráulicos (INDRHI)coreInter-institutional agreement with INDRHI for seismic network modernization and data sharing. Both institutions operate seismic monitoring networks around dams and hydroelectric facilities, with shared data strengthening national seismic monitoring capabilities.
- Instituto Politécnico Loyola (IPL)minorAcademic partnership with IPL's Seismological Observatory for seismic network modernization, staff training, and research collaboration on seismic data analysis and equipment maintenance.
- Inter-American Development Bank (BID)minorEGEHID socializes hydroelectric projects from the Master Plan 2028 with BID experts, indicating consultation and potential financing discussions for renewable energy initiatives.
- Empresa Metropolitana de Transporte (EMT/OPRET)minorCoordination with EMT for exploration of Metro expansion project to San Cristóbal, with EGEHID participating in inter-institutional agreement discussions for transportation infrastructure development.
- Fundación MetrópoliminorUrban planning advisory partnership for San Cristóbal development project, providing technical and urbanistic expertise for integrated territorial planning in coordination with transportation expansion initiatives.
Scale indicators8 records
Recent moves6 records
Expansion highlights6 records
EGEHID competitors and assessment
Company assessmentDirect peers
- Ontario Power Generation: Ontario's provincially owned generator with significant hydroelectric and nuclear capacity. Comparable business model to EGEHID: state-owned fleet operator with regulated revenues and multi-decade capital expansion programs.
- BC Hydro: British Columbia's provincially owned hydroelectric utility. Direct peer to EGEHID given its state-ownership model, multi-purpose reservoir infrastructure (power + water management), and regulated single-jurisdiction monopoly structure.
- Statkraft: Norway's state-owned hydropower operator and Europe's largest renewable generator. Directly comparable as a state-owned hydro-led utility expanding into wind, solar, and grid services in regulated markets.
- Comisión Federal de Electricidad (CFE): Mexico's state-owned electric utility with substantial hydroelectric capacity alongside thermal and renewables. Closely mirrors EGEHID's state-owned generator model in a neighboring Latin American/Caribbean regulatory context.
- Hydro-Québec: Canadian provincial state-owned hydroelectric utility. Closely comparable to EGEHID as a government-owned power generator monetizing large reservoir-based hydro assets under a regulated framework, with growing wind and storage investments.
- Tennessee Valley Authority (TVA): US federally owned corporation operating a large integrated hydro/thermal/renewables portfolio. Comparable to EGEHID in mission, federal ownership structure, multi-purpose dam management (power, navigation, flood control), and large capital program.
- China Three Gorges Corporation: World's largest hydropower developer and operator. Relevant to EGEHID as a state-owned hydro-led group executing multi-gigawatt buildouts, with parallel wind and solar expansion under national policy mandates.
Broad incumbents
- EDF (Électricité de France): France's largely state-owned integrated utility with a large hydro portfolio plus nuclear and renewables. Broader incumbent comparable to EGEHID's mission, state ownership, and growing renewable-plus-storage ambitions.
Market position
Strengths5 records
Weaknesses5 records
Competitive moat5 records
Key risks7 records
Key highlights7 records
Customer concentration
EGEHID social profiles
Digital presenceEGEHID financial estimates
Financial estimateRevenue estimate
Valuation estimate
EGEHID leadership team
Management profileNumber of profiles
Profiles6 records
EGEHID funding detail
Funding detailFunding overview
Funding rounds
Investors
Funding detail is available on the Subscription and Enterprise plan.Contact sales →
EGEHID M&A and investment
M&A and investmentM&A
Investments
M&A and investment is available on the Subscription and Enterprise plan.Contact sales →
Frequently asked questions about EGEHID
What does EGEHID do?
EGEHID is the Dominican Republic's state-owned hydroelectric generation enterprise that operates 27 hydroelectric plants with 613.81 MW of installed capacity, supplying approximately 10-11% of the country's electricity to the national interconnected grid (SENI). Beyond power generation, EGEHID manages multi-purpose dam infrastructure delivering potable water to municipal aqueducts, irrigation water for agriculture, flood control, and complementary solar and wind energy projects under its Master Plan 2028 expansion strategy.
Is EGEHID a public or private company?
EGEHID is a private company. It is classified as state government owned and is currently operating.
When was EGEHID founded?
EGEHID was founded in 2001. It employs 1 to 10 people.
Where is EGEHID based?
EGEHID is headquartered in Santo Domingo, Dominican Republic, in the Latin America region.
How does EGEHID make money?
One revenue line is on record: electricity Generation and Sales.
Who are EGEHID's main competitors?
Direct peers on record are Ontario Power Generation, BC Hydro, Statkraft, Comisión Federal de Electricidad (CFE), Hydro-Québec, Tennessee Valley Authority (TVA) and China Three Gorges Corporation. EDF (Électricité de France) is listed as a broad incumbent.
Does EGEHID have an API?
No public API is recorded for EGEHID.
What industry is EGEHID in?
EGEHID's product category is Hydroelectric Power Generation. Its primary akta.pro industry code is EUACAEAB, Reservoir/Impoundment Hydroelectric Generation, with a secondary code of EUACAEAG, Hydropower Operations, Maintenance & Refurbishment (R&M/Life Extension). Its NAICS code is 221111 and its SIC code is 4941.