Developer docs
API playgroundTry for free, no card

Search company profiles

Paks II

Full company profile

uuid00336yb

Namestring
Paks II
Legal namestring
Paks II. Atomerőmű Zártkörűen Működő Részvénytársaság
Websiteurl
mvmpaks2.hu
Company typeenum
Private
Founded yearint
2012
Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
251–500
akta.pro rankint
HeadquartersPaks, Hungary
HQ citystring
Paks
HQ countrystring
Hungary
HQ regionstring
Europe
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
nuclear power generation, nuclear plant construction, baseload electricity supply, VVER reactor technology, energy infrastructure development
Industry5 codes
1Mechanical, Electrical & Piping Installation (MEP)
CodeEUAKAAAGPrimaryYes
2Instrumentation & Control (I&C) Integration & Commissioning Support
CodeEUAKAAAHPrimaryNo
3Nuclear Steam Supply System Components & Turbine Islands
CodeIMAHAFAGPrimaryNo
4Reactor Instrumentation & Control (I&C) Platforms (Safety/Non-safety, Digital Upgrades)
CodeEUAKADAHPrimaryNo
5Reactor Protection, Safety Systems & Engineered Safeguards (ECCS, Containment Isolation)
CodeEUAKADAIPrimaryNo
NAICS code2 codes
  • Nuclear Electric Power Generation221113
  • Turbine and Turbine Generator Set Units Manufacturing333611
SIC code1 code
  • Engines & Turbines3510
Product category
Nuclear Power Generation
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Generation
TypeHardware Sales
Description

Once operational, Paks II will generate electricity for Hungary's national grid. Revenue will be derived from electricity sales to consumers and industry through the national electricity market. The plant has a planned operational lifetime of at least 60 years with a power capacity factor exceeding 90%.

mvmpaks2.hu
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Personnel, Operations, Technology or R&D, Supply Chain
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Paks II is a Hungarian state-owned project company that develops and constructs two new VVER-1200 nuclear reactor units (Blocks 5 and 6) at the existing Paks nuclear power plant site. The project is delivered under a fixed-price turnkey contract valued at 12.5 billion EUR with Russian contractor ASE. Once operational, the plant will supply baseload electricity to the Hungarian national grid for at least 60 years.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • 17 million tonnes CO2 savings annually, equivalent to Hungary's entire transport sector emissions
+3 more records
Product overview1 text field

Paks II is a nuclear power plant construction project in Hungary involving the development of two new reactor blocks (Units 5 and 6) using advanced 3+ generation technology. The project includes supporting infrastructure such as a Training and Simulator Center (Oktató- és Szimulátorközpont) for operator training, an on-site concrete plant (Betonüzem), and the Power Plant Investment Center (Erőmű-beruházási Központ). The project represents Hungary's largest domestic investment, featuring robust safety systems including core melt traps (zónaolvadék-csapda) and dual-wall containment structures. The construction phase involves extensive earthworks, foundation work, and infrastructure development at the Paks site.

Product and service1 record
1Paks II Nuclear Power Plant (Blocks 5 & 6)
CategoryNuclear Power Plant
Description

Two new nuclear reactor blocks using 3+ generation VVER-1200 technology, designed to provide baseload electricity to the Hungarian national grid. Targeted at the Hungarian state, national electricity infrastructure, and the Hungarian population, with an operational lifetime of at least 60 years and a capacity factor exceeding 90%.

Scale indicator6 records

Each record includes

Type, Value, Description, Source

Partnership1 partner
1Atomsztrojekszport (ASE) / Russian Main Contractor
Strategic tierCoreTypeStrategic or Co-development Partner
Description

The main contractor for Paks II construction is Atomsztrojekszport (ASE), a Russian state-owned nuclear energy company. The turnkey fixed-price contract covers design, construction, and initial fuel supply. The project uses Russian VVER-1200 reactor technology. Hungarian state ownership of the project is maintained throughout.

mvmpaks2.hu
Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
TypeRegional player
Description

Czech state-influenced utility that operates the Dukovany and Temelín nuclear plants and is currently developing new nuclear capacity at Dukovany. Comparable as a Central European state-linked nuclear operator pursuing new-build expansion in a similar regulatory and geopolitical context.

TypeDirect peer
Description

Finnish nuclear operator that completed the Olkiluoto 3 (EPR, Gen III+) new-build project, one of Europe's most-watched nuclear project deliveries. Directly comparable as a dedicated nuclear project company delivering a single Gen III+ plant, sharing similar fixed-price/EPC structure and European regulatory environment.

TypeDirect peer
Description

UAE state-owned project company that built the Barakah nuclear power plant (4 × APR1400 reactors). A near-perfect structural analog: dedicated state-owned project company delivering multiple reactors of foreign design under a single national program with state off-take.

TypeOthers
Description

US-based Gen III+ nuclear technology provider (AP1000) competing with VVER-1200 in Central/Eastern European new-build tenders. Comparable as a potential alternative reactor vendor whose technology choice would have reshaped Paks II's cost and risk profile.

TypeOthers
Description

Global EPC contractor with deep nuclear new-build experience (Vogtle, Hanford). Comparable as a nuclear EPC ecosystem participant whose engagement model is the alternative to ASE for large-scale nuclear project delivery.

TypeOthers
Description

Hungarian state-owned energy group and the parent/related entity that will likely be the off-taker for Paks II's electricity output. Compares as the state utility ecosystem in which Paks II sits and the natural commercial counterparty for the project's future generation revenue.

TypeBroad incumbent
Description

France's state-owned nuclear utility and one of the world's largest nuclear operators, currently executing the Hinkley Point C new-build project in the UK. Highly comparable as a state-backed nuclear operator executing multi-billion-euro Gen III+ new-build projects under fixed-price frameworks.

TypeDirect peer
Description

Turkish project company building Turkey's first nuclear plant using four Russian VVER-1200 reactors, with Rosatom/ASE as the EPC contractor. The most direct peer: same Russian VVER-1200 technology, same Russian contractor, same state-driven project-company structure, and same multi-reactor delivery model.

TypeOthers
Description

Russian state-owned nuclear EPC contractor and the actual builder of Paks II under the €12.5B turnkey contract. Material counterparty for project execution; comparable as a nuclear EPC contractor delivering VVER-1200 plants internationally.

TypeDirect peer
Description

Southern Company subsidiary that completed the first new nuclear units built in the US in 30 years (AP1000). Comparable as a regulated-utility project company that delivered Gen III+ new-build under fixed-price EPC with state-regulated off-take and a multi-year construction timeline.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature6 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles2 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Paks II

Nuclear Power Generationmvmpaks2.hu

Paks II firmographics

Firmographics
Name
Paks II
Legal name
Paks II. Atomerőmű Zártkörűen Működő Részvénytársaság
Website
https://mvmpaks2.hu
Company type
Private
Founded year
2012
Operating status
Operating
Headcount range
251–500 employees
Ownership category
akta.pro rank

Paks II industry classification

Industry
Product category
Nuclear Power Generation
NAICS
Nuclear Electric Power Generation (221113), Turbine and Turbine Generator Set Units Manufacturing (333611)
SIC
Engines & Turbines (3510)
akta.pro primary industry
Mechanical, Electrical & Piping Installation (MEP) (EUAKAAAG)
akta.pro secondary industries
Instrumentation & Control (I&C) Integration & Commissioning Support (EUAKAAAH), Nuclear Steam Supply System Components & Turbine Islands (IMAHAFAG), Reactor Instrumentation & Control (I&C) Platforms (Safety/Non-safety, Digital Upgrades) (EUAKADAH), Reactor Protection, Safety Systems & Engineered Safeguards (ECCS, Containment Isolation) (EUAKADAI)

Keywords

  • Nuclear power generation
  • Nuclear plant construction
  • Baseload electricity supply
  • VVER reactor technology
  • Energy infrastructure development

Where Paks II is headquartered

Location

Headquarters

HQ city
Paks
HQ country
Hungary
HQ region
Europe

Offices1 record

Markets served

Paks II business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Personnel, Operations, Technology or R&D, Supply Chain

Revenue model

  1. Electricity Generation: Once operational, Paks II will generate electricity for Hungary's national grid. Revenue will be derived from electricity sales to consumers and industry through the national electricity market. The plant has a planned operational lifetime of at least 60 years with a power capacity factor exceeding 90%.

Go-to-market motion1 record

Distribution channels1 record

Marketing channels5 records

Paks II product offering

Product offering

Core offering

Paks II is a Hungarian state-owned project company that develops and constructs two new VVER-1200 nuclear reactor units (Blocks 5 and 6) at the existing Paks nuclear power plant site. The project is delivered under a fixed-price turnkey contract valued at 12.5 billion EUR with Russian contractor ASE. Once operational, the plant will supply baseload electricity to the Hungarian national grid for at least 60 years.

Product overview

Paks II is a nuclear power plant construction project in Hungary involving the development of two new reactor blocks (Units 5 and 6) using advanced 3+ generation technology. The project includes supporting infrastructure such as a Training and Simulator Center (Oktató- és Szimulátorközpont) for operator training, an on-site concrete plant (Betonüzem), and the Power Plant Investment Center (Erőmű-beruházási Központ). The project represents Hungary's largest domestic investment, featuring robust safety systems including core melt traps (zónaolvadék-csapda) and dual-wall containment structures. The construction phase involves extensive earthworks, foundation work, and infrastructure development at the Paks site.

Differentiator

Problem solved

Functional benefit

Products and services

  • Paks II Nuclear Power Plant (Blocks 5 & 6) Two new nuclear reactor blocks using 3+ generation VVER-1200 technology, designed to provide baseload electricity to the Hungarian national grid. Targeted at the Hungarian state, national electricity infrastructure, and the Hungarian population, with an operational lifetime of at least 60 years and a capacity factor exceeding 90%.

Quantifiable outcome

  • 17 million tonnes CO2 savings annually, equivalent to Hungary's entire transport sector emissions
  • +3 more outcomes

Companies that use Paks II

Customer profile

Segments1 record

Ideal customer profiles1 record

Paks II technology and API

Technology

Technology focussed Yes

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature6 records

Paks II partnerships and signals

Strategic signal

Partnerships

One partnership is on record.

  • Atomsztrojekszport (ASE) / Russian Main ContractorcoreStrategic or Co-development PartnerThe main contractor for Paks II construction is Atomsztrojekszport (ASE), a Russian state-owned nuclear energy company. The turnkey fixed-price contract covers design, construction, and initial fuel supply. The project uses Russian VVER-1200 reactor technology. Hungarian state ownership of the project is maintained throughout.

Scale indicators6 records

Recent moves6 records

Expansion highlights5 records

Paks II competitors and assessment

Company assessment

Regional players

  • ČEZ Group: Czech state-influenced utility that operates the Dukovany and Temelín nuclear plants and is currently developing new nuclear capacity at Dukovany. Comparable as a Central European state-linked nuclear operator pursuing new-build expansion in a similar regulatory and geopolitical context.

Direct peers

  • Teollisuuden Voima Oy (TVO): Finnish nuclear operator that completed the Olkiluoto 3 (EPR, Gen III+) new-build project, one of Europe's most-watched nuclear project deliveries. Directly comparable as a dedicated nuclear project company delivering a single Gen III+ plant, sharing similar fixed-price/EPC structure and European regulatory environment.
  • Emirates Nuclear Energy Corporation (ENEC): UAE state-owned project company that built the Barakah nuclear power plant (4 × APR1400 reactors). A near-perfect structural analog: dedicated state-owned project company delivering multiple reactors of foreign design under a single national program with state off-take.
  • Akkuyu Nükleer A.Ş. Turkish project company building Turkey's first nuclear plant using four Russian VVER-1200 reactors, with Rosatom/ASE as the EPC contractor. The most direct peer: same Russian VVER-1200 technology, same Russian contractor, same state-driven project-company structure, and same multi-reactor delivery model.
  • Georgia Power (Plant Vogtle Units 3 & 4): Southern Company subsidiary that completed the first new nuclear units built in the US in 30 years (AP1000). Comparable as a regulated-utility project company that delivered Gen III+ new-build under fixed-price EPC with state-regulated off-take and a multi-year construction timeline.

Others

  • Westinghouse Electric Company: US-based Gen III+ nuclear technology provider (AP1000) competing with VVER-1200 in Central/Eastern European new-build tenders. Comparable as a potential alternative reactor vendor whose technology choice would have reshaped Paks II's cost and risk profile.
  • Bechtel Corporation: Global EPC contractor with deep nuclear new-build experience (Vogtle, Hanford). Comparable as a nuclear EPC ecosystem participant whose engagement model is the alternative to ASE for large-scale nuclear project delivery.
  • MVM Group: Hungarian state-owned energy group and the parent/related entity that will likely be the off-taker for Paks II's electricity output. Compares as the state utility ecosystem in which Paks II sits and the natural commercial counterparty for the project's future generation revenue.
  • JSC Atomstroyexport (ASE Group / Rosatom): Russian state-owned nuclear EPC contractor and the actual builder of Paks II under the €12.5B turnkey contract. Material counterparty for project execution; comparable as a nuclear EPC contractor delivering VVER-1200 plants internationally.

Broad incumbents

  • EDF (Électricité de France): France's state-owned nuclear utility and one of the world's largest nuclear operators, currently executing the Hinkley Point C new-build project in the UK. Highly comparable as a state-backed nuclear operator executing multi-billion-euro Gen III+ new-build projects under fixed-price frameworks.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat5 records

Key risks6 records

Key highlights6 records

Customer concentration

Paks II social profiles

Digital presence

Paks II financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Paks II leadership team

Management profile

Number of profiles

Profiles2 records

Paks II funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Paks II M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Paks II

What does Paks II do?

Paks II is a Hungarian state-owned project company that develops and constructs two new VVER-1200 nuclear reactor units (Blocks 5 and 6) at the existing Paks nuclear power plant site. The project is delivered under a fixed-price turnkey contract valued at 12.5 billion EUR with Russian contractor ASE. Once operational, the plant will supply baseload electricity to the Hungarian national grid for at least 60 years.

Is Paks II a public or private company?

Paks II is a private company. It is classified as state government owned and is currently operating.

When was Paks II founded?

Paks II was founded in 2012. It employs 251 to 500 people.

Where is Paks II based?

Paks II is headquartered in Paks, Hungary, in the Europe region.

How does Paks II make money?

One revenue line is on record: electricity Generation.

Who are Paks II's main competitors?

ČEZ Group is listed as a regional player. Direct peers are Teollisuuden Voima Oy (TVO), Emirates Nuclear Energy Corporation (ENEC), Akkuyu Nükleer A.Ş. and Georgia Power (Plant Vogtle Units 3 & 4). Others are Westinghouse Electric Company, Bechtel Corporation, MVM Group and JSC Atomstroyexport (ASE Group / Rosatom). EDF (Électricité de France) is listed as a broad incumbent.

Does Paks II have an API?

No public API is recorded for Paks II.

What industry is Paks II in?

Paks II's product category is Nuclear Power Generation. Its primary akta.pro industry code is EUAKAAAG, Mechanical, Electrical & Piping Installation (MEP), with a secondary code of EUAKAAAH, Instrumentation & Control (I&C) Integration & Commissioning Support. Its NAICS code is 221113 and its SIC code is 3510.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales