Developer docs
API playgroundTry for free, no card

Search company profiles

Elering

Full company profile

uuid000m38u

Namestring
Elering
Legal namestring
Elering AS
Websiteurl
elering.ee
Company typeenum
Private
Founded yearint
2010
Descriptiontext

Elering AS is the independent, state-owned electricity and gas transmission system operator of Estonia, wholly owned by the Republic of Estonia and operating under the supervision of the Estonian Competition Authority (Konkurentsiamet). It holds the exclusive legal mandate under the Electricity Market Act and Natural Gas Act to operate Estonia's high-voltage electricity network (5,198 km of overhead lines and 158 substations) and gas transmission network (978 km of pipelines and 36 distribution stations), including cross-border AC links to Latvia and HVDC links to Finland via the EstLink connections. Elering provides a portfolio of regulated infrastructure services — transmission, balancing, gas transport, grid connection, and (from January 1, 2026) supply security — to all Estonian electricity producers, large industrial consumers, distribution operators, and energy traders, with tariffs set by the regulator.

The company's business model is a regulated natural monopoly: revenue is generated through usage-based transmission tariffs (segmented by 330 kV, 110 kV, and sub-110 kV voltage levels), one-time connection fees, recurring balancing and aggregation services, and the new supply security fee. Customers access services through a digital platform layer that includes the Elering LIVE real-time dashboard, the e-Gridmap connection feasibility tool, the Client Portal for metering and invoicing, and the Green Portal for renewable energy registration. Go-to-market is sales-led via formal application processes (e.g., egle.ee) rather than traditional marketing. In February 2025 Elering completed synchronization of Estonia's grid with Continental Europe, a strategic step that opened its balancing markets to distributed assets such as telecom batteries, and is executing a multi-year capex program that includes EstLink 3, a fourth Estonia-Latvia interconnector, the Nordic-Baltic Hydrogen Corridor, and EU-funded grid modernization.

Short descriptiontext

Elering AS is Estonia's state-owned, independent electricity and gas transmission system operator, running 5,198 km of power lines, 158 substations, and 978 km of gas pipelines to serve all Estonian producers, large consumers, distribution operators, and energy traders under regulated tariffs.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
101–250
akta.pro rankint
HeadquartersTallinn, Estonia
HQ citystring
Tallinn
HQ countrystring
Estonia
HQ regionstring
Europe
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
electricity transmission services, gas transmission services, transmission system operator, grid balancing services, energy network infrastructure
Industry1 code
PRIMARYEUAEAFAA
High-Voltage Electrical Systems (Switchgear, Transformers, Protection & Control)
Energy, Utilities & Environment/Energy Infrastructure & Services (EPC, O&M, Field Services)/Mechanical, Electrical & Plumbing (MEP) for Energy Facilities
NAICS code3 codes
  • Electric Bulk Power Transmission and Control221121
  • Electric Power Transmission, Control, and Distribution22112
  • Electric Power Generation, Transmission and Distribution2211
SIC code2 codes
  • Electric Services4911
  • Natural Gas Transmisison & Distribution4923
Product category
Electricity and Gas Transmission Services
Social media profiles3 records
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model5 records
1Electricity Transmission Services
TypeUsage Based
Description

Charges for electricity transmission at 330kV, 110kV, and below 110kV voltage levels. Tariffs include edastamistasu (transmission fee), tarbimiskoha tasu (connection point fee), and võimsustasu (capacity fee). Also includes reactive energy charges.

elering.ee
2Connection Fees
TypeOne Time License
Description

Fees for connecting new customers to the electricity transmission network, including fixed connection fees, network reinforcement charges, and processing fees. For production connections: 65,000 €/MVA for up to 110kV, 12,000 €/MVA for 330kV.

elering.ee
3Balancing Services
TypeSubscription Recurring
Description

Revenue from providing electricity balancing services to market participants, including balancing agreements and aggregation services for grid stability.

elering.ee
4Gas Transmission Services
TypeUsage Based
Description

Charges for gas transmission through the 978km pipeline network, including connection fees for B, C, and D category gas installations.

elering.ee
5Supply Security Fee (Varustuskindluse tasu)
TypeSubscription Recurring
Description

New fee introduced January 1, 2026 to maintain dispatchable power plants that ensure electricity supply during challenging conditions.

