Descriptiontext

Shema Power Lake Kivu Limited (SPLK) is a Rwandan Independent Power Producer (IPP) that develops and operates the Kivu56 methane gas-to-power project on Lake Kivu in western Rwanda. Founded in 2014 after winning a competitive tender from the Government of Rwanda, the company extracts dissolved methane gas from the deep waters of Lake Kivu and converts it into electricity using 19 Caterpillar biogas generator sets with a combined installed capacity of 56 MW. The company serves a single off-taker — Rwanda Energy Utility Corporation Limited (EUCL) — under a 25-year Power Purchase Agreement (PPA) signed in December 2015 and amended in March 2019, with power evacuated into Rwanda's national grid via a 220 kV transmission line. The company achieved its Commercial Operations Date on 17 February 2024, nearly a decade after project award, following a delayed construction period affected by COVID-19 and a major design setback related to the mooring of offshore separators.

The underlying technology combines offshore gas extraction infrastructure with onshore power generation. Four Gas Extraction Facility (GEF) Barges are positioned approximately 5.5 km offshore on Lake Kivu, each connected to two Free-Standing Separators (FRSS) that extract pressurized methane at 20 meters below lake level. The gas is piped onshore to wash-water towers that remove CO2 and impurities before feeding the generator sets. The mooring system — designed for 440-meter water depth with 4-meter placement accuracy using 4,000 tons of steel anchors and a purpose-built Damen CeeBee 1 construction barge — required redesign by SIGMA Marine after the original concept proved inadequate. Submarine cables were supplied by Hengtong Group and the 19 biogas generators by Caterpillar, each rated at 3.790 MWe and tolerant of methane content as low as 65%.

SPLK generates revenue exclusively through electricity sales to EUCL under the long-term PPA, with payments tied to installed capacity and dispatch availability rather than volumetric output, targeting 95% dispatch availability. The company is privately held by Highland Power Limited, an investment vehicle controlled by Lord Irvine Laidlaw, which acquired 100% of the project entity in February 2019 and funded construction from balance-sheet resources. SPLK also holds the KP1 Project, a separate 50 MW grid power plant development based on Concession #1 that it intends to develop as a follow-on. The operating model is asset-heavy infrastructure with no marketing or multi-channel distribution; the company maintains a corporate website (splk.co.rw) for stakeholder communication and tendering processes.

Short descriptiontext

Shema Power Lake Kivu Limited is a Rwandan Independent Power Producer that extracts methane gas from Lake Kivu and generates 56 MW of electricity under a 25-year Power Purchase Agreement with state utility EUCL for delivery into Rwanda's national grid.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
51–100
akta.pro rankint
HeadquartersRubavu District, Rwanda
HQ citystring
Rubavu District
HQ countrystring
Rwanda
HQ regionstring
Africa
Markets served

Serves global market

Offices2 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
methane gas power, independent power producer, gas-to-power generation, renewable energy Rwanda, biogas electricity generation
Industry3 codes
1Gas-to-Power Project Development (IPP/CPP, Permitting, Financing)
CodeEUALALACPrimaryYes
2Captive & Embedded Gas-Fired Power Generation (Industrial/Commercial CHP)
CodeEUALALABPrimaryNo
3Gas-Fired Power Plant O&M and Life-Extension/Repowering Services
CodeEUACABAJPrimaryNo
NAICS code1 code
  • Fossil Fuel Electric Power Generation221112
SIC code1 code
  • Cogeneration Services & Small Power Producers4991
Product category
Independent Power Generation
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1Electricity Sales
TypeSubscription Recurring
Description

The company generates revenue by selling electricity produced from methane gas extraction from Lake Kivu to EUCL (Rwanda Energy Utility Corporation Limited) under a 25-year Power Purchase Agreement. Revenue is based on electricity generation capacity and dispatch availability, with a target of 95% dispatch availability.

splk.co.rw
Marketing channels1 record

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D, Marketing or Sales
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Shema Power Lake Kivu Limited extracts methane gas from Lake Kivu in Rwanda using offshore Gas Extraction Facility (GEF) Barges and Free-Standing Separators, processes the gas onshore through wash-water towers to remove CO2, and generates 56MW of electricity using nineteen Caterpillar biogas generator sets. All generated electricity is sold to the Rwanda Energy Utility Corporation Limited (EUCL) under a 25-year Power Purchase Agreement, with power delivered to Rwanda's national grid via a 220kV transmission line. The company is also developing the KP1 Project, a separate 50MW expansion under Concession #1.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 3 values shown
  • 56 MW of installed generation capacity
+2 more records
Product overview1 text field

Shema Power Lake Kivu Ltd operates a unified methane gas-to-power generation system comprising offshore gas extraction infrastructure and an onshore power plant. The Kivu56 Project forms the core offering, featuring four offshore GEF Barges with Free-Standing Separators (FRSS) that extract methane gas from Lake Kivu at depths of 20 meters, transport it via export pipelines to onshore wash-water towers for processing, and feed nineteen Caterpillar biogas gensets (totaling approximately 76MW gross, 56MW net) connected to the national grid. The company also holds the KP1 Project, a separate 50MW development derived from the original pilot plant that validated the methane gas-to-power concept.

Product and service4 records
1Kivu56 Methane Gas to Power Project
CategoryIndependent Power Generation
Description

A 56MW methane extraction and gas-to-power generation facility on Lake Kivu, Rwanda, consisting of offshore gas extraction using GEF Barges and FRSS units, an onshore gas processing plant with wash-water towers, and a 19-engine Caterpillar biogas genset power plant delivering electricity to EUCL under a 25-year PPA.

2KP1 Project (Concession #1 Development)
CategoryIndependent Power Generation
Description

A planned 50MW grid power plant development under Concession #1, based on assets acquired by SPLK's holding company SPM from KP1 Assets. The KP1 Project was the initial pilot plant that proved the Methane Gas to Power concept on Lake Kivu.

3Offshore Gas Extraction System (Gas Plant)
CategoryIndependent Power Generation
Description

Four GEF Barges located 5.5 km offshore on Lake Kivu, each connected to two Free-Standing Separators (FRSS) units, with submarine export pipelines and onshore wash-water towers for CO2 and impurity removal. The system extracts pressurized methane gas at 20 meters below lake level.

4Onshore Biogas Power Plant
Scale indicator6 records

Each record includes

Type, Value, Description, Source

Partnership9 partners
Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Local Rwandese contractor appointed to undertake civil and earthworks of the site. Operated under difficult circumstances during heavy rainy season. Civil works on gas plant substantially complete by December 2020. Project engaged local contractors with view to engage them once plant goes into operations for upskilling purposes.

Strategic tierMajorTypeImplementation/ SI/ Consulting Partner
Description

Gas Plant Contractor for the Kivu 56 project. Established site in August 2020 and responsible for offshore gas export line welding and gas plant construction. Part of construction update showing progress on wash water towers and separators.

Strategic tierMajorTypeOthers
Description

Manufactured the CeeBee 1 construction barge capable of placing individual 100-ton anchors at 440 meter depth with 4-meter accuracy.

Strategic tierMajorTypeOthers
Description

Supplier of submarine cables for the project as mentioned in construction progress July 2020.

Strategic tierMinorTypeOthers
Description

Listed as contractor site establishment container supplier for Kivu 56 project.

Strategic tierMinorTypeOthers
Description

Listed as contractor site establishment container supplier for Kivu 56 project, based in South Africa.

Strategic tierMajorTypeTechnology or Integration
Description

Appointed to carry out redesign of Free-Standing Separators (FRSS) mooring system after initial design did not work as required. Conceptual design approved in May 2022 and detail design commenced.

Strategic tierMajorTypeOthers
Description

Supplier of 19 biogas generator sets for the power plant, each with technical capacity of 3.790 MWe at site conditions, capable of running on gas with minimum 65% CH4 content.

Strategic tierMinorTypeOthers
Description

Lord Irvine Laidlaw chairs the Laidlaw Foundation which invests in education of underprivileged and underrepresented. Not directly involved in SPLK operations but affiliated through Lord Laidlaw's investment.

Recent move2 records

Each record includes

Date, Type, Title, Description, Source

Peers10 records
TypeBroad incumbent
Description

ContourGlobal is a London-listed IPP with a portfolio of thermal and renewable assets across Africa, Europe, and the Americas. It is the parent of KivuWatt, making it a direct corporate-level peer to SPLK / Highland Power in the African gas-to-power IPP space.

TypeBroad incumbent
Description

Globeleq is a UK-based IPP focused on sub-Saharan Africa, owning and operating a diversified portfolio of power generation assets. It is comparable to SPLK as an African-focused IPP with multi-country ambition and similar long-term PPA structures with national utilities.

TypeDirect peer
Description

KivuWatt is the other major methane gas-to-power operator on Lake Kivu, developed by ContourGlobal. It is the closest direct peer to SPLK, operating the same resource, same technology profile, and targeting the same Rwandan off-taker (EUCL) under its own PPA.

TypeBroad incumbent
Description

Aggreko is a global leader in temporary and modular power generation, including gas-fired solutions for utilities and industrial customers. Its IPP/temporary power model and use of gas engine technology (Caterpillar, Wärtsilä) align with SPLK's gas genset architecture.

TypeRegional player
Description

Kenya Electricity Generating Company (KenGen) is the largest power producer in Kenya, operating geothermal, hydro, and thermal assets. It is a regional East African state-linked power producer comparable in asset type, scale, and PPA-driven utility relationships to SPLK's positioning in Rwanda.

TypeRegional player
Description

Bujagali Energy operates the 250 MW Bujagali hydropower plant on the Victoria Nile in Uganda under a 30-year PPA with the Ugandan government. It is a regional East African IPP peer with a comparable long-term PPA structure and state-utility off-taker model.

TypeOthers
Description

Wärtsilä supplies flexible gas engine and balancing solutions to the global power industry, including to island and African grids. SPLK's reliance on Caterpillar biogas gensets (19 units) makes Wärtsilä a closely adjacent technology supplier and competitor in gas-engine IPPs.

TypeOthers
Description

Caterpillar supplied the 19 biogas generator sets (3.790 MWe each) that form SPLK's power island. As the OEM of the project's core generation equipment, Caterpillar is a critical technology supplier and a comparable gas-engine generation company in spirit, though not a direct operational IPP competitor.

TypeBroad incumbent
Description

Symbion Energy is a US-based distributed power generation company with operations in Africa and Asia. SPLK was originally named Symbion Power Lake Kivu and the capital was acquired through Symbion Power Mauritius Ltd, making Symbion a directly related IPP peer in the gas-to-power and African distributed generation space.

10Rusumo Power Company
TypeRegional player
Description

Rusumo Power Company operates the 80 MW Rusumo Falls run-of-river hydropower project on the Kagera River, supplying Rwanda, Burundi, and Tanzania. It is a regional East African cross-border IPP with a similar state-utility off-taker structure and similar plant-scale economics.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature5 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles10 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Shema Power Lake Kivu Limited

Independent Power Generationsplk.co.rw

Shema Power Lake Kivu Limited is a Rwandan Independent Power Producer that extracts methane gas from Lake Kivu and generates 56 MW of electricity under a 25-year Power Purchase Agreement with state utility EUCL for delivery into Rwanda's national grid.

What Shema Power Lake Kivu Limited does

Shema Power Lake Kivu Limited (SPLK) is a Rwandan Independent Power Producer (IPP) that develops and operates the Kivu56 methane gas-to-power project on Lake Kivu in western Rwanda. Founded in 2014 after winning a competitive tender from the Government of Rwanda, the company extracts dissolved methane gas from the deep waters of Lake Kivu and converts it into electricity using 19 Caterpillar biogas generator sets with a combined installed capacity of 56 MW. The company serves a single off-taker — Rwanda Energy Utility Corporation Limited (EUCL) — under a 25-year Power Purchase Agreement (PPA) signed in December 2015 and amended in March 2019, with power evacuated into Rwanda's national grid via a 220 kV transmission line. The company achieved its Commercial Operations Date on 17 February 2024, nearly a decade after project award, following a delayed construction period affected by COVID-19 and a major design setback related to the mooring of offshore separators.

The underlying technology combines offshore gas extraction infrastructure with onshore power generation. Four Gas Extraction Facility (GEF) Barges are positioned approximately 5.5 km offshore on Lake Kivu, each connected to two Free-Standing Separators (FRSS) that extract pressurized methane at 20 meters below lake level. The gas is piped onshore to wash-water towers that remove CO2 and impurities before feeding the generator sets. The mooring system — designed for 440-meter water depth with 4-meter placement accuracy using 4,000 tons of steel anchors and a purpose-built Damen CeeBee 1 construction barge — required redesign by SIGMA Marine after the original concept proved inadequate. Submarine cables were supplied by Hengtong Group and the 19 biogas generators by Caterpillar, each rated at 3.790 MWe and tolerant of methane content as low as 65%.

SPLK generates revenue exclusively through electricity sales to EUCL under the long-term PPA, with payments tied to installed capacity and dispatch availability rather than volumetric output, targeting 95% dispatch availability. The company is privately held by Highland Power Limited, an investment vehicle controlled by Lord Irvine Laidlaw, which acquired 100% of the project entity in February 2019 and funded construction from balance-sheet resources. SPLK also holds the KP1 Project, a separate 50 MW grid power plant development based on Concession #1 that it intends to develop as a follow-on. The operating model is asset-heavy infrastructure with no marketing or multi-channel distribution; the company maintains a corporate website (splk.co.rw) for stakeholder communication and tendering processes.

Shema Power Lake Kivu Limited firmographics

Firmographics
Name
Shema Power Lake Kivu Limited
Legal name
Shema Power Lake Kivu Limited
Website
https://splk.co.rw
Company type
Private
Founded year
2014
Operating status
Operating
Headcount range
51–100 employees
Short description
Shema Power Lake Kivu Limited is a Rwandan Independent Power Producer that extracts methane gas from Lake Kivu and generates 56 MW of electricity under a 25-year Power Purchase Agreement with state utility EUCL for delivery into Rwanda's national grid.
Ownership category
akta.pro rank

Shema Power Lake Kivu Limited industry classification

Industry
Product category
Independent Power Generation
NAICS
Fossil Fuel Electric Power Generation (221112)
SIC
Cogeneration Services & Small Power Producers (4991)
akta.pro primary industry
Gas-to-Power Project Development (IPP/CPP, Permitting, Financing) (EUALALAC)
akta.pro secondary industries
Captive & Embedded Gas-Fired Power Generation (Industrial/Commercial CHP) (EUALALAB), Gas-Fired Power Plant O&M and Life-Extension/Repowering Services (EUACABAJ)

Keywords

  • Methane gas power
  • Independent power producer
  • Gas-to-power generation
  • Renewable energy Rwanda
  • Biogas electricity generation

Where Shema Power Lake Kivu Limited is headquartered

Location

Headquarters

HQ city
Rubavu District
HQ country
Rwanda
HQ region
Africa

Offices2 records

Markets served

Shema Power Lake Kivu Limited business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Supply Chain, Technology or R&D, Marketing or Sales

Revenue model

  1. Electricity Sales: The company generates revenue by selling electricity produced from methane gas extraction from Lake Kivu to EUCL (Rwanda Energy Utility Corporation Limited) under a 25-year Power Purchase Agreement. Revenue is based on electricity generation capacity and dispatch availability, with a target of 95% dispatch availability.

Go-to-market motion1 record

Distribution channels1 record

Marketing channels1 record

Shema Power Lake Kivu Limited product offering

Product offering

Core offering

Shema Power Lake Kivu Limited extracts methane gas from Lake Kivu in Rwanda using offshore Gas Extraction Facility (GEF) Barges and Free-Standing Separators, processes the gas onshore through wash-water towers to remove CO2, and generates 56MW of electricity using nineteen Caterpillar biogas generator sets. All generated electricity is sold to the Rwanda Energy Utility Corporation Limited (EUCL) under a 25-year Power Purchase Agreement, with power delivered to Rwanda's national grid via a 220kV transmission line. The company is also developing the KP1 Project, a separate 50MW expansion under Concession #1.

Product overview

Shema Power Lake Kivu Ltd operates a unified methane gas-to-power generation system comprising offshore gas extraction infrastructure and an onshore power plant. The Kivu56 Project forms the core offering, featuring four offshore GEF Barges with Free-Standing Separators (FRSS) that extract methane gas from Lake Kivu at depths of 20 meters, transport it via export pipelines to onshore wash-water towers for processing, and feed nineteen Caterpillar biogas gensets (totaling approximately 76MW gross, 56MW net) connected to the national grid. The company also holds the KP1 Project, a separate 50MW development derived from the original pilot plant that validated the methane gas-to-power concept.

Differentiator

Problem solved

Functional benefit

Products and services

  • Kivu56 Methane Gas to Power Project A 56MW methane extraction and gas-to-power generation facility on Lake Kivu, Rwanda, consisting of offshore gas extraction using GEF Barges and FRSS units, an onshore gas processing plant with wash-water towers, and a 19-engine Caterpillar biogas genset power plant delivering electricity to EUCL under a 25-year PPA.
  • KP1 Project (Concession #1 Development) A planned 50MW grid power plant development under Concession #1, based on assets acquired by SPLK's holding company SPM from KP1 Assets. The KP1 Project was the initial pilot plant that proved the Methane Gas to Power concept on Lake Kivu.
  • Offshore Gas Extraction System (Gas Plant) Four GEF Barges located 5.5 km offshore on Lake Kivu, each connected to two Free-Standing Separators (FRSS) units, with submarine export pipelines and onshore wash-water towers for CO2 and impurity removal. The system extracts pressurized methane gas at 20 meters below lake level.
  • Onshore Biogas Power Plant

Quantifiable outcome

  • 56 MW of installed generation capacity
  • +2 more outcomes

Companies that use Shema Power Lake Kivu Limited

Customer profile

Named customers1 record

Segments1 record

Ideal customer profiles1 record

Shema Power Lake Kivu Limited technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature5 records

Shema Power Lake Kivu Limited partnerships and signals

Strategic signal

Partnerships

Nine partnerships are on record, tiered major and minor.

  • Fair ConstructionmajorImplementation/ SI/ Consulting PartnerLocal Rwandese contractor appointed to undertake civil and earthworks of the site. Operated under difficult circumstances during heavy rainy season. Civil works on gas plant substantially complete by December 2020. Project engaged local contractors with view to engage them once plant goes into operations for upskilling purposes.
  • Galil EngineeringmajorImplementation/ SI/ Consulting PartnerGas Plant Contractor for the Kivu 56 project. Established site in August 2020 and responsible for offshore gas export line welding and gas plant construction. Part of construction update showing progress on wash water towers and separators.
  • DamenmajorOthersManufactured the CeeBee 1 construction barge capable of placing individual 100-ton anchors at 440 meter depth with 4-meter accuracy.
  • Hengtong GroupmajorOthersSupplier of submarine cables for the project as mentioned in construction progress July 2020.
  • Global Power SystemsminorOthersListed as contractor site establishment container supplier for Kivu 56 project.
  • Control GearminorOthersListed as contractor site establishment container supplier for Kivu 56 project, based in South Africa.
  • SIGMA MarinemajorTechnology or IntegrationAppointed to carry out redesign of Free-Standing Separators (FRSS) mooring system after initial design did not work as required. Conceptual design approved in May 2022 and detail design commenced.
  • CaterpillarmajorOthersSupplier of 19 biogas generator sets for the power plant, each with technical capacity of 3.790 MWe at site conditions, capable of running on gas with minimum 65% CH4 content.
  • Laidlaw FoundationminorOthersLord Irvine Laidlaw chairs the Laidlaw Foundation which invests in education of underprivileged and underrepresented. Not directly involved in SPLK operations but affiliated through Lord Laidlaw's investment.

Scale indicators6 records

Recent moves2 records

Shema Power Lake Kivu Limited competitors and assessment

Company assessment

Broad incumbents

  • ContourGlobal: ContourGlobal is a London-listed IPP with a portfolio of thermal and renewable assets across Africa, Europe, and the Americas. It is the parent of KivuWatt, making it a direct corporate-level peer to SPLK / Highland Power in the African gas-to-power IPP space.
  • Globeleq: Globeleq is a UK-based IPP focused on sub-Saharan Africa, owning and operating a diversified portfolio of power generation assets. It is comparable to SPLK as an African-focused IPP with multi-country ambition and similar long-term PPA structures with national utilities.
  • Aggreko: Aggreko is a global leader in temporary and modular power generation, including gas-fired solutions for utilities and industrial customers. Its IPP/temporary power model and use of gas engine technology (Caterpillar, Wärtsilä) align with SPLK's gas genset architecture.
  • Symbion Energy: Symbion Energy is a US-based distributed power generation company with operations in Africa and Asia. SPLK was originally named Symbion Power Lake Kivu and the capital was acquired through Symbion Power Mauritius Ltd, making Symbion a directly related IPP peer in the gas-to-power and African distributed generation space.

Direct peers

  • KivuWatt: KivuWatt is the other major methane gas-to-power operator on Lake Kivu, developed by ContourGlobal. It is the closest direct peer to SPLK, operating the same resource, same technology profile, and targeting the same Rwandan off-taker (EUCL) under its own PPA.

Regional players

  • Kengen: Kenya Electricity Generating Company (KenGen) is the largest power producer in Kenya, operating geothermal, hydro, and thermal assets. It is a regional East African state-linked power producer comparable in asset type, scale, and PPA-driven utility relationships to SPLK's positioning in Rwanda.
  • Bujagali Energy: Bujagali Energy operates the 250 MW Bujagali hydropower plant on the Victoria Nile in Uganda under a 30-year PPA with the Ugandan government. It is a regional East African IPP peer with a comparable long-term PPA structure and state-utility off-taker model.
  • Rusumo Power Company: Rusumo Power Company operates the 80 MW Rusumo Falls run-of-river hydropower project on the Kagera River, supplying Rwanda, Burundi, and Tanzania. It is a regional East African cross-border IPP with a similar state-utility off-taker structure and similar plant-scale economics.

Others

  • Wärtsilä Energy: Wärtsilä supplies flexible gas engine and balancing solutions to the global power industry, including to island and African grids. SPLK's reliance on Caterpillar biogas gensets (19 units) makes Wärtsilä a closely adjacent technology supplier and competitor in gas-engine IPPs.
  • Caterpillar (Electric Power): Caterpillar supplied the 19 biogas generator sets (3.790 MWe each) that form SPLK's power island. As the OEM of the project's core generation equipment, Caterpillar is a critical technology supplier and a comparable gas-engine generation company in spirit, though not a direct operational IPP competitor.

Market position

Strengths4 records

Weaknesses5 records

Key risks6 records

Key highlights6 records

Customer concentration

Shema Power Lake Kivu Limited social profiles

Digital presence

Shema Power Lake Kivu Limited financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Shema Power Lake Kivu Limited leadership team

Management profile

Number of profiles

Profiles10 records

Shema Power Lake Kivu Limited funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Shema Power Lake Kivu Limited M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Shema Power Lake Kivu Limited

What does Shema Power Lake Kivu Limited do?

Shema Power Lake Kivu Limited extracts methane gas from Lake Kivu in Rwanda using offshore Gas Extraction Facility (GEF) Barges and Free-Standing Separators, processes the gas onshore through wash-water towers to remove CO2, and generates 56MW of electricity using nineteen Caterpillar biogas generator sets. All generated electricity is sold to the Rwanda Energy Utility Corporation Limited (EUCL) under a 25-year Power Purchase Agreement, with power delivered to Rwanda's national grid via a 220kV transmission line. The company is also developing the KP1 Project, a separate 50MW expansion under Concession #1.

Is Shema Power Lake Kivu Limited a public or private company?

Shema Power Lake Kivu Limited is a private company. It is classified as corporate owned and is currently operating.

When was Shema Power Lake Kivu Limited founded?

Shema Power Lake Kivu Limited was founded in 2014. It employs 51 to 100 people.

Where is Shema Power Lake Kivu Limited based?

Shema Power Lake Kivu Limited is headquartered in Rubavu District, Rwanda, in the Africa region.

How does Shema Power Lake Kivu Limited make money?

One revenue line is on record: electricity Sales.

Who are Shema Power Lake Kivu Limited's main competitors?

Broad incumbents on record are ContourGlobal, Globeleq, Aggreko and Symbion Energy. KivuWatt is listed as a direct peer. Regional players are Kengen, Bujagali Energy and Rusumo Power Company. Others are Wärtsilä Energy and Caterpillar (Electric Power).

Does Shema Power Lake Kivu Limited have an API?

No public API is recorded for Shema Power Lake Kivu Limited.

What industry is Shema Power Lake Kivu Limited in?

Shema Power Lake Kivu Limited's product category is Independent Power Generation. Its primary akta.pro industry code is EUALALAC, Gas-to-Power Project Development (IPP/CPP, Permitting, Financing), with a secondary code of EUALALAB, Captive & Embedded Gas-Fired Power Generation (Industrial/Commercial CHP). Its NAICS code is 221112 and its SIC code is 4991.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales