Developer docs
API playgroundTry for free, no card

Search company profiles

Interconnect Malta

Full company profile

uuid00k9pgf

Namestring
Interconnect Malta
Legal namestring
InterConnect Malta Limited
Websiteurl
icm.mt
Company typeenum
Private
Founded yearint
2018
Descriptiontext

Interconnect Malta Ltd (ICM) is a 100% government-owned energy infrastructure company established in 2018 (originally as Melita TransGas Co Ltd, renamed 4 August 2021) and domiciled in Birkirkara, Malta, operating under the Ministry for the Environment, Energy and Public Cleanliness. ICM is the sole mandated developer of Malta's strategic electricity and gas interconnectivity projects, with a portfolio spanning five core programmes: the 2nd Malta-Sicily HVAC Cable Link (IC2, a 122km / 220kV / 225MW subsea interconnection operational target Q1 2027), the planned 3rd Malta-Sicily HVDC Cable Link (IC3, 380kV, basic engineering tender issued May 2026), grid-scale Battery Energy Storage Systems at Marsa and Delimara (~84MWh / 40MW total, ~€47M), a ~300MW offshore floating wind farm concession in Malta's Exclusive Economic Zone, and the Melita TransGas hydrogen-ready pipeline (PCI 5.19).

ICM's technology stack centres on high-voltage subsea cable systems (HVAC and HVDC), grid-scale lithium battery storage, and offshore floating wind, with supporting infrastructure including 250MVA auto-transformers, variable shunt reactors, and GIS switchgear at the Magħtab and Ragusa terminal stations. Cross-border engineering, marine surveying, and EIA work are coordinated with Italian authorities (MASE, Regione Siciliana, Terna), and EPC delivery is distributed across international contractors (Nexans, SELT, Terna Energy Solutions, NextGeo, AG Installations, PowerFix JV, GE Vernova).

The business model is non-commercial: ICM does not sell products or services to end customers. Capital and operating costs are funded through a blend of Maltese Government budgets, EU structural funds (ERDF 2021-2027, Recovery and Resilience Facility), and European Investment Bank debt (€100M approved July 2025). The sole counterparty for project outputs is Enemalta plc, the Maltese state-owned transmission/distribution utility, into whose 132kV grid all infrastructure assets are delivered.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersBirkirkara, Malta
HQ citystring
Birkirkara
HQ countrystring
Malta
HQ regionstring
Europe
Markets served

Serves global market

Offices5 records

Each record includes

City, Country, Type, Description, Source

Keyword5 values
electricity transmission infrastructure, submarine power cables, battery energy storage, offshore wind energy, energy interconnector development
Industry3 codes
PRIMARYEUACAFAE
Wind Farm Development & Permitting (Greenfield/Brownfield)
Energy, Utilities & Environment/Electric Power Generation/Wind Power Generation (Onshore & Offshore)
SECONDARYEUAEABAK
Grid Interconnection & Collector Substation EPC (Utility-Scale Renewables)
SECONDARYEUACAFAF
Wind Farm Ownership & Operations (IPP/Utility-Owned Asset Operations)
Energy, Utilities & Environment/Electric Power Generation/Wind Power Generation (Onshore & Offshore)
NAICS code2 codes
  • Wind Electric Power Generation221115
  • Electric Power Generation, Transmission and Distribution2211
SIC code1 code
  • Engines & Turbines3510
Product category
Energy Infrastructure Development
Social media profiles1 record
GTM motion1 record

Each record includes

Type, Description, Source

Revenue model2 records
1Government Infrastructure Development Mandate
TypeManaged Services
Description

As a 100% government-owned company, Interconnect Malta does not generate commercial revenue in the traditional sense. It receives government funding and EU co-financing to develop national energy infrastructure projects. The company's operational costs are borne by the Maltese Government through the Ministry for the Environment, Energy and Public Cleanliness.

icm.mt
2EU Co-Financing (ERDF/RRF)
TypeLicensing Royalties
Description

Major projects (IC2, BESS, IC3) are co-financed by the European Union, primarily through the European Regional Development Fund (ERDF) 2021–2027 Programme. For example, IC2 receives €165 million in ERDF funding out of ~€300 million total cost. BESS 1 is 100% funded from the Recovery and Resilience Fund (RRF); BESS 2 is considered for ERDF co-financing.

offshore-energy.biz
Marketing channels4 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels4 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Operations, Personnel, Technology or R&D, Marketing or Sales
GTM typeB2B
B2B
Offering typeServices
Services
Core offering1 text field

Interconnect Malta develops and implements national-scale energy infrastructure projects on behalf of the Maltese Government, including a 122-kilometre 220kV HVAC submarine electricity interconnector between Malta and Sicily (IC2), a planned 380kV HVDC third interconnector (IC3), grid-scale battery energy storage systems (84MWh total), a ~300MW floating offshore wind farm in Malta's EEZ, and a hydrogen-ready gas pipeline (Melita TransGas). The company's outputs are delivered to the national grid operator Enemalta plc and coordinated cross-border with Italian authorities; project delivery is executed via public tenders and EU co-financing.

Differentiator
Functional benefit
Problem solved
Quantifiable outcome1 of 7 values shown
  • Doubling of Malta's interconnection capacity (from ~225MW to ~450MW+)
+6 more records
Product overview1 text field

Interconnect Malta Ltd (ICM) is a 100% government-owned energy infrastructure company that develops and implements energy infrastructure projects for increasing Malta's electricity interconnectivity and ending Malta's isolation from the European Gas Network. The company's portfolio comprises five core infrastructure projects: (1) the 2nd Electricity HVAC Cable Link (IC2), a 122km high-voltage interconnector to Sicily that will double Malta's interconnection capacity; (2) the 3rd Electricity HVDC Cable Link (IC3), an innovative 380kV HVDC interconnector to Italy's national grid; (3) Battery Energy Storage Systems (BESS) at Marsa and Delimara for grid-scale energy storage totaling 84MWh capacity; (4) an Offshore Renewable Energy Project involving a 300MW floating wind farm in Malta's EEZ; and (5) the Melita TransGas Hydrogen-Ready Pipeline connecting Malta to the European Gas Network.

Product and service5 records
12nd Electricity HVAC Cable Link (IC2)
CategoryElectricity transmission infrastructure
Description

A 122-kilometre high-voltage alternating current (HVAC) electrical cable interconnection operating at 220kV, 50Hz with nominal power throughput of 225MW in any direction. The system comprises approximately 21km of land cable in Sicily, 99km of submarine cable, and approximately 2km of land cable in Malta, connecting the Enemalta terminal at Magħtab to the Terna substation at Ragusa, Sicily. It will double Malta's electricity interconnection capacity with the European network and is designated an Operation of Strategic Importance under the EU ERDF 2021–2027 Programme.

23rd Electricity HVDC Cable Link (IC3)
CategoryElectricity transmission infrastructure
Description

A planned third electricity interconnector between Malta and Italy using High-Voltage Direct Current (HVDC) technology at 380kV, designed to connect directly to Italy's national grid backbone. This will be Malta's first HVDC interconnector, providing more direct access to the European mainland electricity network. Capacity is to be determined through the basic engineering tender.

3Battery Energy Storage Systems (BESS)
CategoryGrid-scale energy storage
Description

Grid-scale battery energy storage systems connected to Malta's national electric grid network. Two systems: BESS 1 at the former Marsa A-Station (20MWh/8MW) located in underground tunnels, and BESS 2 at Delimara Power Station (64MWh/32MW). Combined capacity of 84MWh, providing fast frequency response, voltage stabilisation, black start capability, and renewable energy curtailment mitigation.

4Offshore Renewable Energy Project
CategoryRenewable energy generation
Description

A floating offshore wind farm project located beyond Malta's territorial waters (12 nautical miles) within its Exclusive Economic Zone. With an installed capacity of approximately 300MW, the project is designed to generate up to 0.8 TWh of renewable energy annually at 132kV. Developed via a 35-year concession awarded through a Competitive Dialogue Process (PQQ → ITPD → BAFO).

5Melita TransGas Hydrogen Ready Pipeline (MTGP)
CategoryGas transmission infrastructure
Description

A hydrogen-ready natural gas pipeline project designated as Project of Common Interest 5.19 under the TEN-E Regulation, designed to connect Malta to the European Gas Network and end Malta's energy isolation from European gas infrastructure.

Scale indicator9 records

Each record includes

Type, Value, Description, Source

Partnership12 partners
1PowerFix JV
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2025-12-02
Description

PowerFix JV was awarded the contract for the supply and installation of a 132kV variable shunt reactor at Magħtab Terminal Station, completing the final EPC contract for the IC2 interconnector project.

icm.mt
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2025-09-21
Description

NextGeo, a leading international marine geoscience and offshore construction company, is carrying out the Detailed Marine Survey (DMS) for IC2, covering a 50-metre corridor along the ~100-kilometre route between Malta and Sicily. The survey uses ROV-mounted multi-beam, side-scan, sub-bottom imaging, and magnetometer/UXO checks.

3Nexans AS
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2025-04-29
Description

Nexans AS (Norway) was awarded the contract for the manufacturing and installation of the 245kV submarine cable system for IC2 (Malta-Sicily Second Interconnector). Nexans is producing the high-voltage subsea cable at its Charleston, South Carolina facility and fibre optic elements at Rognan, Norway. The contract is valued as part of the ~€300 million IC2 project and designated a 'Project of Strategic Importance' by the EU.

icm.mt
Strategic tierCoreTypeTechnology or IntegrationAnnounced on2024-09-28
Description

SELT SpA was recommended for award of the €34.2 million contract for the manufacture and installation of the onshore cables for IC2. The contract covers 21 kilometres of high-voltage cable in Sicily (Marina di Ragusa to Ragusa 220kV substation) and 1.8 kilometres in Malta (Magħtab terminal to l-Għallis offshore landing site).

Strategic tierSupportingTypeTechnology or IntegrationAnnounced on2023-03-10
Description

Fugro Italy Spa completed the preliminary marine route survey (PMRS) for the second interconnector, collecting geophysical data in nearshore Malta, offshore, and nearshore Italy, as well as environmental and geotechnical samples to inform the FEED and EIA.

Strategic tierSupportingTypeImplementation/ SI/ Consulting PartnerAnnounced on2022-12-01
Description

CESI-Techfem JV was awarded the contract for the Front-End Engineering Design (FEED) of the second interconnector project, providing the technical specifications that underpinned the permitting applications and subsequent procurement tenders.

7AIS Environment / HPC Italia
Strategic tierSupportingTypeImplementation/ SI/ Consulting PartnerAnnounced on2022-12-01
Description

AIS Environment was contracted to execute the Environmental Impact Assessment in Malta, and HPC Italia for the EIA in Italy. These assessments were required for development permitting of IC2 in both jurisdictions.

icm.mt
Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Terna Energy Solutions Srl is the EPC contractor for civil works at the Ragusa Terminal Station in Sicily, including installation of hybrid switchgear, 220kV shunt reactor foundations, and fire-water tank construction. The company is coordinating with Enemalta and the Italian TSO for IC1 control cable rerouting during the IC2 construction phase.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

AG Installations, a local Maltese contractor, was awarded the €20.2 million contract for the design, supply, and installation of a 245kV 1×250MVA auto-transformer, 1×120MVAr variable shunt reactor (Maghtab), and 1×240MVAr variable shunt reactor (Ragusa), working in close collaboration with BEST (manufacturing plant in Turkey).

Strategic tierSupportingTypeTechnology or Integration
Description

GE Vernova is collaborating on GIS terminations and upgrades at the Magħtab Terminal Station as part of the IC2 project, working alongside Enemalta, SELT SpA, and Demirer Kablo on cable laying and integration works.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Enemalta plc is the Maltese national electricity transmission/distribution utility. ICM coordinates with Enemalta for grid connection of all infrastructure projects. Enemalta actively participates in IC2 construction coordination (cable rerouting, IC1 shutdown management) and BESS implementation alongside its subsidiary International Energy Service Centre Ltd.

Strategic tierSupportingTypeOthers
Description

The Armed Forces of Malta is coordinating with ICM and Italian authorities during the Identification and Clearance (ID&C) campaign for IC2, particularly for the management of any unexploded ordnance discovered along the submarine cable route.

Recent move7 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight6 records

Each record includes

Type, Description

Peers10 records
TypeOthers
Description

Danish manufacturer of HV power cables and a major supplier into the European subsea interconnector market (e.g., Viking Link, IJmuiden Ver). Comparable as a subsea HV cable technology enabler, though operating as a cable OEM rather than a project developer.

TypeOthers
Description

Global leader in subsea HV/EHV cable manufacturing and installation — a key supplier alongside Nexans (ICM's selected cable partner) for the interconnector market. Comparable project scale and technology, though Prysmian is a commercial manufacturer rather than project developer.

TypeBroad incumbent
Description

Norwegian state-owned TSO developing subsea interconnectors (North Sea Link, Skagerrak) and integrating variable renewables. Comparable mandate of national grid operator for an energy-isolated nation, with EU co-financing experience.

TypeBroad incumbent
Description

UK-based major TSO that develops and operates subsea interconnectors (IFA, Nemo Link, Viking Link, Nautilus). Same business model of national grid operator with cross-border subsea interconnector development, though at vastly larger scale and commercial scope.

TypeEmerging player
Description

Pioneer of floating offshore wind (Hywind Scotland, Hywind Tampen) and a relevant technology benchmark for ICM's planned 300MW floating wind project in Malta's EEZ. Operates at much larger scale and with deep offshore experience; relevant for technology benchmarking rather than direct competition.

TypeDirect peer
Description

Developer-operator of the 500MW Greenlink subsea interconnector between Ireland and the UK — a dedicated project company with a similar mandate (state-backed, single-asset, subsea HVAC/HVDC, EU PCI status) to ICM's IC2/IC3 portfolio.

7Terna S.p.A.
TypeDirect peer
Description

Italian transmission system operator (TSO) and direct counterparty on IC2 — Terna Energy Solutions Srl is the EPC contractor for civil works at Ragusa Terminal Station, and Terna's grid is the destination for Malta's interconnection. Closest operational peer given bilateral project execution.

TypeBroad incumbent
Description

Danish state-owned TSO operating cross-border interconnectors (Viking Link, COBRAcable) and developing energy islands in the North Sea. Comparable mission of integrating variable renewables via subsea transmission for an island/peninsula nation.

9ElecLink
TypeDirect peer
Description

Operator of the 1GW subsea electricity interconnector through the Channel Tunnel between UK and France. Highly comparable as a dedicated subsea interconnector project company with EU/UK regulatory regime and similar engineering and financing structure.

TypeBroad incumbent
Description

Dutch-German TSO with major offshore wind integration programme (2 GW Program, IJmuiden Ver). Highly comparable mandate of connecting utility-scale offshore renewables to onshore grid via subsea transmission, with EU TEN-E co-financing experience.

Market position
Strengths5 records

Each record includes

Headline, Details, Source

Weaknesses5 records

Each record includes

Headline, Details, Source

Competitive moat4 records

Each record includes

Type, Details

Key risks6 records

Each record includes

Headline, Details, Source

Key highlights7 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Named customers1 record

Each record includes

Name, Industry, Type, Use case, Source, UUID

Segment2 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile2 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

AI maturity
App detail

Has app

Feature6 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
Profiles12 records

Each record includes

Name, Designation, Designation category, Overview, Profile commentary, Source

No data
Compliance1 record

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds1 record

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors1 record

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Interconnect Malta

Energy Infrastructure Developmenticm.mt

What Interconnect Malta does

Interconnect Malta Ltd (ICM) is a 100% government-owned energy infrastructure company established in 2018 (originally as Melita TransGas Co Ltd, renamed 4 August 2021) and domiciled in Birkirkara, Malta, operating under the Ministry for the Environment, Energy and Public Cleanliness. ICM is the sole mandated developer of Malta's strategic electricity and gas interconnectivity projects, with a portfolio spanning five core programmes: the 2nd Malta-Sicily HVAC Cable Link (IC2, a 122km / 220kV / 225MW subsea interconnection operational target Q1 2027), the planned 3rd Malta-Sicily HVDC Cable Link (IC3, 380kV, basic engineering tender issued May 2026), grid-scale Battery Energy Storage Systems at Marsa and Delimara (~84MWh / 40MW total, ~€47M), a ~300MW offshore floating wind farm concession in Malta's Exclusive Economic Zone, and the Melita TransGas hydrogen-ready pipeline (PCI 5.19).

ICM's technology stack centres on high-voltage subsea cable systems (HVAC and HVDC), grid-scale lithium battery storage, and offshore floating wind, with supporting infrastructure including 250MVA auto-transformers, variable shunt reactors, and GIS switchgear at the Magħtab and Ragusa terminal stations. Cross-border engineering, marine surveying, and EIA work are coordinated with Italian authorities (MASE, Regione Siciliana, Terna), and EPC delivery is distributed across international contractors (Nexans, SELT, Terna Energy Solutions, NextGeo, AG Installations, PowerFix JV, GE Vernova).

The business model is non-commercial: ICM does not sell products or services to end customers. Capital and operating costs are funded through a blend of Maltese Government budgets, EU structural funds (ERDF 2021-2027, Recovery and Resilience Facility), and European Investment Bank debt (€100M approved July 2025). The sole counterparty for project outputs is Enemalta plc, the Maltese state-owned transmission/distribution utility, into whose 132kV grid all infrastructure assets are delivered.

Interconnect Malta firmographics

Firmographics
Name
Interconnect Malta
Legal name
InterConnect Malta Limited
Website
https://icm.mt
Company type
Private
Founded year
2018
Operating status
Operating
Headcount range
11–50 employees
Ownership category
akta.pro rank

Interconnect Malta industry classification

Industry
Product category
Energy Infrastructure Development
NAICS
Wind Electric Power Generation (221115), Electric Power Generation, Transmission and Distribution (2211)
SIC
Engines & Turbines (3510)
akta.pro industry
PRIMARYEUACAFAE
Wind Farm Development & Permitting (Greenfield/Brownfield)
Energy, Utilities & Environment/Electric Power Generation/Wind Power Generation (Onshore & Offshore)
SECONDARYEUAEABAK
Grid Interconnection & Collector Substation EPC (Utility-Scale Renewables)
SECONDARYEUACAFAF
Wind Farm Ownership & Operations (IPP/Utility-Owned Asset Operations)
Energy, Utilities & Environment/Electric Power Generation/Wind Power Generation (Onshore & Offshore)

Keywords

  • Electricity transmission infrastructure
  • Submarine power cables
  • Battery energy storage
  • Offshore wind energy
  • Energy interconnector development

Where Interconnect Malta is headquartered

Location

Headquarters

HQ city
Birkirkara
HQ country
Malta
HQ region
Europe

Offices5 records

Markets served

Interconnect Malta business model

Business model
GTM type
B2B
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Technology or R&D, Marketing or Sales

Revenue model

  1. Government Infrastructure Development Mandate: As a 100% government-owned company, Interconnect Malta does not generate commercial revenue in the traditional sense. It receives government funding and EU co-financing to develop national energy infrastructure projects. The company's operational costs are borne by the Maltese Government through the Ministry for the Environment, Energy and Public Cleanliness.
  2. EU Co-Financing (ERDF/RRF): Major projects (IC2, BESS, IC3) are co-financed by the European Union, primarily through the European Regional Development Fund (ERDF) 2021–2027 Programme. For example, IC2 receives €165 million in ERDF funding out of ~€300 million total cost. BESS 1 is 100% funded from the Recovery and Resilience Fund (RRF); BESS 2 is considered for ERDF co-financing.

Go-to-market motion1 record

Distribution channels4 records

Marketing channels4 records

Interconnect Malta product offering

Product offering

Core offering

Interconnect Malta develops and implements national-scale energy infrastructure projects on behalf of the Maltese Government, including a 122-kilometre 220kV HVAC submarine electricity interconnector between Malta and Sicily (IC2), a planned 380kV HVDC third interconnector (IC3), grid-scale battery energy storage systems (84MWh total), a ~300MW floating offshore wind farm in Malta's EEZ, and a hydrogen-ready gas pipeline (Melita TransGas). The company's outputs are delivered to the national grid operator Enemalta plc and coordinated cross-border with Italian authorities; project delivery is executed via public tenders and EU co-financing.

Product overview

Interconnect Malta Ltd (ICM) is a 100% government-owned energy infrastructure company that develops and implements energy infrastructure projects for increasing Malta's electricity interconnectivity and ending Malta's isolation from the European Gas Network. The company's portfolio comprises five core infrastructure projects: (1) the 2nd Electricity HVAC Cable Link (IC2), a 122km high-voltage interconnector to Sicily that will double Malta's interconnection capacity; (2) the 3rd Electricity HVDC Cable Link (IC3), an innovative 380kV HVDC interconnector to Italy's national grid; (3) Battery Energy Storage Systems (BESS) at Marsa and Delimara for grid-scale energy storage totaling 84MWh capacity; (4) an Offshore Renewable Energy Project involving a 300MW floating wind farm in Malta's EEZ; and (5) the Melita TransGas Hydrogen-Ready Pipeline connecting Malta to the European Gas Network.

Differentiator

Problem solved

Functional benefit

Products and services

  • 2nd Electricity HVAC Cable Link (IC2) A 122-kilometre high-voltage alternating current (HVAC) electrical cable interconnection operating at 220kV, 50Hz with nominal power throughput of 225MW in any direction. The system comprises approximately 21km of land cable in Sicily, 99km of submarine cable, and approximately 2km of land cable in Malta, connecting the Enemalta terminal at Magħtab to the Terna substation at Ragusa, Sicily. It will double Malta's electricity interconnection capacity with the European network and is designated an Operation of Strategic Importance under the EU ERDF 2021–2027 Programme.
  • 3rd Electricity HVDC Cable Link (IC3) A planned third electricity interconnector between Malta and Italy using High-Voltage Direct Current (HVDC) technology at 380kV, designed to connect directly to Italy's national grid backbone. This will be Malta's first HVDC interconnector, providing more direct access to the European mainland electricity network. Capacity is to be determined through the basic engineering tender.
  • Battery Energy Storage Systems (BESS) Grid-scale battery energy storage systems connected to Malta's national electric grid network. Two systems: BESS 1 at the former Marsa A-Station (20MWh/8MW) located in underground tunnels, and BESS 2 at Delimara Power Station (64MWh/32MW). Combined capacity of 84MWh, providing fast frequency response, voltage stabilisation, black start capability, and renewable energy curtailment mitigation.
  • Offshore Renewable Energy Project A floating offshore wind farm project located beyond Malta's territorial waters (12 nautical miles) within its Exclusive Economic Zone. With an installed capacity of approximately 300MW, the project is designed to generate up to 0.8 TWh of renewable energy annually at 132kV. Developed via a 35-year concession awarded through a Competitive Dialogue Process (PQQ → ITPD → BAFO).
  • Melita TransGas Hydrogen Ready Pipeline (MTGP) A hydrogen-ready natural gas pipeline project designated as Project of Common Interest 5.19 under the TEN-E Regulation, designed to connect Malta to the European Gas Network and end Malta's energy isolation from European gas infrastructure.

Quantifiable outcome

  • Doubling of Malta's interconnection capacity (from ~225MW to ~450MW+)
  • +6 more outcomes

Companies that use Interconnect Malta

Customer profile

Named customers1 record

Segments2 records

Ideal customer profiles2 records

Interconnect Malta technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Feature6 records

Interconnect Malta partnerships and signals

Strategic signal

Partnerships

Twelve partnerships are on record, tiered core and supporting.

  • PowerFix JVcoreTechnology or Integration · 2 December 2025PowerFix JV was awarded the contract for the supply and installation of a 132kV variable shunt reactor at Magħtab Terminal Station, completing the final EPC contract for the IC2 interconnector project.
  • NextGeocoreTechnology or Integration · 21 September 2025NextGeo, a leading international marine geoscience and offshore construction company, is carrying out the Detailed Marine Survey (DMS) for IC2, covering a 50-metre corridor along the ~100-kilometre route between Malta and Sicily. The survey uses ROV-mounted multi-beam, side-scan, sub-bottom imaging, and magnetometer/UXO checks.
  • Nexans AScoreTechnology or Integration · 29 April 2025Nexans AS (Norway) was awarded the contract for the manufacturing and installation of the 245kV submarine cable system for IC2 (Malta-Sicily Second Interconnector). Nexans is producing the high-voltage subsea cable at its Charleston, South Carolina facility and fibre optic elements at Rognan, Norway. The contract is valued as part of the ~€300 million IC2 project and designated a 'Project of Strategic Importance' by the EU.
  • SELT SpAcoreTechnology or Integration · 28 September 2024SELT SpA was recommended for award of the €34.2 million contract for the manufacture and installation of the onshore cables for IC2. The contract covers 21 kilometres of high-voltage cable in Sicily (Marina di Ragusa to Ragusa 220kV substation) and 1.8 kilometres in Malta (Magħtab terminal to l-Għallis offshore landing site).
  • Fugro Italy SpasupportingTechnology or Integration · 10 March 2023Fugro Italy Spa completed the preliminary marine route survey (PMRS) for the second interconnector, collecting geophysical data in nearshore Malta, offshore, and nearshore Italy, as well as environmental and geotechnical samples to inform the FEED and EIA.
  • CESI-Techfem JVsupportingImplementation/ SI/ Consulting Partner · 1 December 2022CESI-Techfem JV was awarded the contract for the Front-End Engineering Design (FEED) of the second interconnector project, providing the technical specifications that underpinned the permitting applications and subsequent procurement tenders.
  • AIS Environment / HPC ItaliasupportingImplementation/ SI/ Consulting Partner · 1 December 2022AIS Environment was contracted to execute the Environmental Impact Assessment in Malta, and HPC Italia for the EIA in Italy. These assessments were required for development permitting of IC2 in both jurisdictions.
  • Terna Energy Solutions SrlcoreImplementation/ SI/ Consulting PartnerTerna Energy Solutions Srl is the EPC contractor for civil works at the Ragusa Terminal Station in Sicily, including installation of hybrid switchgear, 220kV shunt reactor foundations, and fire-water tank construction. The company is coordinating with Enemalta and the Italian TSO for IC1 control cable rerouting during the IC2 construction phase.
  • AG InstallationscoreImplementation/ SI/ Consulting PartnerAG Installations, a local Maltese contractor, was awarded the €20.2 million contract for the design, supply, and installation of a 245kV 1×250MVA auto-transformer, 1×120MVAr variable shunt reactor (Maghtab), and 1×240MVAr variable shunt reactor (Ragusa), working in close collaboration with BEST (manufacturing plant in Turkey).
  • GE VernovasupportingTechnology or IntegrationGE Vernova is collaborating on GIS terminations and upgrades at the Magħtab Terminal Station as part of the IC2 project, working alongside Enemalta, SELT SpA, and Demirer Kablo on cable laying and integration works.
  • Enemalta plccoreStrategic or Co-development PartnerEnemalta plc is the Maltese national electricity transmission/distribution utility. ICM coordinates with Enemalta for grid connection of all infrastructure projects. Enemalta actively participates in IC2 construction coordination (cable rerouting, IC1 shutdown management) and BESS implementation alongside its subsidiary International Energy Service Centre Ltd.
  • Armed Forces of MaltasupportingOthersThe Armed Forces of Malta is coordinating with ICM and Italian authorities during the Identification and Clearance (ID&C) campaign for IC2, particularly for the management of any unexploded ordnance discovered along the submarine cable route.

Scale indicators9 records

Recent moves7 records

Expansion highlights6 records

Interconnect Malta competitors and assessment

Company assessment

Others

  • NKT A/S: Danish manufacturer of HV power cables and a major supplier into the European subsea interconnector market (e.g., Viking Link, IJmuiden Ver). Comparable as a subsea HV cable technology enabler, though operating as a cable OEM rather than a project developer.
  • Prysmian Group: Global leader in subsea HV/EHV cable manufacturing and installation — a key supplier alongside Nexans (ICM's selected cable partner) for the interconnector market. Comparable project scale and technology, though Prysmian is a commercial manufacturer rather than project developer.

Broad incumbents

  • Statnett SF: Norwegian state-owned TSO developing subsea interconnectors (North Sea Link, Skagerrak) and integrating variable renewables. Comparable mandate of national grid operator for an energy-isolated nation, with EU co-financing experience.
  • National Grid plc: UK-based major TSO that develops and operates subsea interconnectors (IFA, Nemo Link, Viking Link, Nautilus). Same business model of national grid operator with cross-border subsea interconnector development, though at vastly larger scale and commercial scope.
  • Energinet: Danish state-owned TSO operating cross-border interconnectors (Viking Link, COBRAcable) and developing energy islands in the North Sea. Comparable mission of integrating variable renewables via subsea transmission for an island/peninsula nation.
  • Tennet TSO: Dutch-German TSO with major offshore wind integration programme (2 GW Program, IJmuiden Ver). Highly comparable mandate of connecting utility-scale offshore renewables to onshore grid via subsea transmission, with EU TEN-E co-financing experience.

Emerging players

  • Equinor ASA: Pioneer of floating offshore wind (Hywind Scotland, Hywind Tampen) and a relevant technology benchmark for ICM's planned 300MW floating wind project in Malta's EEZ. Operates at much larger scale and with deep offshore experience; relevant for technology benchmarking rather than direct competition.

Direct peers

  • Greenlink Interconnector Ltd: Developer-operator of the 500MW Greenlink subsea interconnector between Ireland and the UK — a dedicated project company with a similar mandate (state-backed, single-asset, subsea HVAC/HVDC, EU PCI status) to ICM's IC2/IC3 portfolio.
  • Terna S.p.A. Italian transmission system operator (TSO) and direct counterparty on IC2 — Terna Energy Solutions Srl is the EPC contractor for civil works at Ragusa Terminal Station, and Terna's grid is the destination for Malta's interconnection. Closest operational peer given bilateral project execution.
  • ElecLink: Operator of the 1GW subsea electricity interconnector through the Channel Tunnel between UK and France. Highly comparable as a dedicated subsea interconnector project company with EU/UK regulatory regime and similar engineering and financing structure.

Market position

Strengths5 records

Weaknesses5 records

Competitive moat4 records

Key risks6 records

Key highlights7 records

Customer concentration

Interconnect Malta social profiles

Digital presence

Interconnect Malta compliance and trust

Trust signal

Compliance1 record

Interconnect Malta financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Interconnect Malta leadership team

Management profile

Number of profiles

Profiles12 records

Interconnect Malta funding detail

Funding detail

Funding overview

Funding rounds1 record

Investors1 record

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Interconnect Malta M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Interconnect Malta

What does Interconnect Malta do?

Interconnect Malta develops and implements national-scale energy infrastructure projects on behalf of the Maltese Government, including a 122-kilometre 220kV HVAC submarine electricity interconnector between Malta and Sicily (IC2), a planned 380kV HVDC third interconnector (IC3), grid-scale battery energy storage systems (84MWh total), a ~300MW floating offshore wind farm in Malta's EEZ, and a hydrogen-ready gas pipeline (Melita TransGas). The company's outputs are delivered to the national grid operator Enemalta plc and coordinated cross-border with Italian authorities; project delivery is executed via public tenders and EU co-financing.

Is Interconnect Malta a public or private company?

Interconnect Malta is a private company. It is classified as state government owned and is currently operating.

When was Interconnect Malta founded?

Interconnect Malta was founded in 2018. It employs 11 to 50 people.

Where is Interconnect Malta based?

Interconnect Malta is headquartered in Birkirkara, Malta, in the Europe region.

How does Interconnect Malta make money?

Two revenue lines are on record. Government Infrastructure Development Mandate is the primary driver. The others are EU Co-Financing (ERDF/RRF).

Who are Interconnect Malta's main competitors?

Others on record are NKT A/S and Prysmian Group. Broad incumbents are Statnett SF, National Grid plc, Energinet and Tennet TSO. Equinor ASA is listed as an emerging player. Direct peers are Greenlink Interconnector Ltd, Terna S.p.A. and ElecLink.

Does Interconnect Malta have an API?

No public API is recorded for Interconnect Malta.

What industry is Interconnect Malta in?

Interconnect Malta's product category is Energy Infrastructure Development. Its primary akta.pro industry code is EUACAFAE, Wind Farm Development & Permitting (Greenfield/Brownfield), with a secondary code of EUAEABAK, Grid Interconnection & Collector Substation EPC (Utility-Scale Renewables). Its NAICS code is 221115 and its SIC code is 3510.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales
Live signals
EIN PresswireProgress registered on Sicily side on second interconnector for Malta - TVMnews.mtWork on Malta's second electricity interconnector in Sicily is advanced, with the land cable 92% installed and a tunnel soon excavated. The 21km cable from Ragusa to the jetty is nearly complete, and a 300m sea trench is being prepared. Energy Minister Miriam Dalli said the project is close to final phases.Offshore EnergyUnderground drilling marks start of offshore section works for second Malta-Italy linkNexans has begun horizontal directional drilling (HDD) works in Malta for the second electrical interconnector to Italy, marking the start of the project's offshore section. The IC2 interconnector will be a 122-kilometer, 225 MW HVAC cable linking Sicily to Malta, running parallel to an existing cable that Nexans also delivered in 2015. Nexans completed manufacturing and factory acceptance testing of 100 kilometers of subsea cable just over 13 months after contract signing, and once HDD works are complete in both countries, subsea cable laying will begin from Malta toward Italy.Offshore EnergyCable for Malta’s second interconnector with Sicily ready for installationNexans has completed the manufacturing and factory acceptance testing (FAT) of 100 kilometers of subsea cable for Malta's second electrical interconnector (IC2) with Sicily, Italy, with the cable now ready for load-out and installation. The 122-kilometer, 225 MW HVAC interconnector will run between Terna's substation at Ragusa, Sicily and Enemalta's terminal station in Maghtab, Malta, parallel to the existing IC1 cable that Nexans also delivered in 2015. The FAT was completed approximately 13 months after the contract was signed, and installation will use Nexans' Capjet deep burial system for additional cable protection.Malta Business WeeklyMajor hurdle cleared for Second Interconnector as seabed route is secured for cable layingInterconnect Malta cleared 117 unexploded ordnance items from the 99-kilometre submarine route for the Second Malta-Sicily Interconnector, enabling cable laying later this year. The €300 million project, approved for ERDF funding, will double Malta's grid connectivity and reduce 13.5 million tonnes of CO2 emissions.TvmnewsMalta launches tender for third electricity interconnector (IC3) to Italy using HVDC technologyInterconnect Malta has issued a tender for the preliminary design of the third electricity interconnector (IC3) linking Malta to Italy's national grid, marking the start of the design and permitting phase. The IC3 project will be the first local interconnector to use High Voltage Direct Current (HVDC) technology, operating at 380 kilovolts with an initial capacity of 200 megawatts, scalable to 400 megawatts. The project aims to enhance Malta's electricity supply security, diversify connections to the European network, and support higher levels of renewable energy integration.SpuntThe planned third Malta–Sicily interconnector would initially provide 200MW and — SpuntA fact-check analysis evaluated Malta Prime Minister Robert Abela's claim that the planned third Malta–Sicily interconnector would initially provide 200MW and could scale to 400MW, rating it 'Mostly True' against published technical specifications from Interconnect Malta. The verification found the published specs do call for a 200MW initial cable with an engineering-feasible 400MW scaling option via a parallel cable, though the 400MW option remains on the roadmap rather than under construction. Final commissioning is targeted for mid-to-late 2027, subject to manufacturing and installation schedules, with the caveat that large subsea projects routinely face 12–24 month delays.Offshore EnergyEIB continues its support for Malta-Italy interconnector with €100 millionThe European Investment Bank has approved €100 million in financing for the second Malta-Italy electrical interconnector (IC2), a ~122-kilometer 225 MW HVAC cable connecting Ragusa in Sicily to Maghtab in Malta. The €296.68 million project, signed on April 23, is financed alongside €165.78 million in EU Regional Development Funds and Malta's own resources, with €49 million allocated to Malta and €51 million to Italy. Interconnect Malta will manage project implementation and operation, with the interconnector scheduled to enter service in Q1 2027.FundsforngosEIB Invests €100M in Malta-Italy Electricity InterconnectorThe European Investment Bank has committed €100 million in financing for Malta's second electricity interconnector with Italy, a 122-kilometre subsea cable linking Malta to Sicily's grid. The project, with a total cost of €296.68 million and expected to be operational by Q1 2027, will provide 225 MW of transmission capacity to strengthen Malta's energy security and enable greater integration of renewable energy sources into the national electricity system. The infrastructure will be owned by Malta's government through state-owned Interconnect Malta, with EU funding support from the European Regional Development Fund combined with the EIB loan and national resources.Malta Business WeeklyEIB backs with €100 million Malta’s energy transition through second electricity interconnector with ItalyThe European Investment Bank announced a €100 million financing agreement for Malta's second electricity interconnector with Italy, a 122 km subsea cable with 225 MW capacity. The project, costing €296.68 million, is funded by EU funds and Malta's resources, with operation scheduled for the first quarter of 2027.EibMalta: EIB backs with €100 million energy transition through second electricity interconnector with ItalyThe European Investment Bank and Malta's Minister for Finance Clyde Caruana announced a €100 million financing agreement to support Malta's second electricity interconnector with Italy (IC2). The project involves constructing a 122 km subsea cable connecting Malta to Sicily with a transmission capacity of 225 MW, with total costs estimated at €296.68 million. The interconnector, scheduled to be operational in the first quarter of 2027, will increase electricity interconnection capacity, strengthen security of supply, and support Malta's decarbonisation objectives and EU 2030 climate targets.