Fermi Energia

Full company profile

uuid000au2p

Namestring
Fermi Energia
Legal namestring
Fermi Energia AS
Websiteurl
fermi.ee
Company typeenum
Private
Founded yearint
2019
Descriptiontext

Fermi Energia AS is an Estonian privately held nuclear development company founded in 2019 and headquartered in Tallinn. The company is developing Estonia's first nuclear power program, with the objective of deploying two-to-four GE Hitachi BWRX-300 boiling water small modular reactors (300 MW each, totaling 600–1,200 MW) at the Madala site near Kunda port in Viru-Nigula municipality. The BWRX-300 is a Generation III+ passive-safety reactor whose first reference unit is under construction at Darlington, Ontario, Canada, targeted for 2028. Fermi selected the BWRX-300 in 2023 after evaluating over 50 SMR designs with Tractebel, citing 40+ years of Nordic boiling water reactor experience as the key technical rationale.

Fermi operates a pre-commercial project-development business model. Current cash inflow is limited to a €1.7 million capital raise completed in 2023 and a South Korean government-funded pre-feasibility study awarded in December 2025; the company is pre-revenue with no electricity generation. Forward revenue is intended to come from long-term power purchase agreements (PPAs) at a target price of €80–90/MWh with Estonian industrial buyers, with the state expected to take a significant equity stake in the operator (supported by 78% of respondents in a January 2026 Kantar Emor survey). Pricing is structured to cover full lifecycle costs including construction, fuel (5–6% of electricity price), staff training, waste management, decommissioning, and regulator fees.

The company's go-to-market is government-relations and enterprise sales-led, anchored on legislative milestones (Nuclear Energy Act adopted 17 June 2026, regulator commencing 1 January 2027), a conditional municipal land agreement for the Madala site (May 2026), and an ecosystem of execution partners including TVO Nuclear Services (Finnish operator consulting), Aecon (Darlington construction reference), Samsung C&T (South Korean pre-feasibility), and OPG (operational readiness). Fermi also runs public-engagement programs — annual nuclear conference, Fermion Summer School, Reactor Friday lectures, the Atomic Room in Kunda, scholarships, and Kantar Emor polling — to build and sustain the 71% public support rate that underpins the political viability of the project.

Short descriptiontext

Fermi Energia is a privately held Estonian nuclear development company founded in 2019, developing Estonia's first nuclear power plant using 2–4 GE Hitachi BWRX-300 small modular reactors (600–1,200 MW) at the Madala site near Kunda, with planned long-term PPA electricity sales to Estonian industry.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersTallinn, Estonia
HQ citystring
Tallinn
HQ countrystring
Estonia
HQ regionstring
Europe
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
small modular reactors, nuclear power development, baseload electricity, carbon-free generation, energy infrastructure
Industry2 codes
1Small Modular Reactor (SMR) Power Generation
CodeEUACADAFPrimaryYes
2Small Modular Reactor (SMR) Platforms & Balance-of-Plant Integration
CodeEUAKADAAPrimaryNo
NAICS code2 codes
  • Nuclear Electric Power Generation221113
  • Turbine and Turbine Generator Set Units Manufacturing333611
SIC code1 code
  • Engines & Turbines3510
Product category
Nuclear Power Generation / Small Modular Reactor Development
No data
GTM motion2 records

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Sales (Power Purchase Agreements)
TypeSubscription Recurring
Description

Fermi Energia plans to sell electricity from the Estonian nuclear power plant to Estonian businesses and eventually households via long-term power purchase agreements (PPAs). The target selling price is €80–90/MWh. The price covers all life-cycle costs including staff training, waste management, decommissioning, and regulator fees. The company is currently inviting Estonian businesses to sign memoranda for future long-term electricity contracts.

fermi.ee
Marketing channels9 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels3 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Personnel, Technology or R&D, Operations, Marketing or Sales, Infrastructure, Others
Pricing details1 tier
1Long-term electricity sales contracts (PPAs) for Estonian businesses and industrial consumers
ModelSubscriptionBilling cadenceMulti-year contract
Notes

Target price €80–90/MWh. Covers all lifecycle costs. Fuel accounts for only 5-6% of electricity price, making the primary cost component the construction of the plant itself. The company is inviting Estonian businesses to sign memoranda for future contracts.

fermi.ee
GTM typeB2B and B2C
B2B and B2C
Offering typeServices
Services
Core offering1 text field

Fermi Energia is developing Estonia's first nuclear power plant using new-generation GE Hitachi BWRX-300 boiling water small modular reactors (SMRs), planning to build two to four 300 MW reactors (600–1,200 MW total) to supply carbon-free, weather-independent baseload electricity. The company's near-term offerings comprise pre-feasibility studies, site-selection and regulatory advisory work, training and educational programs (e.g., Fermion Summer School), and long-term electricity sales via power purchase agreements targeting €80–90/MWh.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 9 values shown
  • 71% of Estonians support nuclear power plant preparations (January 2026, highest since 2019)
+8 more records
Product overview1 text field

Fermi Energia is developing Estonia's first nuclear power plant program using new generation GE Hitachi BWRX-300 small modular reactors (SMRs). The company plans to build two 300 MW reactors (totaling 600 MW, expandable to 1200 MW with 2-4 reactors) to provide carbon-free, weather-independent electricity production. The portfolio includes the core nuclear power plant development project, the BWRX-300 technology (selected in 2023 as reference technology from Canada's first-of-its-kind project), pre-feasibility studies covering technology assessment and site selection, consulting services from TVO Nuclear Services, and educational programs like the Fermion Summer School. The project timeline extends from 2019 through potential commercial operation by 2031-2035.

Product and service4 records
1Nuclear Power Plant Development (Estonia)
CategoryNuclear power generation / Energy infrastructure
Description

End-to-end development of a nuclear power plant project in Estonia using GE Hitachi BWRX-300 small modular reactors, covering site selection at Madala (Viru-Nigula municipality), regulatory licensing framework establishment, construction planning, and eventual electricity supply of 600–1,200 MW to Estonian consumers via long-term PPAs at €80–90/MWh.

2Long-Term Electricity Sales (Power Purchase Agreements)
CategoryElectricity supply / Energy services
Description

Long-term power purchase agreements (PPAs) for sale of nuclear-generated electricity to Estonian businesses and industrial consumers, with target pricing of €80–90/MWh covering all lifecycle costs (construction, fuel at 5–6% of price, waste management, decommissioning, regulator fees). Commercial supply is contingent on plant commissioning.

3Pre-feasibility and Site Selection Studies
CategoryPre-feasibility studies / Technical advisory
Description

Comprehensive pre-feasibility studies covering SMR technology assessment, economic impact analysis, fuel cycle requirements, waste management solutions, safety parameters, licensing principles, and cooling water availability for Estonia's nuclear program. Includes studies produced in cooperation with partners such as Tractebel, Deep Isolation, Sweco, Skepast&Puhkim, Steiger Engineering, and Samsung C&T (with South Korean government funding).

4Fermion Summer School
CategoryEducational outreach / Talent development
Description

Annual 3-day summer school educational program for students and young professionals interested in nuclear energy, providing foundational knowledge about nuclear power and career pathways in the Estonian nuclear sector. Complemented by the autumn Reactor Route school at Tallinn University of Applied Sciences Mõdriku Institute.

Scale indicator11 records

Each record includes

Type, Value, Description, Source

Partnership11 partners
Strategic tierCoreTypeImplementation/ SI/ Consulting PartnerAnnounced on2026-02-17
Description

TVONS, a wholly-owned subsidiary of Finnish nuclear operator Teollisuuden Voima Oyj (TVO), signed a framework agreement with Fermi Energia to act as consultant on the Estonian SMR project. TVONS brings experience from the Olkiluoto nuclear plant (operating since 1978) and the recently completed Olkiluoto 3 project. Its expertise covers project initiation, permitting, supply model evaluation, construction support, and commissioning readiness. TVONS will help ensure the project meets international requirements and safety standards.

Strategic tierCoreTypeTechnology or IntegrationAnnounced on2025-12-18
Description

Samsung C&T, in collaboration with Fermi Energia, was selected for South Korean government funding for a pre-feasibility study on BWRX-300 deployment in Estonia. Samsung C&T is also working with GE Vernova Hitachi on strategic global BWRX-300 projects including Sweden. The partnership provides international validation of the BWRX-300 for Estonia through a government-funded study.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2025-09-16
Description

Fermi Energia and Aecon signed a teaming agreement to advance SMR deployment in Estonia. Aecon is a major Canadian construction company currently building the world's first BWRX-300 at Darlington, Ontario. Aecon is responsible for constructing the reactor building using innovative modular steel-and-concrete methods. The partnership leverages Aecon's hands-on BWRX-300 construction experience directly for the Estonian project.

Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Joint tender of Estonian companies Skepast&Puhkim OÜ and Steiger Engineering Bureau won the public procurement for the nuclear power plant planning consultant, advising the Ministry of Climate on site pre-selection, impact assessment, and Phase 1 of the national special plan.

5Norte Korea (Engineering Firm)
Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Conducted a preliminary feasibility study for the new Madala site in Kunda, funded by KIND (KredEx). The study confirmed Madala as the most suitable site among all options considered for the nuclear plant.

fermi.ee
Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Conducted a cooling water study for the Madala site, contributing to site suitability assessment. Sweco is a European engineering consultancy.

Strategic tierCoreTypeTechnology or Integration
Description

Tractebel, a Belgian nuclear engineering company, conducted the comparative SMR technology assessment in 2020 that helped Fermi Energia pre-select the most suitable SMR technology for Estonia. The company evaluated over 50 SMR designs and contributed to the technology selection process.

Strategic tierCoreTypeTechnology or Integration
Description

OPG is building the world's first BWRX-300 reference plant at Darlington, Ontario (targeting 2028 commissioning). Fermi Energia Kallemets visited Darlington in April 2026 and met with OPG, confirming OPG is ready to provide operational readiness services for the Estonian project. OPG's experience from its CANDU reactor modernization program (8,780 documented lessons) is being applied to SMR construction.

Strategic tierCoreTypeTechnology or Integration
Description

GE Hitachi is the technology provider for the BWRX-300 reactor. The company selected BWRX-300 in 2022 after requesting bids from three SMR developers. GE Hitachi's BWRX-300 is becoming an international standard — adopted by Poland (~20 reactors), Estonia, and US (TVA).

Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Fermi Energia and KSU (the Swedish provider of training for nuclear power plant operators) signed an agreement in January 2024 to create a joint training program for the Estonian nuclear workforce.

Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

The Estonian Academy of Sciences, in partnership with Fermi Energia, established the Anto Raukas Scholarship for nuclear energy studies, supporting the development of Estonian nuclear expertise.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

Canadian molten-salt reactor developer (Integral MSR); comparable pre-revenue SMR/advanced-reactor developer pursuing regulatory approvals in Canada/UK and industrial offtake partnerships, with similar first-of-a-kind execution profile.

TypeEmerging player
Description

US developer of the fluoride-salt-cooled high-temperature reactor (Hermes/Flibe); overlaps with Fermi as a non-LWR advanced-reactor developer pursuing first-of-a-kind demonstrations and licensing.

TypeBroad incumbent
Description

Major Western nuclear OEM providing AP1000 and AP300 (SMR) designs; comparable as a broad incumbent offering competing SMR and large LWR technologies and competing for new-build projects in Europe.

TypeDirect peer
Description

US/European SMR developer focused on small, factory-built LWRs for European industrial and national utility buyers; comparable in pursuing siting, licensing, and PPA-led commercial model in Europe.

TypeDirect peer
Description

US SMR developer commercializing its VOYGR light-water SMR; like Fermi, it is a pre-revenue project developer pitching SMRs to national utilities, with first-of-a-kind reference projects and reliance on licensing, government support, and long-term PPAs.

TypeDirect peer
Description

UK-based SMR developer building a 470 MW pressurized-water SMR for deployment at home and abroad; directly comparable in business model — selecting a reference design, raising capital for fleet deployment, securing government and offtake backing.

TypeDirect peer
Description

US developer of the Xe-100 high-temperature gas-cooled SMR; comparable pre-commercial SMR venture pursuing licensing, demonstration projects, and industrial off-takers in the same first-wave SMR deployment timeline as Fermi.

TypeBroad incumbent
Description

French nuclear OEM with EPR and Nuward SMR offerings; a broad incumbent pursuing European SMR deployment alongside its large-reactor business, competing for the same European utilities and governments that Fermi targets.

TypeDirect peer
Description

Developer of the SMR-160 LWR and owner/manufacturer of nuclear fuel-cycle equipment; comparable as a vertically integrated SMR project developer targeting utility-scale deployment in similar timeframes to Fermi.

TypeBroad incumbent
Description

Vendor and designer of the BWRX-300 chosen by Fermi; comparable as a broad nuclear OEM involved in new-build, services, and SMR commercialization, and also a key Fermi's technology partner.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile3 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature3 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles16 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Fermi Energia

Nuclear Power Generation / Small Modular Reactor Developmentfermi.ee

Fermi Energia is a privately held Estonian nuclear development company founded in 2019, developing Estonia's first nuclear power plant using 2–4 GE Hitachi BWRX-300 small modular reactors (600–1,200 MW) at the Madala site near Kunda, with planned long-term PPA electricity sales to Estonian industry.

What Fermi Energia does

Fermi Energia AS is an Estonian privately held nuclear development company founded in 2019 and headquartered in Tallinn. The company is developing Estonia's first nuclear power program, with the objective of deploying two-to-four GE Hitachi BWRX-300 boiling water small modular reactors (300 MW each, totaling 600–1,200 MW) at the Madala site near Kunda port in Viru-Nigula municipality. The BWRX-300 is a Generation III+ passive-safety reactor whose first reference unit is under construction at Darlington, Ontario, Canada, targeted for 2028. Fermi selected the BWRX-300 in 2023 after evaluating over 50 SMR designs with Tractebel, citing 40+ years of Nordic boiling water reactor experience as the key technical rationale.

Fermi operates a pre-commercial project-development business model. Current cash inflow is limited to a €1.7 million capital raise completed in 2023 and a South Korean government-funded pre-feasibility study awarded in December 2025; the company is pre-revenue with no electricity generation. Forward revenue is intended to come from long-term power purchase agreements (PPAs) at a target price of €80–90/MWh with Estonian industrial buyers, with the state expected to take a significant equity stake in the operator (supported by 78% of respondents in a January 2026 Kantar Emor survey). Pricing is structured to cover full lifecycle costs including construction, fuel (5–6% of electricity price), staff training, waste management, decommissioning, and regulator fees.

The company's go-to-market is government-relations and enterprise sales-led, anchored on legislative milestones (Nuclear Energy Act adopted 17 June 2026, regulator commencing 1 January 2027), a conditional municipal land agreement for the Madala site (May 2026), and an ecosystem of execution partners including TVO Nuclear Services (Finnish operator consulting), Aecon (Darlington construction reference), Samsung C&T (South Korean pre-feasibility), and OPG (operational readiness). Fermi also runs public-engagement programs — annual nuclear conference, Fermion Summer School, Reactor Friday lectures, the Atomic Room in Kunda, scholarships, and Kantar Emor polling — to build and sustain the 71% public support rate that underpins the political viability of the project.

Fermi Energia firmographics

Firmographics
Name
Fermi Energia
Legal name
Fermi Energia AS
Website
https://fermi.ee
Company type
Private
Founded year
2019
Operating status
Operating
Headcount range
11–50 employees
Short description
Fermi Energia is a privately held Estonian nuclear development company founded in 2019, developing Estonia's first nuclear power plant using 2–4 GE Hitachi BWRX-300 small modular reactors (600–1,200 MW) at the Madala site near Kunda, with planned long-term PPA electricity sales to Estonian industry.
Ownership category
akta.pro rank

Fermi Energia industry classification

Industry
Product category
Nuclear Power Generation / Small Modular Reactor Development
NAICS
Nuclear Electric Power Generation (221113), Turbine and Turbine Generator Set Units Manufacturing (333611)
SIC
Engines & Turbines (3510)
akta.pro primary industry
Small Modular Reactor (SMR) Power Generation (EUACADAF)
akta.pro secondary industry
Small Modular Reactor (SMR) Platforms & Balance-of-Plant Integration (EUAKADAA)

Keywords

  • Small modular reactors
  • Nuclear power development
  • Baseload electricity
  • Carbon-free generation
  • Energy infrastructure

Where Fermi Energia is headquartered

Location

Headquarters

HQ city
Tallinn
HQ country
Estonia
HQ region
Europe

Offices1 record

Markets served

Fermi Energia business model

Business model
GTM type
B2B and B2C
Offering type
Services
Cost components
Personnel, Technology or R&D, Operations, Marketing or Sales, Infrastructure, Others

Revenue model

  1. Electricity Sales (Power Purchase Agreements): Fermi Energia plans to sell electricity from the Estonian nuclear power plant to Estonian businesses and eventually households via long-term power purchase agreements (PPAs). The target selling price is €80–90/MWh. The price covers all life-cycle costs including staff training, waste management, decommissioning, and regulator fees. The company is currently inviting Estonian businesses to sign memoranda for future long-term electricity contracts.

Pricing tiers

ModelBillingPrice
SubscriptionMulti-year contractLong-term electricity sales contracts (PPAs) for Estonian businesses and industrial consumers

Go-to-market motion2 records

Distribution channels3 records

Marketing channels9 records

Fermi Energia product offering

Product offering

Core offering

Fermi Energia is developing Estonia's first nuclear power plant using new-generation GE Hitachi BWRX-300 boiling water small modular reactors (SMRs), planning to build two to four 300 MW reactors (600–1,200 MW total) to supply carbon-free, weather-independent baseload electricity. The company's near-term offerings comprise pre-feasibility studies, site-selection and regulatory advisory work, training and educational programs (e.g., Fermion Summer School), and long-term electricity sales via power purchase agreements targeting €80–90/MWh.

Product overview

Fermi Energia is developing Estonia's first nuclear power plant program using new generation GE Hitachi BWRX-300 small modular reactors (SMRs). The company plans to build two 300 MW reactors (totaling 600 MW, expandable to 1200 MW with 2-4 reactors) to provide carbon-free, weather-independent electricity production. The portfolio includes the core nuclear power plant development project, the BWRX-300 technology (selected in 2023 as reference technology from Canada's first-of-its-kind project), pre-feasibility studies covering technology assessment and site selection, consulting services from TVO Nuclear Services, and educational programs like the Fermion Summer School. The project timeline extends from 2019 through potential commercial operation by 2031-2035.

Differentiator

Problem solved

Functional benefit

Products and services

  • Nuclear Power Plant Development (Estonia) End-to-end development of a nuclear power plant project in Estonia using GE Hitachi BWRX-300 small modular reactors, covering site selection at Madala (Viru-Nigula municipality), regulatory licensing framework establishment, construction planning, and eventual electricity supply of 600–1,200 MW to Estonian consumers via long-term PPAs at €80–90/MWh.
  • Long-Term Electricity Sales (Power Purchase Agreements) Long-term power purchase agreements (PPAs) for sale of nuclear-generated electricity to Estonian businesses and industrial consumers, with target pricing of €80–90/MWh covering all lifecycle costs (construction, fuel at 5–6% of price, waste management, decommissioning, regulator fees). Commercial supply is contingent on plant commissioning.
  • Pre-feasibility and Site Selection Studies Comprehensive pre-feasibility studies covering SMR technology assessment, economic impact analysis, fuel cycle requirements, waste management solutions, safety parameters, licensing principles, and cooling water availability for Estonia's nuclear program. Includes studies produced in cooperation with partners such as Tractebel, Deep Isolation, Sweco, Skepast&Puhkim, Steiger Engineering, and Samsung C&T (with South Korean government funding).
  • Fermion Summer School Annual 3-day summer school educational program for students and young professionals interested in nuclear energy, providing foundational knowledge about nuclear power and career pathways in the Estonian nuclear sector. Complemented by the autumn Reactor Route school at Tallinn University of Applied Sciences Mõdriku Institute.

Quantifiable outcome

  • 71% of Estonians support nuclear power plant preparations (January 2026, highest since 2019)
  • +8 more outcomes

Companies that use Fermi Energia

Customer profile

Named customers1 record

Segments3 records

Ideal customer profiles3 records

Fermi Energia technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature3 records

Fermi Energia partnerships and signals

Strategic signal

Partnerships

Eleven partnerships are on record, tiered core and minor.

  • TVO Nuclear Services (TVONS)coreImplementation/ SI/ Consulting Partner · 17 February 2026TVONS, a wholly-owned subsidiary of Finnish nuclear operator Teollisuuden Voima Oyj (TVO), signed a framework agreement with Fermi Energia to act as consultant on the Estonian SMR project. TVONS brings experience from the Olkiluoto nuclear plant (operating since 1978) and the recently completed Olkiluoto 3 project. Its expertise covers project initiation, permitting, supply model evaluation, construction support, and commissioning readiness. TVONS will help ensure the project meets international requirements and safety standards.
  • Samsung C&T Engineering & Construction GroupcoreTechnology or Integration · 18 December 2025Samsung C&T, in collaboration with Fermi Energia, was selected for South Korean government funding for a pre-feasibility study on BWRX-300 deployment in Estonia. Samsung C&T is also working with GE Vernova Hitachi on strategic global BWRX-300 projects including Sweden. The partnership provides international validation of the BWRX-300 for Estonia through a government-funded study.
  • Aecon Group Inc.coreStrategic or Co-development Partner · 16 September 2025Fermi Energia and Aecon signed a teaming agreement to advance SMR deployment in Estonia. Aecon is a major Canadian construction company currently building the world's first BWRX-300 at Darlington, Ontario. Aecon is responsible for constructing the reactor building using innovative modular steel-and-concrete methods. The partnership leverages Aecon's hands-on BWRX-300 construction experience directly for the Estonian project.
  • Skepast&Puhkim OÜ and Steiger Engineering Bureau (joint tender)minorImplementation/ SI/ Consulting PartnerJoint tender of Estonian companies Skepast&Puhkim OÜ and Steiger Engineering Bureau won the public procurement for the nuclear power plant planning consultant, advising the Ministry of Climate on site pre-selection, impact assessment, and Phase 1 of the national special plan.
  • Norte Korea (Engineering Firm)minorImplementation/ SI/ Consulting PartnerConducted a preliminary feasibility study for the new Madala site in Kunda, funded by KIND (KredEx). The study confirmed Madala as the most suitable site among all options considered for the nuclear plant.
  • SwecominorImplementation/ SI/ Consulting PartnerConducted a cooling water study for the Madala site, contributing to site suitability assessment. Sweco is a European engineering consultancy.
  • Tractebel (Belgian Nuclear Engineering Company)coreTechnology or IntegrationTractebel, a Belgian nuclear engineering company, conducted the comparative SMR technology assessment in 2020 that helped Fermi Energia pre-select the most suitable SMR technology for Estonia. The company evaluated over 50 SMR designs and contributed to the technology selection process.
  • Ontario Power Generation (OPG)coreTechnology or IntegrationOPG is building the world's first BWRX-300 reference plant at Darlington, Ontario (targeting 2028 commissioning). Fermi Energia Kallemets visited Darlington in April 2026 and met with OPG, confirming OPG is ready to provide operational readiness services for the Estonian project. OPG's experience from its CANDU reactor modernization program (8,780 documented lessons) is being applied to SMR construction.
  • GE Hitachi Nuclear Energy (BWRX-300)coreTechnology or IntegrationGE Hitachi is the technology provider for the BWRX-300 reactor. The company selected BWRX-300 in 2022 after requesting bids from three SMR developers. GE Hitachi's BWRX-300 is becoming an international standard — adopted by Poland (~20 reactors), Estonia, and US (TVA).
  • KSU (Swedish Nuclear Power Plant Operator Training Provider)minorImplementation/ SI/ Consulting PartnerFermi Energia and KSU (the Swedish provider of training for nuclear power plant operators) signed an agreement in January 2024 to create a joint training program for the Estonian nuclear workforce.
  • Estonian Academy of SciencesminorImplementation/ SI/ Consulting PartnerThe Estonian Academy of Sciences, in partnership with Fermi Energia, established the Anto Raukas Scholarship for nuclear energy studies, supporting the development of Estonian nuclear expertise.

Scale indicators11 records

Recent moves6 records

Expansion highlights6 records

Fermi Energia competitors and assessment

Company assessment

Direct peers

  • Terrestrial Energy: Canadian molten-salt reactor developer (Integral MSR); comparable pre-revenue SMR/advanced-reactor developer pursuing regulatory approvals in Canada/UK and industrial offtake partnerships, with similar first-of-a-kind execution profile.
  • Last Energy: US/European SMR developer focused on small, factory-built LWRs for European industrial and national utility buyers; comparable in pursuing siting, licensing, and PPA-led commercial model in Europe.
  • NuScale Power: US SMR developer commercializing its VOYGR light-water SMR; like Fermi, it is a pre-revenue project developer pitching SMRs to national utilities, with first-of-a-kind reference projects and reliance on licensing, government support, and long-term PPAs.
  • Rolls-Royce SMR: UK-based SMR developer building a 470 MW pressurized-water SMR for deployment at home and abroad; directly comparable in business model — selecting a reference design, raising capital for fleet deployment, securing government and offtake backing.
  • X-energy: US developer of the Xe-100 high-temperature gas-cooled SMR; comparable pre-commercial SMR venture pursuing licensing, demonstration projects, and industrial off-takers in the same first-wave SMR deployment timeline as Fermi.
  • Holtec International: Developer of the SMR-160 LWR and owner/manufacturer of nuclear fuel-cycle equipment; comparable as a vertically integrated SMR project developer targeting utility-scale deployment in similar timeframes to Fermi.

Emerging players

  • Kairos Power: US developer of the fluoride-salt-cooled high-temperature reactor (Hermes/Flibe); overlaps with Fermi as a non-LWR advanced-reactor developer pursuing first-of-a-kind demonstrations and licensing.