elering.ee
Marketing channels7 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Operations, Personnel, Technology or R&D, Supply Chain
Pricing details7 tiers
1330 kV Transmission Tariffs
ModelUsage-basedBilling cadenceAnnual
Notes

Edastamistasu (A1): 14.50 €/MWh; Tarbimiskoha tasu (T1): 90,779.76 €/connection/year; Võimsustasu (V1): 6,425.85 €/MVA/year. Alternative Package II: T4: 90,779.76 €/connection/year; V4: 11,958.54 €/MVA/year.

elering.ee
2110 kV Transmission Tariffs
ModelUsage-basedBilling cadenceAnnual
Notes

Edastamistasu (A2): 23.67 €/MWh; Tarbimiskoha tasu (T2): 11,487.92 €/connection/year; Võimsustasu (V2): 10,785.86 €/MVA/year. Alternative T5/V5 packages available.

elering.ee
3Below 110 kV Transmission Tariffs
ModelUsage-basedBilling cadenceAnnual
Notes

Edastamistasu (A3): 25.69 €/MWh; Tarbimiskoha tasu (T3): 27,679.58 €/connection/year; Võimsustasu (V3): 13,613.52 €/MVA/year.

elering.ee
4Reactive Energy Tariff
ModelUsage-basedBilling cadencePay-as-you-go
Notes

R: 1.88 €/MVArh

elering.ee
5Electricity Connection Fees - Network Reinforcement
ModelUnit PricingBilling cadenceMulti-year contract
Notes

Production connection: 65,000 €/MVA (up to 110kV), 12,000 €/MVA (330kV). Processing fee: 3,200-4,000 € depending on connection type. Service fee: 4,200-12,800 €.

elering.ee
6Preliminary Study Fees
ModelUnit PricingBilling cadenceOne time
Notes

Consumer/distribution operator preliminary study: 1,200 + km €. Generator/stagged installation preliminary study: 2,000 + km €. Procurement document preparation: 7,500 + km €.

elering.ee
7Gas Network Connection Fees
ModelUnit PricingBilling cadenceMulti-year contract
Notes

Processing fee: 1,300 € (both consumption and production connections). Service fee: 4,800 € (consumption), 6,400 € (production). Construction costs covered separately.

elering.ee
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Elering operates Estonia's high-voltage electricity transmission network (5,198 km of overhead lines, 158 substations) and gas transmission network (978 km of pipelines, 36 distribution stations), providing regulated transmission, grid connection, balancing, and cross-border energy trade services. The company also operates digital platforms including the Elering LIVE real-time energy dashboard, e-Gridmap connection feasibility application, Client Portal, and Renewable Energy Information System to support market participants and system transparency.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 3 values shown
  • Estonia achieved 63% renewable electricity production in 2024, nearly doubling from 34% in 2022, enabled by grid infrastructure and synchronization with Continental Europe
+2 more records
Product overview1 text field

Elering is Estonia's independent electricity and gas transmission system operator offering a portfolio of interconnected infrastructure services and digital platforms. The core offering includes electricity and gas transmission networks (5,198 km of overhead lines and 978 km of gas pipelines), complemented by digital platforms such as Elering Live (real-time energy dashboard), e-Gridmap (connection feasibility mapping), Client Portal (metering data access), and the Renewable Energy Information System. These products work together to enable grid connection services, balancing services, cross-border electricity and gas trade, and system stability management. The infrastructure includes EstLink DC connections to Finland and cross-border AC connections to Latvia.

Product and service9 records
1Electricity Transmission Network Service
CategoryInfrastructure service
Description

Regulated high-voltage electricity transmission service operating through 5,198 km of overhead lines and 158 substations, with cross-border AC links to Latvia and DC links (EstLinks) to Finland. Available at 330 kV, 110 kV, and below 110 kV voltage levels, serving electricity producers, large consumers, distribution operators, and energy traders in Estonia.

2Gas Transmission Network Service
CategoryInfrastructure service
Description

Regulated gas transmission service through 978 km of gas pipelines and 36 gas distribution stations, with cross-border connections to Latvia and Finland. Serves industrial and commercial gas consumers and gas-fired power plants within Estonia's B, C, and D category installations (above 0.1 bar pressure).

