Developer docs
API playgroundTry for free, no card

Search company profiles

Creekstone Energy

Full company profile

uuid003t6ki

Namestring
Creekstone Energy
Legal namestring
Creekstone Energy LLC
Company typeenum
Private
Founded yearint
2020
Descriptiontext

Creekstone Energy LLC is a private hyperscale AI infrastructure developer founded in 2020 and headquartered in Salt Lake City, Utah. The company designs, owns, and develops behind-the-meter power and data center campuses that bypass utility grid constraints to serve AI and hyperscale customers. Its flagship project, the Delta Gigasite in Delta, Utah, targets over 10 GW of generation capacity across natural gas, solar, battery storage, and potentially nuclear, supported by 1,143 acres of fee-simple land, a 13,000+ acre SITLA solar lease, and an executed 43,000 Dth/day gas interconnect.

The underlying technology stack centers on multi-source behind-the-meter generation combining natural gas turbines (29 engines via Quanta Services), grid-forming battery backup with flywheel inertia from Torus (installed December 2025), dry cooling technology that enables essentially waterless operation, and purpose-built facilities rated for 60+ kW/rack densities, five to ten times conventional data center loads. The site sits at the convergence of six on-net fiber carriers and 14 additional routes within 28 miles, providing carrier-neutral 100G/400G connectivity. Regulatory positioning includes five pieces of Utah legislation (including SB 132) enabling private off-grid generation above 100 MW, plus Heavy Industrial zoning and a C-2 Conditional Use Permit secured in 2025.

Commercially, Creekstone generates revenue through long-term contracted behind-the-meter power capacity and data center colocation under subscription-style agreements. The company sells directly to enterprise hyperscalers and AI companies requiring 500 MW to 10+ GW, with custom quote-based pricing tied to project scope. Confirmed commercial traction includes a 50 MW allocation to Blue Sky AI and a 25-acre facility commitment from BluSky AI. The company is pre-revenue as of mid-2026, with substation EPC scheduled for Q2 2027 completion and Phase 1 capacity targeting 220 MW. Capital partners include Trident Ridge (Series B lead) and Pelion Ventures, with strategic counterparties spanning Zeo Energy (280 MW solar/storage MOU), EnergySolutions (2 GW nuclear feasibility study), and Enchant Energy (carbon capture LOI).

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1–10
akta.pro rankint
HeadquartersSalt Lake City, United States
HQ citystring
Salt Lake City
HQ countrystring
United States
HQ regionstring
North America
Markets served

Serves global market

Offices2 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
behind-the-meter power, hyperscale data centers, AI power infrastructure, data center colocation, multi-source energy generation
Industry1 code
1Microgrid & Local Distribution Operators (Campus/Base/Industrial Park DSOs)
CodeEUADABAFPrimaryYes
NAICS code4 codes
  • Electric Power Generation, Transmission and Distribution2211
  • Electric Power Generation22111
  • Solar Electric Power Generation221114
  • Fossil Fuel Electric Power Generation221112
SIC code2 codes
  • Cogeneration Services & Small Power Producers4991
  • Natural Gas Transmisison & Distribution4923
Product category
Hyperscale Data Center Power Infrastructure
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model2 records
1Power Generation Services
TypeSubscription Recurring
Description

Revenue generated from providing dedicated behind-the-meter power generation to hyperscale data center operators. Multi-source generation (gas, solar, storage) sold under long-term contracted capacity agreements.

creekstone.energy
2Data Center Colocation
TypeSubscription Recurring
Description

Revenue from providing data center infrastructure (land, shell, connectivity, power) to AI/hyperscale tenants. Tenants include Blue Sky AI (50 MW allocation) and BluSky AI (25-acre facility).

creekstone.energy
Marketing channels4 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Supply Chain, Personnel, Technology or R&D, Operations, Marketing or Sales
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Creekstone Energy develops and owns behind-the-meter, multi-source power generation infrastructure (natural gas, solar, battery/flywheel storage) purpose-built to deliver grid-independent, high-density electricity for hyperscale AI data centers. Its flagship offering is the Delta Gigasite in Delta, Utah—a >10 GW campus that combines land, power, cooling, and connectivity into a single integrated platform sold to AI and hyperscale tenants under long-term capacity agreements.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 4 values shown
  • Deploys hundreds of megawatts of IT load in under 18 months
+3 more records
Product overview1 text field

Creekstone Energy is a hyperscale AI energy and infrastructure company developing purpose-built data centers with integrated, behind-the-meter power generation. The company's flagship offering is the Delta Gigasite project — a >10 GW AI infrastructure campus in Delta, Utah — which combines natural gas, solar, and battery storage power generation to deliver grid-independent electricity for AI and high-performance computing workloads. The Delta Gigasite and behind-the-meter power generation solutions work together as an integrated infrastructure system: the Gigasite provides the physical data center campus, while the power generation capabilities ensure reliable energy delivery independent of utility grid constraints.

Product and service2 records
1Delta Gigasite
CategoryHyperscale Data Center Campus
Description

Flagship >10 GW AI infrastructure campus in Delta, Utah comprising 1,143 acres (fee simple ownership of 10 contiguous parcels), with contracted behind-the-meter power generation combining natural gas, solar, and storage. Purpose-built for hyperscale AI data centers with dry cooling technology and >20 carrier-neutral fiber routes. First confirmed tenants include Blue Sky AI (50 MW allocation) and BluSky AI (25-acre facility).

2Behind-the-Meter Multi-Source Power Generation
CategoryDedicated Behind-the-Meter Power Generation
Description

Integrated, grid-independent power generation service combining natural gas (29 engines via Quanta Services), solar (over 13,000 acres SITLA land lease, ~29% capacity factor), battery/flywheel storage (Torus), propane peaking, and adjacent Intermountain Power Project 345kV transmission. Sold under long-term contracted capacity agreements to hyperscale AI data center operators, eliminating utility interconnection queues and transmission bottlenecks.

Scale indicator14 records

Each record includes

Type, Value, Description, Source

Partnership10 partners
Strategic tierMinorTypeStrategic or Co-development PartnerAnnounced on2026-06-10
Description

Signed letter of intent to partner on carbon capture technology for the data center campus in Millard County. Partnership aims to develop carbon capture capabilities at the massive data center development to address environmental concerns and emissions.

Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2026-02-18
Description

Signed MOU to develop approximately 280 MW of baseload energy generation through solar and long-duration storage for Creekstone's data center in Millard County, Utah. Zeo acquired Heliogen in August 2025 bringing concentrated solar power and molten salt storage capabilities. Pre-feasibility study commenced for combined solar and LDES system. Represents Zeo's strategic entry into data center power market.

Strategic tierFlagshipTypeStrategic or Co-development PartnerAnnounced on2025-12-13
Description

Signed non-binding MOU to study feasibility of integrating 2 GW of nuclear power at the Utah Creekstone Gigasite data center project. Partnership aims to evaluate creation of one of the largest clean energy concentrations in the United States with nuclear as the power source. Targeting 2030-2035 commercial window for nuclear capacity.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Substation EPC contractor for Delta Gigasite. Transformer and switchgear in production with Q2 2027 completion target. Executed gas interconnect agreement with 43,000 Dth/day initial capacity.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Exclusive operations and maintenance partner for power plant operations. MOU executed for O&M services for generation facilities at the Gigasite.

Strategic tierCoreTypeTechnology or Integration
Description

Grid stability solution provider. Advanced storage solution installed on site December 2025. Provides grid-forming battery backup and flywheel inertia for stability.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Environmental consulting partner handling air permitting engineering and modeling for generation facilities. Air permits in final modeling stage.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Architecture firm for campus design. Campus test fit complete. Master plan for 4-zone development underway.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Geotechnical engineering, ALTA surveys, and Phase I Environmental Site Assessment. Completed 300+ soil borings at Delta Gigasite.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Data center design partner. Powered shell design completed. Near-zero water cooling architecture for the facility.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

Hyperscale data center developer delivering purpose-built facilities at scale for enterprise and cloud customers. Shares the model of building to suit for large power-intensive tenants.

