Developer docs
API playgroundTry for free, no card

Search company profiles

Baku Metropolitan

Full company profile

uuid006god2

Namestring
Baku Metropolitan
Legal namestring
Bakı Metropoliteni Qapalı Səhmdar Cəmiyyəti
Websiteurl
metro.gov.az
Company typeenum
Private
Founded yearint
1966
Descriptiontext

Baku Metropolitan, legally Bakı Metropoliteni Qapalı Səhmdar Cəmiyyəti (Baku Metropolitan Closed Joint-Stock Company), is the state-owned operator of the underground metro rail system in Baku, Azerbaijan, founded in 1966 and entering service on 6 November 1967. It operates three lines (Red, Green, and Purple) spanning 40.7 km across 27 stations, including seven deep-level stations, and historically moves more than 720,000 passengers per day, placing it in the top 10 of 213 metros worldwide by passenger density. The Red and Green lines merge at 28 May station to function as a combined corridor, and the network is undergoing structural separation as part of a multi-year capital program. The company is wholly owned by the Government of Azerbaijan, with its Chairman appointed by presidential decree; a December 2024 reorganization decree directs the merger of state-owned BakuBus LLC and Baku Taxi Service LLC into the metro entity to create a unified public transport operator.

The underlying technology stack combines physical rail infrastructure (Vollert-Rheda concrete sleeper and slab track system engineered for 15-ton axle loads and 50 km/h speeds with vibration absorption) with a growing digital layer. AI-based video surveillance analyzes passenger behavior, detects escalator falls in real time, and monitors 825V platform hazards, while a passenger density management system (in pilot) and dynamic car-occupancy displays feed an automated scheduling system that has raised peak-hour train pairs from 30 to 36. Fare collection runs on the BakiKart system supporting contactless cards, mobile QR tickets valid for five minutes, Apple Pay, Google Pay, and foreign bank cards as of 2025, with payment integration delivered by K Group LLC and journey planning exposed through the AYNA MaaS platform and Google Maps.

Revenue is generated primarily through passenger fares collected at turnstiles via BakiKart and QR tickets, supplemented by station advertising and commercial partnerships. Pricing is state-subsidized pay-as-you-go with no publicly disclosed fare table, and capital expenditure is funded through the state budget and external credit, including a June 2026 credit agreement for the Baku Metro Expansion Project Phase I and a 5.6 billion EUR master plan developed with French engineering firm Systra. The customer base is exclusively the general public and urban commuters of Baku, with no enterprise segment, and the customer surface is being widened through tourist-friendly payment options and accessibility services such as the Accessible Metro Project.

Short descriptiontext

Baku Metropolitan is the state-owned operator of Baku's 27-station, 40.7 km metro rail network serving the city's 2.2 million residents with fare collection, AI-based safety systems, and digital payments, currently expanding under a state program and merging with bus and taxi services.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
51–100
akta.pro rankint
HeadquartersBaku, Azerbaijan
HQ citystring
Baku
HQ countrystring
Azerbaijan
HQ regionstring
Asia
Markets served

Serves global market

Offices1 record

Each record includes

City, Country, Type, Description, Source

Keyword5 values
urban rail transit, public metro transportation, passenger rail services, contactless fare payment, metro network operations
Industry5 codes
1Heavy Rail Metro/Subway Operators (Grade-Separated)
CodeTLAFAEAAPrimaryYes
2Metro/Urban Rail Operators (Integrated Multimodal Agencies)
CodeTLAFAEAGPrimaryNo
3Urban Rail Stations & Passenger Facilities Management
CodeTHAIABAFPrimaryNo
4Commuter/Suburban Rail Operators (S-Bahn/Regional Metro)
CodeTLAFAEADPrimaryNo
5Metro/Subway Operators
CodeTHAIABAAPrimaryNo
NAICS code3 codes
  • Urban Transit Systems48511
  • Mixed Mode Transit Systems485111
  • Commuter Rail Systems485112
SIC code1 code
  • Local & Suburban Transit & Interurban Hwy Passenger Trans4100
Product category
Urban Metro Rail Transportation
Revenue model2 records
1Passenger Fare Collection
TypeTransaction Fee
Description

State-owned metro system generating revenue through passenger fares collected via BakiKart cards, QR tickets, and other payment methods at turnstiles and fare machines

metro.gov.az
2Advertising and Commercial Services
TypeAdvertising
Description

Revenue from advertising spaces in metro stations and commercial partnerships

metro.gov.az
Marketing channels6 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels1 record

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Personnel, Infrastructure, Operations, Technology or R&D, Supply Chain
Pricing details1 tier
1Standard fare for metro travel
ModelTransaction based/ take rateBilling cadencePay-as-you-go
Notes

Fares collected via BakiKart cards; QR ticket system implemented at select stations

metro.gov.az
GTM typeB2C
B2C
Offering typeServices
Services
Core offering1 text field

Baku Metropolitan operates an underground urban metro rail network in Baku, Azerbaijan, consisting of 3 lines (Red, Green, Purple) with 27 stations over 40.7 km, providing passenger rail transportation services across the city. The offering is supplemented by the BakiKart contactless fare payment system, a mobile application, and AI-based passenger density and safety management systems to optimize train scheduling and platform safety.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 3 values shown
  • Train interval reduced from 30 to 36 pairs during peak hours
+2 more records
Product overview1 text field

Baku Metropolitan operates a core underground metro rail network in Baku, Azerbaijan with 3 lines (Red, Green, Purple), 27 stations, and 40.7 km total length. The company provides passenger rail services supplemented by digital offerings including the BakiKart contactless payment system (plastic cards, mobile QR tickets, Apple Pay, Google Pay), AI-based passenger density management using video surveillance and behavioral analysis, and a mobile application integrated with the AYNA MaaS platform for journey planning. Accessibility services for disabled passengers are available through the Accessible Metro Project. Currently undergoing major expansion with 10 new stations under construction and line separation projects.

Product and service3 records
1Baku Metro Rail Network
CategoryPassenger Rail Transportation
Description

Underground metro rail system in Baku consisting of 3 lines (Red, Green, Purple) with 27 stations and 40.7 km of track, providing urban mass transit for Baku's residents and visitors between districts and the city center.

2BakiKart Contactless Payment System
CategoryFare Payment Service
Description

Contactless fare payment system accepting BakiKart plastic cards, mobile QR tickets via the BakiKart app, Apple Pay, Google Pay, Azerbaijani bank cards, and foreign bank cards (as of 2025).

3Metro Mobile Application
Scale indicator10 records

Each record includes

Type, Value, Description, Source

Partnership7 partners
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2024-11-06
Description

COP29 Operations Company coordinated volunteer deployment and navigation systems for the UN Climate Change Conference. 100 volunteers were stationed at 10 metro stations, and additional directional signage was installed at Koroğlu station for conference attendees.

2K Group LLC
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2023-12-31
Description

K Group LLC is the implementer of the BakiKart payment system that developed and deployed the QR ticket functionality within Baku Metro stations. They conducted technical work on devices at automation-control points and integrated the required software for QR payment processing.

metro.gov.az
Strategic tierMajorTypeTechnology or Integration
Description

French engineering firm Systra developed the master plan for Baku Metro's mega-project expansion worth 5.6 billion euros, including design and development of railway transport and urban rail public transport systems.

Strategic tierMajorTypeTechnology or Integration
Description

German specialist in concrete plant construction, Vollert was responsible for redesigning the entire track system, designing new sections, solving interface issues with existing systems, and designing concrete sleeper production facility.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Coordination on alternative bus routes during metro line separation projects. AYNA MaaS software displays Baku Metro train intervals, integrating metro data with other transport modes for unified journey planning.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

State-owned bus company operating routes in Baku, Ganja, and Khankendi. Baku Metro CJSC is being reorganized to merge with BakuBus as part of unified transport network development.

7Baku Taxi Service LLC
Strategic tierCoreTypeStrategic or Co-development Partner
Description

Taxi service consisting of special taxis (London taxis) being integrated into Baku Metro CJSC reorganization for unified transport network development.

metro.gov.az
Recent move8 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
TypeDirect peer
Description

State-owned heavy-rail metro operator with similar Soviet-era engineering heritage and deep-station architecture; comparable in scale and operating model, though materially larger. Direct functional peer for benchmarking operations, digitalization, and expansion execution.

TypeRegional player
Description

Middle East regional peer with state backing and high ridership density. Comparable in regional positioning and dense urban operations, though politically and structurally distinct.

TypeBroad incumbent
Description

Municipal metro operator managing Istanbul's rapidly expanding urban rail network. Comparable in state/municipal ownership and multimodal integration but materially larger and more commercially diverse.

TypeDirect peer
Description

Central Asian state-owned metro operator with rapid expansion and modernization; comparable in scale and growth trajectory to Baku Metro.

5Almaty Metro
TypeDirect peer
Description

Post-Soviet state-owned metro operator in Kazakhstan with a similar urban-scale footprint and government-backed investment programme. Closest comparable in size, geography, and capital structure among ex-USSR systems.

TypeRegional player
Description

State-owned metro operator in neighboring Georgia with a small two-line network. Comparable as a regional Caucasus peer with similar Soviet-era infrastructure and limited expansion scope.

TypeDirect peer
Description

Ukraine's state-owned metro operator with three lines and deep Soviet-era stations. Direct peer in operating model and infrastructure profile, though constrained by conflict-related capex disruption.

8Minsk Metro
TypeDirect peer
Description

Belarus's state-owned metro operator with a comparable two/three-line structure and ongoing Russian-backed expansion. Direct peer for capex execution and fleet renewal benchmarks.

9Yerevan Metro
TypeRegional player
Description

Armenia's single-line state-owned metro; a regional Caucasus peer with comparable Soviet heritage and constrained expansion budget, useful for benchmarking low-scale metro economics.

TypeEmerging player
Description

State-backed driverless metro with strong digital ticketing and event-driven demand. Comparable as an emerging-market state-backed urban rail system investing heavily in technology and expansion, though operated under franchise.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat5 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment1 record

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile1 record

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

Integration5 records

Each record includes

Title, Type, Description, Source

AI capability6 records

Each record includes

Type, Description, Source

AI maturity
App detail

Has app

Feature6 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles3 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

Subsidiaries2 records

Each record includes

Name, Acquired on, Relationship type, Type, Business focus

No data
Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Baku Metropolitan

Urban Metro Rail Transportationmetro.gov.az

Baku Metropolitan is the state-owned operator of Baku's 27-station, 40.7 km metro rail network serving the city's 2.2 million residents with fare collection, AI-based safety systems, and digital payments, currently expanding under a state program and merging with bus and taxi services.

What Baku Metropolitan does

Baku Metropolitan, legally Bakı Metropoliteni Qapalı Səhmdar Cəmiyyəti (Baku Metropolitan Closed Joint-Stock Company), is the state-owned operator of the underground metro rail system in Baku, Azerbaijan, founded in 1966 and entering service on 6 November 1967. It operates three lines (Red, Green, and Purple) spanning 40.7 km across 27 stations, including seven deep-level stations, and historically moves more than 720,000 passengers per day, placing it in the top 10 of 213 metros worldwide by passenger density. The Red and Green lines merge at 28 May station to function as a combined corridor, and the network is undergoing structural separation as part of a multi-year capital program. The company is wholly owned by the Government of Azerbaijan, with its Chairman appointed by presidential decree; a December 2024 reorganization decree directs the merger of state-owned BakuBus LLC and Baku Taxi Service LLC into the metro entity to create a unified public transport operator.

The underlying technology stack combines physical rail infrastructure (Vollert-Rheda concrete sleeper and slab track system engineered for 15-ton axle loads and 50 km/h speeds with vibration absorption) with a growing digital layer. AI-based video surveillance analyzes passenger behavior, detects escalator falls in real time, and monitors 825V platform hazards, while a passenger density management system (in pilot) and dynamic car-occupancy displays feed an automated scheduling system that has raised peak-hour train pairs from 30 to 36. Fare collection runs on the BakiKart system supporting contactless cards, mobile QR tickets valid for five minutes, Apple Pay, Google Pay, and foreign bank cards as of 2025, with payment integration delivered by K Group LLC and journey planning exposed through the AYNA MaaS platform and Google Maps.

Revenue is generated primarily through passenger fares collected at turnstiles via BakiKart and QR tickets, supplemented by station advertising and commercial partnerships. Pricing is state-subsidized pay-as-you-go with no publicly disclosed fare table, and capital expenditure is funded through the state budget and external credit, including a June 2026 credit agreement for the Baku Metro Expansion Project Phase I and a 5.6 billion EUR master plan developed with French engineering firm Systra. The customer base is exclusively the general public and urban commuters of Baku, with no enterprise segment, and the customer surface is being widened through tourist-friendly payment options and accessibility services such as the Accessible Metro Project.

Baku Metropolitan firmographics

Firmographics
Name
Baku Metropolitan
Legal name
Bakı Metropoliteni Qapalı Səhmdar Cəmiyyəti
Website
https://metro.gov.az
Company type
Private
Founded year
1966
Operating status
Operating
Headcount range
51–100 employees
Short description
Baku Metropolitan is the state-owned operator of Baku's 27-station, 40.7 km metro rail network serving the city's 2.2 million residents with fare collection, AI-based safety systems, and digital payments, currently expanding under a state program and merging with bus and taxi services.
Ownership category
akta.pro rank

Baku Metropolitan industry classification

Industry
Product category
Urban Metro Rail Transportation
NAICS
Urban Transit Systems (48511), Mixed Mode Transit Systems (485111), Commuter Rail Systems (485112)
SIC
Local & Suburban Transit & Interurban Hwy Passenger Trans (4100)
akta.pro primary industry
Heavy Rail Metro/Subway Operators (Grade-Separated) (TLAFAEAA)
akta.pro secondary industries
Metro/Urban Rail Operators (Integrated Multimodal Agencies) (TLAFAEAG), Urban Rail Stations & Passenger Facilities Management (THAIABAF), Commuter/Suburban Rail Operators (S-Bahn/Regional Metro) (TLAFAEAD), Metro/Subway Operators (THAIABAA)

Keywords

  • Urban rail transit
  • Public metro transportation
  • Passenger rail services
  • Contactless fare payment
  • Metro network operations

Where Baku Metropolitan is headquartered

Location

Headquarters

HQ city
Baku
HQ country
Azerbaijan
HQ region
Asia

Offices1 record

Markets served

Baku Metropolitan business model

Business model
GTM type
B2C
Offering type
Services
Cost components
Personnel, Infrastructure, Operations, Technology or R&D, Supply Chain

Revenue model

  1. Passenger Fare Collection: State-owned metro system generating revenue through passenger fares collected via BakiKart cards, QR tickets, and other payment methods at turnstiles and fare machines
  2. Advertising and Commercial Services: Revenue from advertising spaces in metro stations and commercial partnerships

Pricing tiers

ModelBillingPrice
Transaction based/ take ratePay-as-you-goStandard fare for metro travel

Distribution channels1 record

Marketing channels6 records

Baku Metropolitan product offering

Product offering

Core offering

Baku Metropolitan operates an underground urban metro rail network in Baku, Azerbaijan, consisting of 3 lines (Red, Green, Purple) with 27 stations over 40.7 km, providing passenger rail transportation services across the city. The offering is supplemented by the BakiKart contactless fare payment system, a mobile application, and AI-based passenger density and safety management systems to optimize train scheduling and platform safety.

Product overview

Baku Metropolitan operates a core underground metro rail network in Baku, Azerbaijan with 3 lines (Red, Green, Purple), 27 stations, and 40.7 km total length. The company provides passenger rail services supplemented by digital offerings including the BakiKart contactless payment system (plastic cards, mobile QR tickets, Apple Pay, Google Pay), AI-based passenger density management using video surveillance and behavioral analysis, and a mobile application integrated with the AYNA MaaS platform for journey planning. Accessibility services for disabled passengers are available through the Accessible Metro Project. Currently undergoing major expansion with 10 new stations under construction and line separation projects.

Differentiator

Problem solved

Functional benefit

Products and services

  • Baku Metro Rail Network Underground metro rail system in Baku consisting of 3 lines (Red, Green, Purple) with 27 stations and 40.7 km of track, providing urban mass transit for Baku's residents and visitors between districts and the city center.
  • BakiKart Contactless Payment System Contactless fare payment system accepting BakiKart plastic cards, mobile QR tickets via the BakiKart app, Apple Pay, Google Pay, Azerbaijani bank cards, and foreign bank cards (as of 2025).
  • Metro Mobile Application

Quantifiable outcome

  • Train interval reduced from 30 to 36 pairs during peak hours
  • +2 more outcomes

Companies that use Baku Metropolitan

Customer profile

Segments1 record

Ideal customer profiles1 record

Baku Metropolitan technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Integration5 records

AI capability6 records

Feature6 records

Baku Metropolitan partnerships and signals

Strategic signal

Partnerships

Seven partnerships are on record, tiered core and major.

  • COP29 Operations CompanycoreStrategic or Co-development Partner · 6 November 2024COP29 Operations Company coordinated volunteer deployment and navigation systems for the UN Climate Change Conference. 100 volunteers were stationed at 10 metro stations, and additional directional signage was installed at Koroğlu station for conference attendees.
  • K Group LLCcoreTechnology or Integration · 31 December 2023K Group LLC is the implementer of the BakiKart payment system that developed and deployed the QR ticket functionality within Baku Metro stations. They conducted technical work on devices at automation-control points and integrated the required software for QR payment processing.
  • SystramajorTechnology or IntegrationFrench engineering firm Systra developed the master plan for Baku Metro's mega-project expansion worth 5.6 billion euros, including design and development of railway transport and urban rail public transport systems.
  • VollertmajorTechnology or IntegrationGerman specialist in concrete plant construction, Vollert was responsible for redesigning the entire track system, designing new sections, solving interface issues with existing systems, and designing concrete sleeper production facility.
  • Azerbaijan Land Transport Agency (AYNA)coreStrategic or Co-development PartnerCoordination on alternative bus routes during metro line separation projects. AYNA MaaS software displays Baku Metro train intervals, integrating metro data with other transport modes for unified journey planning.
  • BakuBus LLCcoreStrategic or Co-development PartnerState-owned bus company operating routes in Baku, Ganja, and Khankendi. Baku Metro CJSC is being reorganized to merge with BakuBus as part of unified transport network development.
  • Baku Taxi Service LLCcoreStrategic or Co-development PartnerTaxi service consisting of special taxis (London taxis) being integrated into Baku Metro CJSC reorganization for unified transport network development.

Scale indicators10 records

Recent moves8 records

Expansion highlights5 records

Baku Metropolitan competitors and assessment

Company assessment

Direct peers

  • Moscow Metro: State-owned heavy-rail metro operator with similar Soviet-era engineering heritage and deep-station architecture; comparable in scale and operating model, though materially larger. Direct functional peer for benchmarking operations, digitalization, and expansion execution.
  • Tashkent Metro: Central Asian state-owned metro operator with rapid expansion and modernization; comparable in scale and growth trajectory to Baku Metro.
  • Almaty Metro: Post-Soviet state-owned metro operator in Kazakhstan with a similar urban-scale footprint and government-backed investment programme. Closest comparable in size, geography, and capital structure among ex-USSR systems.
  • Kyiv Metro: Ukraine's state-owned metro operator with three lines and deep Soviet-era stations. Direct peer in operating model and infrastructure profile, though constrained by conflict-related capex disruption.
  • Minsk Metro: Belarus's state-owned metro operator with a comparable two/three-line structure and ongoing Russian-backed expansion. Direct peer for capex execution and fleet renewal benchmarks.

Regional players

  • Tehran Metro: Middle East regional peer with state backing and high ridership density. Comparable in regional positioning and dense urban operations, though politically and structurally distinct.
  • Tbilisi Metro: State-owned metro operator in neighboring Georgia with a small two-line network. Comparable as a regional Caucasus peer with similar Soviet-era infrastructure and limited expansion scope.
  • Yerevan Metro: Armenia's single-line state-owned metro; a regional Caucasus peer with comparable Soviet heritage and constrained expansion budget, useful for benchmarking low-scale metro economics.

Broad incumbents

  • Istanbul Metro (Metro İstanbul): Municipal metro operator managing Istanbul's rapidly expanding urban rail network. Comparable in state/municipal ownership and multimodal integration but materially larger and more commercially diverse.

Emerging players

  • Dubai Metro (Serco/Keolis operator for RTA): State-backed driverless metro with strong digital ticketing and event-driven demand. Comparable as an emerging-market state-backed urban rail system investing heavily in technology and expansion, though operated under franchise.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat5 records

Key risks6 records

Key highlights7 records

Customer concentration

Baku Metropolitan social profiles

Digital presence

Baku Metropolitan financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Baku Metropolitan leadership team

Management profile

Number of profiles

Profiles3 records

Baku Metropolitan subsidiaries and ownership

Company hierarchy

Subsidiaries2 records

Baku Metropolitan funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Baku Metropolitan M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Baku Metropolitan

What does Baku Metropolitan do?

Baku Metropolitan operates an underground urban metro rail network in Baku, Azerbaijan, consisting of 3 lines (Red, Green, Purple) with 27 stations over 40.7 km, providing passenger rail transportation services across the city. The offering is supplemented by the BakiKart contactless fare payment system, a mobile application, and AI-based passenger density and safety management systems to optimize train scheduling and platform safety.

Is Baku Metropolitan a public or private company?

Baku Metropolitan is a private company. It is classified as state government owned and is currently operating.

When was Baku Metropolitan founded?

Baku Metropolitan was founded in 1966. It employs 51 to 100 people.

Where is Baku Metropolitan based?

Baku Metropolitan is headquartered in Baku, Azerbaijan, in the Asia region.

How does Baku Metropolitan make money?

Two revenue lines are on record. Passenger Fare Collection is the primary driver. The others are advertising and Commercial Services.

Who are Baku Metropolitan's main competitors?

Direct peers on record are Moscow Metro, Tashkent Metro, Almaty Metro, Kyiv Metro and Minsk Metro. Regional players are Tehran Metro, Tbilisi Metro and Yerevan Metro. Istanbul Metro (Metro İstanbul) is listed as a broad incumbent. Dubai Metro (Serco/Keolis operator for RTA) is listed as an emerging player.

Does Baku Metropolitan have an API?

No public API is recorded for Baku Metropolitan.

What industry is Baku Metropolitan in?

Baku Metropolitan's product category is Urban Metro Rail Transportation. Its primary akta.pro industry code is TLAFAEAA, Heavy Rail Metro/Subway Operators (Grade-Separated), with a secondary code of TLAFAEAG, Metro/Urban Rail Operators (Integrated Multimodal Agencies). Its NAICS code is 48511 and its SIC code is 4100.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals