Developer docs
API playgroundTry for free, no card

Search company profiles

Camino Real Regional Mobility Authority

Full company profile

uuid00339z9

Namestring
Camino Real Regional Mobility Authority
Legal namestring
Camino Real Regional Mobility Authority
Websiteurl
crrma.org
Company typeenum
Private
Founded yearint
2007
Descriptiontext

The Camino Real Regional Mobility Authority (CRRMA) is a regional mobility authority established in 2007 under Texas Transportation Code Section 370.262, serving as the statutory transportation infrastructure development agency for the El Paso, Texas region. The organization manages a portfolio of mobility assets including two toll road facilities — the César Chávez Express Toll Lanes and the Border West Expressway Loop 375 Toll Lanes, both with electronic toll collection via TollTag transponder and Pay-By-Mail — plus the El Paso Streetcar system restored in 2018 (six refurbished PCC streetcars on a 4.8-mile figure-eight route with five power substations and over 400 overhead contact system poles), the SunCycle bike share program, and the Metropia traffic management smartphone application. CRRMA also oversees active road construction projects including the Pellicano Drive Widening Project, the Winn Road extension near the Zaragoza Port of Entry, the Loop 375 Americas Managed Lanes Project, and the Wyler Aerial Tramway Project.

The organization's underlying technical infrastructure spans legacy transit systems (streetcar power and overhead contact systems), tolling back-office systems (interoperable with NTTA via Interlocal Agreement and with CTRMA for shared back-office toll operations), and modern traffic management software (Metropia). CRRMA has cumulatively managed over $1.4 billion in major transportation projects including State Spur 601 (Inner Loop), the Americas Interchange, and the El Paso Streetcar Project. Its general engineering consultant AtkinsRéalis USA provides oversight across multiple work authorizations, with HNTB and Consor Engineers supporting individual sub-projects.

CRRMA operates as an independent governmental entity with no parent company and no equity ownership; it is funded through a combination of bond issuances (notably a $75 million Senior Lien Vehicle Registration Fee Revenue Bond, Series 2014), toll revenues, and interlocal agreements with funding partners including TxDOT, El Paso County, the City of El Paso, the El Paso Metropolitan Planning Organization, and Texas Parks and Wildlife Department. The authority operates with 11-50 employees and serves El Paso regional residents and commuters, international border crossers, and freight and commercial transportation users. Its end-user base is distributed, but its funding flows and project pipeline are concentrated on a small number of governmental counterparties, which represents the primary counterparty and political risk.

Short descriptiontext

The Camino Real Regional Mobility Authority (CRRMA) is a Texas government mobility authority established in 2007 that develops and manages transportation infrastructure for the El Paso region, including toll roads, the El Paso Streetcar, the SunCycle bike share program, and road construction projects.

Operating statusenum
Operating
Ownership categoryenum
Headcount rangeband
11–50
akta.pro rankint
HeadquartersEl Paso, United States
HQ citystring
El Paso
HQ countrystring
United States
HQ regionstring
North America
Markets served

Serves global market

Keyword5 values
regional mobility authority, toll road operations, public transit services, transportation infrastructure, bike share program
Industry4 codes
1Local Transportation, Parking & Mobility Administration
CodeBPAIACAMPrimaryYes
2Electronic Toll Collection (ETC) & Transponder/Tag Systems (RFID/DSRC)
CodeTLAJABAAPrimaryNo
3Urban Rail Transit Authorities & Public Transport Agencies
CodeTHAIABADPrimaryNo
4Centralized Traffic Management Platforms (ATMS/TMC Software)
CodeTLAJACABPrimaryNo
NAICS code2 codes
  • Urban Transit Systems48511
  • Other Support Activities for Transportation4889
SIC code2 codes
  • Local & Suburban Transit & Interurban Hwy Passenger Trans4100
  • Transportation Services4700
Product category
Public Transportation and Mobility Infrastructure Services
Marketing channels5 records

Each record includes

Title, Type, Stage, Description, Source

Distribution channels3 records

Each record includes

Title, Type, Scope, Target buyer, Description, Source

Cost components5 values
Infrastructure, Operations, Personnel, Technology or R&D, Others
GTM typeB2C
B2C
Offering typeServices
Services
Brand1 of 5 records shown
1SunCycle
Description

El Paso Bike Share Program - a bike-sharing initiative operated by CRRMA

crrma.org
+4 more records
Core offering1 text field

CRRMA plans, finances, builds, and operates regional transportation infrastructure and mobility services for the El Paso region. Its core offerings include managed toll lanes (César Chávez Express Toll Lanes and Border West Expressway on Loop 375), the El Paso Streetcar system, the SunCycle bike share program, and the Metropia traffic management app, alongside roadway projects such as Pellicano Drive Widening, Winn Road, and the Loop 375 Americas Managed Lanes. CRRMA collaborates with TxDOT, El Paso County, and the City of El Paso to develop multimodal mobility solutions.

Differentiator
Functional benefit
Problem solved
Product overview1 text field

Camino Real Regional Mobility Authority (CRRMA) operates as a regional transportation authority managing a portfolio of mobility infrastructure and services across the El Paso region. The portfolio includes toll facilities (César Chávez Express Toll Lanes and Border West Expressway Toll Lanes), the El Paso Streetcar system, the SunCycle bike share program, and various road construction projects (Loop 375 Americas Managed Lanes, Pellicano Drive Widening, Winn Road extension). The CRRMA also supports the Metropia traffic management app for congestion mitigation. Projects span toll roads, public transit, bike infrastructure, and highway improvements, all aimed at enhancing regional mobility in the El Paso metropolitan area.

Product and service8 records
1César Chávez Express Toll Lanes
Categorytoll facility
Description

Managed toll lanes on Loop 375 providing express routes for the El Paso region with electronic toll collection via TollTag transponder (interoperable with NTTA) and Pay-By-Mail options. Used by El Paso commuters and travelers for express regional mobility.

2Border West Expressway Loop 375 Toll Lanes
Categorytoll facility
Description

Toll lanes on Loop 375 providing western corridor mobility options as part of the El Paso regional transportation network, with electronic toll collection via TollTag and Pay-By-Mail.

3El Paso Streetcar
Categorypublic transit
Description

Historic streetcar system returning electric streetcar service to El Paso using six fully refurbished Presidents' Conference Committee (PCC) cars on a 4.8-mile figure-eight route connecting Downtown to Kern Place, operated by Sun Metro for daily public transit service.

4SunCycle - El Paso Bike Share Program
Categorybike share
Description

Bike share program providing bicycle access across the El Paso region with multiple stations for public use, enabling short-trip mobility and multimodal connections to transit.

5Metropia Traffic Management App
Categorytraffic management software
Description

Free smartphone app that incentivizes drivers to utilize various roadways across the El Paso region's transportation system by distributing traffic among routes and incentivizing departure times outside congestion peaks; includes wait time estimation for international ports of entry.

6Loop 375 - Americas Managed Lanes Project
Categoryroad infrastructure
Description

Managed lanes project on Loop 375 from Zaragoza Port of Entry to Americas Interchange improving regional traffic flow for cross-border travelers and commuters.

7Pellicano Drive Widening Project
Categoryroad infrastructure
Description

Roadway widening and improvement project reconstructing approximately a 6-lane divided roadway with raised median, concrete pavement, curb and gutter, sidewalk, landscaping, safety illumination, and storm drainage from Loop 375 to Berryville Street/Darrington Road, improving regional traffic flow.

8Winn Road Project
Categoryroad infrastructure
Description

Road extension project near Zaragoza Port of Entry that will serve as the main entrance route for the port, alleviating traffic congestion on Loop 375 and frontage roads and complementing Americas Managed Lanes Project improvements for cross-border freight and commuter traffic.

Partnership15 partners
Strategic tierCoreTypeStrategic or Co-development PartnerAnnounced on2017-01-01
Description

Partnership for the Pellicano Drive Widening Project. County entered into agreement with CRRMA for CRRMA to design and construct the project. County provided $6 million contribution for project advancement. El Paso County and CRRMA have taken major strides to restart construction through Interlocal Agreement.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

General Engineering Consultant (GEC) to CRRMA, providing various general engineering and oversight services across multiple projects including the Pellicano Drive Widening Project, streetcar project, and managed lanes projects. Multiple work authorizations executed for different project phases.

Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Engineering consultant providing services for the Homestead Meadows Shared Use Path Project through work authorization amendments.

Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Engineering consultant providing services for the Homestead Meadows Shared Use Path Project through work authorization amendments.

Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Contractor identified by the project's Surety company to execute Phase 1 construction of the Pellicano Drive Widening Project between Aircoupe and Loop 375.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

State grant agreement with CRRMA for the tramway component of the Wyler Aerial Tramway Project.

Strategic tierMinorTypeStrategic or Co-development Partner
Description

Interlocal Agreement with CRRMA for the completion of Phase 2 of the Mission Ridge Boulevard Project.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Primary state funding and oversight partner. Funded initial startup of Metropia traffic management program. Multiple project development agreements, financial assistance agreements, and maintenance service agreements for managed lanes projects, streetcar project ($97 million construction funding), and comprehensive mobility plans.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Regional planning partner providing funding continuation for the Metropia traffic management program. Contributed funding for expansion of Metropia program to include wait time estimation for international ports of entry.

Strategic tierCoreTypeStrategic or Co-development Partner
Description

Key municipal partner providing funds for Winn Road Project (near Zaragoza Port of Entry). Assigned environmental and engineering work to CRRMA for streetcar construction. Contributed funding for Metropia program expansion. CRRMA relocated to City Hall location (300 N. Campbell).

Strategic tierCoreTypeStrategic or Co-development Partner
Description

City of El Paso's Mass Transit Department that now operates the streetcar service. Took over control of Maintenance and Storage Facility (MSF) from CRRMA in 2018 and operates daily streetcar service.

Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Contracted by CRRMA to renovate six PCC streetcars. Vehicles were stripped to bare frames and rebuilt with modern amenities while maintaining historic feel. All designs for reproductions of historic elements created by Brookville.

13Paso del Norte Trackworks
Strategic tierCoreTypeImplementation/ SI/ Consulting Partner
Description

Contracted by CRRMA to complete streetcar infrastructure including 4.8 miles of track placement, installation of five power substations, construction of maintenance facility, and installation of OCS poles and wire.

crrma.org
Strategic tierMinorTypeStrategic or Co-development Partner
Description

Interlocal Agreement for Phase I of the bike share program, providing funding and site locations for bike share stations at the university.

Strategic tierMinorTypeImplementation/ SI/ Consulting Partner
Description

Original construction contractor awarded approximately $22.1 million contract for Pellicano Drive Widening Project. Project subsequently defaulted and CRRMA issued Notice of Default and claim against performance bond.

Recent move6 records

Each record includes

Date, Type, Title, Description, Source

Expansion highlight5 records

Each record includes

Type, Description

Peers10 records
TypeOthers
Description

General Engineering Consultant providing program management, design oversight, and construction administration across CRRMA's portfolio. Indirect peer as the engineering services layer that effectively extends CRRMA's small in-house team.

TypeDirect peer
Description

Texas RMA on the southern border with comparable mandate of managing cross-border mobility infrastructure, including bridges and tolled crossings. Operates the Veterans International Bridge and related toll facilities.

TypeDirect peer
Description

Toll authority operating NTTA TollTag transponder system across North Texas; CRRMA has an Interlocal Agreement with NTTA to promote TollTag interoperability on its toll facilities. Closest operating peer for toll collection back-office and customer service operations.

TypeBroad incumbent
Description

State-level transportation agency that funds and oversees CRRMA projects. While not a peer in the RMA sense, it is the parent counterparty for nearly every CRRMA project and the source of the $97M streetcar construction funding and managed-lane agreements.

TypeEmerging player
Description

Public-sector partner that operates the El Paso Streetcar and fixed-route bus service on behalf of CRRMA. While not a peer RMA, it is the operator responsible for daily service delivery on CRRMA-built transit infrastructure, making it the closest operating analog for transit execution.

TypeDirect peer
Description

Another Texas Regional Mobility Authority with statutory authority to develop tolled and managed-lane transportation projects. Already operates MoPac Express Lane and 290 Toll, and shares a back-office toll operations Interlocal Agreement with CRRMA.

7Grayson County Regional Mobility Authority
TypeDirect peer
Description

Texas RMA serving the Sherman-Denison metropolitan area; while smaller, it operates under the same Texas Transportation Code Chapter 370 framework and provides comparison for project-financing and toll-development approaches in non-border markets.

TypeEmerging player
Description

Developer of the Metropia traffic management smartphone app that CRRMA deployed. While CRRMA is the customer rather than peer, Metropia's incentive-based congestion pricing architecture is the technology underpinning CRRMA's demand-management capabilities.

9Alamo Regional Mobility Authority
TypeDirect peer
Description

Texas Regional Mobility Authority serving the San Antonio region with similar statutory powers to plan, finance, and operate tolled transportation projects. Same enabling legislation (Texas Transportation Code Chapter 370) and operating model.

TypeDirect peer
Description

Texas RMA serving Hidalgo County on the US-Mexico border, providing direct comparability around international port-of-entry congestion, cross-border freight mobility, and toll road operations in a border economy.

Market position
Strengths4 records

Each record includes

Headline, Details, Source

Weaknesses4 records

Each record includes

Headline, Details, Source

Competitive moat3 records

Each record includes

Type, Details

Key risks5 records

Each record includes

Headline, Details, Source

Key highlights6 records

Each record includes

Headline, Details, Source

Customer concentration

Classification, Details

Segment2 records

Each record includes

Title, Type, Primary, Description, Pain point addressed, Use case, Source

Ideal customer profile2 records

Each record includes

Profile, Firmographic size, Sales motion, Sales cycle length, Buying structure, Purchase trigger, Buyer persona, Geography, Industry vertical, Primary use case, Description, Pain points, Evidence proof points, Target buyer

Technology focused
No
API detail
Has APIbool
No

Docs URL, Description

Integration1 record

Each record includes

Title, Type, Description, Source

AI maturity
App detail

Has app

Feature4 records

Each record includes

Title, Differentiator, Description, Source

Core technology
Revenue estimate
Valuation estimate
Number of profiles
No data
Compliance3 records

Each record includes

Name, Class, Description

Funding overview

Funding stage, Last funding date, Total funding USD

Funding rounds

Each record includes

Round, Amount USD, Date, Pre money valuation, Total investors, Investors, News

Investors

Each record includes

Name, Type, Date of entry, Rounds participated, Website

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

M&A

Each record includes

Name, Acquisition type, Announced date, Completed date, Status, Website, News

Investment

Each record includes

Name, Round, Announced date, Lead investor, Website, News

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Camino Real Regional Mobility Authority

Public Transportation and Mobility Infrastructure Servicescrrma.org

The Camino Real Regional Mobility Authority (CRRMA) is a Texas government mobility authority established in 2007 that develops and manages transportation infrastructure for the El Paso region, including toll roads, the El Paso Streetcar, the SunCycle bike share program, and road construction projects.

What Camino Real Regional Mobility Authority does

The Camino Real Regional Mobility Authority (CRRMA) is a regional mobility authority established in 2007 under Texas Transportation Code Section 370.262, serving as the statutory transportation infrastructure development agency for the El Paso, Texas region. The organization manages a portfolio of mobility assets including two toll road facilities — the César Chávez Express Toll Lanes and the Border West Expressway Loop 375 Toll Lanes, both with electronic toll collection via TollTag transponder and Pay-By-Mail — plus the El Paso Streetcar system restored in 2018 (six refurbished PCC streetcars on a 4.8-mile figure-eight route with five power substations and over 400 overhead contact system poles), the SunCycle bike share program, and the Metropia traffic management smartphone application. CRRMA also oversees active road construction projects including the Pellicano Drive Widening Project, the Winn Road extension near the Zaragoza Port of Entry, the Loop 375 Americas Managed Lanes Project, and the Wyler Aerial Tramway Project.

The organization's underlying technical infrastructure spans legacy transit systems (streetcar power and overhead contact systems), tolling back-office systems (interoperable with NTTA via Interlocal Agreement and with CTRMA for shared back-office toll operations), and modern traffic management software (Metropia). CRRMA has cumulatively managed over $1.4 billion in major transportation projects including State Spur 601 (Inner Loop), the Americas Interchange, and the El Paso Streetcar Project. Its general engineering consultant AtkinsRéalis USA provides oversight across multiple work authorizations, with HNTB and Consor Engineers supporting individual sub-projects.

CRRMA operates as an independent governmental entity with no parent company and no equity ownership; it is funded through a combination of bond issuances (notably a $75 million Senior Lien Vehicle Registration Fee Revenue Bond, Series 2014), toll revenues, and interlocal agreements with funding partners including TxDOT, El Paso County, the City of El Paso, the El Paso Metropolitan Planning Organization, and Texas Parks and Wildlife Department. The authority operates with 11-50 employees and serves El Paso regional residents and commuters, international border crossers, and freight and commercial transportation users. Its end-user base is distributed, but its funding flows and project pipeline are concentrated on a small number of governmental counterparties, which represents the primary counterparty and political risk.

Camino Real Regional Mobility Authority firmographics

Firmographics
Name
Camino Real Regional Mobility Authority
Legal name
Camino Real Regional Mobility Authority
Website
https://crrma.org
Company type
Private
Founded year
2007
Operating status
Operating
Headcount range
11–50 employees
Short description
The Camino Real Regional Mobility Authority (CRRMA) is a Texas government mobility authority established in 2007 that develops and manages transportation infrastructure for the El Paso region, including toll roads, the El Paso Streetcar, the SunCycle bike share program, and road construction projects.
Ownership category
akta.pro rank

Camino Real Regional Mobility Authority industry classification

Industry
Product category
Public Transportation and Mobility Infrastructure Services
NAICS
Urban Transit Systems (48511), Other Support Activities for Transportation (4889)
SIC
Local & Suburban Transit & Interurban Hwy Passenger Trans (4100), Transportation Services (4700)
akta.pro primary industry
Local Transportation, Parking & Mobility Administration (BPAIACAM)
akta.pro secondary industries
Electronic Toll Collection (ETC) & Transponder/Tag Systems (RFID/DSRC) (TLAJABAA), Urban Rail Transit Authorities & Public Transport Agencies (THAIABAD), Centralized Traffic Management Platforms (ATMS/TMC Software) (TLAJACAB)

Keywords

  • Regional mobility authority
  • Toll road operations
  • Public transit services
  • Transportation infrastructure
  • Bike share program

Where Camino Real Regional Mobility Authority is headquartered

Location

Headquarters

HQ city
El Paso
HQ country
United States
HQ region
North America

Markets served

Camino Real Regional Mobility Authority business model

Business model
GTM type
B2C
Offering type
Services
Cost components
Infrastructure, Operations, Personnel, Technology or R&D, Others

Distribution channels3 records

Marketing channels5 records

Camino Real Regional Mobility Authority product offering

Product offering

Core offering

CRRMA plans, finances, builds, and operates regional transportation infrastructure and mobility services for the El Paso region. Its core offerings include managed toll lanes (César Chávez Express Toll Lanes and Border West Expressway on Loop 375), the El Paso Streetcar system, the SunCycle bike share program, and the Metropia traffic management app, alongside roadway projects such as Pellicano Drive Widening, Winn Road, and the Loop 375 Americas Managed Lanes. CRRMA collaborates with TxDOT, El Paso County, and the City of El Paso to develop multimodal mobility solutions.

Product overview

Camino Real Regional Mobility Authority (CRRMA) operates as a regional transportation authority managing a portfolio of mobility infrastructure and services across the El Paso region. The portfolio includes toll facilities (César Chávez Express Toll Lanes and Border West Expressway Toll Lanes), the El Paso Streetcar system, the SunCycle bike share program, and various road construction projects (Loop 375 Americas Managed Lanes, Pellicano Drive Widening, Winn Road extension). The CRRMA also supports the Metropia traffic management app for congestion mitigation. Projects span toll roads, public transit, bike infrastructure, and highway improvements, all aimed at enhancing regional mobility in the El Paso metropolitan area.

Differentiator

Problem solved

Functional benefit

Brands

  • SunCycle: El Paso Bike Share Program - a bike-sharing initiative operated by CRRMA
  • El Paso Streetcar
  • Metropia
  • César Chávez Express Toll Lanes
  • Border West Expressway

Products and services

  • César Chávez Express Toll Lanes Managed toll lanes on Loop 375 providing express routes for the El Paso region with electronic toll collection via TollTag transponder (interoperable with NTTA) and Pay-By-Mail options. Used by El Paso commuters and travelers for express regional mobility.
  • Border West Expressway Loop 375 Toll Lanes Toll lanes on Loop 375 providing western corridor mobility options as part of the El Paso regional transportation network, with electronic toll collection via TollTag and Pay-By-Mail.
  • El Paso Streetcar Historic streetcar system returning electric streetcar service to El Paso using six fully refurbished Presidents' Conference Committee (PCC) cars on a 4.8-mile figure-eight route connecting Downtown to Kern Place, operated by Sun Metro for daily public transit service.
  • SunCycle - El Paso Bike Share Program Bike share program providing bicycle access across the El Paso region with multiple stations for public use, enabling short-trip mobility and multimodal connections to transit.
  • Metropia Traffic Management App Free smartphone app that incentivizes drivers to utilize various roadways across the El Paso region's transportation system by distributing traffic among routes and incentivizing departure times outside congestion peaks; includes wait time estimation for international ports of entry.
  • Loop 375 - Americas Managed Lanes Project Managed lanes project on Loop 375 from Zaragoza Port of Entry to Americas Interchange improving regional traffic flow for cross-border travelers and commuters.
  • Pellicano Drive Widening Project Roadway widening and improvement project reconstructing approximately a 6-lane divided roadway with raised median, concrete pavement, curb and gutter, sidewalk, landscaping, safety illumination, and storm drainage from Loop 375 to Berryville Street/Darrington Road, improving regional traffic flow.
  • Winn Road Project Road extension project near Zaragoza Port of Entry that will serve as the main entrance route for the port, alleviating traffic congestion on Loop 375 and frontage roads and complementing Americas Managed Lanes Project improvements for cross-border freight and commuter traffic.

Companies that use Camino Real Regional Mobility Authority

Customer profile

Segments2 records

Ideal customer profiles2 records

Camino Real Regional Mobility Authority technology and API

Technology

Technology focussed No

API detail

Has API
No
API docs
API detail

Core technology

AI maturity

App detail

Integration1 record

Feature4 records

Camino Real Regional Mobility Authority partnerships and signals

Strategic signal

Partnerships

15 partnerships are on record, tiered core and minor.

  • El Paso CountycoreStrategic or Co-development Partner · 1 January 2017Partnership for the Pellicano Drive Widening Project. County entered into agreement with CRRMA for CRRMA to design and construct the project. County provided $6 million contribution for project advancement. El Paso County and CRRMA have taken major strides to restart construction through Interlocal Agreement.
  • AtkinsRéalis USA, Inc. (formerly Atkins North America, Inc.)coreImplementation/ SI/ Consulting PartnerGeneral Engineering Consultant (GEC) to CRRMA, providing various general engineering and oversight services across multiple projects including the Pellicano Drive Widening Project, streetcar project, and managed lanes projects. Multiple work authorizations executed for different project phases.
  • HNTB CorporationminorImplementation/ SI/ Consulting PartnerEngineering consultant providing services for the Homestead Meadows Shared Use Path Project through work authorization amendments.
  • Consor Engineers, LLCminorImplementation/ SI/ Consulting PartnerEngineering consultant providing services for the Homestead Meadows Shared Use Path Project through work authorization amendments.
  • Hawk ConstructionminorImplementation/ SI/ Consulting PartnerContractor identified by the project's Surety company to execute Phase 1 construction of the Pellicano Drive Widening Project between Aircoupe and Loop 375.
  • Texas Parks and Wildlife DepartmentminorStrategic or Co-development PartnerState grant agreement with CRRMA for the tramway component of the Wyler Aerial Tramway Project.
  • Paseo del Este MUD No. 1minorStrategic or Co-development PartnerInterlocal Agreement with CRRMA for the completion of Phase 2 of the Mission Ridge Boulevard Project.
  • TxDOT (Texas Department of Transportation)coreStrategic or Co-development PartnerPrimary state funding and oversight partner. Funded initial startup of Metropia traffic management program. Multiple project development agreements, financial assistance agreements, and maintenance service agreements for managed lanes projects, streetcar project ($97 million construction funding), and comprehensive mobility plans.
  • El Paso Metropolitan Planning OrganizationcoreStrategic or Co-development PartnerRegional planning partner providing funding continuation for the Metropia traffic management program. Contributed funding for expansion of Metropia program to include wait time estimation for international ports of entry.
  • City of El PasocoreStrategic or Co-development PartnerKey municipal partner providing funds for Winn Road Project (near Zaragoza Port of Entry). Assigned environmental and engineering work to CRRMA for streetcar construction. Contributed funding for Metropia program expansion. CRRMA relocated to City Hall location (300 N. Campbell).
  • Sun MetrocoreStrategic or Co-development PartnerCity of El Paso's Mass Transit Department that now operates the streetcar service. Took over control of Maintenance and Storage Facility (MSF) from CRRMA in 2018 and operates daily streetcar service.
  • Brookville Equipment CorporationcoreImplementation/ SI/ Consulting PartnerContracted by CRRMA to renovate six PCC streetcars. Vehicles were stripped to bare frames and rebuilt with modern amenities while maintaining historic feel. All designs for reproductions of historic elements created by Brookville.
  • Paso del Norte TrackworkscoreImplementation/ SI/ Consulting PartnerContracted by CRRMA to complete streetcar infrastructure including 4.8 miles of track placement, installation of five power substations, construction of maintenance facility, and installation of OCS poles and wire.
  • University of Texas at El PasominorStrategic or Co-development PartnerInterlocal Agreement for Phase I of the bike share program, providing funding and site locations for bike share stations at the university.
  • J.A.R. Construction, Inc.minorImplementation/ SI/ Consulting PartnerOriginal construction contractor awarded approximately $22.1 million contract for Pellicano Drive Widening Project. Project subsequently defaulted and CRRMA issued Notice of Default and claim against performance bond.

Recent moves6 records

Expansion highlights5 records

Camino Real Regional Mobility Authority competitors and assessment

Company assessment

Others

  • AtkinsRéalis USA (formerly Atkins North America): General Engineering Consultant providing program management, design oversight, and construction administration across CRRMA's portfolio. Indirect peer as the engineering services layer that effectively extends CRRMA's small in-house team.

Direct peers

  • Cameron County Regional Mobility Authority: Texas RMA on the southern border with comparable mandate of managing cross-border mobility infrastructure, including bridges and tolled crossings. Operates the Veterans International Bridge and related toll facilities.
  • North Texas Tollway Authority (NTTA): Toll authority operating NTTA TollTag transponder system across North Texas; CRRMA has an Interlocal Agreement with NTTA to promote TollTag interoperability on its toll facilities. Closest operating peer for toll collection back-office and customer service operations.
  • Central Texas Regional Mobility Authority (CTRMA): Another Texas Regional Mobility Authority with statutory authority to develop tolled and managed-lane transportation projects. Already operates MoPac Express Lane and 290 Toll, and shares a back-office toll operations Interlocal Agreement with CRRMA.
  • Grayson County Regional Mobility Authority: Texas RMA serving the Sherman-Denison metropolitan area; while smaller, it operates under the same Texas Transportation Code Chapter 370 framework and provides comparison for project-financing and toll-development approaches in non-border markets.
  • Alamo Regional Mobility Authority: Texas Regional Mobility Authority serving the San Antonio region with similar statutory powers to plan, finance, and operate tolled transportation projects. Same enabling legislation (Texas Transportation Code Chapter 370) and operating model.
  • Hidalgo County Regional Mobility Authority: Texas RMA serving Hidalgo County on the US-Mexico border, providing direct comparability around international port-of-entry congestion, cross-border freight mobility, and toll road operations in a border economy.

Broad incumbents

  • Texas Department of Transportation (TxDOT): State-level transportation agency that funds and oversees CRRMA projects. While not a peer in the RMA sense, it is the parent counterparty for nearly every CRRMA project and the source of the $97M streetcar construction funding and managed-lane agreements.

Emerging players

  • Sun Metro (City of El Paso Mass Transit Department): Public-sector partner that operates the El Paso Streetcar and fixed-route bus service on behalf of CRRMA. While not a peer RMA, it is the operator responsible for daily service delivery on CRRMA-built transit infrastructure, making it the closest operating analog for transit execution.
  • Metropia (app developer): Developer of the Metropia traffic management smartphone app that CRRMA deployed. While CRRMA is the customer rather than peer, Metropia's incentive-based congestion pricing architecture is the technology underpinning CRRMA's demand-management capabilities.

Market position

Strengths4 records

Weaknesses4 records

Competitive moat3 records

Key risks5 records

Key highlights6 records

Customer concentration

Camino Real Regional Mobility Authority social profiles

Digital presence

Camino Real Regional Mobility Authority compliance and trust

Trust signal

Compliance3 records

Camino Real Regional Mobility Authority financial estimates

Financial estimate

Revenue estimate

Valuation estimate

Camino Real Regional Mobility Authority leadership team

Management profile

Number of profiles

Camino Real Regional Mobility Authority funding detail

Funding detail

Funding overview

Funding rounds

Investors

Funding detail is available on the Subscription and Enterprise plan.Contact sales →

Camino Real Regional Mobility Authority M&A and investment

M&A and investment

M&A

Investments

M&A and investment is available on the Subscription and Enterprise plan.Contact sales →

Frequently asked questions about Camino Real Regional Mobility Authority

What does Camino Real Regional Mobility Authority do?

CRRMA plans, finances, builds, and operates regional transportation infrastructure and mobility services for the El Paso region. Its core offerings include managed toll lanes (César Chávez Express Toll Lanes and Border West Expressway on Loop 375), the El Paso Streetcar system, the SunCycle bike share program, and the Metropia traffic management app, alongside roadway projects such as Pellicano Drive Widening, Winn Road, and the Loop 375 Americas Managed Lanes. CRRMA collaborates with TxDOT, El Paso County, and the City of El Paso to develop multimodal mobility solutions.

Is Camino Real Regional Mobility Authority a public or private company?

Camino Real Regional Mobility Authority is a private company. It is classified as state government owned and is currently operating.

When was Camino Real Regional Mobility Authority founded?

Camino Real Regional Mobility Authority was founded in 2007. It employs 11 to 50 people.

Where is Camino Real Regional Mobility Authority based?

Camino Real Regional Mobility Authority is headquartered in El Paso, United States, in the North America region.

Who are Camino Real Regional Mobility Authority's main competitors?

AtkinsRéalis USA (formerly Atkins North America) is listed as an others. Direct peers are Cameron County Regional Mobility Authority, North Texas Tollway Authority (NTTA), Central Texas Regional Mobility Authority (CTRMA), Grayson County Regional Mobility Authority, Alamo Regional Mobility Authority and Hidalgo County Regional Mobility Authority. Texas Department of Transportation (TxDOT) is listed as a broad incumbent. Emerging players are Sun Metro (City of El Paso Mass Transit Department) and Metropia (app developer).

Does Camino Real Regional Mobility Authority have an API?

No public API is recorded for Camino Real Regional Mobility Authority.

What industry is Camino Real Regional Mobility Authority in?

Camino Real Regional Mobility Authority's product category is Public Transportation and Mobility Infrastructure Services. Its primary akta.pro industry code is BPAIACAM, Local Transportation, Parking & Mobility Administration, with a secondary code of TLAJABAA, Electronic Toll Collection (ETC) & Transponder/Tag Systems (RFID/DSRC). Its NAICS code is 48511 and its SIC code is 4100.

Unlock the full company data

50 free credits on sign-up, no credit card required.

Contact sales