Broad incumbents

  • Westinghouse Electric Company: Major Western nuclear OEM providing AP1000 and AP300 (SMR) designs; comparable as a broad incumbent offering competing SMR and large LWR technologies and competing for new-build projects in Europe.
  • Framatome: French nuclear OEM with EPR and Nuward SMR offerings; a broad incumbent pursuing European SMR deployment alongside its large-reactor business, competing for the same European utilities and governments that Fermi targets.
  • GE Hitachi Nuclear Energy (GE Vernova): Vendor and designer of the BWRX-300 chosen by Fermi; comparable as a broad nuclear OEM involved in new-build, services, and SMR commercialization, and also a key Fermi's technology partner.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat4 records

Key risks6 records

Key highlights7 records

Customer concentration

Fermi Energia financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Fermi Energia leadership team

Management profile

Number of profiles

Profiles16 records

Fermi Energia funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Fermi Energia M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Fermi Energia

What does Fermi Energia do?

Fermi Energia is developing Estonia's first nuclear power plant using new-generation GE Hitachi BWRX-300 boiling water small modular reactors (SMRs), planning to build two to four 300 MW reactors (600–1,200 MW total) to supply carbon-free, weather-independent baseload electricity. The company's near-term offerings comprise pre-feasibility studies, site-selection and regulatory advisory work, training and educational programs (e.g., Fermion Summer School), and long-term electricity sales via power purchase agreements targeting €80–90/MWh.

Is Fermi Energia a public or private company?

Fermi Energia is a private company. It is classified as founder individual operated bootstrapped and is currently operating.

When was Fermi Energia founded?

Fermi Energia was founded in 2019. It employs 11 to 50 people.

Where is Fermi Energia based?

Fermi Energia is headquartered in Tallinn, Estonia, in the Europe region.

How does Fermi Energia make money?

One revenue line is on record: electricity Sales (Power Purchase Agreements).

Who are Fermi Energia's main competitors?

Direct peers on record are Terrestrial Energy, Last Energy, NuScale Power, Rolls-Royce SMR, X-energy and Holtec International. Kairos Power is listed as an emerging player. Broad incumbents are Westinghouse Electric Company, Framatome and GE Hitachi Nuclear Energy (GE Vernova).

Does Fermi Energia have an API?

No public API is recorded for Fermi Energia.

What industry is Fermi Energia in?

Fermi Energia's product category is Nuclear Power Generation / Small Modular Reactor Development. Its primary akta.pro industry code is EUACADAF, Small Modular Reactor (SMR) Power Generation, with a secondary code of EUAKADAA, Small Modular Reactor (SMR) Platforms & Balance-of-Plant Integration. Its NAICS code is 221113 and its SIC code is 3510.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
Power TechnologyEurope’s electrification target needs 50GW of new nuclear capacityThe European Commission aims for electricity to cover 46% of final energy by 2040. Kalev Kallemets, CEO of Fermi Energia, says this requires nuclear providing 25–30% of generation, implying roughly 60 new large-reactor or SMR projects over four years.NatoassociationSpecial Report: The Case for Canada to Become an Allied Energy SuperpowerThis special report argues that Canada has a significant strategic opportunity to emerge as an allied energy superpower within NATO's evolving security architecture, driven by Russia's weaponization of energy following the 2022 invasion of Ukraine. The report presents three case studies illustrating Canadian energy engagement: the Baltic states' successful synchronization with the European grid (February 2025), the Estonian-Canadian small modular reactor partnership via Fermi Energia and Aecon, and Newfoundland and Labrador's hydrogen export MOU with the Port of Amsterdam. The author recommends that Ottawa formalize a NATO-oriented energy security initiative, prioritize partnerships with front-line states seeking to decouple from Russian energy infrastructure, and integrate energy infrastructure protection into national defence planning.The Independent Global Nuclear News AgencySouth Korea Awards Funding For Estonia New Nuclear Pre-Feasibility StudySamsung C&T Engineering & Construction Group, in collaboration with Estonian nuclear company Fermi Energia, has been selected to receive funding from the South Korean government for a pre-feasibility study related to Estonia's planned new nuclear energy project. The study focuses on the deployment of BWRX-300 small modular reactors (SMRs) in Estonia, representing progress in the Baltic nation's nuclear energy ambitions.ANSIndustry Update—December 2025The December 2025 nuclear energy industry update covers multiple strategic partnerships, contracts, and technology developments across the global nuclear sector. Key developments include GE Vernova Hitachi advancing BWRX-300 small modular reactor deployment through alliances with Samsung C&T for strategic global projects including Sweden, and with Aecon and Fermi Energia for Estonian deployment, while Oklo and Blykalla formalized a joint technology agreement and Newcleo committed up to $2 billion for advanced fuel fabrication infrastructure in the United States. Additional significant activity includes nuclear-powered data center partnerships in Sweden, Sizewell C securing fuel and turbine island contracts ahead of construction, Romania's Nuclearelectrica securing $720 million in financing for Cernavoda refurbishment, and India awarding Larsen & Toubro a contract worth up to $285 million for Kudankulam Units 5 and 6.PR NewswireEstónske geologické podložie je vhodné pre uloženie jadrového odpaduDeep Isolation conducted a preliminary geological study for Fermi Energia examining Estonia's suitability for deep horizontal nuclear waste storage, finding no substantial geological limitations and identifying multiple locations meeting IAEA safety regulations. The study supports Estonia's ambition to build a small modular reactor (SMR) nuclear power plant by 2030 as part of its goal to reduce carbon emissions by 70%. The proposed horizontal repository would be built at approximately 1,500 meters depth—significantly deeper than conventional repositories (500m) in countries like Finland, Sweden, and France—at an estimated quarter of typical construction costs.PR NewswirePromesses estoniennes : la géologie du pays présente un potentiel intéressant pour le stockage de déchets nucléairesA deep burial study commissioned by advanced reactor company Fermi Energia found no fundamental geological limitations to disposing of nuclear waste in deep horizontal boreholes in Estonia, with various locations identified as potentially compliant with IAEA safety regulations. The study examined risk factors across Estonia's 15 counties and assessed crystalline bedrock suitability for a waste repository at approximately 1,500 meters depth. Estonia is pursuing small modular reactors to meet its goal of reducing carbon emissions by 70% by 2030, and the findings suggest a deep borehole repository could be safer and roughly a quarter of the cost of traditional mined repositories.PR NewswireЭстония может заняться утилизацией ядерных отходовDeep Isolation and Fermi Energia conducted a geological study assessing the suitability of Estonian regions for storing nuclear waste in deep horizontal wells, finding no fundamental geological restrictions. The research highlights this method as a safe and cost-effective solution to support Estonia's goal of reducing carbon emissions by 70% by 2030 through advanced small modular reactors. The proposed storage depth of 1,500 meters offers significant advantages over existing facilities in terms of safety and construction time.PR NewswireEstlands Geologie ist vielversprechend für die Endlagerung von AtommüllDeep Isolation conducted a geological study for Estonian company Fermi Energia evaluating Estonia's crystalline bedrock for deep horizontal borehole nuclear waste disposal, finding no fundamental geological restrictions and multiple sites with potential to meet IAEA safety standards. The study, assessing all 15 counties of Estonia, found that horizontal borehole disposal at 1,500 metres depth could cost roughly a quarter of traditional mined repositories while offering faster deployment and enhanced safety. This preliminary assessment supports Estonia's ambition to deploy small modular reactors in the 2030s as part of its goal to reduce carbon emissions by 70%, though spent nuclear fuel disposal remains a challenge to resolve.PR NewswireZ geologicznego punktu widzenia Estonia jest obiecującym miejscem dla składowania odpadów jądrowychDeep Isolation completed a geological assessment for Fermi Energia evaluating Estonia's suitability for nuclear waste storage in deep horizontal drilling holes, finding no fundamental geological limitations and confirming multiple sites could meet IAEA safety requirements. Fermi Energia, pursuing small modular reactor (SMR) development to support Estonia's goal of reducing carbon emissions by 70% by 2030, is the first European company to commission such a study from Deep Isolation. Research conducted with Electric Power Research Institute indicates deep horizontal drilling (1,500 meters) would be significantly faster and approximately 25% cheaper than conventional mine-based repositories being developed in Finland, Sweden, and France.PR NewswireLa geología de Estonia promete en desechos de residuos nuclearesDeep Isolation conducted a preliminary geological study for Fermi Energia, finding that Estonia's crystalline bedrock is suitable for deep horizontal borehole disposal of nuclear waste. The study indicates that this method could isolate waste at depths of 1,500 meters, potentially offering a safer and more cost-effective solution than traditional mining repositories currently being built in neighboring countries.