3Electricity and Gas Connection Services
CategoryCore service
Description

End-to-end grid connection service for new electricity and gas installations to the transmission network, including application processing, technical conditions, preliminary studies, network reinforcement, and connection fee management. Serves power generation facilities, industrial consumers, and gas installation operators connecting at 110 kV, 330 kV, or gas transmission network levels.

4Electricity Balancing Service
CategoryCore service
Description

Electricity grid balancing service for market participants, including balance agreements, regulation services, and aggregation services to maintain system stability. Includes reserve capacity procurement (e.g., up to 1,036 MW contract awarded to Enefit Power valued at €59.5 million annually) and frequency reserve readiness.

5Gas Balancing Service
CategoryCore service
Description

Gas system balancing service providing gas balance management and balance agreements (bilansileping) to maintain stability of Estonia's gas transmission system for market participants.

6EstLink Cross-Border HVDC Interconnections
CategoryInfrastructure product
Description

High-voltage direct current (HVDC) cross-border interconnections (EstLinks) between Estonia and Finland that enable cross-border electricity trade, capacity allocation, and grid stability for the Baltic-Finnish energy system.

7Elering LIVE Real-Time Energy Dashboard
CategoryCore product
Description

Real-time public dashboard providing live data on Estonia's energy system, including electricity flows, gas flows, energy trade volumes, market prices, and system status. Serves energy market participants, traders, researchers, and the general public.

8e-Gridmap Connection Feasibility Application
CategoryCore product
Description

Web-based map application enabling prospective grid customers to view preliminary information about connection feasibility and estimated costs to the main electricity grid at 110 kV and 330 kV voltage levels, before submitting a formal connection application.

9Renewable Energy Information System (Green Portal)
CategoryCore product
Description

Dedicated information system (Taastuvenergia infosüsteem) for tracking and managing renewable energy data, producer registrations, and renewable energy connections across Estonia. Serves renewable energy producers (wind, solar, biomass) and Elering's own market operations.

Scale indicator9 records

Each record includes

Type, Value, Description, Source

Partnership5 partners
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-05-29
Description

Elisa Estonia deployed Elisa Industriq's Gridle AI-powered battery optimization solution across its mobile network base stations. The solution enables backup batteries to automatically charge and discharge in response to signals from grid operator Elering, allowing batteries to participate in Estonia's electricity balancing markets. This deployment follows Estonia's synchronization with the Continental European electricity system in February 2025, which enabled distributed assets like telecom batteries to support national grid stability.

Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2026-01-20
Description

Evecon owns the 100 MW Kiisa battery park. On January 20, a testing fault at this facility caused both EstLink connections between Estonia and Finland to trip, resulting in a loss of approximately 1 GW of power. Evecon has pointed to battery manufacturer Nidec Conversion as bearing primary responsibility for the incident.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2025-11-11
Description

Elering AS awarded Enefit Power OÜ, a subsidiary of Eesti Energia Group, a contract to ensure up to 1,036 MW of electricity reserve capacity in Estonia. The annual cost for this service is capped at 59.5 million euros. A new regulation effective January 1, 2026 provides Eesti Energia approximately 59.5 million euros annually from system operator Elering for reserve capacity services.

4Baltic Transmission System Operators (Litgrid, AST)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Elering cooperates with Baltic electricity transmission system operators including Litgrid (Lithuania) and AST (Latvia) on regional coordination, synchronization with Continental Europe, cross-border trade, and balancing resources management. In November 2025, Baltic TSOs announced a plan to phase out balancing resources.

elering.ee
5Nordic Transmission System Operators (Fingrid)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Elering cooperates with Nordic TSOs, primarily Fingrid (Finland), through DC interconnectors (EstLinks) and the Nordic-Baltic Hydrogen Corridor initiative for cross-border energy cooperation and system integration.

elering.ee
Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
1National Grid ESO
TypeBroad incumbent
Description

Great Britain system operator running the GB high-voltage grid, balancing mechanism, and capacity market; a global benchmark for TSO operating models that Elering's market-design choices are often compared against.

TypeDirect peer
Description

Lithuania's electricity transmission system operator and Baltic TSO counterpart; operates the Lithuanian high-voltage grid, co-coordinates Baltic balancing/synchronization, and is the most direct functional and scale peer to Elering.

