ECO STOR

Full company profile

uuid0009acb

Namestring
ECO STOR
Legal namestring
ECO STOR-AS
Websiteurl
eco-stor.com
Company typeenum
Private
Founded yearint
2018
Descriptiontext

ECO STOR is a German-Norwegian privately held battery energy storage company founded in 2018 and headquartered in Oslo, with operational and project-development activities concentrated in Germany. The company develops, finances, constructs, and operates large-scale Battery Energy Storage Systems (BESS) using both first-life and second-life lithium-ion batteries, including its containerized ReCube product line (up to 2,500 kWh capacity and 1,440 kW power in a high-cube 20-foot format, supporting air-cooled and liquid-cooled batteries). ECO STOR's anchor asset is the 103.5 MW Bollingstedt facility in Schleswig-Holstein, Germany, and it is constructing the 300 MW/718 MWh Förderstedt project in Saxony-Anhalt—scheduled to be Germany's largest standalone BESS when operational in 2027.

The company's business model combines utility-scale BESS project development with recurring contracted revenue from long-term flexibility tolling agreements (e.g., a five-year deal with Next Kraftwerke covering 80% of Förderstedt's capacity) and cross-market optimization across day-ahead, intraday, and balancing energy markets. Route-to-market is delivered via strategic partners including Next Kraftwerke and Alpiq (VPP optimization), E.ON, Schleswig-Holstein Netz, and HanseWerk (grid integration and FCA framework co-development), and financial partners NORD/LB and Banco Santander (project financing). ECO STOR's ReCube brand extends the model to second-life battery repurposing for EV fleet operators and industrial users, with end-of-life recycling routed through partner LiCycle (up to 99% material recovery).

ECO STOR serves grid operators, utilities, energy companies, and IPPs across Germany, Italy, and the Netherlands. Differentiators include the industry's first interactive storage operations dashboard (free, open transparency platform built on live Bollingstedt data), open PyPSA-based energy-economic modeling tools, and demonstrated ability to structure Germany's largest BESS project financing. Pricing for utility-scale projects is project-specific and undisclosed; the ReCube product is quote-based with 6-9 month lead times for first systems and 3-6 months for subsequent containers.

Short descriptiontext

ECO STOR is a German-Norwegian developer and operator of utility-scale battery energy storage systems (BESS) using first- and second-life EV batteries. It serves grid operators, utilities, and energy companies across Germany, Italy, and the Netherlands via the ReCube product line and projects like Bollingstedt (103.5 MW) and Förderstedt (300 MW/718 MWh).

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersOslo, Norway
HQ citystring
Oslo
HQ countrystring
Norway
HQ regionstring
Europe
Markets served

Serves global market

Offices2 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
battery energy storage, grid-scale BESS, second-life EV batteries, renewable energy integration, utility-scale storage
Industry6 codes
PRIMARYEUAFAAAA
Utility-Scale BESS Project Development & Ownership (IPP/Developer)
SECONDARYEUAFAAAB
BESS EPC, Integration & Commissioning
SECONDARYEUAFAAAC
BESS OEMs (Containerized Systems, Racks, Turnkey Solutions)
SECONDARYEUAFAAAG
BESS Operations, Maintenance & Asset Performance Management (APM)
SECONDARYEUAFAAAI
BESS Financing, Insurance & Contracting (Tax Equity, PPA/Tolling, Warranties)
SECONDARYEUAFAAAL
BESS Market Participation & Trading Services (Ancillary/Capacity/Arbitrage)
NAICS code3 codes
  • Electric Power Generation22111
  • Battery Manufacturing33591
  • Electric Power Transmission, Control, and Distribution22112
SIC code1 code
  • Cogeneration Services & Small Power Producers4991
Product category
Grid-Scale Battery Energy Storage
Social media profiles1 record
GTM motion3 records

Each record includes

Type, Description, Source

Revenue model3 records
1Battery Storage Project Development & Operation
TypeManaged Services
Description

ECO STOR develops, finances, constructs, and operates large-scale BESS projects. Revenue is generated through the sale of storage capacity services, grid stabilization, and renewable energy integration support. The Förderstedt project (300 MW/718 MWh) is Germany's largest standalone BESS once operational in 2027.

renewablesnow.com
2Flexibility Tolling Agreements
TypeSubscription Recurring
Description

Long-term tolling agreements with virtual power plant operators (e.g., 5-year deal with Next Kraftwerke covering 80% of Förderstedt capacity) provide contracted, predictable revenue streams. Tolling deals enable debt financing by reducing revenue uncertainty.

renewablesnow.com
3Cross-Market Optimization
TypeUsage Based
Description

BESS assets optimized across multiple energy markets including day-ahead, intraday, and balancing energy markets, generating additional revenue from market-price-oriented trading on uncontracted capacity (20% of Förderstedt capacity).

renewablesnow.com
Marketing channels4 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels5 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Supply Chain, Technology or R&D, Operations, Infrastructure, Personnel
GTM typeB2B
B2B
Offering typeHardware or Manufacturing
Hardware or Manufacturing
Core offering1 text field

ECO STOR develops, finances, builds, and operates large-scale grid-connected battery energy storage systems (BESS) using both first-life and second-life lithium-ion batteries. Through its ReCube product line, it provides containerized second-life battery storage solutions to industrial and fleet operators, and independently develops utility-scale projects such as the 300 MW/718 MWh Förderstedt facility in Germany, the largest standalone BESS in the country once operational.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 5 values shown
  • 300 MW / 718 MWh Förderstedt project — Germany's largest standalone BESS, 3x larger than previous largest facility, operational in 2027
+4 more records
Product overview1 text field

ECO STOR operates as a German-Norwegian battery storage company offering the ReCube product line, a modular containerized battery energy storage system (BESS) that utilizes both first-life and second-life batteries. The ReCube solution integrates used EV batteries into standardized container designs, enabling applications such as fast charging, peak shaving, and grid ancillary services. When second-life battery performance declines, the system facilitates end-of-life recycling through partner LiCycle, achieving up to 99% material recovery for new battery production.

Product and service3 records
1ReCube Second-Life Battery BESS
CategoryBattery Energy Storage Systems (BESS)
Description

Containerized battery energy storage system that repurposes first-life and second-life EV batteries into standardized High Cube 20-foot containers with up to 1440 kW power and 2500 kWh capacity, supporting both air-cooled and liquid-cooled configurations. Designed for companies with used EV or industrial batteries seeking to defer recycling costs, optimize own energy consumption, or generate revenue via fast charging, peak shaving, or ancillary services.

2Large-Scale BESS Project Development & Operation
CategoryEnergy Infrastructure Services
Description

End-to-end development, financing, construction, and operation of utility-scale grid-connected battery storage projects for utilities, grid operators, and energy companies. Includes storage capacity services, grid stabilization, and renewable energy integration support, with cross-market optimization across day-ahead, intraday, and balancing energy markets.

3Storage Operations Dashboard
CategoryGrid Operations Software / Transparency Tool
Description

Interactive dashboard displaying real-time charge/discharge performance, actual storage operating strategies, and interactions with wind, solar, and grid load using live data from the Bollingstedt facility, provided as a free open transparency and reference platform for evaluating grid-appropriate storage operations.

Scale indicator8 records

Each record includes

Type, Value, Description, Source

Partnership6 partners
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2026-06-24
Description

Joint development of the industry's first interactive storage operations dashboard, providing real operating data from the 103.5 MW Bollingstedt facility to demonstrate grid-friendly and system-friendly battery storage operations.

2HanseWerk
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2026-06-24
Description

Joint development of the interactive storage operations dashboard, contributing to open transparency and reference platform for evaluating grid-appropriate storage operations.

finanznachrichten.de
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2026-06-22
Description

E.ON piloted the flexible connection agreement (FCA) framework with ECO STOR at the Bollingstedt site. E.ON operates distribution networks covering approximately 65% of Germany and introduced the FCA standard to accelerate BESS grid integration nationwide.

Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-12-01
Description

Tolling agreement with Alpiq for BESS project optimization, in addition to the Next Kraftwerke partnership, expanding route-to-market coverage across European markets.

Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-06-03
Description

Five-year flexibility tolling agreement for the 300 MW Förderstedt BESS project. Next Kraftwerke manages cross-market optimization across day-ahead, intraday, and balancing energy markets, starting November with the first 100 MW unit, with two additional units deployed in phases. Covers 80% of capacity under contracted revenue.

Strategic tierSupportingTypeStrategic or Co-development Partner
Description

Recycling partner for the ReCube second-life battery solution. When second-life battery performance is no longer sufficient, LiCycle recycles the batteries, recovering approximately 99% of precious elements for use in brand-new batteries, supporting circular economy goals.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
TypeBroad incumbent
Description

Tesla's Megapack and Autobidder platform compete with ECO STOR's ReCube product and optimization services at the utility-scale BESS level. Tesla operates across many markets and product lines, making it a broad incumbent rather than a focused European storage specialist.

TypeBroad incumbent
Description

RWE is a major European utility developing large-scale renewable and storage projects across multiple markets. It competes with ECO STOR on utility-scale BESS development but as part of a much broader generation portfolio rather than a storage-focused platform.

TypeBroad incumbent
Description

E.ON operates distribution networks covering ~65% of Germany and is both a customer/partner of ECO STOR and a developer of its own grid and storage solutions. It overlaps as a broad incumbent in European grid services and storage deployment.

TypeDirect peer
Description

Fluence is a global BESS OEM and project developer offering turnkey utility-scale energy storage solutions and asset performance services. It directly competes with ECO STOR in European utility-scale BESS development and operates similar tolling/optimization business models.

TypeEmerging player
Description

Next Kraftwerke is a German VPP operator that aggregates and optimizes distributed assets across European energy markets. While ECO STOR's primary route-to-market partner, Next Kraftwerke is also expanding into own-asset storage and competes for optimization mandates on third-party storage assets.

TypeDirect peer
Description

Belectric is a German-based EPC and O&M specialist for utility-scale solar and battery storage, now part of E.ON. It directly overlaps with ECO STOR in German BESS project execution and operations, though typically as a contractor rather than asset owner.

TypeDirect peer
Description

Wärtsilä provides utility-scale BESS through its GridSolv product line and storage-as-a-service offerings across European markets. It directly competes with ECO STOR on EPC, optimization, and long-term service contracts for grid-scale storage.

TypeDirect peer
Description

Nidec ASI supplies power conversion, energy storage, and grid integration solutions for utility-scale BESS projects across Europe. It directly competes with ECO STOR in delivering integrated BESS systems and storage-as-a-service offerings for grid operators.

TypeDirect peer
Description

Giga Storage is a Dutch utility-scale BESS developer and operator with operational and pipeline projects across the Netherlands and Belgium. It directly competes with ECO STOR in European grid-scale storage project development and uses comparable route-to-market agreements.

TypeEmerging player
Description

Octopus Energy Generation develops and operates renewable and storage assets across Europe, including the Sessa Aurunca project co-developed with ECO STOR in Italy. It is an emerging player in European BESS development that partners with and competes against ECO STOR in select markets.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers3 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile3 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles1 record

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance1 record

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

ECO STOR

Grid-Scale Battery Energy Storageeco-stor.com

ECO STOR is a German-Norwegian developer and operator of utility-scale battery energy storage systems (BESS) using first- and second-life EV batteries. It serves grid operators, utilities, and energy companies across Germany, Italy, and the Netherlands via the ReCube product line and projects like Bollingstedt (103.5 MW) and Förderstedt (300 MW/718 MWh).

What ECO STOR does

ECO STOR is a German-Norwegian privately held battery energy storage company founded in 2018 and headquartered in Oslo, with operational and project-development activities concentrated in Germany. The company develops, finances, constructs, and operates large-scale Battery Energy Storage Systems (BESS) using both first-life and second-life lithium-ion batteries, including its containerized ReCube product line (up to 2,500 kWh capacity and 1,440 kW power in a high-cube 20-foot format, supporting air-cooled and liquid-cooled batteries). ECO STOR's anchor asset is the 103.5 MW Bollingstedt facility in Schleswig-Holstein, Germany, and it is constructing the 300 MW/718 MWh Förderstedt project in Saxony-Anhalt—scheduled to be Germany's largest standalone BESS when operational in 2027.

The company's business model combines utility-scale BESS project development with recurring contracted revenue from long-term flexibility tolling agreements (e.g., a five-year deal with Next Kraftwerke covering 80% of Förderstedt's capacity) and cross-market optimization across day-ahead, intraday, and balancing energy markets. Route-to-market is delivered via strategic partners including Next Kraftwerke and Alpiq (VPP optimization), E.ON, Schleswig-Holstein Netz, and HanseWerk (grid integration and FCA framework co-development), and financial partners NORD/LB and Banco Santander (project financing). ECO STOR's ReCube brand extends the model to second-life battery repurposing for EV fleet operators and industrial users, with end-of-life recycling routed through partner LiCycle (up to 99% material recovery).

ECO STOR serves grid operators, utilities, energy companies, and IPPs across Germany, Italy, and the Netherlands. Differentiators include the industry's first interactive storage operations dashboard (free, open transparency platform built on live Bollingstedt data), open PyPSA-based energy-economic modeling tools, and demonstrated ability to structure Germany's largest BESS project financing. Pricing for utility-scale projects is project-specific and undisclosed; the ReCube product is quote-based with 6-9 month lead times for first systems and 3-6 months for subsequent containers.

ECO STOR firmographics

Firmographics
Name
ECO STOR
Legal name
ECO STOR-AS
Website
https://eco-stor.com
Company type
Private
Founded year
2018
Operating status
Operating
Headcount range
11–50 employees
Short description
ECO STOR is a German-Norwegian developer and operator of utility-scale battery energy storage systems (BESS) using first- and second-life EV batteries. It serves grid operators, utilities, and energy companies across Germany, Italy, and the Netherlands via the ReCube product line and projects like Bollingstedt (103.5 MW) and Förderstedt (300 MW/718 MWh).
Ownership category
akta.pro rank

ECO STOR industry classification

Industry
Product category
Grid-Scale Battery Energy Storage
NAICS
Electric Power Generation (22111), Battery Manufacturing (33591), Electric Power Transmission, Control, and Distribution (22112)
SIC
Cogeneration Services & Small Power Producers (4991)
akta.pro industry
PRIMARYEUAFAAAA
Utility-Scale BESS Project Development & Ownership (IPP/Developer)
SECONDARYEUAFAAAB
BESS EPC, Integration & Commissioning
SECONDARYEUAFAAAC
BESS OEMs (Containerized Systems, Racks, Turnkey Solutions)
SECONDARYEUAFAAAG
BESS Operations, Maintenance & Asset Performance Management (APM)
SECONDARYEUAFAAAI
BESS Financing, Insurance & Contracting (Tax Equity, PPA/Tolling, Warranties)
SECONDARYEUAFAAAL
BESS Market Participation & Trading Services (Ancillary/Capacity/Arbitrage)

Keywords

  • Battery energy storage
  • Grid-scale BESS
  • Second-life EV batteries
  • Renewable energy integration
  • Utility-scale storage

Where ECO STOR is headquartered

Location

Headquarters

HQ city
Oslo
HQ country
Norway
HQ region
Europe

Offices2 records

Markets served

ECO STOR business model

Business model
GTM type
B2B
Offering type
Hardware or Manufacturing
Cost components
Supply Chain, Technology or R&D, Operations, Infrastructure, Personnel

Revenue model

  1. Battery Storage Project Development & Operation: ECO STOR develops, finances, constructs, and operates large-scale BESS projects. Revenue is generated through the sale of storage capacity services, grid stabilization, and renewable energy integration support. The Förderstedt project (300 MW/718 MWh) is Germany's largest standalone BESS once operational in 2027.
  2. Flexibility Tolling Agreements: Long-term tolling agreements with virtual power plant operators (e.g., 5-year deal with Next Kraftwerke covering 80% of Förderstedt capacity) provide contracted, predictable revenue streams. Tolling deals enable debt financing by reducing revenue uncertainty.
  3. Cross-Market Optimization: BESS assets optimized across multiple energy markets including day-ahead, intraday, and balancing energy markets, generating additional revenue from market-price-oriented trading on uncontracted capacity (20% of Förderstedt capacity).

Go-to-market motion3 records

Distribution channels5 records

Marketing channels4 records

ECO STOR product offering

Product offering

Core offering

ECO STOR develops, finances, builds, and operates large-scale grid-connected battery energy storage systems (BESS) using both first-life and second-life lithium-ion batteries. Through its ReCube product line, it provides containerized second-life battery storage solutions to industrial and fleet operators, and independently develops utility-scale projects such as the 300 MW/718 MWh Förderstedt facility in Germany, the largest standalone BESS in the country once operational.

Product overview

ECO STOR operates as a German-Norwegian battery storage company offering the ReCube product line, a modular containerized battery energy storage system (BESS) that utilizes both first-life and second-life batteries. The ReCube solution integrates used EV batteries into standardized container designs, enabling applications such as fast charging, peak shaving, and grid ancillary services. When second-life battery performance declines, the system facilitates end-of-life recycling through partner LiCycle, achieving up to 99% material recovery for new battery production.

Differentiator

Problem solved

Functional benefit

Products and services

  • ReCube Second-Life Battery BESS Containerized battery energy storage system that repurposes first-life and second-life EV batteries into standardized High Cube 20-foot containers with up to 1440 kW power and 2500 kWh capacity, supporting both air-cooled and liquid-cooled configurations. Designed for companies with used EV or industrial batteries seeking to defer recycling costs, optimize own energy consumption, or generate revenue via fast charging, peak shaving, or ancillary services.
  • Large-Scale BESS Project Development & Operation End-to-end development, financing, construction, and operation of utility-scale grid-connected battery storage projects for utilities, grid operators, and energy companies. Includes storage capacity services, grid stabilization, and renewable energy integration support, with cross-market optimization across day-ahead, intraday, and balancing energy markets.
  • Storage Operations Dashboard Interactive dashboard displaying real-time charge/discharge performance, actual storage operating strategies, and interactions with wind, solar, and grid load using live data from the Bollingstedt facility, provided as a free open transparency and reference platform for evaluating grid-appropriate storage operations.

Quantifiable outcome

  • 300 MW / 718 MWh Förderstedt project — Germany's largest standalone BESS, 3x larger than previous largest facility, operational in 2027
  • +4 more outcomes

Companies that use ECO STOR

Customer profile

Named customers3 records

Segments3 records

Ideal customer profiles3 records

ECO STOR technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

ECO STOR partnerships and signals

Strategic signal

Partnerships

Six partnerships are on record, tiered core and supporting.

  • Schleswig-Holstein NetzcoreTechnology or Integration · 24 June 2026Joint development of the industry's first interactive storage operations dashboard, providing real operating data from the 103.5 MW Bollingstedt facility to demonstrate grid-friendly and system-friendly battery storage operations.
  • HanseWerkcoreTechnology or Integration · 24 June 2026Joint development of the interactive storage operations dashboard, contributing to open transparency and reference platform for evaluating grid-appropriate storage operations.
  • E.ONcoreTechnology or Integration · 22 June 2026E.ON piloted the flexible connection agreement (FCA) framework with ECO STOR at the Bollingstedt site. E.ON operates distribution networks covering approximately 65% of Germany and introduced the FCA standard to accelerate BESS grid integration nationwide.
  • AlpiqcoreImplementation/ SI/ Consulting Partner · 1 December 2025Tolling agreement with Alpiq for BESS project optimization, in addition to the Next Kraftwerke partnership, expanding route-to-market coverage across European markets.
  • Next KraftwerkecoreImplementation/ SI/ Consulting Partner · 3 June 2025Five-year flexibility tolling agreement for the 300 MW Förderstedt BESS project. Next Kraftwerke manages cross-market optimization across day-ahead, intraday, and balancing energy markets, starting November with the first 100 MW unit, with two additional units deployed in phases. Covers 80% of capacity under contracted revenue.
  • LiCyclesupportingStrategic or Co-development PartnerRecycling partner for the ReCube second-life battery solution. When second-life battery performance is no longer sufficient, LiCycle recycles the batteries, recovering approximately 99% of precious elements for use in brand-new batteries, supporting circular economy goals.

Scale indicators8 records

Recent moves6 records

Expansion highlights5 records

ECO STOR competitors and assessment

Company assessment

Broad incumbents

  • Tesla Energy: Tesla's Megapack and Autobidder platform compete with ECO STOR's ReCube product and optimization services at the utility-scale BESS level. Tesla operates across many markets and product lines, making it a broad incumbent rather than a focused European storage specialist.
  • RWE: RWE is a major European utility developing large-scale renewable and storage projects across multiple markets. It competes with ECO STOR on utility-scale BESS development but as part of a much broader generation portfolio rather than a storage-focused platform.
  • E.ON: E.ON operates distribution networks covering ~65% of Germany and is both a customer/partner of ECO STOR and a developer of its own grid and storage solutions. It overlaps as a broad incumbent in European grid services and storage deployment.

Direct peers

  • Fluence Energy: Fluence is a global BESS OEM and project developer offering turnkey utility-scale energy storage solutions and asset performance services. It directly competes with ECO STOR in European utility-scale BESS development and operates similar tolling/optimization business models.
  • Belectric: Belectric is a German-based EPC and O&M specialist for utility-scale solar and battery storage, now part of E.ON. It directly overlaps with ECO STOR in German BESS project execution and operations, though typically as a contractor rather than asset owner.
  • Wärtsilä Energy Storage: Wärtsilä provides utility-scale BESS through its GridSolv product line and storage-as-a-service offerings across European markets. It directly competes with ECO STOR on EPC, optimization, and long-term service contracts for grid-scale storage.
  • Nidec ASI: Nidec ASI supplies power conversion, energy storage, and grid integration solutions for utility-scale BESS projects across Europe. It directly competes with ECO STOR in delivering integrated BESS systems and storage-as-a-service offerings for grid operators.
  • Giga Storage: Giga Storage is a Dutch utility-scale BESS developer and operator with operational and pipeline projects across the Netherlands and Belgium. It directly competes with ECO STOR in European grid-scale storage project development and uses comparable route-to-market agreements.

Emerging players

  • Next Kraftwerke: Next Kraftwerke is a German VPP operator that aggregates and optimizes distributed assets across European energy markets. While ECO STOR's primary route-to-market partner, Next Kraftwerke is also expanding into own-asset storage and competes for optimization mandates on third-party storage assets.
  • Octopus Energy Generation: Octopus Energy Generation develops and operates renewable and storage assets across Europe, including the Sessa Aurunca project co-developed with ECO STOR in Italy. It is an emerging player in European BESS development that partners with and competes against ECO STOR in select markets.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks6 records

Key highlights6 records

Customer concentration

ECO STOR social profiles

Digital presence

ECO STOR compliance and trust

Trust signal

Compliance1 record

ECO STOR financial estimates

Financial estimate

Revenue estimate

Valuation estimate

ECO STOR leadership team

Management profile

Number of profiles

Profiles1 record

ECO STOR funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

ECO STOR M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about ECO STOR

What does ECO STOR do?

ECO STOR develops, finances, builds, and operates large-scale grid-connected battery energy storage systems (BESS) using both first-life and second-life lithium-ion batteries. Through its ReCube product line, it provides containerized second-life battery storage solutions to industrial and fleet operators, and independently develops utility-scale projects such as the 300 MW/718 MWh Förderstedt facility in Germany, the largest standalone BESS in the country once operational.

Is ECO STOR a public or private company?

ECO STOR is a private company. It is classified as unknown and is currently operating.

When was ECO STOR founded?

ECO STOR was founded in 2018. It employs 11 to 50 people.

Where is ECO STOR based?

ECO STOR is headquartered in Oslo, Norway, in the Europe region.

How does ECO STOR make money?

Three revenue lines are on record. Battery Storage Project Development & Operation is the primary driver. The others are flexibility Tolling Agreements and cross-Market Optimization.

Who are ECO STOR's main competitors?

Broad incumbents on record are Tesla Energy, RWE and E.ON. Direct peers are Fluence Energy, Belectric, Wärtsilä Energy Storage, Nidec ASI and Giga Storage. Emerging players are Next Kraftwerke and Octopus Energy Generation.

Does ECO STOR have an API?

No public API is recorded for ECO STOR.

What industry is ECO STOR in?

ECO STOR's product category is Grid-Scale Battery Energy Storage. Its primary akta.pro industry code is EUAFAAAA, Utility-Scale BESS Project Development & Ownership (IPP/Developer), with a secondary code of EUAFAAAB, BESS EPC, Integration & Commissioning. Its NAICS code is 22111 and its SIC code is 4991.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
FinanzNachrichten.deECO STOR präsentiert erstes Speicherbetriebs-Dashboard für Batteriegroßspeicher / Anlage Bollingstedt wird zum "gläsernen Speicher"The German-Norwegian battery storage company ECO STOR launched the industry's first interactive storage operations dashboard for large-scale battery storage at the ees Europe trade fair, using real operating data from the 103.5 MW Bollingstedt facility in Schleswig-Holstein, Germany. The dashboard, available for free, makes visible charge and discharge performance, actual storage operating strategies, and interactions with wind energy, solar feed-in, and grid load. It was jointly developed with grid operators Schleswig-Holstein Netz, HanseWerk, and E.ON to demonstrate how battery storage can be intelligently operated in a grid-friendly and system-friendly manner, and serves as an open transparency and reference platform for evaluating grid-appropriate storage operations.SolarQuarterE.ON Introduces Flexible Connection Standard to Accelerate Battery Storage Integration Across German GridE.ON has introduced a new standard framework for flexible connection agreements (FCAs) designed to accelerate the integration of battery energy storage systems into Germany's electricity grid despite limited local grid capacity. The framework, tested in a pilot project with ECO STOR at the Bollingstedt site in Schleswig-Holstein, synchronizes battery storage operations with real-time grid conditions to improve investment certainty, reduce connection delays, and enhance grid stability. E.ON, which operates distribution networks covering approximately 65% of Germany, reports that grid operators have committed around 25 GW of storage capacity while receiving requests exceeding 500 GW.Energy-Storage.NewsEU Roundup: Octopus and Eco Stor financing deals for large-scale BESS in Italy and Germany enable 1.6GWh of capacityOctopus Energy secured a 15-year contract through Terna's MACSE auction for a 95MW/895MWh battery energy storage project in Sessa Aurunca, Italy, representing the third-largest project by capacity in the auction. Eco Stor simultaneously secured financing from NORD/LB and Santander for its 300MW/718MWh Foerderstedt project in Germany, one of the largest BESS projects under construction in the country, set to go live in 2027. The article also covers optimization agreements for additional BESS projects in Germany and the Netherlands involving Entrix, Dillinger Group, Giga Storage, and Veolia.AInvestGermany's Largest Battery Storage Project Closes Financing. The Stock Market Still Hasn't Figured Out What to Buy.ECO STOR, together with Banco Santander and NORD/LB, has closed financing for the 300 MW/718 MWh Förderstedt battery storage facility in Saxony-Anhalt, Germany, which is set to become the country's largest standalone BESS once operational in 2027. The project is already backed by a five-year flexibility tolling agreement with Next Kraftwerke, providing contracted revenue, while BloombergNEF data shows battery pack prices have fallen to $70/kWh, a 45% decline from 2024. The article argues that publicly traded battery storage names remain cash-burning growth stocks without dividends, suggesting the stock market has not yet priced in the hardening commercial model for utility-scale storage in Europe.Modern Power SystemsFinancing closed for Germany’s largest BESS projectNORD/LB, Banco Santander, and ECO STOR announced a financing package for the 300 MW/718 MWh Foerderstedt BESS project in Germany, the largest ever built and financed in the country. The facility is set to go live in 2027 and will support renewable integration and grid stability. It is backed by a long-term Flexibility Tolling Agreement with Next Kraftwerke.RenewablesnowEco Stor closes financing for 718-MWh battery project in GermanyEco Stor has closed financing for a 718-MWh battery storage project in Förderstedt, Germany, with the transaction led by Banco Santander and NORD/LB. The project is described as the largest battery storage facility realised and financed in Germany to date, roughly three times larger than the current biggest facility in Bollingstedt. The site is scheduled to reach full operation in 2027 and will facilitate renewable energy integration, grid stabilisation, and security of supply under a flexibility tolling agreement with Next Kraftwerke.Energy-Storage.NewsExpert counterparties and tolling structures key to minimising uncertainty in German BESS marketIndustry experts at the Energy Storage Summit at Battery Show Europe in Germany highlighted that minimizing counterparty risk and adopting tolling agreements are essential strategies for navigating uncertainty in the German battery energy storage system (BESS) market amid ongoing political and regulatory instability. Panelists from Berenberg, Alexa Capital, KfW, ECO STOR, and Ingrid Capacity emphasized that reliable counterparties and contracted revenue structures provide critical risk mitigation for lenders and investors seeking predictable returns. Despite challenges, the German market was described as offering some of the best risk-adjusted returns for storage as an asset class globally, second only to the United States.RenewablesnowEco Stor signs tolling deal for 300-MW German battery projectEco Stor has signed a five-year tolling deal with virtual power plant operator Next Kraftwerke for its 300-MW Foerderstedt battery energy storage system in Germany, securing revenue for 80% of capacity while the remaining 20% operates on market-price-oriented terms. Next Kraftwerke will manage cross-market optimization across day-ahead, intraday, and balancing energy markets starting in November with the first 100 MW unit, with two additional units to be deployed in phases. Once fully operational, the facility will be Germany's largest battery storage system, capable of supplying up to 500,000 households with electricity for two hours and helping compensate for frequency fluctuations and grid imbalances.Energy-Storage.NewsEco Stor and Next Kraftwerke agree toll for 700MWh Germany BESSEco Stor secured a long-term toll with Next Kraftwerke for its 300MW/700MWh BESS in Förderstedt, Germany, with trading starting November 2026. The project is built in three 100MW phases, with full operation in 2027. The toll provides the economic basis for long-term operation.Energy-Storage.NewsStrong regulatory uncertainty ‘cools’ investor interest in Germany, clarity in 2027 at earliestGeorg Gallmetzer, managing director of Eco Stor, said regulatory uncertainty on grid fees, connection agreements, and capacity markets has cooled investor interest in Germany's energy storage market. He expects clarity by 2027 or later, making financing challenging. The uncertainty stems from multiple parallel regulatory processes affecting the BESS market.