TypeBroad incumbent
Description

Global hyperscale data center operator (owned by DigitalBridge) with multi-GW campus portfolio. Targets hyperscalers and large enterprises with turnkey colocation and powered shell solutions, broadly comparable in customer profile and scale.

TypeBroad incumbent
Description

Hyperscale and edge data center provider with 80+ facilities globally. Builds powered-shell and build-to-suit campuses for hyperscalers, comparable in serving the same enterprise AI/hyperscale customer base.

TypeBroad incumbent
Description

Builds and operates hyperscale data center campuses with deep capital backing (IPI Partners). Comparable as a hyperscale powered-shell and colocation provider pursuing AI-tenant demand.

TypeEmerging player
Description

Owns and operates data center campuses with dedicated behind-the-meter power infrastructure, originally for bitcoin mining and now pivoting toward AI/HPC hosting. Directly comparable behind-the-meter + dedicated power model.

TypeEmerging player
Description

AI-focused GPU cloud infrastructure provider with proprietary data center footprint. Comparable as a buyer of large-scale dedicated AI compute power, and as a peer in the AI infrastructure value chain.

TypeDirect peer
Description

Builds large-scale AI/cloud data centers with dedicated behind-the-meter power generation (originally flared gas, now renewable-heavy). Same core thesis: solve the AI power gap by colocating generation with compute. Most directly comparable peer.

TypeOthers
Description

Creekstone's contracted substation EPC partner and a leading infrastructure provider for power, renewables, and telecommunications. Comparable as an ecosystem enabler for hyperscale power infrastructure deployment rather than a direct competitor.

TypeDirect peer
Description

Hyperscale data center operator known for liquid cooling and high-density power (up to 50+ kW/rack). Targets AI/HPC customers with adaptive infrastructure, comparable in serving high-density AI workloads.

TypeDirect peer
Description

Designs, builds, and operates data centers purpose-built for AI/HPC and cloud customers with dedicated large-scale power. Operates campuses in North Dakota and other states, directly competing for hyperscale AI tenants.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers2 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment2 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile2 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles10 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds1 record

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors2 records

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Creekstone Energy

Hyperscale Data Center Power Infrastructurecreekstone.energy

What Creekstone Energy does

Creekstone Energy LLC is a private hyperscale AI infrastructure developer founded in 2020 and headquartered in Salt Lake City, Utah. The company designs, owns, and develops behind-the-meter power and data center campuses that bypass utility grid constraints to serve AI and hyperscale customers. Its flagship project, the Delta Gigasite in Delta, Utah, targets over 10 GW of generation capacity across natural gas, solar, battery storage, and potentially nuclear, supported by 1,143 acres of fee-simple land, a 13,000+ acre SITLA solar lease, and an executed 43,000 Dth/day gas interconnect.

The underlying technology stack centers on multi-source behind-the-meter generation combining natural gas turbines (29 engines via Quanta Services), grid-forming battery backup with flywheel inertia from Torus (installed December 2025), dry cooling technology that enables essentially waterless operation, and purpose-built facilities rated for 60+ kW/rack densities, five to ten times conventional data center loads. The site sits at the convergence of six on-net fiber carriers and 14 additional routes within 28 miles, providing carrier-neutral 100G/400G connectivity. Regulatory positioning includes five pieces of Utah legislation (including SB 132) enabling private off-grid generation above 100 MW, plus Heavy Industrial zoning and a C-2 Conditional Use Permit secured in 2025.

Commercially, Creekstone generates revenue through long-term contracted behind-the-meter power capacity and data center colocation under subscription-style agreements. The company sells directly to enterprise hyperscalers and AI companies requiring 500 MW to 10+ GW, with custom quote-based pricing tied to project scope. Confirmed commercial traction includes a 50 MW allocation to Blue Sky AI and a 25-acre facility commitment from BluSky AI. The company is pre-revenue as of mid-2026, with substation EPC scheduled for Q2 2027 completion and Phase 1 capacity targeting 220 MW. Capital partners include Trident Ridge (Series B lead) and Pelion Ventures, with strategic counterparties spanning Zeo Energy (280 MW solar/storage MOU), EnergySolutions (2 GW nuclear feasibility study), and Enchant Energy (carbon capture LOI).

Creekstone Energy firmographics

Firmographics
Name
Creekstone Energy
Legal name
Creekstone Energy LLC
Website
https://creekstone.energy
Company type
Private
Founded year
2020
Operating status
Operating
Headcount range
1–10 employees
Ownership category
akta.pro rank

Creekstone Energy industry classification

Industry
Product category
Hyperscale Data Center Power Infrastructure
NAICS
Electric Power Generation, Transmission and Distribution (2211), Electric Power Generation (22111), Solar Electric Power Generation (221114), Fossil Fuel Electric Power Generation (221112)
SIC
Cogeneration Services & Small Power Producers (4991), Natural Gas Transmisison & Distribution (4923)
akta.pro primary industry
Microgrid & Local Distribution Operators (Campus/Base/Industrial Park DSOs) (EUADABAF)

Keywords

  • Behind-the-meter power
  • Hyperscale data centers
  • AI power infrastructure
  • Data center colocation
  • Multi-source energy generation

Where Creekstone Energy is headquartered

Location

Headquarters

HQ city
Salt Lake City
HQ country
United States
HQ region
North America

Offices2 records

Markets served

Creekstone Energy business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Supply Chain, Personnel, Technology or R&D, Operations, Marketing or Sales

Revenue model

  1. Power Generation Services: Revenue generated from providing dedicated behind-the-meter power generation to hyperscale data center operators. Multi-source generation (gas, solar, storage) sold under long-term contracted capacity agreements.
  2. Data Center Colocation: Revenue from providing data center infrastructure (land, shell, connectivity, power) to AI/hyperscale tenants. Tenants include Blue Sky AI (50 MW allocation) and BluSky AI (25-acre facility).

Go-to-market motion1 record

Distribution channels1 record

Marketing channels4 records

Creekstone Energy product offering

Product offering

Core offering

Creekstone Energy develops and owns behind-the-meter, multi-source power generation infrastructure (natural gas, solar, battery/flywheel storage) purpose-built to deliver grid-independent, high-density electricity for hyperscale AI data centers. Its flagship offering is the Delta Gigasite in Delta, Utah—a >10 GW campus that combines land, power, cooling, and connectivity into a single integrated platform sold to AI and hyperscale tenants under long-term capacity agreements.

Product overview

Creekstone Energy is a hyperscale AI energy and infrastructure company developing purpose-built data centers with integrated, behind-the-meter power generation. The company's flagship offering is the Delta Gigasite project — a >10 GW AI infrastructure campus in Delta, Utah — which combines natural gas, solar, and battery storage power generation to deliver grid-independent electricity for AI and high-performance computing workloads. The Delta Gigasite and behind-the-meter power generation solutions work together as an integrated infrastructure system: the Gigasite provides the physical data center campus, while the power generation capabilities ensure reliable energy delivery independent of utility grid constraints.

Differentiator

Problem solved

Functional benefit

Products and services

  • Delta Gigasite Flagship >10 GW AI infrastructure campus in Delta, Utah comprising 1,143 acres (fee simple ownership of 10 contiguous parcels), with contracted behind-the-meter power generation combining natural gas, solar, and storage. Purpose-built for hyperscale AI data centers with dry cooling technology and >20 carrier-neutral fiber routes. First confirmed tenants include Blue Sky AI (50 MW allocation) and BluSky AI (25-acre facility).
  • Behind-the-Meter Multi-Source Power Generation Integrated, grid-independent power generation service combining natural gas (29 engines via Quanta Services), solar (over 13,000 acres SITLA land lease, ~29% capacity factor), battery/flywheel storage (Torus), propane peaking, and adjacent Intermountain Power Project 345kV transmission. Sold under long-term contracted capacity agreements to hyperscale AI data center operators, eliminating utility interconnection queues and transmission bottlenecks.

Quantifiable outcome

  • Deploys hundreds of megawatts of IT load in under 18 months
  • +3 more outcomes

Companies that use Creekstone Energy

Customer profile

Named customers2 records

Segments2 records

Ideal customer profiles2 records

Creekstone Energy technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

Creekstone Energy partnerships and signals

Strategic signal

Partnerships

Ten partnerships are on record, tiered minor, core and flagship.

  • Enchant Energy CorporationminorStrategic or Co-development Partner · 10 June 2026Signed letter of intent to partner on carbon capture technology for the data center campus in Millard County. Partnership aims to develop carbon capture capabilities at the massive data center development to address environmental concerns and emissions.
  • Zeo EnergycoreStrategic or Co-development Partner · 18 February 2026Signed MOU to develop approximately 280 MW of baseload energy generation through solar and long-duration storage for Creekstone's data center in Millard County, Utah. Zeo acquired Heliogen in August 2025 bringing concentrated solar power and molten salt storage capabilities. Pre-feasibility study commenced for combined solar and LDES system. Represents Zeo's strategic entry into data center power market.
  • EnergySolutionsflagshipStrategic or Co-development Partner · 13 December 2025Signed non-binding MOU to study feasibility of integrating 2 GW of nuclear power at the Utah Creekstone Gigasite data center project. Partnership aims to evaluate creation of one of the largest clean energy concentrations in the United States with nuclear as the power source. Targeting 2030-2035 commercial window for nuclear capacity.
  • Quanta Services / DashiellcoreImplementation/ SI/ Consulting PartnerSubstation EPC contractor for Delta Gigasite. Transformer and switchgear in production with Q2 2027 completion target. Executed gas interconnect agreement with 43,000 Dth/day initial capacity.
  • NAES CorporationcoreImplementation/ SI/ Consulting PartnerExclusive operations and maintenance partner for power plant operations. MOU executed for O&M services for generation facilities at the Gigasite.
  • ToruscoreTechnology or IntegrationGrid stability solution provider. Advanced storage solution installed on site December 2025. Provides grid-forming battery backup and flywheel inertia for stability.
  • RambollcoreImplementation/ SI/ Consulting PartnerEnvironmental consulting partner handling air permitting engineering and modeling for generation facilities. Air permits in final modeling stage.
  • Clayco / CobaltcoreImplementation/ SI/ Consulting PartnerArchitecture firm for campus design. Campus test fit complete. Master plan for 4-zone development underway.
  • CMT Technical ServicescoreImplementation/ SI/ Consulting PartnerGeotechnical engineering, ALTA surveys, and Phase I Environmental Site Assessment. Completed 300+ soil borings at Delta Gigasite.
  • Integra Mission CriticalcoreImplementation/ SI/ Consulting PartnerData center design partner. Powered shell design completed. Near-zero water cooling architecture for the facility.

Scale indicators14 records

Recent moves6 records

Expansion highlights5 records

Creekstone Energy competitors and assessment

Company assessment

Direct peers

  • Compass Datacenters: Hyperscale data center developer delivering purpose-built facilities at scale for enterprise and cloud customers. Shares the model of building to suit for large power-intensive tenants.
  • Crusoe Energy: Builds large-scale AI/cloud data centers with dedicated behind-the-meter power generation (originally flared gas, now renewable-heavy). Same core thesis: solve the AI power gap by colocating generation with compute. Most directly comparable peer.
  • Aligned Energy: Hyperscale data center operator known for liquid cooling and high-density power (up to 50+ kW/rack). Targets AI/HPC customers with adaptive infrastructure, comparable in serving high-density AI workloads.
  • Applied Digital: Designs, builds, and operates data centers purpose-built for AI/HPC and cloud customers with dedicated large-scale power. Operates campuses in North Dakota and other states, directly competing for hyperscale AI tenants.

Broad incumbents

  • Vantage Data Centers: Global hyperscale data center operator (owned by DigitalBridge) with multi-GW campus portfolio. Targets hyperscalers and large enterprises with turnkey colocation and powered shell solutions, broadly comparable in customer profile and scale.
  • EdgeConneX: Hyperscale and edge data center provider with 80+ facilities globally. Builds powered-shell and build-to-suit campuses for hyperscalers, comparable in serving the same enterprise AI/hyperscale customer base.
  • Stack Infrastructure: Builds and operates hyperscale data center campuses with deep capital backing (IPI Partners). Comparable as a hyperscale powered-shell and colocation provider pursuing AI-tenant demand.

Emerging players

  • TeraWulf: Owns and operates data center campuses with dedicated behind-the-meter power infrastructure, originally for bitcoin mining and now pivoting toward AI/HPC hosting. Directly comparable behind-the-meter + dedicated power model.
  • CoreWeave: AI-focused GPU cloud infrastructure provider with proprietary data center footprint. Comparable as a buyer of large-scale dedicated AI compute power, and as a peer in the AI infrastructure value chain.

Others

  • Quanta Services: Creekstone's contracted substation EPC partner and a leading infrastructure provider for power, renewables, and telecommunications. Comparable as an ecosystem enabler for hyperscale power infrastructure deployment rather than a direct competitor.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat4 records

Key risks6 records

Key highlights7 records

Customer concentration

Creekstone Energy social profiles

Digital presence

Creekstone Energy financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Creekstone Energy leadership team

Management profile

Number of profiles

Profiles10 records

Creekstone Energy funding detail

Funding detail

Funding overview

Funding rounds1 record

Investors2 records

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Creekstone Energy M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Creekstone Energy

What does Creekstone Energy do?

Creekstone Energy develops and owns behind-the-meter, multi-source power generation infrastructure (natural gas, solar, battery/flywheel storage) purpose-built to deliver grid-independent, high-density electricity for hyperscale AI data centers. Its flagship offering is the Delta Gigasite in Delta, Utah—a >10 GW campus that combines land, power, cooling, and connectivity into a single integrated platform sold to AI and hyperscale tenants under long-term capacity agreements.

Is Creekstone Energy a public or private company?

Creekstone Energy is a private company. It is classified as venture growth investor backed and is currently operating.

When was Creekstone Energy founded?

Creekstone Energy was founded in 2020. It employs 1 to 10 people.

Where is Creekstone Energy based?

Creekstone Energy is headquartered in Salt Lake City, United States, in the North America region.

How does Creekstone Energy make money?

Two revenue lines are on record. Power Generation Services are the primary driver. The others are data Center Colocation.

Who are Creekstone Energy's main competitors?

Direct peers on record are Compass Datacenters, Crusoe Energy, Aligned Energy and Applied Digital. Broad incumbents are Vantage Data Centers, EdgeConneX and Stack Infrastructure. Emerging players are TeraWulf and CoreWeave. Quanta Services is listed as an others.

Does Creekstone Energy have an API?

No public API is recorded for Creekstone Energy.

What industry is Creekstone Energy in?

Creekstone Energy's product category is Hyperscale Data Center Power Infrastructure. Its primary akta.pro industry code is EUADABAF, Microgrid & Local Distribution Operators (Campus/Base/Industrial Park DSOs). Its NAICS code is 2211 and its SIC code is 4991.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
The Cool DownUtah energy company says it can capture water from methane-gas exhaust for agricultureCreekstone Energy's GIGAWATER system recovers water from natural-gas exhaust by condensing moisture in an underground cooling process. The company is working with University of Utah researchers to test whether the collected water is suitable for agriculture. Major questions remain about recovery volume, water quality, and financial viability.ABC4 UtahDelta data center company claims it can create new water, commissions U of U study to verifyCreekstone Energy, building a 10-gigawatt AI data center in Delta, claims its technology can generate up to 4,000 acre-feet of water annually from burning natural gas. It has hired the University of Utah's Energy & Geoscience Institute to independently verify the science. The company hopes the study will be completed next summer.Business Wire BlogCreekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI CampusCreekstone Energy LLC has secured 43,000 dekatherms per day of firm natural gas transportation capacity on the Kern River Gas Transmission pipeline for its Delta Gigasite AI energy campus in Millard County, Utah. This capacity is sufficient to support approximately 220 megawatts of behind-the-meter generation, the first phase of a campus master-planned to scale beyond 10 gigawatts. The project represents a multi-billion-dollar reinvestment in the region following the retirement of local coal units, with on-site power generation expected to begin in 2027.MillardccpCreekstone signs deal to capture carbonCreekstone Energy LLC signed a letter of intent to partner with Enchant Energy Corporation on carbon capture technology for a data center campus in Millard County. The partnership aims to develop carbon capture capabilities at the massive data center development. The full details of the agreement remain unavailable due to paywall restrictions on the article.EIN PresswireEnchant Energy Offers a Carbon Answer to America's Surging AI Data Center DemandEnchant Energy signed a letter of intent with Creekstone Energy to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite data center campus in Utah. The plan captures CO2 from the power generation facility and converts it into low-carbon fuels, generating revenue instead of sequestration costs. The approach also produces water as a byproduct, potentially reducing the data center's water footprint.SolarQuarterZeo Energy Signs MOU With Creekstone Energy to Develop 280 MW Of Baseload Power & Storage And Reports Steady Q4 Revenue & Improved Margin Despite A Challenging 2025Zeo Energy Corp. reported Q4 2025 revenue of $18.6 million, flat year-over-year, but gross profit fell sharply to $2.1 million (11.3% of revenue) from $8.3 million (44.6%) due to higher labor costs and domestic-content material expenses, resulting in a net loss of $1.8 million and adjusted EBITDA of negative $1.4 million. For the full year 2025, revenue declined 5% to $69.3 million and net loss nearly doubled to $19.6 million, driven by amortization charges from the Lumio acquisition, a $3.2 million bad-debt expense from a financing partner's bankruptcy, and elevated labor costs. The company also signed an MOU with Creekstone Energy on February 18, 2026, to develop approximately 280 megawatts of baseload power and long-duration storage for Creekstone's data center in Millard County, Utah, leveraging Zeo Energy's 2025 acquisition of Heliogen to expand into the commercial and industrial market.Stock TitanZeo Energy Q4 revenue flat at $18.6M, loss widensZeo Energy Corp. reported Q4 2025 revenue of $18.6 million, flat compared to the prior year period, while net loss widened to $1.8 million from $1.1 million, driven by increased labor costs and domestic content materials required for tax incentive compliance. Full-year 2025 revenue declined 5% to $69.3 million from $73.2 million, with net loss nearly doubling to $19.6 million, impacted by $8 million in amortization from the November 2024 Lumio acquisition and a $3.2 million bad debt expense from a finance partner bankruptcy. The company signed a memorandum of understanding with Creekstone Energy in February 2026 to develop approximately 280 MW of energy generation and storage for a data center in Utah, representing a potential expansion into the commercial market through its Heliogen subsidiary.JD SupraRenewable Energy Update 3.12.26This article is a news aggregator feed containing multiple unrelated stories regarding the renewable energy sector, including financing for Arevon's Nighthawk project, court rulings on California's NEM 3.0 policy, and delays in U.S. clean power projects. It also reports on legal developments for Equinor's Empire Wind, RWE's capacity expansion, and Creekstone Energy's solar lease in Utah. Due to the fragmented nature of the content comprising distinct, unrelated events from different dates, no single cohesive narrative exists.Pv-magazine-usaCreekstone Energy secures 13,000-acre lease for 1 GW solar project in UtahCreekstone Energy has secured a 13,000-acre lease from the Utah School and Institutional Trust Lands Administration in Millard County for what will be the largest solar project by acreage in Utah's history, targeting 1 GW of capacity. The solar generation will power the Delta Gigasite, a data center campus planned for 10 GW to support AI and computing operations, with electricity production scheduled for 2027. The project, developed in partnership with Zeo Energy and supported by Creekstone's recent Series B funding, will increase Utah's total solar capacity by approximately 21% and generate revenue for the state's public education system.of AI and Artificial Intelligence NewsZeo & Creekstone: How to Power Delta Gigasite AI Data CentreZeo Energy and Creekstone Energy signed a memorandum of understanding to develop approximately 280 MW of solar and storage capacity for the Delta Gigasite AI data centre campus in Utah. This partnership aims to provide clean baseload power to support the facility's projected 10 GW capacity, with Blue Sky AI confirmed as the first tenant. The collaboration leverages Zeo's long-duration energy storage technology acquired from Heliogen to address the increasing power demands of AI workloads.