Developer docs
API playgroundTry for free, no card

Search company profiles

Fidra Energy

Full company profile

uuid005pvhw

Namestring
Fidra Energy
Legal namestring
Fidra Energy Ltd.
Websiteurl
fidraenergy.com
Company typeenum
Private
Founded yearint
2024
Descriptiontext

Fidra Energy Ltd. is a UK-based battery energy storage system (BESS) developer and operator headquartered in Edinburgh, established in 2024 as the European BESS platform of EIG (Energy Infrastructure Group) with co-investment from the UK National Wealth Fund. The company develops, builds, and operates large-scale, grid-connected lithium-ion battery storage projects using Sungrow's PowerTitan 2.0 liquid-cooled grid-forming technology, currently managing a UK pipeline exceeding 4.1GW across four projects: Thorpe Marsh (1.45GW/2.9GWh in Yorkshire, the largest BESS project in the UK, under construction since September 2025), West Burton C (500MW/1GWh in Nottinghamshire), Bicker Fen 1&2 (1.2GW/2.4GWh in Lincolnshire), and Enderby (1,025MW in Leicestershire, acquired from Innova in June 2026).

The company's business model is anchored on three revenue streams: (1) 15-year UK Capacity Market awards providing fixed revenues (approximately £357M secured across Thorpe Marsh and West Burton C, representing ~22% of total derated new build BESS capacity in the T-4 auction); (2) long-term tolling agreements with generators such as Drax (10-year deal for 250MW/500MWh at West Burton) providing inflation-indexed fixed fees in exchange for counterparty dispatch rights; and (3) energy trading and balancing services through offtake agreements with EDF, Octopus Energy, and Statkraft covering approximately 80% of Thorpe Marsh capacity. Revenue is therefore a mix of regulated recurring capacity payments, contracted recurring tolling fees, and usage-based trading income.

Fidra raised approximately £445M in equity from EIG and the National Wealth Fund plus £594M in debt from international lenders in September 2025 to reach financial close on Thorpe Marsh, totaling approximately £1B for that project alone. The company is led by an experienced management team previously responsible for West Burton Energy, including CEO Chris Elder, COO Lisa Mackay, CFO Tony Julius, and CGO Morris Van Looy, who led the prior £450M divestiture of West Burton B power station to TotalEnergies. Fidra's stated ambition is to develop 10GW of battery storage in the UK and other European markets by 2030.

Short descriptiontext

Fidra Energy is a UK-based battery energy storage developer, backed by EIG and the National Wealth Fund, developing and operating grid-scale lithium-ion BESS projects exceeding 4.1GW across the UK using Sungrow PowerTitan 2.0 technology, serving the National Grid, energy suppliers, and generators through capacity market contracts, tolling agreements, and energy trading.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersEdinburgh, United Kingdom
HQ citystring
Edinburgh
HQ countrystring
United Kingdom
HQ regionstring
Europe
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
battery energy storage, grid-scale BESS, energy storage projects, renewable integration, capacity market services
Industry5 codes
1Utility-Scale BESS Project Development & Ownership (IPP/Developer)
CodeEUAFAAAAPrimaryYes
2BESS Operations, Maintenance & Asset Performance Management (APM)
CodeEUAFAAAGPrimaryNo
3BESS Financing, Insurance & Contracting (Tax Equity, PPA/Tolling, Warranties)
CodeEUAFAAAIPrimaryNo
4BESS Market Participation & Trading Services (Ancillary/Capacity/Arbitrage)
CodeEUAFAAALPrimaryNo
5Utility-Scale BESS EPC & Integration
CodeEUAEAEAAPrimaryNo
NAICS code2 codes
  • Electric Power Generation22111
  • Electric Power Generation, Transmission and Distribution2211
SIC code1 code
  • Cogeneration Services & Small Power Producers4991
Product category
Battery Energy Storage
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model3 records
1Capacity Market Revenue
TypeSubscription Recurring
Description

Long-term capacity market awards from the UK Government providing fixed revenues over 15-year contract periods. Fidra secured ~22% of total derated new build BESS capacity in the T-4 Capacity Market Auction for 2028/29, generating approximately £357 million in fixed revenues for Thorpe Marsh and West Burton C projects in today's money.

fidraenergy.com
2Tolling Agreements
TypeSubscription Recurring
Description

Long-term tolling agreements where counterparties (e.g., Drax) pay fixed annual fees indexed to inflation in exchange for full operational control and dispatch rights. Fidra retains construction, maintenance, and availability risks. Drax signed a 10-year tolling agreement for 250MW/500MWh at West Burton.

ess-news.com
3Energy Trading and Balancing Services
TypeUsage Based
Description

Revenue from providing grid balancing services, storing energy during excess renewable generation periods and releasing during peak demand. Projects have signed long-term offtake agreements covering approximately 80% of Thorpe Marsh capacity with EDF, Octopus Energy, and Statkraft.

fidraenergy.com
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels3 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Supply Chain, Personnel, Technology or R&D, Operations, Marketing or Sales
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Fidra Energy develops, builds, and operates large-scale grid-connected battery energy storage system (BESS) projects in the UK and other European markets. The company finances, constructs, and manages multi-gigawatt lithium-ion storage projects using Sungrow PowerTitan 2.0 liquid-cooled technology, and monetises capacity through long-term offtake agreements, tolling deals, capacity market awards, and energy trading/balancing services.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 5 values shown
  • Thorpe Marsh can power 800,000 homes during peak demand and export over 2 million MWh annually
+4 more records
Product overview1 text field

Fidra Energy is a battery energy storage system (BESS) development and operating platform offering large-scale grid-connected battery storage projects. The company's portfolio includes four major projects: Thorpe Marsh (1.45GW/2.9GWh in Yorkshire), West Burton C (500MW/1GWh in Nottinghamshire), Bicker Fen 1 & 2 (1.2GW/2.4GWh in Lincolnshire), and Enderby (1,025MW in Leicestershire). Combined pipeline exceeds 4.1GW. Projects provide grid flexibility, renewable energy integration, and capacity market services using lithium-ion battery technology supplied by Sungrow.

Product and service4 records
1Thorpe Marsh Battery Storage Project
CategoryBattery Energy Storage Project
Description

The largest battery storage project in the UK at 1.45GW (2.9GWh), located in Yorkshire, England on a former coal station site adjacent to a large National Grid substation. Capable of powering approximately 785,000-800,000 homes annually and exporting over 2 million MWh per year. Uses Sungrow PowerTitan 2.0 liquid-cooled technology.

2West Burton C (WBC) Battery Storage Project
CategoryBattery Energy Storage Project
Description

A 500MW (1GWh) battery storage project in Nottinghamshire, adjacent to West Burton B gas-fired power station. Subject to a 10-year tolling agreement with Drax for 250MW/500MWh. Capable of powering approximately 300,000 homes. Uses Sungrow PowerTitan 2.0 technology.

3Bicker Fen 1 & 2 Battery Storage Project
CategoryBattery Energy Storage Project
Description

Early-stage development project in Lincolnshire with expected storage capacity of 1.2GW (2.4GWh) on a 40-acre site adjacent to the Bicker Fen 400kV substation. Capable of powering approximately 700,000 homes.

4Enderby Battery Storage Project
CategoryBattery Energy Storage Project
Description

A 1,025MW battery storage project in Leicestershire, acquired from Innova in June 2026, making it one of the largest BESS projects in the UK. Confirmed eligible for the UK's long-duration energy storage cap and floor scheme. Increases Fidra's UK BESS pipeline to over 4.1GW.

Scale indicator8 records

Each record includes

Type, Value, Description, Source

Partnership4 partners
Strategic tierMajorTypeStrategic or Co-development PartnerAnnounced on2026-06-03
Description

Largest UK independent developer of renewable energy projects and data centres. Fidra acquired the 1,025MW Enderby BESS project from Innova. Innova had secured planning consent from Blaby District Council in May 2025 and confirmed eligibility for the first long-duration energy storage cap and floor scheme application. The transaction is Innova's third utility-scale transmission-connected BESS sale in 12 months, totaling over 2.4GW.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-09-10
Description

Principal designer and contractor of the 400kV grid connection, electrical and mechanical scheme, and for the erection and commissioning of Sungrow battery systems at Thorpe Marsh.

Strategic tierMajorTypeImplementation/ SI/ Consulting PartnerAnnounced on2025-09-10
Description

Principal contractor undertaking civil and drainage works at the Thorpe Marsh site in South Yorkshire.

Strategic tierCoreTypeTechnology or IntegrationAnnounced on2024-11-18
Description

Strategic 4.4GWh partnership agreement where Sungrow supplies its PowerTitan 2.0 liquid-cooled BESS technology for Thorpe Marsh and West Burton C projects. Sungrow provides long-term maintenance services for both projects. The PowerTitan 2.0 is specifically designed for grid-forming, enhancing grid resilience and stability while enabling efficient participation in ancillary service markets.

Recent move8 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers3 records
TypeDirect peer
Description

UK-based BESS developer with a multi-gigawatt pipeline of grid-scale battery storage projects competing directly with Fidra for grid connections, capacity market awards, and offtake counterparties.

TypeDirect peer
Description

UK-listed BESS developer and operator with multiple utility-scale projects in the UK and selected European markets. Closest pure-play comparable to Fidra's developer/IPP model, securing capacity market revenues and PPAs with UK utilities.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers4 records

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment3 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile3 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature1 record

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles11 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds3 records

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors15 records

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Fidra Energy

Battery Energy Storagefidraenergy.com

Fidra Energy is a UK-based battery energy storage developer, backed by EIG and the National Wealth Fund, developing and operating grid-scale lithium-ion BESS projects exceeding 4.1GW across the UK using Sungrow PowerTitan 2.0 technology, serving the National Grid, energy suppliers, and generators through capacity market contracts, tolling agreements, and energy trading.

What Fidra Energy does

Fidra Energy Ltd. is a UK-based battery energy storage system (BESS) developer and operator headquartered in Edinburgh, established in 2024 as the European BESS platform of EIG (Energy Infrastructure Group) with co-investment from the UK National Wealth Fund. The company develops, builds, and operates large-scale, grid-connected lithium-ion battery storage projects using Sungrow's PowerTitan 2.0 liquid-cooled grid-forming technology, currently managing a UK pipeline exceeding 4.1GW across four projects: Thorpe Marsh (1.45GW/2.9GWh in Yorkshire, the largest BESS project in the UK, under construction since September 2025), West Burton C (500MW/1GWh in Nottinghamshire), Bicker Fen 1&2 (1.2GW/2.4GWh in Lincolnshire), and Enderby (1,025MW in Leicestershire, acquired from Innova in June 2026).

The company's business model is anchored on three revenue streams: (1) 15-year UK Capacity Market awards providing fixed revenues (approximately £357M secured across Thorpe Marsh and West Burton C, representing ~22% of total derated new build BESS capacity in the T-4 auction); (2) long-term tolling agreements with generators such as Drax (10-year deal for 250MW/500MWh at West Burton) providing inflation-indexed fixed fees in exchange for counterparty dispatch rights; and (3) energy trading and balancing services through offtake agreements with EDF, Octopus Energy, and Statkraft covering approximately 80% of Thorpe Marsh capacity. Revenue is therefore a mix of regulated recurring capacity payments, contracted recurring tolling fees, and usage-based trading income.

Fidra raised approximately £445M in equity from EIG and the National Wealth Fund plus £594M in debt from international lenders in September 2025 to reach financial close on Thorpe Marsh, totaling approximately £1B for that project alone. The company is led by an experienced management team previously responsible for West Burton Energy, including CEO Chris Elder, COO Lisa Mackay, CFO Tony Julius, and CGO Morris Van Looy, who led the prior £450M divestiture of West Burton B power station to TotalEnergies. Fidra's stated ambition is to develop 10GW of battery storage in the UK and other European markets by 2030.

Fidra Energy firmographics

Firmographics
Name
Fidra Energy
Legal name
Fidra Energy Ltd.
Website
https://fidraenergy.com
Company type
Private
Founded year
2024
Operating status
Operating
Headcount range
11–50 employees
Short description
Fidra Energy is a UK-based battery energy storage developer, backed by EIG and the National Wealth Fund, developing and operating grid-scale lithium-ion BESS projects exceeding 4.1GW across the UK using Sungrow PowerTitan 2.0 technology, serving the National Grid, energy suppliers, and generators through capacity market contracts, tolling agreements, and energy trading.
Ownership category
akta.pro rank

Fidra Energy industry classification

Industry
Product category
Battery Energy Storage
NAICS
Electric Power Generation (22111), Electric Power Generation, Transmission and Distribution (2211)
SIC
Cogeneration Services & Small Power Producers (4991)
akta.pro primary industry
Utility-Scale BESS Project Development & Ownership (IPP/Developer) (EUAFAAAA)
akta.pro secondary industries
BESS Operations, Maintenance & Asset Performance Management (APM) (EUAFAAAG), BESS Financing, Insurance & Contracting (Tax Equity, PPA/Tolling, Warranties) (EUAFAAAI), BESS Market Participation & Trading Services (Ancillary/Capacity/Arbitrage) (EUAFAAAL), Utility-Scale BESS EPC & Integration (EUAEAEAA)

Keywords

  • Battery energy storage
  • Grid-scale BESS
  • Energy storage projects
  • Renewable integration
  • Capacity market services

Where Fidra Energy is headquartered

Location

Headquarters

HQ city
Edinburgh
HQ country
United Kingdom
HQ region
Europe

Offices1 record

Markets served

Fidra Energy business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Supply Chain, Personnel, Technology or R&D, Operations, Marketing or Sales

Revenue model

  1. Capacity Market Revenue: Long-term capacity market awards from the UK Government providing fixed revenues over 15-year contract periods. Fidra secured ~22% of total derated new build BESS capacity in the T-4 Capacity Market Auction for 2028/29, generating approximately £357 million in fixed revenues for Thorpe Marsh and West Burton C projects in today's money.
  2. Tolling Agreements: Long-term tolling agreements where counterparties (e.g., Drax) pay fixed annual fees indexed to inflation in exchange for full operational control and dispatch rights. Fidra retains construction, maintenance, and availability risks. Drax signed a 10-year tolling agreement for 250MW/500MWh at West Burton.
  3. Energy Trading and Balancing Services: Revenue from providing grid balancing services, storing energy during excess renewable generation periods and releasing during peak demand. Projects have signed long-term offtake agreements covering approximately 80% of Thorpe Marsh capacity with EDF, Octopus Energy, and Statkraft.

Go-to-market motion1 record

Distribution channels3 records

Marketing channels5 records

Fidra Energy product offering

Product offering

Core offering

Fidra Energy develops, builds, and operates large-scale grid-connected battery energy storage system (BESS) projects in the UK and other European markets. The company finances, constructs, and manages multi-gigawatt lithium-ion storage projects using Sungrow PowerTitan 2.0 liquid-cooled technology, and monetises capacity through long-term offtake agreements, tolling deals, capacity market awards, and energy trading/balancing services.

Product overview

Fidra Energy is a battery energy storage system (BESS) development and operating platform offering large-scale grid-connected battery storage projects. The company's portfolio includes four major projects: Thorpe Marsh (1.45GW/2.9GWh in Yorkshire), West Burton C (500MW/1GWh in Nottinghamshire), Bicker Fen 1 & 2 (1.2GW/2.4GWh in Lincolnshire), and Enderby (1,025MW in Leicestershire). Combined pipeline exceeds 4.1GW. Projects provide grid flexibility, renewable energy integration, and capacity market services using lithium-ion battery technology supplied by Sungrow.

Differentiator

Problem solved

Functional benefit

Products and services

  • Thorpe Marsh Battery Storage Project The largest battery storage project in the UK at 1.45GW (2.9GWh), located in Yorkshire, England on a former coal station site adjacent to a large National Grid substation. Capable of powering approximately 785,000-800,000 homes annually and exporting over 2 million MWh per year. Uses Sungrow PowerTitan 2.0 liquid-cooled technology.
  • West Burton C (WBC) Battery Storage Project A 500MW (1GWh) battery storage project in Nottinghamshire, adjacent to West Burton B gas-fired power station. Subject to a 10-year tolling agreement with Drax for 250MW/500MWh. Capable of powering approximately 300,000 homes. Uses Sungrow PowerTitan 2.0 technology.
  • Bicker Fen 1 & 2 Battery Storage Project Early-stage development project in Lincolnshire with expected storage capacity of 1.2GW (2.4GWh) on a 40-acre site adjacent to the Bicker Fen 400kV substation. Capable of powering approximately 700,000 homes.
  • Enderby Battery Storage Project A 1,025MW battery storage project in Leicestershire, acquired from Innova in June 2026, making it one of the largest BESS projects in the UK. Confirmed eligible for the UK's long-duration energy storage cap and floor scheme. Increases Fidra's UK BESS pipeline to over 4.1GW.

Quantifiable outcome

  • Thorpe Marsh can power 800,000 homes during peak demand and export over 2 million MWh annually
  • +4 more outcomes

Companies that use Fidra Energy

Customer profile

Named customers4 records

Segments3 records

Ideal customer profiles3 records

Fidra Energy technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature1 record

Fidra Energy partnerships and signals

Strategic signal

Partnerships

Four partnerships are on record, tiered major and core.

  • InnovamajorStrategic or Co-development Partner · 3 June 2026Largest UK independent developer of renewable energy projects and data centres. Fidra acquired the 1,025MW Enderby BESS project from Innova. Innova had secured planning consent from Blaby District Council in May 2025 and confirmed eligibility for the first long-duration energy storage cap and floor scheme application. The transaction is Innova's third utility-scale transmission-connected BESS sale in 12 months, totaling over 2.4GW.
  • H&MV EngineeringmajorImplementation/ SI/ Consulting Partner · 10 September 2025Principal designer and contractor of the 400kV grid connection, electrical and mechanical scheme, and for the erection and commissioning of Sungrow battery systems at Thorpe Marsh.
  • Jones Bros.majorImplementation/ SI/ Consulting Partner · 10 September 2025Principal contractor undertaking civil and drainage works at the Thorpe Marsh site in South Yorkshire.
  • SungrowcoreTechnology or Integration · 18 November 2024Strategic 4.4GWh partnership agreement where Sungrow supplies its PowerTitan 2.0 liquid-cooled BESS technology for Thorpe Marsh and West Burton C projects. Sungrow provides long-term maintenance services for both projects. The PowerTitan 2.0 is specifically designed for grid-forming, enhancing grid resilience and stability while enabling efficient participation in ancillary service markets.

Scale indicators8 records

Recent moves8 records

Expansion highlights6 records

Fidra Energy competitors and assessment

Company assessment

Direct peers

  • Statera Energy: UK-based BESS developer with a multi-gigawatt pipeline of grid-scale battery storage projects competing directly with Fidra for grid connections, capacity market awards, and offtake counterparties.
  • Harmony Energy Income Trust: UK-listed BESS developer and operator with multiple utility-scale projects in the UK and selected European markets. Closest pure-play comparable to Fidra's developer/IPP model, securing capacity market revenues and PPAs with UK utilities.

Peers

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks6 records

Key highlights7 records

Customer concentration

Fidra Energy social profiles

Digital presence

Fidra Energy financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Fidra Energy leadership team

Management profile

Number of profiles

Profiles11 records

Fidra Energy funding detail

Funding detail

Funding overview

Funding rounds3 records

Investors15 records

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Fidra Energy M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Fidra Energy

What does Fidra Energy do?

Fidra Energy develops, builds, and operates large-scale grid-connected battery energy storage system (BESS) projects in the UK and other European markets. The company finances, constructs, and manages multi-gigawatt lithium-ion storage projects using Sungrow PowerTitan 2.0 liquid-cooled technology, and monetises capacity through long-term offtake agreements, tolling deals, capacity market awards, and energy trading/balancing services.

Is Fidra Energy a public or private company?

Fidra Energy is a private company. It is classified as private equity controlled and is currently operating.

When was Fidra Energy founded?

Fidra Energy was founded in 2024. It employs 11 to 50 people.

Where is Fidra Energy based?

Fidra Energy is headquartered in Edinburgh, United Kingdom, in the Europe region.

How does Fidra Energy make money?

Three revenue lines are on record. Capacity Market Revenue is the primary driver. The others are tolling Agreements and energy Trading and Balancing Services.

Who are Fidra Energy's main competitors?

Direct peers on record are Statera Energy and Harmony Energy Income Trust. Zenobē Energy is listed as a peer.

Does Fidra Energy have an API?

No public API is recorded for Fidra Energy.

What industry is Fidra Energy in?

Fidra Energy's product category is Battery Energy Storage. Its primary akta.pro industry code is EUAFAAAA, Utility-Scale BESS Project Development & Ownership (IPP/Developer), with a secondary code of EUAFAAAG, BESS Operations, Maintenance & Asset Performance Management (APM). Its NAICS code is 22111 and its SIC code is 4991.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
RechargeWhat keeps a battery storage CEO awake at night? | RechargeFidra Energy CEO Chris Elder said in an interview that while battery storage technology has become bankable, the UK's long-term off-take market strength and grid connection delivery remain his primary concerns heading toward 2030. The Edinburgh-headquartered company, backed by EIG and the UK's National Wealth Fund, has just reached financial close on the £250m West Burton C 500MW/1.1GWh battery project and is developing the UK's largest BESS project at Thorpe Marsh (1.45GW/2.9GWh). Elder noted the company aims to build 4-5GW in operation by 2030 while acknowledging uncertainty beyond that date as market cycles may tighten.The UK£250m battery storage project at former coal power station secures funding green lightFidra Energy has achieved financial close on a £250m battery energy storage project at the former West Burton coal-fired power station in Nottinghamshire, UK, securing £231m in debt facilities from international lenders alongside capital from EIG and the National Wealth Fund. The 500MW/1.1GWh West Burton C project is one of the UK's largest battery storage developments, expected to be operational by 2028 and capable of supplying electricity to around 300,000 homes during peak demand. Sungrow will supply battery technology, H&MV Engineering will handle grid connection infrastructure, and Drax Group has signed a long-term offtake agreement covering half the project's capacity.WFWWFW advises lenders on £231m financing for Fidra Energy’s West Burton C BESS projectWatson Farley & Williams advised lenders on £231m debt financing for Fidra Energy's 500 MW West Burton C battery storage project in Nottinghamshire. The project, backed by EIG and the National Wealth Fund, is expected to supply power to about 300,000 homes, with construction starting in 2026 and full operations in 2028.Power TechnologyFidra Energy secures funding for 500MW West Burton C projectFidra Energy has reached financial close on its 500MW/1.1GWh West Burton C battery energy storage system project in Nottinghamshire, England, with new loan facilities of £231m ($311m) provided by a consortium of international lenders. Construction is expected to begin in 2026 with full operational status by 2028, when the facility will be capable of supplying electricity to approximately 300,000 homes during peak demand periods. The project, backed by EIG and the National Wealth Fund, has secured a 15-year UK Government capacity market award commencing October 2028.Solar Power PortalFinancial close for Fidra Energy’s 500MW battery energy storageFidra Energy reached financial close on its 500MW/1.1GWh West Burton C battery storage project in Nottinghamshire, with construction starting later this year and full operation by 2028. International lenders committed £231 million, backed by EIG and the UK's National Wealth Fund. The project has a 15-year capacity market contract starting October 2028.SolarQuarterFidra Energy Reaches Financial Close on 500 MW/1.1 GWh West Burton C Battery Storage Project in UKFidra Energy has reached financial close on its 500 MW/1.1 GWh West Burton C battery energy storage system project in Nottinghamshire, England, securing £231 million in debt financing from a consortium of international lenders. The project, developed at the site of the former West Burton coal-fired power station, has equity backing from EIG and the National Wealth Fund, with construction scheduled to begin later this year and commercial operations expected in 2028. Fidra Energy has signed a long-term offtake agreement with Drax Group for 50% of the project's storage capacity and secured a 15-year Capacity Market agreement from the UK Government.RenewablesnowFidra reaches fin close on 500-MW battery project in EnglandEdinburgh-based Fidra has reached financial close on the 500-MW West Burton C battery energy storage project in England, with construction planned to begin later this year and full commercial operations targeted for 2028. The project will deploy Sungrow's technology and is financed through a combination of own resources, National Wealth Fund investment, and new loan facilities totalling GBP 231 million (USD 310.5m/EUR 271.4m), with debt from an international lending consortium. The battery will store electricity to supply around 300,000 homes during peak demand hours, with half its capacity contracted to Drax Group under a long-term off-take deal.FidraenergyFidra Energy reaches financial close on 500MW West Burton C battery energy storage project – Fidra EnergyFidra Energy reached financial close on its 500MW/1.1GWh West Burton C battery storage project in Nottinghamshire, securing £231M in loan facilities from international lenders alongside EIG and the National Wealth Fund. Construction begins in 2026, with full operations expected in 2028, and the project will supply electricity to about 300,000 homes during peak demand.Renewable Energy MagazineFidra Energy accelerates UK growth with acquisition of 1 GW Enderby battery storage project from InnovaFidra Energy, a UK-based battery storage developer, acquired the Enderby battery storage project from Innova for an undisclosed sum. The project is located in Enderby, UK, and Fidra is backed by EIG and the National Wealth Fund.DIGITEquity Investment in Scottish Smaller Businesses Jumps 70% in 2025Equity investment in Scotland's smaller businesses surged by 70% in the first three quarters of 2025, reaching £757 million, significantly outpacing the UK average decline of 20%, according to the British Business Bank's Small Business Finance Markets 2025/26 report. The growth was driven by a small number of high-value fundraisings, including Edinburgh-based Fidra Energy's £445 million funding round in Q3 2025. Scotland is on track to exceed its annual equity investment value record set in 2022, underscoring the strength of its investment ecosystem despite broader UK market challenges.