Peak Cluster
Peak Cluster is a UK joint-venture CCS infrastructure project building capture facilities, a 200km onshore + 90km offshore CO2 pipeline, and geological storage to decarbonise cement and lime production for Tarmac, Holcim, Breedon, and Buxton Lime, targeting 3 million tonnes of CO2 abatement per year from 2030.
- Company typePrivate
- Founded-
- HeadquartersPeak Forest, United Kingdom
- Headcount501–1,000
- GTM typeB2B
- OfferingServices
What Peak Cluster does
Peak Cluster is a UK carbon capture and storage (CCS) infrastructure project structured as a special purpose joint venture (Peak Cluster Limited / PCL) that develops, builds, and will operate CO2 capture, transport, and permanent geological storage assets for the cement and lime industries. It is jointly owned by the four anchor cement and lime producers whose Derbyshire and Staffordshire plants it serves — Tarmac (Tunstead), Holcim (Cauldon), Breedon (Hope), and Buxton Lime (Tunstead) — alongside Progressive Energy as project developer, Summit Energy Evolution Limited (a Sumitomo Corporation subsidiary) as financial partner, and the UK National Wealth Fund following its July 2025 multi-million-pound investment. Spirit Energy is integrated as the offshore storage partner via its Morecambe Net Zero project, which provides permanent CO2 storage in depleted gas reservoirs approximately 0.8–3 km beneath the East Irish Sea.
The technical system comprises capture facilities at the four cement/lime plants capable of capturing up to 90–95% of process CO2 emissions, approximately 200 km of buried onshore pipeline (24–36 inches) routing captured CO2 to a Coastal Above Ground Installation (AGI) on the Wirral Peninsula, an additional ~90 km of offshore pipeline (up to 1.1 metres diameter) to Morecambe Bay, Block Valve Stations for section isolation, Connection AGIs designed to allow future third-party offtake, and Distributed Fibre Optic Sensor (DFOS) monitoring running the full pipeline length for real-time leak detection. Together the project targets abatement of over 3 million tonnes of CO2 per year from 2030, accounting for ~40% of UK cement and lime production.
Peak Cluster's business model is that of a regulated industrial infrastructure JV: revenue mechanics are bespoke and undisclosed, structured through JV contributions and ultimately through transport, capture service, and storage tariffs once operational; the project is currently pre-revenue and not publicly listed. Go-to-market is enterprise-field, requiring direct engagement with the four JV partners, government bodies via the Nationally Significant Infrastructure Project (NSIP) Development Consent Order process, and broad stakeholder and community consultation (six published factsheets, public events, webinars across Cheshire, Wirral, Staffordshire, and Derbyshire). The project is positioned as the world's largest cement decarbonisation initiative and is closely coupled to the £5 billion combined MNZ + Peak Cluster capital programme expected to safeguard and create over 13,000 jobs by 2050.
Peak Cluster firmographics
Firmographics- Name
- Peak Cluster
- Legal name
- Peak Cluster
- Website
- https://peakcluster.co.uk
- Company type
- Private
- Operating status
- Operating
- Headcount range
- 501–1,000 employees
- Short description
- Peak Cluster is a UK joint-venture CCS infrastructure project building capture facilities, a 200km onshore + 90km offshore CO2 pipeline, and geological storage to decarbonise cement and lime production for Tarmac, Holcim, Breedon, and Buxton Lime, targeting 3 million tonnes of CO2 abatement per year from 2030.
- Ownership category
- akta.pro rank
Peak Cluster industry classification
Industry- Product category
- Carbon Capture and Storage Infrastructure
- NAICS
- Utility System Construction (2371), Heavy and Civil Engineering Construction (237)
- SIC
- Water, Sewer, Pipeline, Comm & Power Line Construction (1623), Heavy Construction Other Than Bldg Const - Contractors (1600)
- akta.pro primary industry
- CO₂ Pipeline Transport Infrastructure (Onshore/Offshore, Gathering & Trunklines) (EUABAHAA)
- akta.pro secondary industries
- CO2 Gathering & Collection Pipelines (Capture-to-Hub Networks) (TLAGAFAB), CO2 Trunkline Transmission (Long-Haul CCS Pipelines) (TLAGAFAA), CO2 Pipeline Development, Engineering & Construction (EPC) (TLAGAFAJ), CO2 Distribution / Lateral Pipelines (Hub-to-Emitter / Hub-to-User) (TLAGAFAC)
Keywords
Where Peak Cluster is headquartered
LocationHeadquarters
- HQ city
- Peak Forest
- HQ country
- United Kingdom
- HQ region
- Europe
Offices3 records
Markets served
Peak Cluster business model
Business model- GTM type
- B2B
- Offering type
- Services
- Cost components
- Infrastructure, Personnel, Technology or R&D, Operations, Supply Chain, Marketing or Sales
Revenue model
- CCS Infrastructure Services: Peak Cluster provides carbon capture and storage infrastructure services to cement and lime producers. The project is funded through joint venture arrangements between the cement/lime operators and financial partners. Peak Cluster Limited (PCL) funds the development of the onshore pipeline from capture facilities to coastal infrastructure.
Go-to-market motion1 record
Distribution channels1 record
Marketing channels5 records
Peak Cluster product offering
Product offeringCore offering
Peak Cluster is developing a large-scale carbon capture and storage (CCS) infrastructure system that captures up to 95% of CO2 emissions from four major UK cement and lime producers (Tarmac, Holcim, Breedon, Buxton Lime) across sites in Derbyshire and Staffordshire, transports the captured CO2 via approximately 200km of onshore pipeline and 90km of offshore pipeline, and permanently stores it in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is designed to prevent over 3 million tonnes of CO2 emissions annually once operational from 2030, and will operate as a managed services CCS infrastructure serving the UK cement and lime industry.
Product overview
Peak Cluster is a carbon capture and storage (CCS) infrastructure project comprising a unified system of interconnected components. Four major cement and lime producers—Tarmac, Holcim, Breedon, and Buxton Lime—have partnered with Progressive Energy as project developer and Spirit Energy for offshore storage. The integrated infrastructure system includes carbon capture facilities at cement and lime plants (capable of capturing up to 95% of CO2 emissions), an onshore pipeline spanning approximately 200km from Derbyshire and Staffordshire to the Wirral, Above Ground Installations (AGIs) and Block Valve Stations (BVSs) for operational control and safety, a Coastal AGI for compression, an offshore pipeline of approximately 90km, and permanent geological storage in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is supported by the National Wealth Fund and represents the world's largest cement decarbonisation project, with capacity to prevent over 3 million tonnes of CO2 emissions annually.
Differentiator
Problem solved
Functional benefit
Products and services
- Peak Cluster Carbon Capture and Storage Infrastructure Integrated CCS infrastructure service for UK cement and lime producers comprising carbon capture facilities at four cement and lime plants (up to 95% CO2 capture), approximately 200km of onshore CO2 pipeline, 90km of offshore pipeline to Morecambe Bay, Above Ground Installations and Block Valve Stations, and permanent geological storage in depleted gas reservoirs. Delivered to industrial enterprises via a managed services joint venture model.
- Geological CO2 Storage at Morecambe Bay Permanent underground storage of captured CO2 in depleted gas reservoirs under Morecambe Bay in the East Irish Sea, delivered via the Morecambe Net Zero (MNZ) facility operated by Spirit Energy, with storage capacity close to 1 billion tonnes of CO2. Connects directly to Peak Cluster's onshore and offshore pipeline network.
Quantifiable outcome
- Prevent over 3 million tonnes of CO2 emissions per year from 2030
- +4 more outcomes
Companies that use Peak Cluster
Customer profileSegments1 record
Ideal customer profiles1 record
Peak Cluster technology and API
TechnologyTechnology focussed Yes
API detail
- Has API
- No
- API docs
- API detail
Core technology
AI maturity
App detail
Feature4 records
Peak Cluster partnerships and signals
Strategic signalPartnerships
Six partnerships are on record, tiered core.
- TarmaccoreTarmac's Tunstead cement plant in Staffordshire is one of four cement/lime production sites that will develop carbon capture facilities as part of Peak Cluster. Tarmac is a joint venture partner in Peak Cluster Limited (PCL).
- HolcimcoreHolcim's Cauldon plant in Staffordshire will host carbon capture facilities. Holcim is a joint venture partner in Peak Cluster Limited (PCL).
- BreedoncoreBreedon's Hope cement plant in Derbyshire will develop carbon capture facilities. Breedon is a joint venture partner in Peak Cluster Limited (PCL).
- Buxton LimecoreBuxton Lime's lime works at Tunstead in Staffordshire will develop carbon capture facilities. Buxton Lime is a joint venture partner in Peak Cluster Limited (PCL).
- Progressive EnergycoreProgressive Energy is leading the development of the Peak Cluster project. They are a joint venture partner in Peak Cluster Limited (PCL) alongside the cement/lime operators.
- Spirit EnergycoreSpirit Energy is developing the Morecambe Net Zero (MNZ) project which is predominantly offshore and includes the Coastal AGI and pipework from the coast onwards. Spirit Energy provides the CO2 storage facility (depleted gas reservoirs in Morecambe Bay) that Peak Cluster will connect to.
Scale indicators10 records
Recent moves6 records
Expansion highlights6 records
Peak Cluster competitors and assessment
Company assessmentMarket position
Competitive moat5 records
Key risks5 records
Key highlights6 records
Customer concentration
Peak Cluster social profiles
Digital presencePeak Cluster financial estimates
Financial estimateRevenue estimate
Valuation estimate
Peak Cluster leadership team
Management profileNumber of profiles
Peak Cluster funding detail
Funding detailFunding overview
Funding rounds
Investors
Funding detail is available on the Subscription and Enterprise plan.Contact sales →
Peak Cluster M&A and investment
M&A and investmentM&A
Investments
M&A and investment is available on the Subscription and Enterprise plan.Contact sales →
Frequently asked questions about Peak Cluster
What does Peak Cluster do?
Peak Cluster is developing a large-scale carbon capture and storage (CCS) infrastructure system that captures up to 95% of CO2 emissions from four major UK cement and lime producers (Tarmac, Holcim, Breedon, Buxton Lime) across sites in Derbyshire and Staffordshire, transports the captured CO2 via approximately 200km of onshore pipeline and 90km of offshore pipeline, and permanently stores it in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is designed to prevent over 3 million tonnes of CO2 emissions annually once operational from 2030, and will operate as a managed services CCS infrastructure serving the UK cement and lime industry.
Is Peak Cluster a public or private company?
Peak Cluster is a private company. It is classified as corporate owned and is currently operating.
When was Peak Cluster founded?
Peak Cluster was founded in -1. It employs 501 to 1,000 people.
Where is Peak Cluster based?
Peak Cluster is headquartered in Peak Forest, United Kingdom, in the Europe region.
How does Peak Cluster make money?
One revenue line is on record: CCS Infrastructure Services.
Does Peak Cluster have an API?
No public API is recorded for Peak Cluster.
What industry is Peak Cluster in?
Peak Cluster's product category is Carbon Capture and Storage Infrastructure. Its primary akta.pro industry code is EUABAHAA, CO₂ Pipeline Transport Infrastructure (Onshore/Offshore, Gathering & Trunklines), with a secondary code of TLAGAFAB, CO2 Gathering & Collection Pipelines (Capture-to-Hub Networks). Its NAICS code is 2371 and its SIC code is 1623.