Developer docs
API playgroundTry for free, no card

Search company profiles

Tri-valley - San Joaquin Regional Rail Authority

Full company profile

uuid02lq3dd

Namestring
Tri-valley - San Joaquin Regional Rail Authority
Legal namestring
Tri-Valley - San Joaquin Valley Regional Rail Authority
Company typeenum
Private
Founded yearint
2018
Descriptiontext

The Tri-Valley - San Joaquin Valley Regional Rail Authority is a California joint powers authority (JPA) established on January 17, 2018, that plans and develops the Valley Link passenger rail service. The authority is governed by a 15-member Board of Directors drawn from member agencies including the San Joaquin Regional Rail Commission (SJRRC), Bay Area Rapid Transit (BART), the Altamont Corridor Express (ACE), the Metropolitan Transportation Commission (MTC), the Alameda County Transportation Commission (ACTC), the San Joaquin Council of Governments (SJCOG), and 11 cities across Alameda and San Joaquin counties. Headquartered at 2600 Kitty Hawk Road, Suite 103, in Livermore, California, the authority operates as a non-profit government entity with 11–50 employees and is led by Executive Director/CEO Kevin Sheridan and Board Chair Robert Rickman.

The core product is a 42-mile, 7-station passenger rail system connecting the Dublin/Pleasanton BART Station to North Lathrop Station in San Joaquin County. Phase 1A covers an 11-mile initial operating segment from Dublin/Pleasanton to the Vasco Road ACE Station in Livermore, deploying zero-emission battery-electric multiple unit vehicles with charging infrastructure and supporting substations at both station ends and a new Operations and Maintenance Facility. Phase 1A is planned to provide all-day, bi-directional service at 15-minute peak frequencies. Phase 1B adds an 11-mile extension to the Mountain House Community Station. The project uses a Construction Manager/General Contractor (CM/GC) delivery model with AECOM serving as project management and technical advisor; a General Engineering Consultant RFP (2026-01) is planned for Spring 2026, and a Future Vehicles Procurement RFI is underway. The CEQA Environmental Impact Report was certified in May 2021 and CEQA/NEPA environmental review was certified for Phase 1 in 2024.

The authority is pre-revenue and funded through public-sector grants and appropriations rather than commercial sales. Committed capital of roughly $465 million includes $400 million from ACTC, a $25 million state award, $20 million in federal funding advanced by Rep. Swalwell, $10.1 million from MTC, $10 million from SJCOG, and a $750,000 Regional Rail Authority grant. ACE has been selected to operate the service once built, and BART Dublin/Pleasanton and ACE Vasco Road will serve as the intermodal anchors. End users are commuters — over 105,000 Bay Area workers travel daily over Altamont Pass, and four planned stations serve disadvantaged or low-income communities in Northern San Joaquin County. The project is projected to carry 30,000 riders per day by 2040, reduce greenhouse gas emissions by 32,220–42,650 metric tons, and create 22,000 construction jobs plus 400 permanent jobs per year.

Short descriptiontext

The Tri-Valley - San Joaquin Valley Regional Rail Authority is a California joint powers authority developing Valley Link, a 42-mile, 7-station zero-emission passenger rail service connecting the Dublin/Pleasanton BART Station to North Lathrop for Bay Area and San Joaquin Valley commuters.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersLivermore, United States
HQ citystring
Livermore
HQ countrystring
United States
HQ regionstring
North America
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
passenger rail service, public transit, commuter rail, transit infrastructure, zero-emission rail
Industry3 codes
1Rail Infrastructure Authorities (Track, Stations, Grade Crossings)
CodeBPAIALAGPrimaryYes
2Special Event & Peak-Only Commuter Rail Services
CodeTHAIACAIPrimaryNo
3Rail Electrification Systems Construction (OCS/OHL, Third Rail)
CodeIMAFAFABPrimaryNo
NAICS code2 codes
  • Commuter Rail Systems485112
  • Support Activities for Rail Transportation4882
Product category
Public Passenger Rail Transit Services
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model4 records
1Public Transportation Fares
TypeTransaction Fee
Description

Revenue from passenger fares collected for rail service on the Valley Link system once operational.

valleylinkrail.com
2Federal Funding
TypeManaged Services
Description

Federal Transit Administration (FTA) funding and federal appropriations advanced through the federal funding pipeline for project development.

valleylinkrail.com
3State Funding
TypeManaged Services
Description

California state funding including $25 million state award for project development and TIRCP funding.

valleylinkrail.com
4Regional/Local Funding
TypeManaged Services
Description

Funding from regional agencies including MTC ($10.1 million), ACTC ($400 million), SJCOG ($10 million), and Tri-Valley Transportation Council strategic expenditure plan.

valleylinkrail.com
Marketing channels9 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels5 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Personnel, Operations, Technology or R&D, Supply Chain
GTM typeB2C
B2C
Offering typeServices
Services
Core offering1 text field

The Tri-Valley - San Joaquin Regional Rail Authority plans, funds, and develops the Valley Link Rail Service — a 42-mile zero-emission passenger rail system connecting the Dublin/Pleasanton BART Station in Alameda County to North Lathrop Station in San Joaquin County. Phase 1 is being delivered in two segments: Phase 1A (11 miles, Dublin/Pleasanton to Vasco Road ACE Station) uses battery-electric multiple unit trains and three new stations; Phase 1B extends service to Mountain House. The authority also procures CM/GC pre-construction and General Engineering Consultant services for project delivery.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • Reduces greenhouse gas emissions by 32,220 to 42,650 metric tons by 2040
+3 more records
Product overview1 text field

Valley Link is a 42-mile passenger rail service operated by the Tri-Valley – San Joaquin Valley Regional Rail Authority. The service consists of the core Valley Link Rail Service connecting Bay Area workers from the Northern San Joaquin Valley to the Dublin/Pleasanton BART Station, implemented in two phases: Phase 1A (Dublin/Pleasanton to Vasco Road ACE Station, featuring battery-electric train technology with three stations and an Operations and Maintenance Facility) and Phase 1B (Southfront Road to Mountain House, pending funding). Additional services include pre-construction management services, general engineering consultant services, and a future vehicles procurement initiative. The system is designed to provide all-day, bi-directional service at 15-minute frequencies during peak commute periods, projected to carry 30,000 riders daily by 2040.

Product and service3 records
1Valley Link Rail Service
CategoryPublic Passenger Rail Transit Service
Description

A 42-mile, 7-station zero-emission passenger rail service connecting over 105,000 Bay Area workers traveling daily over the Altamont Pass between the Dublin/Pleasanton BART Station in Alameda County and North Lathrop Station in San Joaquin County, providing a transit alternative to the congested Interstate 580 corridor.

2CM/GC Pre-Construction Services
CategoryConstruction Management Services
Description

Construction Manager/General Contractor (CM/GC) pre-construction services for the Valley Link Phase 1A Rail Project, provided during the development of Plans, Specifications and Estimates (PS&E).

3General Engineering Consultant (GEC) Services
CategoryEngineering Consulting Services
Description

General Engineering Consultant services for the Valley Link Rail Project under the Construction Manager/General Contractor (CMGC) delivery model, providing technical expertise across highway, urban rapid transit, rail systems, stations, facilities, and civil design disciplines.

Scale indicator13 records

Each record includes

Type, Value, Description, Source

Partnership5 partners
1Linde
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Linde entered a strategic collaboration with Valley Link, likely related to hydrogen fuel technology. Valley Link has advanced vision to operate on self-produced green hydrogen fuel, and Linde's expertise in industrial gases and hydrogen infrastructure makes this a significant strategic partnership for the project's sustainable energy strategy.

valleylinkrail.com
2Altamont Corridor Express (ACE)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

ACE has been selected to operate the new Valley Link service. This operational partnership creates seamless regional rail connectivity between BART and ACE services, enabling cross-platform transfers at Vasco Road Station and connecting the Valley Link system into the broader Altamont Corridor Express network.

valleylinkrail.com
3Bay Area Rapid Transit (BART)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

BART is the key connection point for Valley Link at the Dublin/Pleasanton Station. The intermodal connection enables riders to transfer between Valley Link and BART's rapid transit system, bringing new riders to the broader Bay Area transit system and creating seamless regional connectivity.

valleylinkrail.com
4San Joaquin Regional Rail Commission (SJRRC)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

SJRRC is both a member agency and the operator of ACE service. As a founding member of the Tri-Valley - San Joaquin Valley Regional Rail Authority, SJRRC plays a governance role in the Valley Link project alongside operating the ACE service that connects with Valley Link.

valleylinkrail.com
5AECOM
Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

AECOM serves as the project management and technical advisor for Valley Link. Contact for the Future Vehicles Procurement RFI is directed through [email protected], indicating AECOM's role in supporting procurement processes.

valleylinkrail.com
Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
1Altamont Corridor Express (ACE)
TypeDirect peer
Description

ACE is the existing commuter rail service operated by SJRRC along the Altamont Corridor from San Joaquin to San Jose/Great America. It is a direct peer in passenger rail service on the same corridor, and has been selected as the operator for Valley Link.

2Capitol Corridor Joint Powers Authority
TypeDirect peer
Description

Capitol Corridor is a California intercity passenger rail JPA operating between Sacramento and the Bay Area via Oakland/San Jose. It is a direct peer in California JPA-governed passenger rail service and shares operational and funding model characteristics with Valley Link.

3Caltrain (Peninsula Corridor JPB)
TypeDirect peer
Description

Caltrain is a California commuter rail JPA operating between San Francisco, San Mateo, and Santa Clara counties. It is a directly comparable JPA-structured commuter rail service with electrification underway, parallel to Valley Link's battery-electric deployment.

4Metrolink (Southern California Regional Rail Authority)
TypeDirect peer
Description

Metrolink is a Southern California JPA commuter rail system serving five counties from Los Angeles to San Bernardino and Oceanside. It is a directly comparable multi-county JPA commuter rail model, providing the closest institutional analog for Valley Link's 15-member agency coalition.

5NCTD Coaster
TypeDirect peer
Description

NCTD operates the Coaster commuter rail service along the San Diego County coastline. Comparable as a regional commuter rail serving commuters between residential suburbs and a major employment center (San Diego), with similar scale and bi-directional peak service.

6Sonoma-Marin Area Rail Transit (SMART)
TypeDirect peer
Description

SMART is a Northern California commuter rail serving Sonoma and Marin counties. Directly comparable as a California commuter rail system targeting suburban-to-employment-center commuters with phased infrastructure rollouts.

7BART (San Francisco Bay Area Rapid Transit District)
TypeBroad incumbent
Description

BART is the major Bay Area rapid transit system and Valley Link's intermodal hub at Dublin/Pleasanton. Comparable as a much larger, established passenger rail system that Valley Link feeds into, with overlapping governance and ridership.

8Metra (Chicago)
TypeRegional player
Description

Metra operates commuter rail in the Chicago metropolitan area across multiple lines serving suburban-to-downtown commuters. Comparable as a peer commuter rail system with similar peak-direction demand profile and multi-line operations.

9MBTA Commuter Rail
TypeRegional player
Description

MBTA Commuter Rail operates across the Greater Boston region. Comparable as a peer commuter rail system of similar scale, serving suburban-to-urban commuters with established bi-directional service.

10Long Island Rail Road (MTA LIRR)
TypeRegional player
Description

LIRR is the nation's busiest commuter railroad, operating across Long Island and into Manhattan. Comparable as a peer commuter rail system serving long-distance suburb-to-urban commuters with high peak-frequency service.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks7 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile2 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature3 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles3 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Tri-valley - San Joaquin Regional Rail Authority

Public Passenger Rail Transit Servicesvalleylinkrail.com

The Tri-Valley - San Joaquin Valley Regional Rail Authority is a California joint powers authority developing Valley Link, a 42-mile, 7-station zero-emission passenger rail service connecting the Dublin/Pleasanton BART Station to North Lathrop for Bay Area and San Joaquin Valley commuters.

What Tri-valley - San Joaquin Regional Rail Authority does

The Tri-Valley - San Joaquin Valley Regional Rail Authority is a California joint powers authority (JPA) established on January 17, 2018, that plans and develops the Valley Link passenger rail service. The authority is governed by a 15-member Board of Directors drawn from member agencies including the San Joaquin Regional Rail Commission (SJRRC), Bay Area Rapid Transit (BART), the Altamont Corridor Express (ACE), the Metropolitan Transportation Commission (MTC), the Alameda County Transportation Commission (ACTC), the San Joaquin Council of Governments (SJCOG), and 11 cities across Alameda and San Joaquin counties. Headquartered at 2600 Kitty Hawk Road, Suite 103, in Livermore, California, the authority operates as a non-profit government entity with 11–50 employees and is led by Executive Director/CEO Kevin Sheridan and Board Chair Robert Rickman.

The core product is a 42-mile, 7-station passenger rail system connecting the Dublin/Pleasanton BART Station to North Lathrop Station in San Joaquin County. Phase 1A covers an 11-mile initial operating segment from Dublin/Pleasanton to the Vasco Road ACE Station in Livermore, deploying zero-emission battery-electric multiple unit vehicles with charging infrastructure and supporting substations at both station ends and a new Operations and Maintenance Facility. Phase 1A is planned to provide all-day, bi-directional service at 15-minute peak frequencies. Phase 1B adds an 11-mile extension to the Mountain House Community Station. The project uses a Construction Manager/General Contractor (CM/GC) delivery model with AECOM serving as project management and technical advisor; a General Engineering Consultant RFP (2026-01) is planned for Spring 2026, and a Future Vehicles Procurement RFI is underway. The CEQA Environmental Impact Report was certified in May 2021 and CEQA/NEPA environmental review was certified for Phase 1 in 2024.

The authority is pre-revenue and funded through public-sector grants and appropriations rather than commercial sales. Committed capital of roughly $465 million includes $400 million from ACTC, a $25 million state award, $20 million in federal funding advanced by Rep. Swalwell, $10.1 million from MTC, $10 million from SJCOG, and a $750,000 Regional Rail Authority grant. ACE has been selected to operate the service once built, and BART Dublin/Pleasanton and ACE Vasco Road will serve as the intermodal anchors. End users are commuters — over 105,000 Bay Area workers travel daily over Altamont Pass, and four planned stations serve disadvantaged or low-income communities in Northern San Joaquin County. The project is projected to carry 30,000 riders per day by 2040, reduce greenhouse gas emissions by 32,220–42,650 metric tons, and create 22,000 construction jobs plus 400 permanent jobs per year.

Tri-valley - San Joaquin Regional Rail Authority firmographics

Firmographics
Name
Tri-valley - San Joaquin Regional Rail Authority
Legal name
Tri-Valley - San Joaquin Valley Regional Rail Authority
Website
https://www.valleylinkrail.com
Company type
Private
Founded year
2018
Operating status
Operating
Headcount range
11–50 employees
Short description
The Tri-Valley - San Joaquin Valley Regional Rail Authority is a California joint powers authority developing Valley Link, a 42-mile, 7-station zero-emission passenger rail service connecting the Dublin/Pleasanton BART Station to North Lathrop for Bay Area and San Joaquin Valley commuters.
Ownership category
akta.pro rank

Tri-valley - San Joaquin Regional Rail Authority industry classification

Industry
Product category
Public Passenger Rail Transit Services
NAICS
Commuter Rail Systems (485112), Support Activities for Rail Transportation (4882)
akta.pro primary industry
Rail Infrastructure Authorities (Track, Stations, Grade Crossings) (BPAIALAG)
akta.pro secondary industries
Special Event & Peak-Only Commuter Rail Services (THAIACAI), Rail Electrification Systems Construction (OCS/OHL, Third Rail) (IMAFAFAB)

Keywords

  • Passenger rail service
  • Public transit
  • Commuter rail
  • Transit infrastructure
  • Zero-emission rail

Where Tri-valley - San Joaquin Regional Rail Authority is headquartered

Location

Headquarters

HQ city
Livermore
HQ country
United States
HQ region
North America

Offices1 record

Markets served

Tri-valley - San Joaquin Regional Rail Authority business model

Business model
GTM type
B2C
Offering type
Services
Cost components
Infrastructure, Personnel, Operations, Technology or R&D, Supply Chain

Revenue model

  1. Public Transportation Fares: Revenue from passenger fares collected for rail service on the Valley Link system once operational.
  2. Federal Funding: Federal Transit Administration (FTA) funding and federal appropriations advanced through the federal funding pipeline for project development.
  3. State Funding: California state funding including $25 million state award for project development and TIRCP funding.
  4. Regional/Local Funding: Funding from regional agencies including MTC ($10.1 million), ACTC ($400 million), SJCOG ($10 million), and Tri-Valley Transportation Council strategic expenditure plan.

Go-to-market motion1 record

Distribution channels5 records

Marketing channels9 records

Tri-valley - San Joaquin Regional Rail Authority product offering

Product offering

Core offering

The Tri-Valley - San Joaquin Regional Rail Authority plans, funds, and develops the Valley Link Rail Service — a 42-mile zero-emission passenger rail system connecting the Dublin/Pleasanton BART Station in Alameda County to North Lathrop Station in San Joaquin County. Phase 1 is being delivered in two segments: Phase 1A (11 miles, Dublin/Pleasanton to Vasco Road ACE Station) uses battery-electric multiple unit trains and three new stations; Phase 1B extends service to Mountain House. The authority also procures CM/GC pre-construction and General Engineering Consultant services for project delivery.

Product overview

Valley Link is a 42-mile passenger rail service operated by the Tri-Valley – San Joaquin Valley Regional Rail Authority. The service consists of the core Valley Link Rail Service connecting Bay Area workers from the Northern San Joaquin Valley to the Dublin/Pleasanton BART Station, implemented in two phases: Phase 1A (Dublin/Pleasanton to Vasco Road ACE Station, featuring battery-electric train technology with three stations and an Operations and Maintenance Facility) and Phase 1B (Southfront Road to Mountain House, pending funding). Additional services include pre-construction management services, general engineering consultant services, and a future vehicles procurement initiative. The system is designed to provide all-day, bi-directional service at 15-minute frequencies during peak commute periods, projected to carry 30,000 riders daily by 2040.

Differentiator

Problem solved

Functional benefit

Products and services

  • Valley Link Rail Service A 42-mile, 7-station zero-emission passenger rail service connecting over 105,000 Bay Area workers traveling daily over the Altamont Pass between the Dublin/Pleasanton BART Station in Alameda County and North Lathrop Station in San Joaquin County, providing a transit alternative to the congested Interstate 580 corridor.
  • CM/GC Pre-Construction Services Construction Manager/General Contractor (CM/GC) pre-construction services for the Valley Link Phase 1A Rail Project, provided during the development of Plans, Specifications and Estimates (PS&E).
  • General Engineering Consultant (GEC) Services General Engineering Consultant services for the Valley Link Rail Project under the Construction Manager/General Contractor (CMGC) delivery model, providing technical expertise across highway, urban rapid transit, rail systems, stations, facilities, and civil design disciplines.

Quantifiable outcome

  • Reduces greenhouse gas emissions by 32,220 to 42,650 metric tons by 2040
  • +3 more outcomes

Companies that use Tri-valley - San Joaquin Regional Rail Authority

Customer profile

Segments3 records

Ideal customer profiles2 records

Tri-valley - San Joaquin Regional Rail Authority technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature3 records

Tri-valley - San Joaquin Regional Rail Authority partnerships and signals

Strategic signal

Partnerships

Five partnerships are on record, tiered core and minor.

  • LindecoreStrategic or Co-development PartnerLinde entered a strategic collaboration with Valley Link, likely related to hydrogen fuel technology. Valley Link has advanced vision to operate on self-produced green hydrogen fuel, and Linde's expertise in industrial gases and hydrogen infrastructure makes this a significant strategic partnership for the project's sustainable energy strategy.
  • Altamont Corridor Express (ACE)coreStrategic or Co-development PartnerACE has been selected to operate the new Valley Link service. This operational partnership creates seamless regional rail connectivity between BART and ACE services, enabling cross-platform transfers at Vasco Road Station and connecting the Valley Link system into the broader Altamont Corridor Express network.
  • Bay Area Rapid Transit (BART)coreStrategic or Co-development PartnerBART is the key connection point for Valley Link at the Dublin/Pleasanton Station. The intermodal connection enables riders to transfer between Valley Link and BART's rapid transit system, bringing new riders to the broader Bay Area transit system and creating seamless regional connectivity.
  • San Joaquin Regional Rail Commission (SJRRC)coreStrategic or Co-development PartnerSJRRC is both a member agency and the operator of ACE service. As a founding member of the Tri-Valley - San Joaquin Valley Regional Rail Authority, SJRRC plays a governance role in the Valley Link project alongside operating the ACE service that connects with Valley Link.
  • AECOMminorImplementation/ SI/ Consulting PartnerAECOM serves as the project management and technical advisor for Valley Link. Contact for the Future Vehicles Procurement RFI is directed through [email protected], indicating AECOM's role in supporting procurement processes.

Scale indicators13 records

Recent moves6 records

Expansion highlights6 records

Tri-valley - San Joaquin Regional Rail Authority competitors and assessment

Company assessment

Direct peers

  • Altamont Corridor Express (ACE): ACE is the existing commuter rail service operated by SJRRC along the Altamont Corridor from San Joaquin to San Jose/Great America. It is a direct peer in passenger rail service on the same corridor, and has been selected as the operator for Valley Link.
  • Capitol Corridor Joint Powers Authority: Capitol Corridor is a California intercity passenger rail JPA operating between Sacramento and the Bay Area via Oakland/San Jose. It is a direct peer in California JPA-governed passenger rail service and shares operational and funding model characteristics with Valley Link.
  • Caltrain (Peninsula Corridor JPB): Caltrain is a California commuter rail JPA operating between San Francisco, San Mateo, and Santa Clara counties. It is a directly comparable JPA-structured commuter rail service with electrification underway, parallel to Valley Link's battery-electric deployment.
  • Metrolink (Southern California Regional Rail Authority): Metrolink is a Southern California JPA commuter rail system serving five counties from Los Angeles to San Bernardino and Oceanside. It is a directly comparable multi-county JPA commuter rail model, providing the closest institutional analog for Valley Link's 15-member agency coalition.
  • NCTD Coaster: NCTD operates the Coaster commuter rail service along the San Diego County coastline. Comparable as a regional commuter rail serving commuters between residential suburbs and a major employment center (San Diego), with similar scale and bi-directional peak service.
  • Sonoma-Marin Area Rail Transit (SMART): SMART is a Northern California commuter rail serving Sonoma and Marin counties. Directly comparable as a California commuter rail system targeting suburban-to-employment-center commuters with phased infrastructure rollouts.

Broad incumbents

  • BART (San Francisco Bay Area Rapid Transit District): BART is the major Bay Area rapid transit system and Valley Link's intermodal hub at Dublin/Pleasanton. Comparable as a much larger, established passenger rail system that Valley Link feeds into, with overlapping governance and ridership.

Regional players

  • Metra (Chicago): Metra operates commuter rail in the Chicago metropolitan area across multiple lines serving suburban-to-downtown commuters. Comparable as a peer commuter rail system with similar peak-direction demand profile and multi-line operations.
  • MBTA Commuter Rail: MBTA Commuter Rail operates across the Greater Boston region. Comparable as a peer commuter rail system of similar scale, serving suburban-to-urban commuters with established bi-directional service.
  • Long Island Rail Road (MTA LIRR): LIRR is the nation's busiest commuter railroad, operating across Long Island and into Manhattan. Comparable as a peer commuter rail system serving long-distance suburb-to-urban commuters with high peak-frequency service.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks7 records

Key highlights7 records

Customer concentration

Tri-valley - San Joaquin Regional Rail Authority social profiles

Digital presence

Tri-valley - San Joaquin Regional Rail Authority financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Tri-valley - San Joaquin Regional Rail Authority leadership team

Management profile

Number of profiles

Profiles3 records

Tri-valley - San Joaquin Regional Rail Authority funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Tri-valley - San Joaquin Regional Rail Authority M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Tri-valley - San Joaquin Regional Rail Authority

What does Tri-valley - San Joaquin Regional Rail Authority do?

The Tri-Valley - San Joaquin Regional Rail Authority plans, funds, and develops the Valley Link Rail Service — a 42-mile zero-emission passenger rail system connecting the Dublin/Pleasanton BART Station in Alameda County to North Lathrop Station in San Joaquin County. Phase 1 is being delivered in two segments: Phase 1A (11 miles, Dublin/Pleasanton to Vasco Road ACE Station) uses battery-electric multiple unit trains and three new stations; Phase 1B extends service to Mountain House. The authority also procures CM/GC pre-construction and General Engineering Consultant services for project delivery.

Is Tri-valley - San Joaquin Regional Rail Authority a public or private company?

Tri-valley - San Joaquin Regional Rail Authority is a private company. It is classified as state government owned and is currently operating.

When was Tri-valley - San Joaquin Regional Rail Authority founded?

Tri-valley - San Joaquin Regional Rail Authority was founded in 2018. It employs 11 to 50 people.

Where is Tri-valley - San Joaquin Regional Rail Authority based?

Tri-valley - San Joaquin Regional Rail Authority is headquartered in Livermore, United States, in the North America region.

How does Tri-valley - San Joaquin Regional Rail Authority make money?

Four revenue lines are on record. Public Transportation Fares are the primary driver. The others are federal Funding, state Funding and regional/Local Funding.

Who are Tri-valley - San Joaquin Regional Rail Authority's main competitors?

Direct peers on record are Altamont Corridor Express (ACE), Capitol Corridor Joint Powers Authority, Caltrain (Peninsula Corridor JPB), Metrolink (Southern California Regional Rail Authority), NCTD Coaster and Sonoma-Marin Area Rail Transit (SMART). BART (San Francisco Bay Area Rapid Transit District) is listed as a broad incumbent. Regional players are Metra (Chicago), MBTA Commuter Rail and Long Island Rail Road (MTA LIRR).

Does Tri-valley - San Joaquin Regional Rail Authority have an API?

No public API is recorded for Tri-valley - San Joaquin Regional Rail Authority.

What industry is Tri-valley - San Joaquin Regional Rail Authority in?

Tri-valley - San Joaquin Regional Rail Authority's product category is Public Passenger Rail Transit Services. Its primary akta.pro industry code is BPAIALAG, Rail Infrastructure Authorities (Track, Stations, Grade Crossings), with a secondary code of THAIACAI, Special Event & Peak-Only Commuter Rail Services. Its NAICS code is 485112.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales