Peak Cluster

Full company profile

uuid006duh5

Namestring
Peak Cluster
Legal namestring
Peak Cluster
Company typeenum
Private
Founded yearstring
-
Descriptiontext

Peak Cluster is a UK carbon capture and storage (CCS) infrastructure project structured as a special purpose joint venture (Peak Cluster Limited / PCL) that develops, builds, and will operate CO2 capture, transport, and permanent geological storage assets for the cement and lime industries. It is jointly owned by the four anchor cement and lime producers whose Derbyshire and Staffordshire plants it serves — Tarmac (Tunstead), Holcim (Cauldon), Breedon (Hope), and Buxton Lime (Tunstead) — alongside Progressive Energy as project developer, Summit Energy Evolution Limited (a Sumitomo Corporation subsidiary) as financial partner, and the UK National Wealth Fund following its July 2025 multi-million-pound investment. Spirit Energy is integrated as the offshore storage partner via its Morecambe Net Zero project, which provides permanent CO2 storage in depleted gas reservoirs approximately 0.8–3 km beneath the East Irish Sea.

The technical system comprises capture facilities at the four cement/lime plants capable of capturing up to 90–95% of process CO2 emissions, approximately 200 km of buried onshore pipeline (24–36 inches) routing captured CO2 to a Coastal Above Ground Installation (AGI) on the Wirral Peninsula, an additional ~90 km of offshore pipeline (up to 1.1 metres diameter) to Morecambe Bay, Block Valve Stations for section isolation, Connection AGIs designed to allow future third-party offtake, and Distributed Fibre Optic Sensor (DFOS) monitoring running the full pipeline length for real-time leak detection. Together the project targets abatement of over 3 million tonnes of CO2 per year from 2030, accounting for ~40% of UK cement and lime production.

Peak Cluster's business model is that of a regulated industrial infrastructure JV: revenue mechanics are bespoke and undisclosed, structured through JV contributions and ultimately through transport, capture service, and storage tariffs once operational; the project is currently pre-revenue and not publicly listed. Go-to-market is enterprise-field, requiring direct engagement with the four JV partners, government bodies via the Nationally Significant Infrastructure Project (NSIP) Development Consent Order process, and broad stakeholder and community consultation (six published factsheets, public events, webinars across Cheshire, Wirral, Staffordshire, and Derbyshire). The project is positioned as the world's largest cement decarbonisation initiative and is closely coupled to the £5 billion combined MNZ + Peak Cluster capital programme expected to safeguard and create over 13,000 jobs by 2050.

Short descriptiontext

Peak Cluster is a UK joint-venture CCS infrastructure project building capture facilities, a 200km onshore + 90km offshore CO2 pipeline, and geological storage to decarbonise cement and lime production for Tarmac, Holcim, Breedon, and Buxton Lime, targeting 3 million tonnes of CO2 abatement per year from 2030.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
1–10
akta.pro rankint
HeadquartersPeak Forest, United Kingdom
HQ citystring
Peak Forest
HQ countrystring
United Kingdom
HQ regionstring
Europe
Markets served

Serves global market

Offices3 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
carbon capture storage, industrial CCS infrastructure, cement decarbonisation, CO2 pipeline transport, geological carbon sequestration
Industry5 codes
PRIMARYEUABAHAA
CO₂ Pipeline Transport Infrastructure (Onshore/Offshore, Gathering & Trunklines)
Energy, Utilities & Environment/Carbon & Climate Solutions (Carbon Markets, Offsets, CCS/CCUS)/CO₂ Transport & Storage Infrastructure (Pipelines, Shipping, Hubs, Saline Storage)
SECONDARYTLAGAFAB
CO2 Gathering & Collection Pipelines (Capture-to-Hub Networks)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)
SECONDARYTLAGAFAA
CO2 Trunkline Transmission (Long-Haul CCS Pipelines)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)
SECONDARYTLAGAFAJ
CO2 Pipeline Development, Engineering & Construction (EPC)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)
SECONDARYTLAGAFAC
CO2 Distribution / Lateral Pipelines (Hub-to-Emitter / Hub-to-User)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)
NAICS code2 codes
  • Utility System Construction2371
  • Heavy and Civil Engineering Construction237
SIC code2 codes
  • Water, Sewer, Pipeline, Comm & Power Line Construction1623
  • Heavy Construction Other Than Bldg Const - Contractors1600
Product category
Carbon Capture and Storage Infrastructure
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model1 record
1CCS Infrastructure Services
TypeManaged Services
Description

Peak Cluster provides carbon capture and storage infrastructure services to cement and lime producers. The project is funded through joint venture arrangements between the cement/lime operators and financial partners. Peak Cluster Limited (PCL) funds the development of the onshore pipeline from capture facilities to coastal infrastructure.

peakcluster.co.uk
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components6 values
Infrastructure, Personnel, Technology or R&D, Operations, Supply Chain, Marketing or Sales
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Peak Cluster is developing a large-scale carbon capture and storage (CCS) infrastructure system that captures up to 95% of CO2 emissions from four major UK cement and lime producers (Tarmac, Holcim, Breedon, Buxton Lime) across sites in Derbyshire and Staffordshire, transports the captured CO2 via approximately 200km of onshore pipeline and 90km of offshore pipeline, and permanently stores it in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is designed to prevent over 3 million tonnes of CO2 emissions annually once operational from 2030, and will operate as a managed services CCS infrastructure serving the UK cement and lime industry.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 5 values shown
  • Prevent over 3 million tonnes of CO2 emissions per year from 2030
+4 more records
Product overview1 text field

Peak Cluster is a carbon capture and storage (CCS) infrastructure project comprising a unified system of interconnected components. Four major cement and lime producers—Tarmac, Holcim, Breedon, and Buxton Lime—have partnered with Progressive Energy as project developer and Spirit Energy for offshore storage. The integrated infrastructure system includes carbon capture facilities at cement and lime plants (capable of capturing up to 95% of CO2 emissions), an onshore pipeline spanning approximately 200km from Derbyshire and Staffordshire to the Wirral, Above Ground Installations (AGIs) and Block Valve Stations (BVSs) for operational control and safety, a Coastal AGI for compression, an offshore pipeline of approximately 90km, and permanent geological storage in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is supported by the National Wealth Fund and represents the world's largest cement decarbonisation project, with capacity to prevent over 3 million tonnes of CO2 emissions annually.

Product and service2 records
1Peak Cluster Carbon Capture and Storage Infrastructure
CategoryCarbon Capture and Storage Infrastructure
Description

Integrated CCS infrastructure service for UK cement and lime producers comprising carbon capture facilities at four cement and lime plants (up to 95% CO2 capture), approximately 200km of onshore CO2 pipeline, 90km of offshore pipeline to Morecambe Bay, Above Ground Installations and Block Valve Stations, and permanent geological storage in depleted gas reservoirs. Delivered to industrial enterprises via a managed services joint venture model.

2Geological CO2 Storage at Morecambe Bay
CategoryGeological Carbon Storage
Description

Permanent underground storage of captured CO2 in depleted gas reservoirs under Morecambe Bay in the East Irish Sea, delivered via the Morecambe Net Zero (MNZ) facility operated by Spirit Energy, with storage capacity close to 1 billion tonnes of CO2. Connects directly to Peak Cluster's onshore and offshore pipeline network.

Scale indicator10 records

Each record includes

Type, Value, Description, Source

Partnership6 partners
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Tarmac's Tunstead cement plant in Staffordshire is one of four cement/lime production sites that will develop carbon capture facilities as part of Peak Cluster. Tarmac is a joint venture partner in Peak Cluster Limited (PCL).

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Holcim's Cauldon plant in Staffordshire will host carbon capture facilities. Holcim is a joint venture partner in Peak Cluster Limited (PCL).

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Breedon's Hope cement plant in Derbyshire will develop carbon capture facilities. Breedon is a joint venture partner in Peak Cluster Limited (PCL).

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Buxton Lime's lime works at Tunstead in Staffordshire will develop carbon capture facilities. Buxton Lime is a joint venture partner in Peak Cluster Limited (PCL).

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Progressive Energy is leading the development of the Peak Cluster project. They are a joint venture partner in Peak Cluster Limited (PCL) alongside the cement/lime operators.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Spirit Energy is developing the Morecambe Net Zero (MNZ) project which is predominantly offshore and includes the Coastal AGI and pipework from the coast onwards. Spirit Energy provides the CO2 storage facility (depleted gas reservoirs in Morecambe Bay) that Peak Cluster will connect to.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Market position
Competitive moat5 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
Yes
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
No data
No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Peak Cluster

Carbon Capture and Storage Infrastructurepeakcluster.co.uk

Peak Cluster is a UK joint-venture CCS infrastructure project building capture facilities, a 200km onshore + 90km offshore CO2 pipeline, and geological storage to decarbonise cement and lime production for Tarmac, Holcim, Breedon, and Buxton Lime, targeting 3 million tonnes of CO2 abatement per year from 2030.

What Peak Cluster does

Peak Cluster is a UK carbon capture and storage (CCS) infrastructure project structured as a special purpose joint venture (Peak Cluster Limited / PCL) that develops, builds, and will operate CO2 capture, transport, and permanent geological storage assets for the cement and lime industries. It is jointly owned by the four anchor cement and lime producers whose Derbyshire and Staffordshire plants it serves — Tarmac (Tunstead), Holcim (Cauldon), Breedon (Hope), and Buxton Lime (Tunstead) — alongside Progressive Energy as project developer, Summit Energy Evolution Limited (a Sumitomo Corporation subsidiary) as financial partner, and the UK National Wealth Fund following its July 2025 multi-million-pound investment. Spirit Energy is integrated as the offshore storage partner via its Morecambe Net Zero project, which provides permanent CO2 storage in depleted gas reservoirs approximately 0.8–3 km beneath the East Irish Sea.

The technical system comprises capture facilities at the four cement/lime plants capable of capturing up to 90–95% of process CO2 emissions, approximately 200 km of buried onshore pipeline (24–36 inches) routing captured CO2 to a Coastal Above Ground Installation (AGI) on the Wirral Peninsula, an additional ~90 km of offshore pipeline (up to 1.1 metres diameter) to Morecambe Bay, Block Valve Stations for section isolation, Connection AGIs designed to allow future third-party offtake, and Distributed Fibre Optic Sensor (DFOS) monitoring running the full pipeline length for real-time leak detection. Together the project targets abatement of over 3 million tonnes of CO2 per year from 2030, accounting for ~40% of UK cement and lime production.

Peak Cluster's business model is that of a regulated industrial infrastructure JV: revenue mechanics are bespoke and undisclosed, structured through JV contributions and ultimately through transport, capture service, and storage tariffs once operational; the project is currently pre-revenue and not publicly listed. Go-to-market is enterprise-field, requiring direct engagement with the four JV partners, government bodies via the Nationally Significant Infrastructure Project (NSIP) Development Consent Order process, and broad stakeholder and community consultation (six published factsheets, public events, webinars across Cheshire, Wirral, Staffordshire, and Derbyshire). The project is positioned as the world's largest cement decarbonisation initiative and is closely coupled to the £5 billion combined MNZ + Peak Cluster capital programme expected to safeguard and create over 13,000 jobs by 2050.

Peak Cluster firmographics

Firmographics
Name
Peak Cluster
Legal name
Peak Cluster
Website
https://peakcluster.co.uk
Company type
Private
Operating status
Operating
Headcount range
1–10 employees
Short description
Peak Cluster is a UK joint-venture CCS infrastructure project building capture facilities, a 200km onshore + 90km offshore CO2 pipeline, and geological storage to decarbonise cement and lime production for Tarmac, Holcim, Breedon, and Buxton Lime, targeting 3 million tonnes of CO2 abatement per year from 2030.
Ownership category
akta.pro rank

Peak Cluster industry classification

Industry
Product category
Carbon Capture and Storage Infrastructure
NAICS
Utility System Construction (2371), Heavy and Civil Engineering Construction (237)
SIC
Water, Sewer, Pipeline, Comm & Power Line Construction (1623), Heavy Construction Other Than Bldg Const - Contractors (1600)
akta.pro industry
PRIMARYEUABAHAA
CO₂ Pipeline Transport Infrastructure (Onshore/Offshore, Gathering & Trunklines)
Energy, Utilities & Environment/Carbon & Climate Solutions (Carbon Markets, Offsets, CCS/CCUS)/CO₂ Transport & Storage Infrastructure (Pipelines, Shipping, Hubs, Saline Storage)
SECONDARYTLAGAFAB
CO2 Gathering & Collection Pipelines (Capture-to-Hub Networks)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)
SECONDARYTLAGAFAA
CO2 Trunkline Transmission (Long-Haul CCS Pipelines)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)
SECONDARYTLAGAFAJ
CO2 Pipeline Development, Engineering & Construction (EPC)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)
SECONDARYTLAGAFAC
CO2 Distribution / Lateral Pipelines (Hub-to-Emitter / Hub-to-User)
Transportation & Logistics/Pipeline Transportation/CO2 Pipeline Transportation (Carbon Capture & Storage)

Keywords

  • Carbon capture storage
  • Industrial CCS infrastructure
  • Cement decarbonisation
  • CO2 pipeline transport
  • Geological carbon sequestration

Where Peak Cluster is headquartered

Location

Headquarters

HQ city
Peak Forest
HQ country
United Kingdom
HQ region
Europe

Offices3 records

Markets served

Peak Cluster business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Personnel, Technology or R&D, Operations, Supply Chain, Marketing or Sales

Revenue model

  1. CCS Infrastructure Services: Peak Cluster provides carbon capture and storage infrastructure services to cement and lime producers. The project is funded through joint venture arrangements between the cement/lime operators and financial partners. Peak Cluster Limited (PCL) funds the development of the onshore pipeline from capture facilities to coastal infrastructure.

Go-to-market motion1 record

Distribution channels1 record

Marketing channels5 records

Peak Cluster product offering

Product offering

Core offering

Peak Cluster is developing a large-scale carbon capture and storage (CCS) infrastructure system that captures up to 95% of CO2 emissions from four major UK cement and lime producers (Tarmac, Holcim, Breedon, Buxton Lime) across sites in Derbyshire and Staffordshire, transports the captured CO2 via approximately 200km of onshore pipeline and 90km of offshore pipeline, and permanently stores it in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is designed to prevent over 3 million tonnes of CO2 emissions annually once operational from 2030, and will operate as a managed services CCS infrastructure serving the UK cement and lime industry.

Product overview

Peak Cluster is a carbon capture and storage (CCS) infrastructure project comprising a unified system of interconnected components. Four major cement and lime producers—Tarmac, Holcim, Breedon, and Buxton Lime—have partnered with Progressive Energy as project developer and Spirit Energy for offshore storage. The integrated infrastructure system includes carbon capture facilities at cement and lime plants (capable of capturing up to 95% of CO2 emissions), an onshore pipeline spanning approximately 200km from Derbyshire and Staffordshire to the Wirral, Above Ground Installations (AGIs) and Block Valve Stations (BVSs) for operational control and safety, a Coastal AGI for compression, an offshore pipeline of approximately 90km, and permanent geological storage in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is supported by the National Wealth Fund and represents the world's largest cement decarbonisation project, with capacity to prevent over 3 million tonnes of CO2 emissions annually.

