Developer docs
API playgroundTry for free, no card

Search company profiles

Nuklearna elektrarna Krško

Full company profile

uuid003kzei

Namestring
Nuklearna elektrarna Krško
Legal namestring
Nuklearna elektrarna Krško, d. o. o.
Websiteurl
nek.si
Company typeenum
Private
Founded yearint
1983
Descriptiontext

Nuklearna elektrarna Krško (NEK) is a single-unit nuclear power plant located in Krško, Slovenia, that has generated electricity commercially since 1983 using a Westinghouse pressurized water reactor (PWR) of approximately 700 MWe gross capacity. The plant operates a three-circuit system — primary (reactor, fuel, control rods, steam generators), secondary (turbines, generator, condenser, transformer), and tertiary (Sava River cooling with cooling towers and a dam) — producing an average of 5.7 TWh of electricity annually, equivalent to roughly 20% of Slovenia's and 16–20% of Croatia's total electricity consumption. NEK supplies baseload electricity sufficient for approximately 1.5 million Slovenian and Croatian households, with zero direct CO2 emissions from generation and a capacity factor approaching 100%.

The facility is jointly owned by the Republic of Slovenia and the Republic of Croatia through an intergovernmental agreement, with governance executed via the Interstate NEK Commission. NEK sells 100% of its output wholesale to the two national grid operators — ELES in Slovenia and HROTE in Croatia — and operates as regulated critical national infrastructure rather than a commercial electricity retailer. The business is sustained by an extended 60-year operating license (originally 40 years, extended in December 2022), international peer reviews by WANO and IAEA, and a continuous modernization program that has executed over 1,000 upgrades since commissioning.

Revenue is not publicly disclosed but is functionally derived from bilateral long-term offtake arrangements with the two state-owned grid operators, with pricing set under national energy regulation in Slovenia and Croatia. NEK employs more than 600 people at the Krško site, including nuclear-qualified operations, maintenance, radiological protection, engineering, and training staff supported by a full-scale control room replica simulator operational since 2000. Strategic posture is anchored on safe long-term operation through 2043, with the former CEO publicly referencing the JEK 2 second-unit project as a potential future expansion.

Short descriptiontext

Nuklearna elektrarna Krško is Slovenia's sole nuclear power plant, operating a single Westinghouse pressurized water reactor at Krško since 1983 and jointly owned by Slovenia and Croatia. It generates approximately 5.7 TWh annually, supplying around 20% of both countries' electricity consumption through their state grid operators.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
501–1,000
akta.pro rankint
HeadquartersKrsko, Slovenia
HQ citystring
Krsko
HQ countrystring
Slovenia
HQ regionstring
Europe
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
nuclear power generation, baseload electricity supply, pressurized water reactor, low-carbon electricity, nuclear fuel cycle
Industry1 code
1Chemistry, Water Treatment & Radiochemistry (Primary/Secondary Chemistry, Sampling)
CodeEUAKABAGPrimaryYes
NAICS code1 code
  • Nuclear Electric Power Generation221113
SIC code1 code
  • Electric Services4911
Product category
Nuclear Power Generation
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Generation and Sales
TypeHardware Sales
Description

NEK generates electricity through nuclear fission and sells the produced electricity to the electrical grid. As a baseload power plant, it provides continuous, stable electricity supply covering approximately 20% of Slovenia's and 20% of Croatia's electricity consumption. The plant has operated reliably since 1983.

nek.si
Marketing channels6 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels2 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Personnel, Operations, Supply Chain, Technology or R&D, Others
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Nuklearna elektrarna Krško (NEK) generates electricity through nuclear fission using a pressurized water reactor and sells baseload electricity directly to the Slovenian and Croatian national grid operators. The plant operates a three-circuit energy system producing an average of 5.7 TWh of low-carbon electricity annually, covering approximately 20% of Slovenia's and 16% of Croatia's total electricity consumption. Electricity is supplied continuously 24/7 regardless of weather conditions, with the plant licensed to operate for 60 years following an extension approved in 2022.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 8 values shown
  • Covers 20% of Slovenia's total electricity consumption
+7 more records
Product overview1 text field

Nuklearna elektrarna Krško (NEK) is a nuclear power plant that generates electricity using nuclear fission technology. The plant operates as a single-purpose facility producing electrical energy for the Slovenian and Croatian power grids. NEK does not offer commercial software products or services — its core offering is nuclear electricity generation. The facility operates three energy circuits (primary/secondary/tertiary) for heat exchange and electricity production, and provides operational reports, public information, and educational content about nuclear energy through its website.