TypeDirect peer
Description

Latvia's electricity transmission system operator and a core Baltic TSO partner; shares the cross-border AC link with Elering and jointly manages Baltic grid synchronization and balancing reserves.

TypeDirect peer
Description

Finland's TSO and Elering's main cross-border HVDC partner via the EstLinks; comparable in operating high-voltage transmission infrastructure, balancing markets, and reserve procurement under Finnish/EU regulation.

TypeBroad incumbent
Description

Swedish national TSO operating a larger high-voltage transmission system with similar balancing, reserve, and cross-border coordination responsibilities, providing a scaled Nordic benchmark for Elering's operations and capex programs.

TypeBroad incumbent
Description

Norwegian TSO responsible for the national and inter-Nordic transmission grid; comparable in system-operator function, balancing-market design, and cross-border HVDC interconnection management.

TypeBroad incumbent
Description

Danish TSO (and gas system operator) owned by the Danish state; one of the closest functional peers to Elering given its combined electricity and gas transmission mandate and regulated monopoly status.

TypeBroad incumbent
Description

German TSO operating the high-voltage grid in northern/eastern Germany; relevant as a Continental European TSO peer, since post-2025 synchronization places Elering inside the same synchronous area as 50Hertz.

TypeBroad incumbent
Description

Large Dutch/German TSO with extensive cross-border HVDC and offshore wind integration; useful benchmark for Elering on HVDC operations, offshore/renewables interconnection, and regulated asset base management.

TypeBroad incumbent
Description

French TSO operating one of Europe's largest high-voltage networks; relevant as a scale, regulated-asset-base, and EU-level TSO benchmark for how Continental synchronization changes Elering's operational context.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers4 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment5 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile5 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature5 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles8 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Elering

Electricity and Gas Transmission Serviceselering.ee

Elering AS is Estonia's state-owned, independent electricity and gas transmission system operator, running 5,198 km of power lines, 158 substations, and 978 km of gas pipelines to serve all Estonian producers, large consumers, distribution operators, and energy traders under regulated tariffs.

What Elering does

Elering AS is the independent, state-owned electricity and gas transmission system operator of Estonia, wholly owned by the Republic of Estonia and operating under the supervision of the Estonian Competition Authority (Konkurentsiamet). It holds the exclusive legal mandate under the Electricity Market Act and Natural Gas Act to operate Estonia's high-voltage electricity network (5,198 km of overhead lines and 158 substations) and gas transmission network (978 km of pipelines and 36 distribution stations), including cross-border AC links to Latvia and HVDC links to Finland via the EstLink connections. Elering provides a portfolio of regulated infrastructure services — transmission, balancing, gas transport, grid connection, and (from January 1, 2026) supply security — to all Estonian electricity producers, large industrial consumers, distribution operators, and energy traders, with tariffs set by the regulator.

The company's business model is a regulated natural monopoly: revenue is generated through usage-based transmission tariffs (segmented by 330 kV, 110 kV, and sub-110 kV voltage levels), one-time connection fees, recurring balancing and aggregation services, and the new supply security fee. Customers access services through a digital platform layer that includes the Elering LIVE real-time dashboard, the e-Gridmap connection feasibility tool, the Client Portal for metering and invoicing, and the Green Portal for renewable energy registration. Go-to-market is sales-led via formal application processes (e.g., egle.ee) rather than traditional marketing. In February 2025 Elering completed synchronization of Estonia's grid with Continental Europe, a strategic step that opened its balancing markets to distributed assets such as telecom batteries, and is executing a multi-year capex program that includes EstLink 3, a fourth Estonia-Latvia interconnector, the Nordic-Baltic Hydrogen Corridor, and EU-funded grid modernization.

Elering firmographics

Firmographics
Name
Elering
Legal name
Elering AS
Website
https://elering.ee
Company type
Private
Founded year
2010
Operating status
Operating
Headcount range
101–250 employees
Short description
Elering AS is Estonia's state-owned, independent electricity and gas transmission system operator, running 5,198 km of power lines, 158 substations, and 978 km of gas pipelines to serve all Estonian producers, large consumers, distribution operators, and energy traders under regulated tariffs.
Ownership category
akta.pro rank

Elering industry classification

Industry
Product category
Electricity and Gas Transmission Services
NAICS
Electric Bulk Power Transmission and Control (221121), Electric Power Transmission, Control, and Distribution (22112), Electric Power Generation, Transmission and Distribution (2211)
SIC
Electric Services (4911), Natural Gas Transmisison & Distribution (4923)
akta.pro industry
PRIMARYEUAEAFAA
High-Voltage Electrical Systems (Switchgear, Transformers, Protection & Control)
Energy, Utilities & Environment/Energy Infrastructure & Services (EPC, O&M, Field Services)/Mechanical, Electrical & Plumbing (MEP) for Energy Facilities

Keywords

  • Electricity transmission services
  • Gas transmission services
  • Transmission system operator
  • Grid balancing services
  • Energy network infrastructure

Where Elering is headquartered

Location

Headquarters

HQ city
Tallinn
HQ country
Estonia
HQ region
Europe

Offices1 record

Markets served

Elering business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Technology or R&D, Supply Chain

Revenue model

  1. Electricity Transmission Services: Charges for electricity transmission at 330kV, 110kV, and below 110kV voltage levels. Tariffs include edastamistasu (transmission fee), tarbimiskoha tasu (connection point fee), and võimsustasu (capacity fee). Also includes reactive energy charges.
  2. Connection Fees: Fees for connecting new customers to the electricity transmission network, including fixed connection fees, network reinforcement charges, and processing fees. For production connections: 65,000 €/MVA for up to 110kV, 12,000 €/MVA for 330kV.
  3. Balancing Services: Revenue from providing electricity balancing services to market participants, including balancing agreements and aggregation services for grid stability.
  4. Gas Transmission Services: Charges for gas transmission through the 978km pipeline network, including connection fees for B, C, and D category gas installations.
  5. Supply Security Fee (Varustuskindluse tasu): New fee introduced January 1, 2026 to maintain dispatchable power plants that ensure electricity supply during challenging conditions.

Pricing tiers

ModelBillingPrice
Usage-basedAnnual330 kV Transmission Tariffs
Usage-basedAnnual110 kV Transmission Tariffs
Usage-basedAnnualBelow 110 kV Transmission Tariffs
Usage-basedPay-as-you-goReactive Energy Tariff
Unit PricingMulti-year contractElectricity Connection Fees - Network Reinforcement
Unit PricingOne timePreliminary Study Fees
Unit PricingMulti-year contractGas Network Connection Fees

Go-to-market motion1 record

Distribution channels1 record

Marketing channels7 records

Elering product offering

Product offering

Core offering

Elering operates Estonia's high-voltage electricity transmission network (5,198 km of overhead lines, 158 substations) and gas transmission network (978 km of pipelines, 36 distribution stations), providing regulated transmission, grid connection, balancing, and cross-border energy trade services. The company also operates digital platforms including the Elering LIVE real-time energy dashboard, e-Gridmap connection feasibility application, Client Portal, and Renewable Energy Information System to support market participants and system transparency.

Product overview

Elering is Estonia's independent electricity and gas transmission system operator offering a portfolio of interconnected infrastructure services and digital platforms. The core offering includes electricity and gas transmission networks (5,198 km of overhead lines and 978 km of gas pipelines), complemented by digital platforms such as Elering Live (real-time energy dashboard), e-Gridmap (connection feasibility mapping), Client Portal (metering data access), and the Renewable Energy Information System. These products work together to enable grid connection services, balancing services, cross-border electricity and gas trade, and system stability management. The infrastructure includes EstLink DC connections to Finland and cross-border AC connections to Latvia.

Differentiator

Problem solved

Functional benefit

Products and services

  • Electricity Transmission Network Service Regulated high-voltage electricity transmission service operating through 5,198 km of overhead lines and 158 substations, with cross-border AC links to Latvia and DC links (EstLinks) to Finland. Available at 330 kV, 110 kV, and below 110 kV voltage levels, serving electricity producers, large consumers, distribution operators, and energy traders in Estonia.
  • Gas Transmission Network Service Regulated gas transmission service through 978 km of gas pipelines and 36 gas distribution stations, with cross-border connections to Latvia and Finland. Serves industrial and commercial gas consumers and gas-fired power plants within Estonia's B, C, and D category installations (above 0.1 bar pressure).
  • Electricity and Gas Connection Services End-to-end grid connection service for new electricity and gas installations to the transmission network, including application processing, technical conditions, preliminary studies, network reinforcement, and connection fee management. Serves power generation facilities, industrial consumers, and gas installation operators connecting at 110 kV, 330 kV, or gas transmission network levels.
  • Electricity Balancing Service Electricity grid balancing service for market participants, including balance agreements, regulation services, and aggregation services to maintain system stability. Includes reserve capacity procurement (e.g., up to 1,036 MW contract awarded to Enefit Power valued at €59.5 million annually) and frequency reserve readiness.
  • Gas Balancing Service Gas system balancing service providing gas balance management and balance agreements (bilansileping) to maintain stability of Estonia's gas transmission system for market participants.
  • EstLink Cross-Border HVDC Interconnections High-voltage direct current (HVDC) cross-border interconnections (EstLinks) between Estonia and Finland that enable cross-border electricity trade, capacity allocation, and grid stability for the Baltic-Finnish energy system.
  • Elering LIVE Real-Time Energy Dashboard Real-time public dashboard providing live data on Estonia's energy system, including electricity flows, gas flows, energy trade volumes, market prices, and system status. Serves energy market participants, traders, researchers, and the general public.
  • e-Gridmap Connection Feasibility Application Web-based map application enabling prospective grid customers to view preliminary information about connection feasibility and estimated costs to the main electricity grid at 110 kV and 330 kV voltage levels, before submitting a formal connection application.
  • Renewable Energy Information System (Green Portal) Dedicated information system (Taastuvenergia infosüsteem) for tracking and managing renewable energy data, producer registrations, and renewable energy connections across Estonia. Serves renewable energy producers (wind, solar, biomass) and Elering's own market operations.

Quantifiable outcome

  • Estonia achieved 63% renewable electricity production in 2024, nearly doubling from 34% in 2022, enabled by grid infrastructure and synchronization with Continental Europe
  • +2 more outcomes

Companies that use Elering

Customer profile

Named customers4 records

Segments5 records

Ideal customer profiles5 records

Elering technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature5 records

Elering partnerships and signals

Strategic signal

Partnerships

Five partnerships are on record, tiered core and minor.

  • Elisa EstoniacoreStrategic or Co-development Partner · 29 May 2026Elisa Estonia deployed Elisa Industriq's Gridle AI-powered battery optimization solution across its mobile network base stations. The solution enables backup batteries to automatically charge and discharge in response to signals from grid operator Elering, allowing batteries to participate in Estonia's electricity balancing markets. This deployment follows Estonia's synchronization with the Continental European electricity system in February 2025, which enabled distributed assets like telecom batteries to support national grid stability.
  • EveconminorStrategic or Co-development Partner · 20 January 2026Evecon owns the 100 MW Kiisa battery park. On January 20, a testing fault at this facility caused both EstLink connections between Estonia and Finland to trip, resulting in a loss of approximately 1 GW of power. Evecon has pointed to battery manufacturer Nidec Conversion as bearing primary responsibility for the incident.
  • Enefit Power (Eesti Energia Group)coreStrategic or Co-development Partner · 11 November 2025Elering AS awarded Enefit Power OÜ, a subsidiary of Eesti Energia Group, a contract to ensure up to 1,036 MW of electricity reserve capacity in Estonia. The annual cost for this service is capped at 59.5 million euros. A new regulation effective January 1, 2026 provides Eesti Energia approximately 59.5 million euros annually from system operator Elering for reserve capacity services.
  • Baltic Transmission System Operators (Litgrid, AST)coreStrategic or Co-development PartnerElering cooperates with Baltic electricity transmission system operators including Litgrid (Lithuania) and AST (Latvia) on regional coordination, synchronization with Continental Europe, cross-border trade, and balancing resources management. In November 2025, Baltic TSOs announced a plan to phase out balancing resources.
  • Nordic Transmission System Operators (Fingrid)coreStrategic or Co-development PartnerElering cooperates with Nordic TSOs, primarily Fingrid (Finland), through DC interconnectors (EstLinks) and the Nordic-Baltic Hydrogen Corridor initiative for cross-border energy cooperation and system integration.

Scale indicators9 records

Recent moves6 records

Expansion highlights6 records

Elering competitors and assessment

Company assessment

Broad incumbents

  • National Grid ESO: Great Britain system operator running the GB high-voltage grid, balancing mechanism, and capacity market; a global benchmark for TSO operating models that Elering's market-design choices are often compared against.
  • Svenska Kraftnät: Swedish national TSO operating a larger high-voltage transmission system with similar balancing, reserve, and cross-border coordination responsibilities, providing a scaled Nordic benchmark for Elering's operations and capex programs.
  • Statnett: Norwegian TSO responsible for the national and inter-Nordic transmission grid; comparable in system-operator function, balancing-market design, and cross-border HVDC interconnection management.
  • Energinet: Danish TSO (and gas system operator) owned by the Danish state; one of the closest functional peers to Elering given its combined electricity and gas transmission mandate and regulated monopoly status.
  • 50Hertz Transmission: German TSO operating the high-voltage grid in northern/eastern Germany; relevant as a Continental European TSO peer, since post-2025 synchronization places Elering inside the same synchronous area as 50Hertz.
  • TenneT TSO: Large Dutch/German TSO with extensive cross-border HVDC and offshore wind integration; useful benchmark for Elering on HVDC operations, offshore/renewables interconnection, and regulated asset base management.
  • RTE (Réseau de Transport d'Électricité): French TSO operating one of Europe's largest high-voltage networks; relevant as a scale, regulated-asset-base, and EU-level TSO benchmark for how Continental synchronization changes Elering's operational context.

Direct peers

  • Litgrid: Lithuania's electricity transmission system operator and Baltic TSO counterpart; operates the Lithuanian high-voltage grid, co-coordinates Baltic balancing/synchronization, and is the most direct functional and scale peer to Elering.
  • Augstsprieguma tīkls (AST): Latvia's electricity transmission system operator and a core Baltic TSO partner; shares the cross-border AC link with Elering and jointly manages Baltic grid synchronization and balancing reserves.
  • Fingrid: Finland's TSO and Elering's main cross-border HVDC partner via the EstLinks; comparable in operating high-voltage transmission infrastructure, balancing markets, and reserve procurement under Finnish/EU regulation.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks5 records

Key highlights6 records

Customer concentration

Elering social profiles

Digital presence

Elering financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Elering leadership team

Management profile

Number of profiles

Profiles8 records

Elering funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Elering M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Elering

What does Elering do?

Elering operates Estonia's high-voltage electricity transmission network (5,198 km of overhead lines, 158 substations) and gas transmission network (978 km of pipelines, 36 distribution stations), providing regulated transmission, grid connection, balancing, and cross-border energy trade services. The company also operates digital platforms including the Elering LIVE real-time energy dashboard, e-Gridmap connection feasibility application, Client Portal, and Renewable Energy Information System to support market participants and system transparency.

Is Elering a public or private company?

Elering is a private company. It is classified as state government owned and is currently operating.

When was Elering founded?

Elering was founded in 2010. It employs 101 to 250 people.

Where is Elering based?

Elering is headquartered in Tallinn, Estonia, in the Europe region.

How does Elering make money?

Five revenue lines are on record. Electricity Transmission Services are the primary driver. The others are connection Fees, balancing Services, gas Transmission Services and supply Security Fee (Varustuskindluse tasu).

Who are Elering's main competitors?

Broad incumbents on record are National Grid ESO, Svenska Kraftnät, Statnett, Energinet, 50Hertz Transmission, TenneT TSO and RTE (Réseau de Transport d'Électricité). Direct peers are Litgrid, Augstsprieguma tīkls (AST) and Fingrid.

Does Elering have an API?

No public API is recorded for Elering.

What industry is Elering in?

Elering's product category is Electricity and Gas Transmission Services. Its primary akta.pro industry code is EUAEAFAA, High-Voltage Electrical Systems (Switchgear, Transformers, Protection & Control). Its NAICS code is 221121 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
GlobeNewswireشركة Elering تتعاون مع Image Soft لحماية البنية التحتية للطاقة تحت سطح البحر في بحر البلطيق باستخدام تقنية UNWAS™ المتقدمةElering, Estonia's national grid operator, signed an agreement with Finnish defense firm Image Soft to supply third-generation UNWAS underwater monitoring systems. The systems will protect high-voltage DC cables under the Baltic Sea from sabotage and anchor dragging, using passive hydrophone sensors. Commercial terms and sensor locations remain confidential.Business & FinancialElering Partners With Image Soft To Safeguard Baltic Sea Subsea Energy Infrastructure With Advanced UNWASTM TechnologyElering signed a contract with Image Soft to deploy the 3rd-generation UNWASTM passive acoustic surveillance system to protect its Baltic Sea subsea interconnect cables. The system provides real-time detection and early-warning alerts for threats like sabotage and anchor dragging, with commercial terms and sensor locations kept confidential.GlobeNewswireElering Partners with Image Soft to Safeguard Baltic Sea Subsea Energy Infrastructure with Advanced UNWAS™ TechnologyElering signed an agreement with Image Soft to deploy its 3rd Generation UNWAS underwater surveillance system to protect Baltic Sea HVDC interconnect cables. The passive acoustic system provides real-time monitoring and early-warning alerts against sabotage and unauthorized interference. Commercial terms and sensor locations remain confidential.TradingViewEnersense International Plc (ESENSE) Wins 2-Year Elering Tower Design ContractEnersense signed a two-year agreement with Elering to design, prototype, and test a modular 110 kV transmission tower for Estonian overhead lines. The contract is booked in Enersense's Q4 2026 order book, adding secured work and visibility. Successful testing and volume adoption could drive follow-on orders.PRESSBEENATO state seeks to shut down Russian gas pipeline – media ...NewsEstonia plans to shut a gas pipeline serving Kaliningrad with Latvia's cooperation, after learning operator Elering kept it operational. The two parallel pipes run 22 km through Voru County and were last used in fall 2024. Estonia may impose sanctions on Russian gas transit if Riga refuses.Eng.lsm.lvMedijs: Igaunija plāno slēgt rezerves gāzesvadu uz Kaļiņingradas apgabaluIgaunija plans to close a reserve gas pipeline to the Kaliningrad region, a 22-kilometer section owned by Elering. The pipeline, 70cm diameter, has transported about 0.5 TWh in 2023 and 2024, roughly 15% of Igaunija's annual gas consumption. No gas deliveries have occurred recently.Eng.lsm.lvSāmsalas iedzīvotāji neapmierināti ar gaisvadu elektrolīniju, ko plāno būvēt uz LatvijuSamsala residents and the municipality oppose Elering's plan to build an overhead line across the island for the Latvia-Estonia interconnector. They prefer underground or submarine cables, citing higher visual impact and maintenance costs. The municipality has again contacted the Ministry of Economic Affairs and Communications.The Fast ModeElisa Estonia Deploys Gridle AI Battery Optimization to Enhance Network Resilience & Grid BalancingElisa Estonia has deployed Elisa Industriq's Gridle AI-powered battery optimization solution across its mobile network to strengthen network resilience and enable base station batteries to participate in Estonia's electricity balancing markets. The solution allows backup batteries to automatically charge and discharge in response to signals from grid operator Elering, generating new revenue from wholesale and balancing markets while reducing electricity costs. This deployment follows Estonia's synchronization with the Continental European electricity system in February 2025, which enabled distributed assets like telecom network batteries to support national grid stability.GlobeNewswireEesti Energia Subsidiary, Enefit Power, Wins Tender for Reserve CapabilityElering AS, Estonia's national Transmission System Operator, has completed a public procurement tender for electricity reserve capability, awarding the contract to Enefit Power OÜ, a subsidiary of Eesti Energia Group. The service will ensure up to 1,036 megawatts of generation capacity at a maximum annual cost of EUR 59.5 million, with the cost now borne by electricity consumers rather than the company itself. The contract is planned to be signed by the end of November, and Enefit Power retains the right to participate in other energy markets with the same capacities.TradingViewTransmissionUnavailability/Planned/ForeseenMaintenance/Active: EE → LV LV → EE Kiisa-Paide Paide-ViruElering AS and Augstsprieguma tīkls AS are conducting planned maintenance on transmission assets between Estonia and Latvia, specifically the Kiisa-Paide and Paide-Viru lines. This coordinated outage affects trading capacity within the Baltic Capacity Calculation Region for day-ahead and intraday markets starting from November 3, 2025. The unavailability involves specific renovation works and outages scheduled across multiple time periods through mid-November.