Differentiator

Problem solved

Functional benefit

Products and services

  • Peak Cluster Carbon Capture and Storage Infrastructure Integrated CCS infrastructure service for UK cement and lime producers comprising carbon capture facilities at four cement and lime plants (up to 95% CO2 capture), approximately 200km of onshore CO2 pipeline, 90km of offshore pipeline to Morecambe Bay, Above Ground Installations and Block Valve Stations, and permanent geological storage in depleted gas reservoirs. Delivered to industrial enterprises via a managed services joint venture model.
  • Geological CO2 Storage at Morecambe Bay Permanent underground storage of captured CO2 in depleted gas reservoirs under Morecambe Bay in the East Irish Sea, delivered via the Morecambe Net Zero (MNZ) facility operated by Spirit Energy, with storage capacity close to 1 billion tonnes of CO2. Connects directly to Peak Cluster's onshore and offshore pipeline network.

Quantifiable outcome

  • Prevent over 3 million tonnes of CO2 emissions per year from 2030
  • +4 more outcomes

Companies that use Peak Cluster

Customer profile

Segments1 record

Ideal customer profiles1 record

Peak Cluster technology and API

Technology

Technology focussed Yes

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature4 records

Peak Cluster partnerships and signals

Strategic signal

Partnerships

Six partnerships are on record, tiered core.

  • TarmaccoreStrategic or Co-development PartnerTarmac's Tunstead cement plant in Staffordshire is one of four cement/lime production sites that will develop carbon capture facilities as part of Peak Cluster. Tarmac is a joint venture partner in Peak Cluster Limited (PCL).
  • HolcimcoreStrategic or Co-development PartnerHolcim's Cauldon plant in Staffordshire will host carbon capture facilities. Holcim is a joint venture partner in Peak Cluster Limited (PCL).
  • BreedoncoreStrategic or Co-development PartnerBreedon's Hope cement plant in Derbyshire will develop carbon capture facilities. Breedon is a joint venture partner in Peak Cluster Limited (PCL).
  • Buxton LimecoreStrategic or Co-development PartnerBuxton Lime's lime works at Tunstead in Staffordshire will develop carbon capture facilities. Buxton Lime is a joint venture partner in Peak Cluster Limited (PCL).
  • Progressive EnergycoreStrategic or Co-development PartnerProgressive Energy is leading the development of the Peak Cluster project. They are a joint venture partner in Peak Cluster Limited (PCL) alongside the cement/lime operators.
  • Spirit EnergycoreStrategic or Co-development PartnerSpirit Energy is developing the Morecambe Net Zero (MNZ) project which is predominantly offshore and includes the Coastal AGI and pipework from the coast onwards. Spirit Energy provides the CO2 storage facility (depleted gas reservoirs in Morecambe Bay) that Peak Cluster will connect to.

Scale indicators10 records

Recent moves6 records

Expansion highlights6 records

Peak Cluster competitors and assessment

Company assessment

Market position

Competitive moat5 records

Key risks5 records

Key highlights6 records

Customer concentration

Peak Cluster social profiles

Digital presence

Peak Cluster financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Peak Cluster leadership team

Management profile

Number of profiles

Peak Cluster funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Peak Cluster M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Peak Cluster

What does Peak Cluster do?

Peak Cluster is developing a large-scale carbon capture and storage (CCS) infrastructure system that captures up to 95% of CO2 emissions from four major UK cement and lime producers (Tarmac, Holcim, Breedon, Buxton Lime) across sites in Derbyshire and Staffordshire, transports the captured CO2 via approximately 200km of onshore pipeline and 90km of offshore pipeline, and permanently stores it in depleted gas reservoirs under Morecambe Bay in the East Irish Sea. The project is designed to prevent over 3 million tonnes of CO2 emissions annually once operational from 2030, and will operate as a managed services CCS infrastructure serving the UK cement and lime industry.

Is Peak Cluster a public or private company?

Peak Cluster is a private company. It is classified as corporate owned and is currently operating.

When was Peak Cluster founded?

Peak Cluster was founded in -1. It employs 1 to 10 people.

Where is Peak Cluster based?

Peak Cluster is headquartered in Peak Forest, United Kingdom, in the Europe region.

How does Peak Cluster make money?

One revenue line is on record: CCS Infrastructure Services.

Does Peak Cluster have an API?

No public API is recorded for Peak Cluster.

What industry is Peak Cluster in?

Peak Cluster's product category is Carbon Capture and Storage Infrastructure. Its primary akta.pro industry code is EUABAHAA, CO₂ Pipeline Transport Infrastructure (Onshore/Offshore, Gathering & Trunklines), with a secondary code of TLAGAFAB, CO2 Gathering & Collection Pipelines (Capture-to-Hub Networks). Its NAICS code is 2371 and its SIC code is 1623.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
Business LiveBoss of controversial gas pipeline says scheme 'will not be unsafe'Peak Cluster CEO Dave Parkin defended the controversial gas pipeline, saying it will not be unsafe despite local safety concerns. The project would transport CO2 from Midlands sites to the Irish Sea, with Wirral's infrastructure reduced by over 85% after consultation. A new consultation runs November 12 to December 18.EIN Presswire'Peak Cluster will cut through our land' say Staffordshire coupleA farming couple in Staffordshire raised concerns that a proposed Peak Cluster gas pipeline could run within 40ft of their home, cutting across their 12-acre property. The 200km pipeline aims to transport CO2 from cement factories to storage under the Irish Sea, with four councils opposing it. Consultation on route changes is scheduled for November.Carbon HeraldCheshire East Council Unanimously Rejects $6.6B Peak Cluster CO2 PipelineCheshire East Council unanimously voted to oppose the £5 billion Peak Cluster CO2 pipeline, becoming the fourth local authority to reject it. The motion urges ministers to withhold approval until safety, environmental, and community concerns are resolved. The project transports CO2 from cement and lime plants to subsea storage in the Irish Sea.YahooFourth council opposes £5bn CO2 pipeline planCheshire East Council unanimously opposed the £5bn Peak Cluster CO2 pipeline, joining three other councils. The motion urged the government not to approve the scheme until safety, environmental, and community concerns are addressed. The project would transport captured CO2 from cement and lime plants to storage beneath the Irish Sea.BBCPeak Cluster: Fourth council opposes £5bn CO2 pipeline planCheshire East Council unanimously opposed the £5bn Peak Cluster CO2 pipeline, joining three other councils. The motion called on the government not to approve the scheme until safety and environmental concerns are addressed. The project would transport captured CO2 from cement and lime plants to storage beneath the Irish Sea.BBC'Peak Cluster will cut through our land' say Staffordshire coupleA farming couple in Staffordshire raised concerns that a proposed Peak Cluster gas pipeline could run within 40ft of their home, cutting across their 12-acre property. The 200km pipeline aims to transport CO2 from cement factories to storage under the Irish Sea, with a £5bn cost and four councils opposing it. Further consultation is planned in November.Carbon HeraldPeak Cluster Requests Wirral Council Land Access For £5B Carbon Pipeline SurveysPeak Cluster requested access to Wirral Council land for surveying its £5 billion carbon capture pipeline. The council's committee will vote on granting access, but a negative vote won't block statutory survey powers, and Peak Cluster can seek a court warrant if access is denied.BBCHow will Peak District carbon capture plan work?The Peak Cluster project will capture CO2 from three cement and lime plants in Derbyshire and Staffordshire and pipe it to an under-sea storage facility off Morecambe. It aims to prevent three million tonnes of CO2 annually, with operations expected by 2030. The project has received £28.6m in government funding and is expected to create about 2,000 jobs.BBCHow will Peak District carbon capture plan work?The UK government is investing £28.6m in the Peak Cluster project, a major initiative to capture carbon dioxide emissions from three cement and lime plants in Derbyshire and Staffordshire for storage under the Irish Sea. This infrastructure aims to prevent three million tonnes of CO2 annually and secure thousands of jobs, with operations expected to begin by 2030. The project has drawn criticism from environmental groups regarding cost and efficacy, while industry leaders argue it is essential for decarbonizing the sector.