Product and service2 records
1Baseload Nuclear Electricity Supply
CategoryBaseload Electricity Generation
2Grid System Services (Ancillary Services)
CategoryGrid Stability Services
Scale indicator10 records

Each record includes

Type, Value, Description, Source

Partnership6 partners
Strategic tierMinorTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-01-01
Description

During refueling outages, more than 1500 external contractors work alongside NEK staff on maintenance, upgrades, and modernization activities. The autumn 2025 outage included 16 major maintenance activities and 20 modernization projects with over 30,000 individual work activities.

2Slovenian Government (Republic of Slovenia)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

The Republic of Slovenia holds ownership stake in NEK as a critical national infrastructure facility. The Slovenian government, through its ministries, provides regulatory oversight, approves operational life extensions, and oversees nuclear safety compliance through the Nuclear Safety Administration (URSJV).

nek.si
3Croatian Government (Republic of Croatia)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Croatia is a co-owner of NEK through an intergovernmental agreement between Slovenia and Croatia. This unique binational arrangement includes the Intergovernmental NEK Commission for joint governance and decision-making. Croatia receives approximately 20% of its electricity consumption from NEK.

nek.si
Strategic tierCoreTypeStrategic or Co-development Partner
Description

NEK participates in WANO peer review programs, sharing operational experience with nuclear plants worldwide and receiving international assessments of operational excellence. WANO visits confirm NEK meets highest industrial standards.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

NEK undergoes regular IAEA safety reviews and missions including the Safety Aspects of Long-Term Operation (SALTO) program. IAEA provides independent international verification of nuclear safety standards compliance.

6Slovenian Nuclear Safety Administration (URSJV)
Strategic tierCoreTypeStrategic or Co-development Partner
Description

URSJV is the national regulatory authority overseeing nuclear and radiation safety in Slovenia. They conduct regular safety inspections, approve operational procedures, and ensure compliance with nuclear safety regulations including the Nuclear and Radiation Safety Act.

nek.si
Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight4 records

Each record includes

Type, Description

Peers10 records
1Mochovce Nuclear Power Plant
TypeDirect peer
Description

Mochovce is a two-unit VVER-440 plant in Slovakia, with new units still being commissioned. Directly comparable to NEK in reactor type, regional context, and national baseload role within a similar Central European regulatory regime.

TypeBroad incumbent
Description

ČEZ operates the Dukovany and Temelín nuclear power plants in the Czech Republic alongside a broad conventional generation portfolio. Comparable to NEK as a Central European integrated utility with nuclear as a core low-carbon pillar.

TypeBroad incumbent
Description

Fortum operates the Loviisa nuclear plant in Finland and holds broader Nordic hydro and thermal generation. Comparable to NEK as a regional incumbent nuclear operator with life-extension experience on VVER-era assets.

TypeDirect peer
Description

Gösgen is a single-unit PWR in Switzerland, closely matching NEK's single-unit pressurized water reactor profile and small-scale national baseload role. Comparable in technology, scale, and emphasis on long-term safe operation.

5Loviisa Nuclear Power Plant
TypeDirect peer
Description

Loviisa is a two-unit VVER-440 plant in Finland operated by Fortum, contributing a significant share of Finland's low-carbon baseload. Comparable to NEK as a small-scale Nordic/Baltic-region nuclear asset with similar age profile and life-extension trajectory.

TypeDirect peer
Description

Slovenské elektrárne operates the Bohunice and Mochovce nuclear power plants in Slovakia, supplying the bulk of the country's low-carbon baseload. Comparable to NEK as a national nuclear operator in a neighboring Central European country with similar VVER-based fleet and regulatory framework.

TypeDirect peer
Description

Dukovany operates four VVER-440 reactors and supplies approximately 20% of the Czech Republic's electricity. Comparable to NEK as a multi-unit VVER-era baseload plant serving a Central European national grid with similar regulatory and political environment.

TypeDirect peer
Description

Paks is Hungary's sole nuclear power plant, operating four VVER-440 reactors that supply roughly half of Hungary's electricity. Like NEK, it is a single-country baseload nuclear asset of strategic national importance with multi-decade operating history — directly comparable in mission, scale, and regulatory profile.

9Bohunice Nuclear Power Plant
TypeDirect peer
Description

Bohunice V2 is a two-unit VVER-440 plant in Slovakia, comparable in reactor technology, scale, and operational era to NEK. Like NEK, it serves as a national baseload asset with a long operating history and life-extension focus.

TypeBroad incumbent
Description

EDF operates the world's second-largest nuclear fleet in France and provides global nuclear services. Comparable to NEK as a leading nuclear operator with deep operational, regulatory, and engineering expertise relevant to long-term operation and life extension.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights5 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers2 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile2 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature5 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles1 record

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance2 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Nuklearna elektrarna Krško

Nuclear Power Generationnek.si

Nuklearna elektrarna Krško is Slovenia's sole nuclear power plant, operating a single Westinghouse pressurized water reactor at Krško since 1983 and jointly owned by Slovenia and Croatia. It generates approximately 5.7 TWh annually, supplying around 20% of both countries' electricity consumption through their state grid operators.

What Nuklearna elektrarna Krško does

Nuklearna elektrarna Krško (NEK) is a single-unit nuclear power plant located in Krško, Slovenia, that has generated electricity commercially since 1983 using a Westinghouse pressurized water reactor (PWR) of approximately 700 MWe gross capacity. The plant operates a three-circuit system — primary (reactor, fuel, control rods, steam generators), secondary (turbines, generator, condenser, transformer), and tertiary (Sava River cooling with cooling towers and a dam) — producing an average of 5.7 TWh of electricity annually, equivalent to roughly 20% of Slovenia's and 16–20% of Croatia's total electricity consumption. NEK supplies baseload electricity sufficient for approximately 1.5 million Slovenian and Croatian households, with zero direct CO2 emissions from generation and a capacity factor approaching 100%.

The facility is jointly owned by the Republic of Slovenia and the Republic of Croatia through an intergovernmental agreement, with governance executed via the Interstate NEK Commission. NEK sells 100% of its output wholesale to the two national grid operators — ELES in Slovenia and HROTE in Croatia — and operates as regulated critical national infrastructure rather than a commercial electricity retailer. The business is sustained by an extended 60-year operating license (originally 40 years, extended in December 2022), international peer reviews by WANO and IAEA, and a continuous modernization program that has executed over 1,000 upgrades since commissioning.

Revenue is not publicly disclosed but is functionally derived from bilateral long-term offtake arrangements with the two state-owned grid operators, with pricing set under national energy regulation in Slovenia and Croatia. NEK employs more than 600 people at the Krško site, including nuclear-qualified operations, maintenance, radiological protection, engineering, and training staff supported by a full-scale control room replica simulator operational since 2000. Strategic posture is anchored on safe long-term operation through 2043, with the former CEO publicly referencing the JEK 2 second-unit project as a potential future expansion.

Nuklearna elektrarna Krško firmographics

Firmographics
Name
Nuklearna elektrarna Krško
Legal name
Nuklearna elektrarna Krško, d. o. o.
Website
https://nek.si
Company type
Private
Founded year
1983
Operating status
Operating
Headcount range
501–1,000 employees
Short description
Nuklearna elektrarna Krško is Slovenia's sole nuclear power plant, operating a single Westinghouse pressurized water reactor at Krško since 1983 and jointly owned by Slovenia and Croatia. It generates approximately 5.7 TWh annually, supplying around 20% of both countries' electricity consumption through their state grid operators.
Ownership category
akta.pro rank

Nuklearna elektrarna Krško industry classification

Industry
Product category
Nuclear Power Generation
NAICS
Nuclear Electric Power Generation (221113)
SIC
Electric Services (4911)
akta.pro primary industry
Chemistry, Water Treatment & Radiochemistry (Primary/Secondary Chemistry, Sampling) (EUAKABAG)

Keywords

  • Nuclear power generation
  • Baseload electricity supply
  • Pressurized water reactor
  • Low-carbon electricity
  • Nuclear fuel cycle

Where Nuklearna elektrarna Krško is headquartered

Location

Headquarters

HQ city
Krsko
HQ country
Slovenia
HQ region
Europe

Offices1 record

Markets served

Nuklearna elektrarna Krško business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Personnel, Operations, Supply Chain, Technology or R&D, Others

Revenue model

  1. Electricity Generation and Sales: NEK generates electricity through nuclear fission and sells the produced electricity to the electrical grid. As a baseload power plant, it provides continuous, stable electricity supply covering approximately 20% of Slovenia's and 20% of Croatia's electricity consumption. The plant has operated reliably since 1983.

Go-to-market motion1 record

Distribution channels2 records

Marketing channels6 records

Nuklearna elektrarna Krško product offering

Product offering

Core offering

Nuklearna elektrarna Krško (NEK) generates electricity through nuclear fission using a pressurized water reactor and sells baseload electricity directly to the Slovenian and Croatian national grid operators. The plant operates a three-circuit energy system producing an average of 5.7 TWh of low-carbon electricity annually, covering approximately 20% of Slovenia's and 16% of Croatia's total electricity consumption. Electricity is supplied continuously 24/7 regardless of weather conditions, with the plant licensed to operate for 60 years following an extension approved in 2022.

Product overview

Nuklearna elektrarna Krško (NEK) is a nuclear power plant that generates electricity using nuclear fission technology. The plant operates as a single-purpose facility producing electrical energy for the Slovenian and Croatian power grids. NEK does not offer commercial software products or services — its core offering is nuclear electricity generation. The facility operates three energy circuits (primary/secondary/tertiary) for heat exchange and electricity production, and provides operational reports, public information, and educational content about nuclear energy through its website.

Differentiator

Problem solved

Functional benefit

Products and services

  • Baseload Nuclear Electricity Supply
  • Grid System Services (Ancillary Services)

Quantifiable outcome

  • Covers 20% of Slovenia's total electricity consumption
  • +7 more outcomes

Companies that use Nuklearna elektrarna Krško

Customer profile

Named customers2 records

Segments3 records

Ideal customer profiles2 records

Nuklearna elektrarna Krško technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature5 records

Nuklearna elektrarna Krško partnerships and signals

Strategic signal

Partnerships

Six partnerships are on record, tiered minor and core.

  • Contractors and External Service Providers (1500+ participants during outages)minorImplementation/ SI/ Consulting Partner · 1 January 2025During refueling outages, more than 1500 external contractors work alongside NEK staff on maintenance, upgrades, and modernization activities. The autumn 2025 outage included 16 major maintenance activities and 20 modernization projects with over 30,000 individual work activities.
  • Slovenian Government (Republic of Slovenia)coreStrategic or Co-development PartnerThe Republic of Slovenia holds ownership stake in NEK as a critical national infrastructure facility. The Slovenian government, through its ministries, provides regulatory oversight, approves operational life extensions, and oversees nuclear safety compliance through the Nuclear Safety Administration (URSJV).
  • Croatian Government (Republic of Croatia)coreStrategic or Co-development PartnerCroatia is a co-owner of NEK through an intergovernmental agreement between Slovenia and Croatia. This unique binational arrangement includes the Intergovernmental NEK Commission for joint governance and decision-making. Croatia receives approximately 20% of its electricity consumption from NEK.
  • World Association of Nuclear Operators (WANO)coreStrategic or Co-development PartnerNEK participates in WANO peer review programs, sharing operational experience with nuclear plants worldwide and receiving international assessments of operational excellence. WANO visits confirm NEK meets highest industrial standards.
  • International Atomic Energy Agency (IAEA)coreStrategic or Co-development PartnerNEK undergoes regular IAEA safety reviews and missions including the Safety Aspects of Long-Term Operation (SALTO) program. IAEA provides independent international verification of nuclear safety standards compliance.
  • Slovenian Nuclear Safety Administration (URSJV)coreStrategic or Co-development PartnerURSJV is the national regulatory authority overseeing nuclear and radiation safety in Slovenia. They conduct regular safety inspections, approve operational procedures, and ensure compliance with nuclear safety regulations including the Nuclear and Radiation Safety Act.

Scale indicators10 records

Recent moves6 records

Expansion highlights4 records

Nuklearna elektrarna Krško competitors and assessment

Company assessment

Direct peers

  • Mochovce Nuclear Power Plant: Mochovce is a two-unit VVER-440 plant in Slovakia, with new units still being commissioned. Directly comparable to NEK in reactor type, regional context, and national baseload role within a similar Central European regulatory regime.
  • Gösgen Nuclear Power Plant: Gösgen is a single-unit PWR in Switzerland, closely matching NEK's single-unit pressurized water reactor profile and small-scale national baseload role. Comparable in technology, scale, and emphasis on long-term safe operation.
  • Loviisa Nuclear Power Plant: Loviisa is a two-unit VVER-440 plant in Finland operated by Fortum, contributing a significant share of Finland's low-carbon baseload. Comparable to NEK as a small-scale Nordic/Baltic-region nuclear asset with similar age profile and life-extension trajectory.
  • Slovenské elektrárne: Slovenské elektrárne operates the Bohunice and Mochovce nuclear power plants in Slovakia, supplying the bulk of the country's low-carbon baseload. Comparable to NEK as a national nuclear operator in a neighboring Central European country with similar VVER-based fleet and regulatory framework.
  • Dukovany Nuclear Power Plant: Dukovany operates four VVER-440 reactors and supplies approximately 20% of the Czech Republic's electricity. Comparable to NEK as a multi-unit VVER-era baseload plant serving a Central European national grid with similar regulatory and political environment.
  • Paks Nuclear Power Plant: Paks is Hungary's sole nuclear power plant, operating four VVER-440 reactors that supply roughly half of Hungary's electricity. Like NEK, it is a single-country baseload nuclear asset of strategic national importance with multi-decade operating history — directly comparable in mission, scale, and regulatory profile.
  • Bohunice Nuclear Power Plant: Bohunice V2 is a two-unit VVER-440 plant in Slovakia, comparable in reactor technology, scale, and operational era to NEK. Like NEK, it serves as a national baseload asset with a long operating history and life-extension focus.

Broad incumbents

  • ČEZ Group: ČEZ operates the Dukovany and Temelín nuclear power plants in the Czech Republic alongside a broad conventional generation portfolio. Comparable to NEK as a Central European integrated utility with nuclear as a core low-carbon pillar.
  • Fortum: Fortum operates the Loviisa nuclear plant in Finland and holds broader Nordic hydro and thermal generation. Comparable to NEK as a regional incumbent nuclear operator with life-extension experience on VVER-era assets.
  • EDF (Électricité de France): EDF operates the world's second-largest nuclear fleet in France and provides global nuclear services. Comparable to NEK as a leading nuclear operator with deep operational, regulatory, and engineering expertise relevant to long-term operation and life extension.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks5 records

Key highlights5 records

Customer concentration

Nuklearna elektrarna Krško social profiles

Digital presence

Nuklearna elektrarna Krško compliance and trust

Trust signal

Compliance2 records

Nuklearna elektrarna Krško financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Nuklearna elektrarna Krško leadership team

Management profile

Number of profiles

Profiles1 record

Nuklearna elektrarna Krško funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Nuklearna elektrarna Krško M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Nuklearna elektrarna Krško

What does Nuklearna elektrarna Krško do?

Nuklearna elektrarna Krško (NEK) generates electricity through nuclear fission using a pressurized water reactor and sells baseload electricity directly to the Slovenian and Croatian national grid operators. The plant operates a three-circuit energy system producing an average of 5.7 TWh of low-carbon electricity annually, covering approximately 20% of Slovenia's and 16% of Croatia's total electricity consumption. Electricity is supplied continuously 24/7 regardless of weather conditions, with the plant licensed to operate for 60 years following an extension approved in 2022.

Is Nuklearna elektrarna Krško a public or private company?

Nuklearna elektrarna Krško is a private company. It is classified as state government owned and is currently operating.

When was Nuklearna elektrarna Krško founded?

Nuklearna elektrarna Krško was founded in 1983. It employs 501 to 1,000 people.

Where is Nuklearna elektrarna Krško based?

Nuklearna elektrarna Krško is headquartered in Krsko, Slovenia, in the Europe region.

How does Nuklearna elektrarna Krško make money?

One revenue line is on record: electricity Generation and Sales.

Who are Nuklearna elektrarna Krško's main competitors?

Direct peers on record are Mochovce Nuclear Power Plant, Gösgen Nuclear Power Plant, Loviisa Nuclear Power Plant, Slovenské elektrárne, Dukovany Nuclear Power Plant, Paks Nuclear Power Plant and Bohunice Nuclear Power Plant. Broad incumbents are ČEZ Group, Fortum and EDF (Électricité de France).

Does Nuklearna elektrarna Krško have an API?

No public API is recorded for Nuklearna elektrarna Krško.

What industry is Nuklearna elektrarna Krško in?

Nuklearna elektrarna Krško's product category is Nuclear Power Generation. Its primary akta.pro industry code is EUAKABAG, Chemistry, Water Treatment & Radiochemistry (Primary/Secondary Chemistry, Sampling). Its NAICS code is 221113 and its SIC code is 4911.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
SeeNewsSlovenia's Krsko NPP restores reactor power to full capacityNuklearna Elektrarna Krsko d.o.o. has restored the power output of its reactor to full capacity following a period of reduced generation. This operational recovery follows previous adjustments made due to improved weather conditions, marking a return to standard production levels for the facility.SeeNewsSlovenian Krsko NPP's power output 0.5% below target in JulyNuklearna Elektrarna Krsko d.o.o. reported that its power output in July was 0.5% below the targeted level. The shortfall is attributed to operational constraints, consistent with recent heatwave impacts on nuclear facilities in the region. This update provides a routine performance metric for the facility's July operations.SeeNewsSlovenia's Krsko NPP to lift reactor power on improved weather conditionsNuklearna Elektrarna Krsko d.o.o. is increasing the power output of its reactor in Slovenia following an improvement in weather conditions. This operational adjustment follows previous reductions in generation capacity caused by a regional heatwave that impacted cooling water availability. The move restores production levels as environmental constraints ease.SeeNewsSlovenia's Krsko NPP reduces reactor power amid heatwaveSlovenia's Krsko nuclear power plant reduced reactor power to 80% on Thursday due to high temperatures and flow constraints on the Sava River caused by a widespread European heatwave, with temperatures expected to reach 38°C. The plant's operator, Nuklearna Elektrarna Krsko (NEK), stated this is a planned temporary measure to comply with environmental consent provisions limiting river temperature to 28°C and daily temperature increase to 3°C. The plant, which meets about 20% of Slovenia's and 16% of Croatia's electricity demand, last faced similar constraints in 2003 when it operated at reduced power for over 90 days.SeeNewsSlovenia's Krsko NPP warns of potential shutdown over critically-low Sava riverSlovenia's Krsko nuclear power plant, operated by Nuklearna Elektrarna Krsko (NEK), has warned it may reduce output or potentially shut down due to critically low water levels in the Sava River, which provides cooling water for the facility. The plant currently operates at full capacity but faces environmental restrictions requiring river water temperature thresholds not to exceed 28 degrees Celsius and daily increases of no more than 3 degrees. The shutdown risk is part of a broader regional issue, as record-low Danube River levels have already threatened nuclear power plants in Hungary, Romania, and Bulgaria that also rely on the river for cooling.Modern Power SystemsAnsaldo Nucleare completes modernisation of Krsko NPPAnsaldo Nucleare completed two modernisation projects at Slovenia's Krško NPP: a water treatment system upgrade and waste gas compressor replacement. The water system became operational in April 2026, and the compressor replacement was handed over in November 2025. A new fire protection contract was awarded in February 2026, with completion scheduled for 2027.